Loading...
HomeMy WebLinkAboutResolution - 2011-R0149 - Contract - Talon LPE Ltd.- Metal Building Demolition, LPSIA - 04_14_2011Resolution No. 2011—RO149 April 14, 2011 Item No. 5.28 RESOLUTION I BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 11-10108-JOC for demolition and removal of metal building and concrete slab, Eastport Section, at the Preston Smith International Airport, by and between the City of Lubbock and Talon LPE, Ltd., of Amarillo, Texas and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on April 14, 2011 TOM TIN, MAYOR ATTEST: Reber Garza, City Secretary AS TO CO�T: James orris, Director of Aviation APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney vwxcdocs/RES.Contract-Talon LPE, Ltd. March 18, 2011 Resolution No. 2011—RO149 City of Lubbock .lob Order This Job Order is governed by all terms and conditions of the Contract referenced below which is hereby incorporated by reference. Owner: Wesley Everett, Director of Facilities Management tor- Airport Buyboard EZIQC Contract No., Area 1-1-TAL Contract Job Order Number: 11-10108-.IOC Contractor: Talon/LPE Date of Contract: September 25, 2008 Job Order Date: February 28, 2011 Summary and Description of Statement of Work attached hereto: Demolition and removal of a metal buildin>? and concrete slab irk Egstgort section of the airport. I'alon Job Order Number: 010608 hereto attached. And Insurance Requirements per Exhibit A, attached. Value of Pre -Priced Work: S 29,716.11 Value of Non -Pre -Priced work: S 00.00 Payment and Performance Bond: S9905.39 Total Fixed Price stipulated sum for this .cob Order (Job Order Sum): $39,621.56 Notice to Proceed Date for this Job Order: To be issued after City council approval Expected Completion Date for this Job Order: to be determined after City Council ap rov. i. I iquidated Damages (if different than set forth in Agreement): $25 per day CONTRACTOR: CITY OF LUBBOCK. TEXAS (OWNER) 141011. i,PF: Torn Martin, Mayor By. Z ATTEST. r1 FI I0:(0)J_F_C"t_iytfatiAGER t M PUTS ADDRESS: Company: I'aI t 1 ff Udress: 921 N. Biyjys Suet it, State, Zip: Airjajl}u, Tgx 79107 C--/V CV-4 Garza, City Secreta VED s Represcntw ivr Loomis, Director &. iatiotl "NPPR - aS "1 FORM: A:- . istant IL tty Alto W' Contractor's Price Proposal CSI - Summary Date. February 28 2011 Re 10C Master Contract au o i ' - TP _ Work Order #_ = 0o Owner PO 9. T)tle City cf Cwabock Eastport Airport Harmer Demolition Contractor Ta*wAPE Proposal Valve. $39,621 56 01 -General Requirements $1,178.00 02 - Site Work $38,443.56 Proposal Total $39,621.56 Page I d I EIQC - Buy Board 212MOI Contractor's price Proposal CSI - Detail Plate February 28, 2011 Re: IOC Master Contract # :area 1 'AL ..1ork Order # Owner PO # Title Criy of Lubbock Eastport Airporl Hanger Demolition Contractor Talon&PE Proposal Value' $39621.56 Sect, item Modifier OOMt Description Line Tobd Labor Equip. Material (EXCfuded if marked vaith an X) 01 - General Requimments t 01560 OD1a LF Temporary 6' High Chain Link Fence And Posts, Up To 6 Months 51 1T8.00 Quantity Unit Price Factor Total Installation 52000 x is? x 1 7500 1,178,00 Subtotal for01 -General Requirements $1,178.00 02 - Site Work 2 02111 0002 G5F Residential Bolding lntadQr, Gutting And Disposal Into Dumpster Or Truck E2,590.00 Quantity Unit Price Factor Total Installation No cc x 2 59 x 1 2500 = 2.590.00 (2) 20' X 20' interior offices to be derndished 3 0211, 0009 CCF Demo Steel Framed Building By Machin Remove Building $21.672 00 Quantity Uni(Price Factor Total Installation 960.00 x 18.06 x 1.2500 z 21.672.00 60 X 80 X 20 hangar to be demolished 4 02112 0026 SY Break -Up And Remove 53" To 6" Thick Concrete, Withoul Reinforcing $6,253,75 Quantity Unit Price Factor Total insialtat4n) 513968 x 834 x 12500 0.253.75 60 X 90 X 6" concrete slab to be removed 021.2 0138 LF Saw Cut Concrete Slab Or Paving Up To 4" (10 cm) Depth $536.60 Quantity Unit Price Factor Total Installation 36000 x 1.19 x 1 2500 $35.50 6 02t19 0010 CYM hauling Up To 5 Miles $3,437.80 Quantity Unit Price Factor Total Instafiation 3.86699 x 075 x 1.2500 3,43780 Concrete slab and hangar (figured at a 3' debris pile for hangar) and concrete ramp 02205 0007 CY Spreading, Shaping, and Rough Grading Imported or Stockpiled Material for $302.75 Bulk Excavation by Machine Quantity Unit PriC4 Factor Tom installation 11110 x 218 x 12500 302,76 02213 0004 CY Native SoBdDirt - Common -,. V$1.942.87 Quantity Unit Price Faclor Total e nstattalion t 11 1C x 327 x 1 2500 1,842117 02464 0134, El- 4" Cap, Drain And Sewer Fitting $23.89 Quantity Unit Price Factor Total tratagativt 100 x 19 12600 - 23,89 �— F 6 "vardaed Chain - Fence 9 Gauge Coiled Spring Mash, Top And $1 78600 Bottom Rails Line Post At IV 0 C Quantity ...: Price Factor Total Installation 80 85 12500 1,785.00 Page . of EZIQC - Buy Board 2/25,2011 Contractor's price Proposal - Detail Continues.. Work Order Number: 010608 00 Work Order Title: City of Lubbock - Eastport Airport Hanger Demolition send Item Moditer UOM Description Una Total Labor Equip, Material (Excluded if marked with an XI Subtotal for 02 - Site Work $39,621.56 Proposal Total $39,621.56 his total represents Uie correct total for the proposal Any discrepancy between line totals, sup -totals and the propot+ai total is duo to rounding Page 2 of 2 E7JoC Buy Board a 201101-