HomeMy WebLinkAboutResolution - 2011-R0149 - Contract - Talon LPE Ltd.- Metal Building Demolition, LPSIA - 04_14_2011Resolution No. 2011—RO149
April 14, 2011
Item No. 5.28
RESOLUTION
I BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Contract No. 11-10108-JOC for
demolition and removal of metal building and concrete slab, Eastport Section, at the
Preston Smith International Airport, by and between the City of Lubbock and Talon LPE,
Ltd., of Amarillo, Texas and related documents. Said Contract is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council on April 14, 2011
TOM TIN, MAYOR
ATTEST:
Reber Garza, City Secretary
AS TO CO�T:
James orris, Director of Aviation
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
vwxcdocs/RES.Contract-Talon LPE, Ltd.
March 18, 2011
Resolution No. 2011—RO149
City of Lubbock .lob Order
This Job Order is governed by all terms and conditions of the Contract referenced below which is hereby
incorporated by reference.
Owner: Wesley Everett, Director of Facilities Management tor- Airport
Buyboard EZIQC Contract No., Area 1-1-TAL
Contract Job Order Number: 11-10108-.IOC
Contractor: Talon/LPE
Date of Contract: September 25, 2008
Job Order Date: February 28, 2011
Summary and Description of Statement of Work attached hereto: Demolition and removal of a metal buildin>?
and concrete slab irk Egstgort section of the airport.
I'alon Job Order Number: 010608 hereto attached. And Insurance Requirements per Exhibit A, attached.
Value of Pre -Priced Work: S 29,716.11
Value of Non -Pre -Priced work: S 00.00
Payment and Performance Bond: S9905.39
Total Fixed Price stipulated sum for this .cob Order (Job Order Sum): $39,621.56
Notice to Proceed Date for this Job Order: To be issued after City council approval
Expected Completion Date for this Job Order: to be determined after City Council ap rov. i.
I iquidated Damages (if different than set forth in Agreement): $25 per day
CONTRACTOR: CITY OF LUBBOCK. TEXAS (OWNER)
141011. i,PF: Torn Martin, Mayor
By. Z
ATTEST.
r1 FI I0:(0)J_F_C"t_iytfatiAGER
t M PUTS ADDRESS:
Company: I'aI t 1 ff
Udress: 921 N. Biyjys Suet
it, State, Zip: Airjajl}u, Tgx 79107
C--/V CV-4
Garza, City Secreta
VED
s Represcntw ivr
Loomis, Director &. iatiotl
"NPPR - aS "1 FORM:
A:- . istant IL tty Alto W'
Contractor's Price Proposal CSI - Summary
Date. February 28 2011
Re 10C Master Contract au o i ' - TP _
Work Order #_ = 0o
Owner PO 9.
T)tle City cf Cwabock Eastport Airport Harmer Demolition
Contractor Ta*wAPE
Proposal Valve. $39,621 56
01 -General Requirements $1,178.00
02 - Site Work
$38,443.56
Proposal Total $39,621.56
Page I d I
EIQC - Buy Board 212MOI
Contractor's price Proposal CSI - Detail
Plate February 28, 2011
Re: IOC Master Contract #
:area 1 'AL
..1ork Order #
Owner PO #
Title
Criy of Lubbock Eastport Airporl Hanger Demolition
Contractor
Talon&PE
Proposal Value'
$39621.56
Sect, item Modifier
OOMt Description
Line Tobd
Labor Equip. Material (EXCfuded if marked vaith an X)
01 - General Requimments
t 01560 OD1a
LF Temporary 6' High Chain Link Fence And Posts, Up To 6 Months
51 1T8.00
Quantity Unit Price Factor
Total
Installation 52000 x is? x 1 7500
1,178,00
Subtotal for01 -General Requirements
$1,178.00
02 - Site Work
2 02111 0002
G5F Residential Bolding lntadQr, Gutting And Disposal Into Dumpster Or Truck
E2,590.00
Quantity Unit Price Factor
Total
Installation No cc x 2 59 x 1 2500 =
2.590.00
(2) 20' X 20' interior offices to be derndished
3 0211, 0009
CCF Demo Steel Framed Building By Machin Remove Building
$21.672 00
Quantity Uni(Price Factor
Total
Installation 960.00 x 18.06 x 1.2500 z
21.672.00
60 X 80 X 20 hangar to be demolished
4 02112 0026
SY Break -Up And Remove 53" To 6" Thick Concrete, Withoul Reinforcing
$6,253,75
Quantity Unit Price Factor
Total
insialtat4n) 513968 x 834 x 12500
0.253.75
60 X 90 X 6" concrete slab to be removed
021.2 0138
LF Saw Cut Concrete Slab Or Paving Up To 4" (10 cm) Depth
$536.60
Quantity Unit Price Factor
Total
Installation 36000 x 1.19 x 1 2500
$35.50
6 02t19 0010
CYM hauling Up To 5 Miles
$3,437.80
Quantity Unit Price Factor
Total
Instafiation 3.86699 x 075 x 1.2500
3,43780
Concrete slab and hangar (figured at a 3' debris pile for hangar) and concrete ramp
02205 0007
CY Spreading, Shaping, and Rough Grading Imported or Stockpiled Material for
$302.75
Bulk Excavation by Machine
Quantity Unit PriC4 Factor
Tom
installation 11110 x 218 x 12500
302,76
02213 0004
CY Native SoBdDirt - Common
-,.
V$1.942.87
Quantity Unit Price Faclor
Total
e
nstattalion t 11 1C x 327 x 1 2500
1,842117
02464 0134,
El- 4" Cap, Drain And Sewer Fitting
$23.89
Quantity Unit Price Factor
Total
tratagativt 100 x 19 12600 -
23,89
�—
F 6 "vardaed Chain - Fence 9 Gauge Coiled Spring Mash, Top And
$1 78600
Bottom Rails Line Post At IV 0 C
Quantity ...: Price Factor
Total
Installation 80 85 12500
1,785.00
Page . of
EZIQC - Buy Board
2/25,2011
Contractor's price Proposal - Detail Continues..
Work Order Number: 010608 00
Work Order Title: City of Lubbock - Eastport Airport Hanger Demolition
send Item Moditer UOM Description Una Total
Labor Equip, Material (Excluded if marked with an XI
Subtotal for 02 - Site Work $39,621.56
Proposal Total $39,621.56
his total represents Uie correct total for the proposal Any discrepancy between line totals,
sup -totals and the propot+ai total is duo to rounding
Page 2 of 2
E7JoC Buy Board a 201101-