HomeMy WebLinkAboutResolution - 2011-R0148 - Contract - Talon LPE Ltd.- Hangar Remodel - 04_14_2011Resolution No. 2011—RO148
April 14, 2011
Item No. 5.27
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock, Contract No. 11-10109-JOC for hangar
remodel at the Preston Smith International Airport, by and between the City of Lubbock
and Talon LPE, Ltd. of Amarillo, Texas, and related documents. Said Contract is
attached hereto and incorporated in this resolution as if fully set forth herein and shall be
included in the minutes of the City Council.
Passed by the City Council on April 14, 2011
TOM MARTIN, MAYOR
ATTEST:
Rebeck a Garza, City Secret
APPROVED AS TO CONTENT:
V .
.lames Loomis, Director of Aviation
APPROVED AS TO FORM:
Chad Weaver, Assistant City Attorney
xcdocs/RES.Contract-Talon LPE, Ltd. -hangar remodel
rch 18, 2011
Resolution No. 2011—RO148
City of Lubbock Job Order
This Job Carder is governed by all terms and conditions of the Contract referenced below which is hereby
incorporated by reference.
Owner: Wesley Everett, Director of facilities Management for-- Airport
Buyboard EZIQC Contract No.: Area 1-1-TAL
Contract Job Order Number: 11-10109-JOC
Contractor: 'talon/LPE
Date; of C:'ontmet: September 25, 2008
Job Order Date: February 23, 2011
Summary and Description of Statement of Work attached hereto: Airport Hangar Remodel
Talon Job Order Number: O1 525 hereto attached. And Insurance Requirements per Exhibit A, attached.
Valuc of Pre -Priced Work: $ 42,030.23
Value of Non -Pre -Priced work: S 00.00
Payment and Performance Bond:S14,010.48
Total Fixed Pricy: stipulated sum for this Job Order (Job Order Sum): $56,040.31
Notice to Proceed Date for this Job Order: To be issued after City Council approval
Expected Completion Date for this Job Order: to be determined after City Council approval.
L iquidated Damages (if different than set forth in Agreement): $25 per day
CON I RACTOR:
CITY OF LUBBOCK, TEXAS (OWNER)
LP]-
Talon#FDAN
Tom artin. Mayor
By: _ _�BRIDG-4,ER
ATTrST:PRIM
110WARD
COMPLETE ADDRESS:
t e,rrtlmty: JWot>tt PE
Nddress: 221 N Iivins Strmt
! +tv, Staic Zip: %vVrillo. Texas 79107
Rebecdra Gar/a, City Secretary
APPROV 'D AS T N
les
Reprrese.is e
�omis. Dirc.-ctor 'Aviation
kI'PR AST ) FORM
Assistant :2ity" Attorney
Contractor's Price Proposal CSI - Summary
Oate: 5ebntary 23, 2011
Fie: IOC Mawr Contras! # area ' T.
. Orrirr # 013525 00
Omier PO #
TOO Lubbock Airport Hanger Remodel
Contractor Talan'LPE
Proposal value 556.040 31
01 General Requirements $4,686.15
02 - Site Work $681.94
03 - Concrete $493.89
04 Masonry $1,142.18
06 -Wood, Plastic, and Composites $7,602.75
07 - Thermal & Moisture Protection $30,035.92
08 - Openings $3,056.26
16 - Electrical $8,341.22
Proposal Total $56,040.31
Page 1 of'
MOC - Buy Boars! M312011
Contractor's Price Proposal CSI - Detail
Date February 23. 201
Re; IQ' Master Contract 0: Area 1 TAL
Work Order t. 010525 00
Owner PO #:
Title: Lubbock- Airport Hanger P.emodei
Contractor: Talon,`LPE
Proposal Value: S56.040 31
Sect.
item
Modifier UOM Doscrlplion
Line Total
Labor Equip,
Material
(Excluded ifmarked a#th an k)
01 • General Requirements
1 01352
0006
HR CarpenterNote' Tasks in the CTC include appropriate costs to cover labor.
$333 60
These tasks will be requested specifically by the owner for miscellaneous work
not covered In the CTC
Quantity Unit Price Factor
Total
Installation 800 x 33.36 x 1 2500
333.60
Nola #,I A-103 Stud inspection
V
_
2 0151.0
0004
LF Circular Prefabricated Stoat 30 in Diameter, Remove After Use
$692 25
Quantity Unit Price Factor
Total
insta+cation 2000 x 2369 x 1 2500 =
592.25
3 01510
0014
EA 30 CY Dumpster (4 Ton) "Construction Debris'Note: Includes delivery of
$3,229.90
dumpster, rental cost, pick -tip cost, hauling, and disposal fee, Non -hazardous
material
Quantity Unit Price Factor
Total
Installation 8.00 x 32296 x 12500
3,229 6D
4 01590
0014
WK 24' Personnel Lin, Manual
S530.50
Quantty Unit Price Factor
Total
Installation 200 x 212.20 x 12500 s
53050
Subtotal for 01 • General Requirements
$4,686.15
02 -Sits Work
5 02201 0002 EA Botrat Delivery, Mobilization And DemobibzationNote: Use for bobcat or $116.33
similar sized equipment. Includes delivery fee, delivery, set-up and return
Quantity Unit Price Factor Total
Installatior 1 00 x 9306 x 1 2500 r 11633
6 02210 0003 CY Excavation For Building Foundations And parer Structures By Bobcat In Soil $73.86
Quantity unit Price Factor Total
astalation 19.50 x 3.03 x 1.2500 = 73.86
02210 0077 CY Compaction Of Fill Or Subbase For Budding Foundations and Other Structures $214.52
by Hand
Quantity unit Price Factor Total
Installation -
1730 a< 992 " 12500 _ 21452
W. 1 0032 CY Spread Fxcess or Impoined Usterim On Sne By Hard $277 23
Quantity Unit Price Factor Total
Installation 17 30 x 12 82 1,2500 a 277.23
Subtotal for 02 - Site Work $5,368.09
03 Concrete
Slab Edge and Bloek• Out b1Mcd Formwork $40 00
Quantity unit Price Factor Total
latic 16 x 2 x 2500 s 40.00
Page t of 5
B2?1QC - Buy Board 2r23r201i
Contractor's Price Proposal - Detail Continues..
Work Order Number- C10525 00
Work Order Title: Lubbock- Airport Hanger Remodet
Sect.
Item
Modifer USIA Deseription
Line Tool
Labor Equip.
ktatarlat IEscluded if marked with an X)
03 - Concrete
0 03210
0006
TON Grade 60 ReWorang Steel. Footings And Stabs, M346
$289.33
auanmy Un-(Ptice
Factor
Total
Installation 0 15 x 1,543 11 x
112500
2a9.33
17 03210
002t.
EA Straight Dowels, lir Diameter x 24` Long (13 mm Diameter x 61 cm Long),
51065
Deformed
Quantity Unit Price
Factor
Total
Installatior 600 x 142 x
12500
10.65
12 03311
0026
CY Pour Stab On Grade, Up To 6", Direct Chute, 3000 PSI Concrete
$119 78
Quantity Unit Price
Factor
Total
Installabon
100 x 95.82 x
=
1.2500
119.78
13 03311
0091
CY Delivery Fee For Concrete Purchases Per CY Fix Each CY Less Than 9 CY1
$18 75
Quantity Unit Prtce
Factor
Total
installation 100 x 15.00 x
1.2500 '
18.75
14 C3MO
0005
SF Concrete Root Finishes Final Foal
S15 36
Quantity Una Price
ce
Factor
Total
Installation
30.00 x 041 x
12500
16.38
Subtotal for 03 - Concrete
$5,861.98
04 -M"orl
15 04210
0007
SF Select Common Brick For Veneer (6.4/SF)
S261.00
Quantity Unit Price
Factor
Total
Installation
2000 x 10.44 x
-
1 2500
261.00
16 04910
0004
SF Cut And Repoint Block, hard In -Tact Mortar, Running Bond
$311.55
Oventfty, Unit Price
Factor
Total
insletlalion 62 00 x 402 x
r�
1,2500
311 5S
1 04910
0011
LF Cut And CauVK (Masonry. Silicone Caulks
$303.80
Quantity unit Price
Factor
Total
installation 62.00 x 392 x
1 2500
30390
IS 04010
OG13
SF Grind Smooth Masonry Wait
S71703
Quantity Un4 Price
Factor
Total
Installabon 6200 x 1,51 it
1.250o =
11703
f9 04910
0018
LF Chip And Repair Wth Masonry Patch. Cracks Up To 1!4'
$148.60
Quantity Una Price
Factor
Total
Instailacion
62 DO x 1 92 x
12600
148.80
Subtotal for 04 - Masonry
$7,004.16
06 - Wood, Platttic, and Cornposftes
29
LF 5cm x 15crn Cedar Rafter Or Joist
$2.709 DD
:+;ant'. Unit f,nte
raclor
Total
;ntalla¢imr
,66000 " 095
f2500
1,995.00
_
De_mott- 5fl0 00 X _ 034 x
1.2500
71400
3W Thick COX Plywood Roof DeclungNote Applied
To Wood Rafters
$4,893 75
- antuty Una Pima
Factor
Total
stallat, t
..�.as
=
.zSeD
4,023 75
Demokdicm Z,auu.Vu x 0-24 x
1.2500
$moo
Page 2 of 5
EZ1QC - Buy Board
2/23/2011
Contractor's Price Proposal - Detail Continues..
Work Order Humber: 010525 00
Work Order Title: Lubbock- Airport Hanger Remodel
Sect
Item
Modifer UQk1 DesrAptton
Llne Told
ahor Equip
Material
(Excluded If marked with an X)
Subtotal for 06 - Wood, Plastic, and Composites
$14,606.91
07 • Thermal & Moisture Pro ctlon
22 07213
OC89
SF li4" (6mm) Tapered Polyisocyanurate Board
S11,273 75
Oventrty
Unit Price
Factor
Total
Installation 2,00000 x
3.11
x
1.2500
11,27375
Dens Desk
73 07410
0036
SF 019" Thick. Aluminum Ridge Cap Natural Finish
$1,764 00
Quantity
Unit Price
Factor
Tots!
Installation 28000 x
449
x
1 2500 c
1,571 50
Demolition_ 280.00 x
0.55
x
7.2590 *
192.50
24 07510
0002
F 4" x 4" Carl Strip Foamgiass
$1.287 00
Quantity
Unit Price
Factor
Total
Installation 880 00 x
117
x
1.2500
1,28700
25 07510 y
0013
SQ Built Up Roofing, 459 Base Sheet
S156 24
Quantity
Unit Pace
Factor
Total
Installation 0 OO x
2887
x
1 2500 Y
0.00
_
Demolitiun 29.0o x
4.31
x
1.2500
156.24
26 07633
0020
SQ 60 Mil Fully Adhered TPO Membrane RoofingNate• Includes adhesive.
35.357 39
Quantity
Una Price
Factor
Total
Installation
2900 x
14779
x
1 2500
6,36739
27
07620
C082
Sr 24 Gauge Galvanized Steel Flashing, Stock, long Panels
39,484.25
Quantity
Unit Price
Factor
Total
Installation 1,180 00 x
5 58
x
1.2600 u
8,230.50
Demolition 1,18000 x
0.85
x
1.2500 =
1,253,75
BaselStripprp, Counlertlashing
2E
07620
0113
EA 00 Mil Flashing, 2" Diameter Pipe
$326,25
Quantity
Unit Price
Factor
Total
Installation 1000 x
22-55
x
1 2500
281.88
Demolition 10_00 X
355
x
1.2500 -
44.38
_
29
07831
4006
LF 0.024" Aluminum Downspout, 3"x4",
M8! Finish
$133.13
Quantity
Unit Price
Factor
Total
Installation 3000 x
270
x
12500 -
10125
camol'twn 3000 x
—
085
x
1 2500 =
31 88
Y
07631
0022
EA Thru-WWa Aluminum Scupper Outlet
$253 91
Quantity
Unit Price
Factor
Total
Installation 3 00 x
6239
1,2500 _
233.96
Demolition 3.00 x
5 32
x
1.2500
19.95
Subtotal
for 07
Thermal & Moisture Protection
$44,64213
08 - Openin
10 -8- Through 7.2'0-34- Creep Metal Door Frame 16 Gauge 5380 05
Unit Price Factor Total
1 00 x 24606 x 1 2500 313756
Ct mofitton x J3' S r 1250 a 42.49
Page 3-if 5
EZJQC - Buy Board 2123f2011
Contractor's Price Proposal - Detail Continues..
Work Order Number: 010525 00
Work Order Title: Lubbock- Airport Hanger Remodel
Sect.
Item Modifer
UOM Description
Line Total
Labor
Equip.
Material (Excluded if marked with an i()
08 - Openings
32
08110
0123 ~
EA 31x7k1 W4" 20 Gauge Metal Door (Unrated)
$414 69
Quantity UN Price Factor
Total
installation 100 x 311,36 x 1.2500 `
389.20
_
Demoliion t 00 x WAS) x 1.2500 c
25,49
33
08MOD
0123 0114
For Insulated Door (Polystyrene Core), Add
33383
Quantity Unit Pica Factor
Total
Installation x x a
1.00 27.08 1,2500
33 83
34
08710
3004
PR 3-ii2" x 3-112", Standard Duty, Full Mortise, Plain Bearing, Brass/Bronze
$153.55
Hinge
Quaotity Unit Price Factor
Total
I nstatiatlon 200 x 6142 x 12500
15355
35
08710
0334
EA EntrancelCifice F04 Mortise LocksetNote: Locked with key outside and thumb
$387.16
knob insiue
Quantity Unit Price Factor
Total
Installation 1.00 x 301.24 x 1 2500 s
37655
Demolition 1.00 x 8.49 x 1.2500 s
1061
36
08720
0164
LF 518" Cushion "V" Spnng Bronze Perimeter Gaske6ng Weather -Strip (Pemko
$272,25
873)
Quantity Unfit Price Factor
Total
Installation 60-00 x 363 x 1 2500 _
27225
08730
0120
LF 5" WAth 112" Height Numinum Saddle Threshold (Pemko 171A)
-'
$234.23
Quantity Unit Price Factor
Total
lnstallation 900 x 1742 x 1.2500
195.98
_
Dernotition goo 7[ 3.40 x 1.2500 m
38.26
38
08820
0005
SF 114" Thick, Clear Float Field Installed Glass
$1.210 50
Quantity Unit Price Factor
Total
installation =
180DD x 5.38 x 1.2500
t,zio SQ
Subtotal for 08 - Openings
$47,699.09
16 - Electrical
d9
fetal
0024
EA Temporary Light Socket With Branch Wiring Connection And Lamp
S255.63
Quantity Unit. Price Factor
Total
Installation 2500 x Big x 1 2500
25563
40
16120
0004 Y
MLF #12 AWG Cable - Type THHN-THWl,,L 600 V Capper, Single Solid, Placed In
$799.38
Condial
Quantity Unit Price Factor
Total
ratalfat or
250 x 25580 x 2500
799.38
r
' 6" g0
0080 -
EA 45735 Distribution Bat 4-3/4 Square x 1-3187 Deep
_.,. $701 68
Quantity Unit Pnce Factor
Total
Installation 5000 x 1123 x 1 2500
701.88
'
a5 ` blank Cover 4-31B
9293.76
Quantity Unit Price Factor
Total
stallaF'° -
50.D0 470 x s 2500
29375
EA ir; 48-3 ° ,And Receptacle Bo For Deep Dukes. 1 Gang
$66.20
. uanbt Unit Price Factor
Total
200 28 46 2500 -
8G 20
EZ10C - Buy Board
Page 4of5
212312011
Contractor's Price Proposal - Detail Continues..
Work Order Number: 010625,00
Work Order Title: Lubbock -Airport Hanger Remodel
Sect. Item Moditer UOM Description Una Total
Labor Equip. Malarial lExcluded If marked with an X)
16 - Electrical
44
1613",
C855
LF 1,2" EMT Canduit, Mounted Exposed On Fiat Wall
S765 00
Quantity Unit Price Factor
70421
l Tate !atwn 425 00 x 1 44 x 1 2500 =
765.00
"
44
'6131
6898
EA V7 EMT Compression Coupling
S123 75
0uanlity Unit Price Factor
Total
ln5fanatK 50 00 x 1 98 if 1 2500
12375
rc
111131
0931
A 1i2" EMT Box Connector, Compression
3301.63
Quantity Unit Price Factor
Total
Installation 95.00 x 254 x 7 2600 -
301 63
4
16134
0021
EA 4-11118" Square Steel 112" Raised Cover
516 45
Ouantity Unit Price Factor
Total
Installation 200 x 658 x 1,2500
1645
46
161411
0136
EA 20 A. 1201277 V 3-Way Switch
$78 80
Quantity Unit Price Factor
Total
instaiiauon 4 00 x 15 76 x 1.2500
78 80
49
16510
0336
EA 2 T5110 lamps 120 Wall Fluorescent, 4' Length. N+9h Bay Ftxture
$3.912.00
Quantity Unit Price Factor
Total
hlslatlalrorl 12.00 x 260 80 x 1 25CO
3,972.00
50
16F110^
L3 K 0215'
rA For Wire Guard, Add
$607 50
Quantity Unit Price Factor
Total
Installation 1200 x 4050 x 12500
607.6D
16510
0357
LF For Eacn Add:tionw LF Of interior Lightmg Wire Whip, AddNota Wire whips
$419 25
are Included with interior lighting fixtures, where necessary, up to six feet in
length Use this task for additional required whip length. For example, it the
fixture requites a 15' wire whip then use 9 LF Of this task to reach required
length
Quantity Unit Price Factor
Total
Inslaliauon 39000 x 986 x 1 2500
419,25
Subtotal for 16 - Electrical
$56,040.31
Proposal Dotal $66,040.31
Th - tnial represents rho uirreri total to We proposal Any discrepancy tetieen Ime totals,
sul .. wid the proposal total Is our, to round rg.
Page 5 of E
EZIQC —Buy Board 2r123:2011