HomeMy WebLinkAboutResolution - 2008-R0022 - Change Order To Contract - Brown Mckee Inc.- Ground Storage Tank, Pump Station - 01_10_2008Resolution No. 2008-R0022
January 10, 2008
Item No. 5.16
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, Change Order No. 2 to that
certain Contract by and between the City of Lubbock and Brown McKee, Inc. for 500,000
Gallon Ground Storage Tank and Booster Pump Station #15 (ITB# 07-065-VK), and
related documents. Said Change Order No. 2 is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Executed by the City Council this 10th
ATTEST:
Garza, City
APPROVED AS TO CONTENT:
Wood Franklin
Chief Ertginie'�r for Water Utilities
APPROVED AS TO FORM:
Richard K. Casner
First Assistant City Attorney
Richard/Res/ChangeOrder-Brown-McKee2, res
December 27, 2007
2008
day of January 7.
DAVID A. MILLER, MAYOR
CITY OF LUBBOCK
CHANGE ORDER
Change Order #: 2 Contractor: Brown McKee, Inc
Date: 1 11/20/2007 BID/ITB #: 07-065-VK
Contract #: 8009 Project Name: 500,00 Gallon Ground Storage Tank and
Booster Pump Station (#15)
Change Order within the scope of the contract means a Change Order that DOES NOT ALTER THE NATURE OF THE THING
TO BE CONSTRUCTED AND THAT IS AN INTEGRAL PART OF THE PROJECT OBJECTIVE. After performance of a
construction contract begins, Change Orders may be approved if necessary to 1) make changes in plans or specifications; or 2)
decrease or increase the quantity of work to be performed or materials, equipment, or supplies to be furnished. This DOES NOT
mean that a department can redefine the project. All work that alters the nature of the thing to be constructed or that is not an
integral part of the project obieetive must be let out for public bid by the Purchasing Department. Description of change
(alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the
specifications and drawings of the project (attach additional pages if necessary):
This Change Order will change the size and type of valves both inside the pump building and in the yard. Also
this Change Order will add 35 days to the contract making the final completion date March 21, 2008
Change Orders must either be negotiated in the best interest of the City of Lubbock or put out for public bid by the Purchasing
Department. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs,
including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where
certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM DESCRIPTION AMOUNT
A. ORIGINAL CONTRACT VALUE: $1,486,738.00
B. AMOUNT OF THIS CHANGE ORDER: Council appraval required if over S25,000 $36,960.14
C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 2.48%
D. AMOUNT OF PREVIOUS CHANGE ORDERS: $36,357.16
E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $73,317.30
F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25%maxmium 4.93%
G. NEW CONTRACT AMOUNT (A+E):
$1,560,055.30
It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes
full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise,
in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor
under this Change Order.
Purchasing and Contract Mannaa'ze}ment Department):
(])CONTRACTOR Date OJECT ARCHITECT N(TINEER Date
Ap oved as to Cant Approved as to Fa
() OWN S RE SENTATIVE Date Q (4) C TY A 1 1 fJNF4,Y D
1
(5) CAPITAL ROJECTS MANAGER Date (6) PURCHASING ND CONTRACT MANAGER Date
Change Orders over $25,000 require d Contract Cover Sheet and the fallowing signatures.
C U A
1/10/08 /10/08
(7) MAYOR Date (8) CIT SECRETARY Date
Council Date: January 10, 2008 Agenda item #: 5.16 Resolution #: 200 — 0022
PUR-045 (Rev 02106)
City of Lubbock Resolution No. 2008-R0022
Pump Station #16
Scope of Work for Proposed Change:
Parkhill, Smith, & Cooper Change Order List Dated September 13, 2007 l Piping Changes
Labor
Unit Prices
Line Item Extended Totals
Task Information
Lours
Unit
Chian
iMLI
Mat Labor Equip 1 Sub
Material Labor Equip l Sub
Station Piping._
Delete 8' FLG Swing Check Valve
ea
1605.88: 126.00 21.00 -1 1605.88. 126.00-21.001 0.00
12" FLG Swing Check Valve
ea
4770.00- 540.00; 108,00: 1 4770-00 540.00; 108.00i 0.00
._
Delete 8" FLG Swing Check Valve
ea
1219.32i 93.60 15.60. -2-2438.64: -167.20' -31.20 0.0
10" FLG Swing Check Valve
ea
3777.50; 480 00,• 96.00�, 2 7555.00: 960.00; 192.Q0,
.... , 0•
- _ -
Delete 8" Bolt Set
ea
-
6.29 -3 -18.87 0.00; 0.00; 0.00-
12" Bolt Set
0.001 0.00 0.0'
De12iB 6 BPIt SeE
ea
6.0o- 6-36,00. 0.00 0.00 0.00
_ ...... _
10" Bolt Set
ea
14.79 6 88.74 0.00, 0.00, 0.00
Delete 8" dia. 1l8" RR FF GSKT,
ea
1.88, -3 -5.58' 0.00 0 00 0.00
-
12' dia. 1/8 RR FF GSKT_
ea
_.__... _ .. .; . :. .. .....�.. . _,_._...._
4.66; 3 13.98 0.00 0.00; 0.00
;...
Delete 6" dia. 1/8" RR FF GSKT
ea
......
� - • - 0.00' 0.00
1.65� � -9.90� 0.00�
10 �i . , r tR FF GSKT
dia 1/8
ea...
3 :��1.._ 6 18.301 0.00?,0.00 0.00
_.
Delete 8" FLG BFV wl Hand Wheel
ea
_ ...... ...
576.131 126.00; 21.00 -1-576.13'-126.00-21.00! 0.00
12" FLG Gate Valve w/ Hand Wheel
ea
15z1ssf 5ao,o0 108,00i 1 1521,98: 540.W 108.00; 0.00
_ ..... _.. - _.... _
Delete 6 FLG BFV w/ Hand Wheel
ea
,
465sad 93.60i 15.fio; 2-931.82-187.20:-31,20: 0.00
_ .. ...._...
10' FLG Gate Valve wt Hand Wheel
ea
e74.9o' 480.00' 96.00 2 1749.80 960,001 192.00; 0.00
Delete 8" FLG BFV wl Hand Wheel
ea
576.14 126,60 21,00 -1-576.14-126.00 -21.W 0.00
Add 12" FLG BFV wt Hand Wheel
ea
1129.94: 900.60' i80,00. 1 1129.94 900.00 180.00 0.00
Delete 6" FLG BFV wl Hand Wheel
ea
:. . _
465.91 93,60, 15,60� •2-931.82 _187.20a -31.20 0.00
Add 10" FLG BFV wl Hand Wheel
ea
1063.67; 720.00' 144.60: 2 2007.74 1440.00 288.00 0 0C
Total Material 11,769.07
Total Labor 4,400.40
Labor Burden 32% 1,408.13
Total Equipment 9.11.40
Total Subcontractor 0.00
Subtotal 18,489.00
i
i... � ...
�324
l]elete 16" FLG BFV w/ Hand Wheel
ea
1563.19' 003 60.00; -1-1563.19!-324,00' -60 00 0.0
_._......__...._ ._.._..._.__..__............. _._.._�_ .._.
16" MJ Gate Valve wl Acc.
.
ea
.
4316.46 1260 00; 270AW 1 4316.46: 1260.00 210.00; 0,00
Delete 20" FLG BFV w/ Hand Wheel
ea
2257.33 360.00: 75.00: -1-2257.33-360-00 75.00' 0.00
'
20 MJ Gate Vawe w/ Acc,
ea
8103.85; 171Ro0� 360.00; 1 8103.85' 1710A0i 360.00' 0.0
. _
ADJ Valve BOX
ea
. ..
58.57' 270.0Q, 54.00' 2 117,14: 540.00, 0.00
108.00;
Frei�ahtea
600.0 1 0.00. 0.00: 0.00 wb0 6 -
Total Material 8,716.93
.............
Total Labor 2,826.00
Labor Burden 32% 904.32
Total Equipment 603.00
Total Subcontractor 600.00
Subtotal ! 13 660.26
10125107 B-MI Project No. 07-021
City of Lubbock
Pump Station #15
Subtotal !
32,139.25
:.
(a tors Mark -Up ' Q%,
Contractors Mark
_
0.00
J
-Up f 5%
4 820.$9
Mike P. Oies, President
PC #2 Total (Add)
$ 36,960.14
_.
Contract Time
36 days
Additionat working days to be added to
M a rC h 21, 2002
contract Time that wilt be required to
complete this proposed Change.
Approval
10I25107 0-M) Projecl No. 07-021
FERGUSON WATERWORKS
OFFEGUSIM' MUNICIPAL PIPE #1107 DoWer To:
WatVT=b - Mltrlk*W P* 8007 NE LOOP 410 From: Debbie Rodriguez
SAN ANTONIO, TX 78219-0000 Comments:
11:51:27 SEP 212007
BO NO.......: 874393
Bid Dote....:
09/19/O7
Quoted By.:
DDR
Customer.
1107 SA PLANT BID ACCOUNT
BIDS ONLY
NO ORDERS
SAN ANTONIO, TX 78219
CUst PO#...: QUOTE
[ram
DesedpRon
MMI 106SOL12 12 FLG OL EPDX BFV W/ H/WHL
Sequence #: 10
SP-1 OFLGCKSB 10' VAL-MATIC #7200 FLG SWG CHECK
Sequence 0 40
SP-12VALWRGECK720 12' VAL-MATIC 07200 FLG SWG CHECK
Sequence 0.41
AFC251OFFOL 10 FLG RW 01 OL GATE VLV
FERGUSON ENTERPRISES, INC.
FERGUSON WATERWORKS
Price Quototlon Pose # 1
Phone: 210-4M2-4902
Fox :210-662-4825
Cust Phone:
Terms........: NET 1 OTH PROX
Ship To. 1107 SA PLANT 810 ACCOUNT
BIBS ONLY
NO ORDERS
SAN ANTONIO, TX 78219
Jab Name: CITY OF LUBBOCK
Quantity Net Price UM Total
1 7129.940 '
EA
1129,94
2 3777.500
EA
7Ei,5,5.00
i 4770.000 •
EA
4770.00
2 874,900
EA
1749.80
ZFEROWN' FERGUSON ENTERPRISES, INC.
WateMVAkS-Mwltc*l Pipe FERGUSON WATERWORKS
Price Quotation Poge # 2
Phone: 210-662-4902
11:5117 SEP 212007 Fax : 210-662-4825
Reference No: 874393
Item
Deswipttan
Quanllty
Net Price
UM
Total
Sequence M 13
AFC2512FFOL
12 FLG RW DI OL GATE VLV
1
1521.980•
EA
1521.96
Sequence #: 14
FBSETU
6 FLG BOLT SET
2
6.000
EA
12.00
Sequence #: 18
FNWR150FFGAU
6 RR 1/8 FF I" GSKT
2
1.650
EA
3.30
Sequence #: 17
FBSETX
8 FLG BOLT SET
1
6.290
EA
6.29
Sequence #: 19
FNWR150FFGAX
8 RR 1/8 FF 150# GSKT
1
2.410
EA
2A1
Sequence #: 20
FBSETIO
10 FLG BOLT SET
8
14.790
EA
118.32
Sequence #: 21
FNWR150FFGAIO
10 RR 1/8 FF 150# GSKT
8
3450
EA
24AO
Sequence #; 22
FBSET 12
12 FLG BOLT SET
4
14.790
EA
59.16
Sequence #: 23
FNWR150FFGA12
12 RR 1/0 FF 1601#GSKT
4
4.660
EA
18.64
Sequence #. 24
FSSETI0
10 FLG BOLTS ET
8
14.790
EA
118.32
Sequence#: 25
FNWR150FFGA10
10 RR 7/8 FF 150# GSKT
8
3.050
EA
24.40
Sequence ##: 26
FBSETI2
12 FLG BOLT SET
4
14.790
EA
59.16
Sequence 0: 27
FNWRISOFFGA12
12 RR 1/8 FF 150# GSKT
4
4.660
EA
18.64
Sequence M 28
MS321106OLID
TC FLG OL BFV
2
1003.870
EA
2007.74
Sequence 0! 29
QUOTED WITH HANDWHEEL
0MIMON.
Wafenaarks - Munkipal Pipe
11:51:27 SEP 212007
Reference No. B74393
Item Deecrlption
MB321106EOL12 12 FIG UL EPDX BFV W/ H/WHL
Sequence * 34
AFC2520MMLAOL 20 MJ RW DI OL GATE VLV L/A
Sequence #: 35
AFC2816MMLAOL 16 MJ RW DI OL GATE VLV L/A
Sequence #: 36
MUN562S 562.5 ADJ VLV BX WATER
Sequence #: 37
FERGUSON ENTERPRISES, INC.
FERGUSON WATERWORKS
Price 6luotalion
Phone.- 210-662-4902
fax :210-662-4625
Page # 3
C mantity Net Price UM Total
1 1129.940
EA
1129,94
1 7923.291)
EA
792129
1 4143.780
EA
4143.78
2 58.570
EA
117.14
Resolution No. 2008-R0022
Capital Project Number:
Capital Project Name:
Capital Project
Project Cost Detail
New Project
92115
Airport Industrial Area Water
Improvements
Original Project Appropriation Amount
Property Acquisition
Design Cost
Construction (Brown-Mckee Contract)
Construction (Change Order #1 - Brown McKee)
Construction (Change Order #2 - Brown McKee)
Permits, Surveys, etc.
Other: Inspection and Testing
Other: potential construction conflicts
Other:
Total Remaining Appropriation
Cost
$ 3,691,081
(50,000)
(1,486,736)
(36.357)
(36,960)
$ 2,081,028