RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Glenridge Addition Lot 265 (Replat), made
arrangements with Commercial Concrete Construction Company for the construc-
tion of paving improvements on certain street dedicated in said subdivision
under the provisions of said Ordinance prior to the recording of the sub-
division plat of Glenridge Addition Lot 265 (Replat) including the following
street:
South property owner's part of 50th Street from its intersection with the
West Property Line of Lot 265(Replat) Glenridge Addition to its intersection
with the East Property Line of Lot 265 (Replat) Glenridge Addition, known
and designated as new Subdivision Unit Number 2015-98.
AND WHEREAS, the construction of the above improvements on the above -
mentioned street was performed under the supervision of the City Engineer,
and sakd improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the city's portion of the cost and to
release escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 27th DAY OF SEPTEMBER, 1973
Morris W. Turner, Mayor
ATTEST: APPRO ED :
J aAz
Lavenia 'Lowe, City 5ecretary Wilf rd Watson,City Engine r
.]F
CONSOLIDATED FINAL ESTIMATE
Glenridge Addition
Lot 265 (Replat)
Accepted September 27, 1973
QUANTI TI ES
S.Y. L.F. S.Y. S.Y. S.Y. L.F.
., Unit Paving C & G Alley Valley Re-sur- Reinforced
Sub -Unit Location 9"Base Return Gutter facing C & G
NS 2015 -98 South 2 of 50th 308.78 174.64 26.38 17.38 60.78 70.8
Street from NW
Corner of Lot
265 to NE Corner
of Lot 265
GLENRIDGE ADDITION
COST ESTIMATE
598.16
S.Y.
Paving 9" Base
$2.95
$ 910.90
174.64
L.F.
Curb & Gutter
$2.35
410.40
708
L.F.
Reinforced Curb & Gutter
$2.85
201.78
26.38
S.Y.
Alley Return
$8.25
217.64
17.38
S.Y.
Valley Gutter
$8.25
143.39
60.78
S.Y.
Resurface
$1.48
89.95
CONTRACT COST $1,974.06
COST DISTRIBUTION
Property
Unit Contract Owner
Sub -Unit Cost Cost
NS-2015-98 $1,974.06 $1 ,974.06