6,'\4� RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock be and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Lease Agreement
in favor of the FEDERAL AVIATION AUTHORITY for Air Traffic Control tower
space at Lubbock Regional Airport, attached herewith which shall be spread upon
the minutes of the Council and as spread upon the minutes of this Council shall
constitute and be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this 14th day of September , 1972.
MORRIS W. TURNER, MAYOR
ATTEST;
vp
Lavenia Lowe, CitySecretary-Treasurer
APPROVED AS TO FORM;
Fred O. Senter, Jr., City,
CHANGE ORDER NO. 3
Runway and Taxiway Improvements
Lubbock Regional Airport
Lubbock, Texas
ADAP Project No. 8-48-0138-01
TO: L. H. LACY COMPANY
P. 0. Box 20297
Dallas, Texas 75220
General Description of Work Included in Contract: Construct approximately,
220,000 square yards of rigid pavement on new and reconstructed taxiways, con-
struct service road and driveways, install medium intensity taxiway lighting,
install high intensity lighting on NIS Runway, construct drainage structures,
and other related items of work.
Original Amount of Contract . . . . . . . . . $ 4,688,732.10
Change Order No. 1 . . . . . . . . . . . . . . (Add) 30,000.00
Change Order No. 2 . . . . . . . . . . . . . . (Add) 8,725.00
Change Order No. 3 . . . . . . . . . . .(No Change ) - -0-
Adjusted Contract Price . . . . . . . . . . $ 4,727,457.10
Adjustment in Construction Time . . . . None
WHEREAS, it is desirable to make changes in the materials used in the
Cement -Treated Subgrade and the Soil -Cement Subbase Course to be constructed
under this project:
THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage
gained, the Owner and the Contractor agree to the following changes:
1. Modify the specifications set forth in Section 3 of the Contract
Documents for Cement -Treated Subgrade, FAA Item P-155 (Modified), to
permit lime treatment of this subgrade. Lime -Treated Subgrade shall
be constructed in accordance with ITEM P-155 LIME -TREATED SUBGRADE of
the "Standard Specifications for Construction of Airports", published
by the Department of Transportation, Federal Aviation Administration,
Washington, D.C., dated May 1968,,with the following modifications:
(a) Hydrated lime as specified in paragraph 155-2.1 shall be used
for treatment.
(b) Lime shall be applied at a rate to be determined by the Engineer.
(c) The entire thickness of the treated subgrade shall be compacted
to a density of at least 95% of maximum density at optimum
moisture, as determined by compaction control tests in Item
T-611, given in the Appendix of the Contract Documents.
CHANGE ORDER NO. 3
Page 1 of .3
There shall be no change in the contract unit prices for the items
of work affected by this substitution of lime for cement. The
contract unit price per barrel for cement used in the subgrade
s
shall aptly to an equal weight of lime.
2. Modify the specifications set forth in Section 4 of the Contract
Documents for Soil -Cement Subbase Course, FAA Item P-301, to allow
• the Contractor to obtain the soil for the subbase from areas off
the airport site instead of from cut or borrow areas on the
airport.
Paragraph 4-2.3 Soil, of the Contract Documents shall be revised ,
to read as follows:
"4-2.3 Soil
The soil shall consist of an approved select soil.
The soil shall be free of roots, sod, weeds, and shall not
contain gravel or stone retained on a 2-inch sieve or'more
than 45% retained on a No. 4 sieve, as determined by AASHO
T 27. Soil used in soil -cement subbase shall be obtained
from cut or borrow areas on the airport, or from other
approved sources."
The soil -cement mixture shall meet the requirements specified
in Paragraph 4-3 of the Contract Documents. Payment for soil used
in soil -cement shall be as specified in Section 4 of the Contract
Documents. There shall be no change in the contract unit prices
for items of work affected by this revision.
The aforementioned changes, and work affected thereby, are subject to
all contract stipulations and covenants.
The Owner and the Contractor agree that there will not be an adjustment
to the time allowed for completion of the project for the above -listed changes.
CHANGE ORDER NO. 3
Page 2 of 3
IN WITNESS WHEREOF, the Owner and the Contractor have hereto set their
hands this the 14th day of September 1972.
------------------------------------------
RECOMMENDED: PARKHILL, SMITH & COOPER, INC., Consulting Engineers
By , , 1972
APPROVED: L. H', LACY COMPANY, Contractor
By 1972
APPROVED: CITY OF LUBBOCK, TEXAS, Owner
By � Mayor � 1972
Morris urner
ATTEST
City Secretary Treasurer
APPROVED: FEDERAL AVIATION ADMINISTRATION
Chief,
By Airports Branch , 1972
CHANGE ORDER NO. 3
Page 3 of 3