Loading...
HomeMy WebLinkAboutResolution - 2011-R0282 - Contract - Talon LPE - Water Well Plugging - 07_14_2011Resolution No. 2011—RO282 July 14, 2011 Item No. 5.8 .RESOLUTION 3E IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to .xecute for and on behalf of the City of Lubbock, Contract No. 10255 for water well plugging, by and between the City of Lubbock and Talon/LPE of Amarillo, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on July 14, 2011 TOM MARTIN, MAYOR ATTEST: Rebecc Garza, City Secretary APPROVED AS TO CONTENT: Marsha Reed, P.E., Chief Operations Officer APPROVED AS TO FORM: /--4,,,— ELd Weaver, Assistant City Attorney vwxcdocs/RES.Contract-Talon LEE June 16, 2011 0 Resolution No. 2011—RO282 Job order Contract: It -10255 i a Work Order Signature Document BUYSOARD EZIQC Contract No.: Area 1-1- TAL New Work Order 0 Modify an Existing Work Order Work Order Number: 010936.00 Work Order Date: Work Girder title: City of Lubbock - Well Plugging Phase 3 owner Name: City of Lubbock Contractor Name: Talon/tPE Contact: Steve Cisneros Contact; Brtdger Howard Phone: (806) 775-3000 Phone. (806) 676-3815 Words to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of BuyBoard EZ1l7C Contract No Area 1-1- TAL Brief y&rX Q! er e rintion; Well Plugging Phase 3 Time of Performance See Schedule Secdon of the Detailed Scope of Work Liquidated Damages Will apply: Q Will not apply: Work Order Firm Fixed Price; $149,531.08 Owner Purchase Order Number: CITY OF LUBBOCK Tom Martiu, Mayor Attest: lie e a Garza, City Secretary — Q� OWME S APPROVED As TO CONTENT: rtarsha Reed, Chief Operating Officer TALONILPE r award, roject Manager r � 1 D C/V O/y& Wesley Everett, Director of Facilities APP"0"' 3 T F IuYI: Ch Weaver, Assistant City Attorney Work 0,det EZICC - Buy Board 5�18/20t 1 wBoldp�rfw�rd" Detailed Scopeof Work To: Bridger Howard from: Steve Gsneros TalonILPE City ofLubbodc 921 N Bivins Street 162513th St AmadIlo, TX 79107 Lubbock TX 79401 (806)676-3815 (806)775-3000 Date Printed: June 28, 2011 Work Order Number. 010936.00 Work Order Title: City of Lubbock - Well Plugging Phase 3 Brief Scope_ Well Plugging Phase 3 Preliminary Revised LE Final The following items detail the scope ofmrk asdiscussed at the site. All requirements necessary to accomplish the Items set forth below shall be considered part of this scope ofwurk SOW. Well Plugging Phase 3 To include 25welis as listed by the City of Lubbock Includes plugging wells, removing well pads, removal ofwell houses, and site cleanup at all locations. Scope oiNbrk Pne S of 1 EZIQC - Buy Board 6128r20i 1 Contractor's Price Proposal CSI -Summary Date: June 28, 2011 Re: rCC Master Contact t, Ama M- TAL Work Order k; 010936.00 Owner PO * Title: City of Lubbock -Well PluggingPhase 3 Ccrilraclar: Talon/LPE Proposal Value: $149,631.08 01 • General RegLdremen(s $23,940.65 02 - SBe work $12,927.13 03 - Concrete $112.763.30 Proposal Total $149,631.08 Contractors Pe ce Pioposal -Summary Page 1 011 E71QC. - BUY 8owd 612812011 Contractor's Price Proposal CSI -Detail Date: June 28, 2011 Re: SOC Master Contract #: Area 1-1- TAL Work order A 010936.00 Owner POIk Title: CI ly of Lubbock - Well Plugging Phase 3 Contrado: TalonA-PE Proposal Value: $149,631 08 SecL hem Modlfer UOki Description Line Tole1 Labor Equip Material jExaludedifmarked vAth anX) 01 - General Requirements 1 01590 0228 VW 36 N40e, 118 CY Bobcat Nth Full -Time Operator 55,682.09 Ouantlty UndPdas Factor Total Tnstallation a 3.00 x 1.515.22 x 1.2500 5.682.08 2 01590 0327 1M( 112 To N8 CY, 65 HP, Loader-Baddwe, NAth Full•Tima Operator $6.740.18 Quantity UnitPdco Factor Total Installation = 3.00 x 1397.38 x 1.2500 6,740.18 3 01590 0904 M 1-1l2 Ton Flal8ed Trutt, 4 x 2, Y11th Full -Time Truck Ddvedvote: Includes $5.812.39 hydraulic tlltbed. Quantity UnitPdce Factor Total Installation 3.00 x 1IM9.97 x 1.2500 > 5,812.39 4 01590 0911 NM 112 To 314 Ton Light Duty Truck. 4 x 2 Conventional PicupNots: N41h full-time $5,099.74 Wclt driver Quantity UretPrl® Factor Total Installation 3.00 x 1,359.93 x 1.2500 - 5,099.74 5 01590 0999 EA Bob®tOelrvery. MobilizatlonAndDemoblllrafionNote:Use forbotical. lifts tip $116,33 to 35' or similar sized equipment Includes dellveryfee, delivery, Setup and ratum. Quantity Unit Pdce Factor Total Installation 100 x 93.06 x 1 25G0 116.33 6 01590 1001 EA Bacifts, Doasr Or Roller Up To 250 HP Dellvary, Motllhzation And $489,93 DemoNOzationNcte: Use for baddnoe, dozer, roller, Loader, excavator, III over 40-to 60' arsimllarslmd equipment Indudesdellvery fee, delivery, set-up and retum. Quantity UnttPdce Factor Total installation 1.00 x 391,94 x 1.2500 489.93 Subtotal for 01 • General Reguirefnerlts $23,940.65 02 - Site work 7 02112 0091 CF Dema Reinforced Concrete BuildlngiFoundatlon $4,286.25 Quantity UnitPrtra Fodor Total Installation 90000 x 381 x 1.2500 s 4,286.26 Nall pads based on 87r6'X1' pads 8 02115 0040 HR Hourly Office Nbrk For Both For Reports Required For EPANoteAndudes title $7.839.00 searches, well Survey data, dmvMng site drawings, filing prelvminaryuork with EPA for feedback prepare an CAP,A and CAP-B plans, aft Hours not to be used In association xrthother left performed. Quantity UnilPd[a Feder Total Installation 13400 x 46.00 x 1 2500 - 7,839.00 9 02213 0004 CY Nadve Sd1lDld-Common $801.88 Quantity Unit Pdm Factor Total Installation 50,00 x 12.83 x 1.2500 801.88 Based on 2CY persile contractors Price Proposal - Detail Page 1 012 EZQC - stry 8oald 612812011 Contractol'sPrice Proposal- Detail Continues.. Work Order Number. 010936.00 Work Older TXle: City of Lubbock - Well Plugging Phase 3 sect Item Modthr UOM Descrlpdon une Total Labor Equip Material (Excluded If merked wilt an %} Subtotal for 02- Site Work $12,927.13 03 - Concrete 10 03640 D003 CF Pressure Infected CenlentitiousGiout $112.763,30 Quantity UnitPAm FacbDr Total Installation 6,604.0D x 1166 x 1.2500 ' 112,763.30 Subtotal for 03 - Concrete $112,763.30 Proposal Total $149,631.08 This total represents the correct total for the peoposel. Any discrepancy between Nnetotals, sub4otel3 and the proposal total Is due to rounding. Contractors PAMProposal-Oetall Page 2 of 2 EZ1QC -Buy Qoard 612012011