RESOLUTION
/Z/�1?d c
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock be and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock an addendum to the
Engineering Service Contract entered into between the City of Lubbock and Quinton
T. Colwell and Associates, Inc., for services for Lubbock Power and Light,
attached herewith which shall be spread upon the minutes of the Council and as
spread upon the minutes of this Council shall constitute and be a part of this Res-
olution as if fully copied herein in detail.
Passed by the City Council this 17
ATTEST -
Lav(ania Lowe, Ci .Secretary -Treasurer
APPROVED AS -TO FORM:
. Senter, Jr., Citylktffirney
ADDENDUM
ENGINEERING SERVICE CONTRACT
September 11•, 1969
SCOPE
1 69 KV Transmission Line
Ahproxiimitoly 5 milen as necessary to tir, existing
loop into Chalker Substation. Kn9ine(!rinq Design,
PI. -in h Profile Sheets, Staking and Inspection.
Recommend-itions and plats as necessary for ROW
acquisition. Owner to provide ROW.
2. Holly Plant
a. Study & Layout
Study of facilities.to tie new gas turbine from
generator terminals into existing Holly Bus and to
connect existing bus into new transmission line,
with rearrangement of facilities as necessary.,;
This layout will include immediate needs and
probable future locations and positions of
equipment. Study of relaying scheme will be joint
effort as with Chalker Substation. 3
b. Specifications of Equipment
Specifications of underground cable from gas turbine! i
generator to transformer, foundation Plans for
transformer and 69 KV oil circuit bre, including; t;
Pole structure (as previously planned) for mounting }
OCB by -Pass and disconnect switches. Supervision 4
and inspection.
Note: If Study under 2,a shows that additional bus
is needed for extension of existing Holly
Switchyard, or that steel columns or stands k
will be desirable or needed; then a new c
Engineering Contract or Addendum should be
made at that time to cover the proposed
far-4 t i.tion.
COMPENSAT ION : is
The total amount of compensation due for Engineering
Services pursuant to this Addendum is as follows:
Item 1----------------------- $ 1850.00
Item 2.-------------------------------- $ 2650.00
i
To $ 4500.00,
Quinton T. Colwoll. '= Ansoo.lnc. 1=('t' "00f.11�ht'.
8y-�� isy
Date A-., 2-7. /f7a December 17, 1970 Fam a .a ,
�+h Aftarriq. s: