Loading...
HomeMy WebLinkAboutResolution - 2011-R0148 - Contract - Talon LPE Ltd.- Hangar Remodel - 04_14_2011Resolution No. 2011—RO148 April 14, 2011 Item No. 5.27 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 11-10109-JOC for hangar remodel at the Preston Smith International Airport, by and between the City of Lubbock and Talon LPE, Ltd. of Amarillo, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on April 14, 2011 TOM MARTIN, MAYOR ATTEST: Rebeck a Garza, City Secret APPROVED AS TO CONTENT: V . .lames Loomis, Director of Aviation APPROVED AS TO FORM: Chad Weaver, Assistant City Attorney xcdocs/RES.Contract-Talon LPE, Ltd. -hangar remodel rch 18, 2011 Resolution No. 2011—RO148 City of Lubbock Job Order This Job Carder is governed by all terms and conditions of the Contract referenced below which is hereby incorporated by reference. Owner: Wesley Everett, Director of facilities Management for-- Airport Buyboard EZIQC Contract No.: Area 1-1-TAL Contract Job Order Number: 11-10109-JOC Contractor: 'talon/LPE Date; of C:'ontmet: September 25, 2008 Job Order Date: February 23, 2011 Summary and Description of Statement of Work attached hereto: Airport Hangar Remodel Talon Job Order Number: O1 525 hereto attached. And Insurance Requirements per Exhibit A, attached. Valuc of Pre -Priced Work: $ 42,030.23 Value of Non -Pre -Priced work: S 00.00 Payment and Performance Bond:S14,010.48 Total Fixed Pricy: stipulated sum for this Job Order (Job Order Sum): $56,040.31 Notice to Proceed Date for this Job Order: To be issued after City Council approval Expected Completion Date for this Job Order: to be determined after City Council approval. L iquidated Damages (if different than set forth in Agreement): $25 per day CON I RACTOR: CITY OF LUBBOCK, TEXAS (OWNER) LP]- Talon#FDAN Tom artin. Mayor By: _ _�BRIDG-4,ER ATTrST:PRIM 110WARD COMPLETE ADDRESS: t e,rrtlmty: JWot>tt PE Nddress: 221 N Iivins Strmt ! +tv, Staic Zip: %vVrillo. Texas 79107 Rebecdra Gar/a, City Secretary APPROV 'D AS T N les Reprrese.is e �omis. Dirc.-ctor 'Aviation kI'PR AST ) FORM Assistant :2ity" Attorney Contractor's Price Proposal CSI - Summary Oate: 5ebntary 23, 2011 Fie: IOC Mawr Contras! # area ' T. . Orrirr # 013525 00 Omier PO # TOO Lubbock Airport Hanger Remodel Contractor Talan'LPE Proposal value 556.040 31 01 General Requirements $4,686.15 02 - Site Work $681.94 03 - Concrete $493.89 04 Masonry $1,142.18 06 -Wood, Plastic, and Composites $7,602.75 07 - Thermal & Moisture Protection $30,035.92 08 - Openings $3,056.26 16 - Electrical $8,341.22 Proposal Total $56,040.31 Page 1 of' MOC - Buy Boars! M312011 Contractor's Price Proposal CSI - Detail Date February 23. 201 Re; IQ' Master Contract 0: Area 1 TAL Work Order t. 010525 00 Owner PO #: Title: Lubbock- Airport Hanger P.emodei Contractor: Talon,`LPE Proposal Value: S56.040 31 Sect. item Modifier UOM Doscrlplion Line Total Labor Equip, Material (Excluded ifmarked a#th an k) 01 • General Requirements 1 01352 0006 HR CarpenterNote' Tasks in the CTC include appropriate costs to cover labor. $333 60 These tasks will be requested specifically by the owner for miscellaneous work not covered In the CTC Quantity Unit Price Factor Total Installation 800 x 33.36 x 1 2500 333.60 Nola #,I A-103 Stud inspection V _ 2 0151.0 0004 LF Circular Prefabricated Stoat 30 in Diameter, Remove After Use $692 25 Quantity Unit Price Factor Total insta+cation 2000 x 2369 x 1 2500 = 592.25 3 01510 0014 EA 30 CY Dumpster (4 Ton) "Construction Debris'Note: Includes delivery of $3,229.90 dumpster, rental cost, pick -tip cost, hauling, and disposal fee, Non -hazardous material Quantity Unit Price Factor Total Installation 8.00 x 32296 x 12500 3,229 6D 4 01590 0014 WK 24' Personnel Lin, Manual S530.50 Quantty Unit Price Factor Total Installation 200 x 212.20 x 12500 s 53050 Subtotal for 01 • General Requirements $4,686.15 02 -Sits Work 5 02201 0002 EA Botrat Delivery, Mobilization And DemobibzationNote: Use for bobcat or $116.33 similar sized equipment. Includes delivery fee, delivery, set-up and return Quantity Unit Price Factor Total Installatior 1 00 x 9306 x 1 2500 r 11633 6 02210 0003 CY Excavation For Building Foundations And parer Structures By Bobcat In Soil $73.86 Quantity unit Price Factor Total astalation 19.50 x 3.03 x 1.2500 = 73.86 02210 0077 CY Compaction Of Fill Or Subbase For Budding Foundations and Other Structures $214.52 by Hand Quantity unit Price Factor Total Installation - 1730 a< 992 " 12500 _ 21452 W. 1 0032 CY Spread Fxcess or Impoined Usterim On Sne By Hard $277 23 Quantity Unit Price Factor Total Installation 17 30 x 12 82 1,2500 a 277.23 Subtotal for 02 - Site Work $5,368.09 03 Concrete Slab Edge and Bloek• Out b1Mcd Formwork $40 00 Quantity unit Price Factor Total latic 16 x 2 x 2500 s 40.00 Page t of 5 B2?1QC - Buy Board 2r23r201i Contractor's Price Proposal - Detail Continues.. Work Order Number- C10525 00 Work Order Title: Lubbock- Airport Hanger Remodet Sect. Item Modifer USIA Deseription Line Tool Labor Equip. ktatarlat IEscluded if marked with an X) 03 - Concrete 0 03210 0006 TON Grade 60 ReWorang Steel. Footings And Stabs, M346 $289.33 auanmy Un-(Ptice Factor Total Installation 0 15 x 1,543 11 x 112500 2a9.33 17 03210 002t. EA Straight Dowels, lir Diameter x 24` Long (13 mm Diameter x 61 cm Long), 51065 Deformed Quantity Unit Price Factor Total Installatior 600 x 142 x 12500 10.65 12 03311 0026 CY Pour Stab On Grade, Up To 6", Direct Chute, 3000 PSI Concrete $119 78 Quantity Unit Price Factor Total Installabon 100 x 95.82 x = 1.2500 119.78 13 03311 0091 CY Delivery Fee For Concrete Purchases Per CY Fix Each CY Less Than 9 CY1 $18 75 Quantity Unit Prtce Factor Total installation 100 x 15.00 x 1.2500 ' 18.75 14 C3MO 0005 SF Concrete Root Finishes Final Foal S15 36 Quantity Una Price ce Factor Total Installation 30.00 x 041 x 12500 16.38 Subtotal for 03 - Concrete $5,861.98 04 -M"orl 15 04210 0007 SF Select Common Brick For Veneer (6.4/SF) S261.00 Quantity Unit Price Factor Total Installation 2000 x 10.44 x - 1 2500 261.00 16 04910 0004 SF Cut And Repoint Block, hard In -Tact Mortar, Running Bond $311.55 Oventfty, Unit Price Factor Total insletlalion 62 00 x 402 x r� 1,2500 311 5S 1 04910 0011 LF Cut And CauVK (Masonry. Silicone Caulks $303.80 Quantity unit Price Factor Total installation 62.00 x 392 x 1 2500 30390 IS 04010 OG13 SF Grind Smooth Masonry Wait S71703 Quantity Un4 Price Factor Total Installabon 6200 x 1,51 it 1.250o = 11703 f9 04910 0018 LF Chip And Repair Wth Masonry Patch. Cracks Up To 1!4' $148.60 Quantity Una Price Factor Total Instailacion 62 DO x 1 92 x 12600 148.80 Subtotal for 04 - Masonry $7,004.16 06 - Wood, Platttic, and Cornposftes 29 LF 5cm x 15crn Cedar Rafter Or Joist $2.709 DD :+;ant'. Unit f,nte raclor Total ;ntalla¢imr ,66000 " 095 f2500 1,995.00 _ De_mott- 5fl0 00 X _ 034 x 1.2500 71400 3W Thick COX Plywood Roof DeclungNote Applied To Wood Rafters $4,893 75 - antuty Una Pima Factor Total stallat, t ..�.as = .zSeD 4,023 75 Demokdicm Z,auu.Vu x 0-24 x 1.2500 $moo Page 2 of 5 EZ1QC - Buy Board 2/23/2011 Contractor's Price Proposal - Detail Continues.. Work Order Humber: 010525 00 Work Order Title: Lubbock- Airport Hanger Remodel Sect Item Modifer UQk1 DesrAptton Llne Told ahor Equip Material (Excluded If marked with an X) Subtotal for 06 - Wood, Plastic, and Composites $14,606.91 07 • Thermal & Moisture Pro ctlon 22 07213 OC89 SF li4" (6mm) Tapered Polyisocyanurate Board S11,273 75 Oventrty Unit Price Factor Total Installation 2,00000 x 3.11 x 1.2500 11,27375 Dens Desk 73 07410 0036 SF 019" Thick. Aluminum Ridge Cap Natural Finish $1,764 00 Quantity Unit Price Factor Tots! Installation 28000 x 449 x 1 2500 c 1,571 50 Demolition_ 280.00 x 0.55 x 7.2590 * 192.50 24 07510 0002 F 4" x 4" Carl Strip Foamgiass $1.287 00 Quantity Unit Price Factor Total Installation 880 00 x 117 x 1.2500 1,28700 25 07510 y 0013 SQ Built Up Roofing, 459 Base Sheet S156 24 Quantity Unit Pace Factor Total Installation 0 OO x 2887 x 1 2500 Y 0.00 _ Demolitiun 29.0o x 4.31 x 1.2500 156.24 26 07633 0020 SQ 60 Mil Fully Adhered TPO Membrane RoofingNate• Includes adhesive. 35.357 39 Quantity Una Price Factor Total Installation 2900 x 14779 x 1 2500 6,36739 27 07620 C082 Sr 24 Gauge Galvanized Steel Flashing, Stock, long Panels 39,484.25 Quantity Unit Price Factor Total Installation 1,180 00 x 5 58 x 1.2600 u 8,230.50 Demolition 1,18000 x 0.85 x 1.2500 = 1,253,75 BaselStripprp, Counlertlashing 2E 07620 0113 EA 00 Mil Flashing, 2" Diameter Pipe $326,25 Quantity Unit Price Factor Total Installation 1000 x 22-55 x 1 2500 281.88 Demolition 10_00 X 355 x 1.2500 - 44.38 _ 29 07831 4006 LF 0.024" Aluminum Downspout, 3"x4", M8! Finish $133.13 Quantity Unit Price Factor Total Installation 3000 x 270 x 12500 - 10125 camol'twn 3000 x — 085 x 1 2500 = 31 88 Y 07631 0022 EA Thru-WWa Aluminum Scupper Outlet $253 91 Quantity Unit Price Factor Total Installation 3 00 x 6239 1,2500 _ 233.96 Demolition 3.00 x 5 32 x 1.2500 19.95 Subtotal for 07 Thermal & Moisture Protection $44,64213 08 - Openin 10 -8- Through 7.2'0-34- Creep Metal Door Frame 16 Gauge 5380 05 Unit Price Factor Total 1 00 x 24606 x 1 2500 313756 Ct mofitton x J3' S r 1250 a 42.49 Page 3-if 5 EZJQC - Buy Board 2123f2011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010525 00 Work Order Title: Lubbock- Airport Hanger Remodel Sect. Item Modifer UOM Description Line Total Labor Equip. Material (Excluded if marked with an i() 08 - Openings 32 08110 0123 ~ EA 31x7k1 W4" 20 Gauge Metal Door (Unrated) $414 69 Quantity UN Price Factor Total installation 100 x 311,36 x 1.2500 ` 389.20 _ Demoliion t 00 x WAS) x 1.2500 c 25,49 33 08MOD 0123 0114 For Insulated Door (Polystyrene Core), Add 33383 Quantity Unit Pica Factor Total Installation x x a 1.00 27.08 1,2500 33 83 34 08710 3004 PR 3-ii2" x 3-112", Standard Duty, Full Mortise, Plain Bearing, Brass/Bronze $153.55 Hinge Quaotity Unit Price Factor Total I nstatiatlon 200 x 6142 x 12500 15355 35 08710 0334 EA EntrancelCifice F04 Mortise LocksetNote: Locked with key outside and thumb $387.16 knob insiue Quantity Unit Price Factor Total Installation 1.00 x 301.24 x 1 2500 s 37655 Demolition 1.00 x 8.49 x 1.2500 s 1061 36 08720 0164 LF 518" Cushion "V" Spnng Bronze Perimeter Gaske6ng Weather -Strip (Pemko $272,25 873) Quantity Unfit Price Factor Total Installation 60-00 x 363 x 1 2500 _ 27225 08730 0120 LF 5" WAth 112" Height Numinum Saddle Threshold (Pemko 171A) -' $234.23 Quantity Unit Price Factor Total lnstallation 900 x 1742 x 1.2500 195.98 _ Dernotition goo 7[ 3.40 x 1.2500 m 38.26 38 08820 0005 SF 114" Thick, Clear Float Field Installed Glass $1.210 50 Quantity Unit Price Factor Total installation = 180DD x 5.38 x 1.2500 t,zio SQ Subtotal for 08 - Openings $47,699.09 16 - Electrical d9 fetal 0024 EA Temporary Light Socket With Branch Wiring Connection And Lamp S255.63 Quantity Unit. Price Factor Total Installation 2500 x Big x 1 2500 25563 40 16120 0004 Y MLF #12 AWG Cable - Type THHN-THWl,,L 600 V Capper, Single Solid, Placed In $799.38 Condial Quantity Unit Price Factor Total ratalfat or 250 x 25580 x 2500 799.38 r ' 6" g0 0080 - EA 45735 Distribution Bat 4-3/4 Square x 1-3187 Deep _.,. $701 68 Quantity Unit Pnce Factor Total Installation 5000 x 1123 x 1 2500 701.88 ' a5 ` blank Cover 4-31B 9293.76 Quantity Unit Price Factor Total stallaF'° - 50.D0 470 x s 2500 29375 EA ir; 48-3 ° ,And Receptacle Bo For Deep Dukes. 1 Gang $66.20 . uanbt Unit Price Factor Total 200 28 46 2500 - 8G 20 EZ10C - Buy Board Page 4of5 212312011 Contractor's Price Proposal - Detail Continues.. Work Order Number: 010625,00 Work Order Title: Lubbock -Airport Hanger Remodel Sect. Item Moditer UOM Description Una Total Labor Equip. Malarial lExcluded If marked with an X) 16 - Electrical 44 1613", C855 LF 1,2" EMT Canduit, Mounted Exposed On Fiat Wall S765 00 Quantity Unit Price Factor 70421 l Tate !atwn 425 00 x 1 44 x 1 2500 = 765.00 " 44 '6131 6898 EA V7 EMT Compression Coupling S123 75 0uanlity Unit Price Factor Total ln5fanatK 50 00 x 1 98 if 1 2500 12375 rc 111131 0931 A 1i2" EMT Box Connector, Compression 3301.63 Quantity Unit Price Factor Total Installation 95.00 x 254 x 7 2600 - 301 63 4 16134 0021 EA 4-11118" Square Steel 112" Raised Cover 516 45 Ouantity Unit Price Factor Total Installation 200 x 658 x 1,2500 1645 46 161411 0136 EA 20 A. 1201277 V 3-Way Switch $78 80 Quantity Unit Price Factor Total instaiiauon 4 00 x 15 76 x 1.2500 78 80 49 16510 0336 EA 2 T51­10 lamps 120 Wall Fluorescent, 4' Length. N+9h Bay Ftxture $3.912.00 Quantity Unit Price Factor Total hlslatlalrorl 12.00 x 260 80 x 1 25CO 3,972.00 50 16F110^ L3 K 0215' rA For Wire Guard, Add $607 50 Quantity Unit Price Factor Total Installation 1200 x 4050 x 12500 607.6D 16510 0357 LF For Eacn Add:tionw LF Of interior Lightmg Wire Whip, AddNota Wire whips $419 25 are Included with interior lighting fixtures, where necessary, up to six feet in length Use this task for additional required whip length. For example, it the fixture requites a 15' wire whip then use 9 LF Of this task to reach required length Quantity Unit Price Factor Total Inslaliauon 39000 x 986 x 1 2500 419,25 Subtotal for 16 - Electrical $56,040.31 Proposal Dotal $66,040.31 Th - tnial represents rho uirreri total to We proposal Any discrepancy tetieen Ime totals, sul .. wid the proposal total Is our, to round rg. Page 5 of E EZIQC —Buy Board 2r123:2011