Loading...
HomeMy WebLinkAboutResolution - 121770C - Addendum Engineering Service Contract - Quinton T. Colwell & Associates - LP&L - 12_17_1970=I■*'lN RESOLUTION /Z/�1?d c BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock be and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an addendum to the Engineering Service Contract entered into between the City of Lubbock and Quinton T. Colwell and Associates, Inc., for services for Lubbock Power and Light, attached herewith which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Res- olution as if fully copied herein in detail. Passed by the City Council this 17 ATTEST - Lav(ania Lowe, Ci .Secretary -Treasurer APPROVED AS -TO FORM: . Senter, Jr., Citylktffirney ADDENDUM ENGINEERING SERVICE CONTRACT September 11•, 1969 SCOPE 1 69 KV Transmission Line Ahproxiimitoly 5 milen as necessary to tir, existing loop into Chalker Substation. Kn9ine(!rinq Design, PI. -in h Profile Sheets, Staking and Inspection. Recommend-itions and plats as necessary for ROW acquisition. Owner to provide ROW. 2. Holly Plant a. Study & Layout Study of facilities.to tie new gas turbine from generator terminals into existing Holly Bus and to connect existing bus into new transmission line, with rearrangement of facilities as necessary.,; This layout will include immediate needs and probable future locations and positions of equipment. Study of relaying scheme will be joint effort as with Chalker Substation. 3 b. Specifications of Equipment Specifications of underground cable from gas turbine! i generator to transformer, foundation Plans for transformer and 69 KV oil circuit bre, including; t; Pole structure (as previously planned) for mounting } OCB by -Pass and disconnect switches. Supervision 4 and inspection. Note: If Study under 2,a shows that additional bus is needed for extension of existing Holly Switchyard, or that steel columns or stands k will be desirable or needed; then a new c Engineering Contract or Addendum should be made at that time to cover the proposed far-4 t i.tion. COMPENSAT ION : is The total amount of compensation due for Engineering Services pursuant to this Addendum is as follows: Item 1----------------------- $ 1850.00 Item 2.-------------------------------- $ 2650.00 i To $ 4500.00, Quinton T. Colwoll. '= Ansoo.lnc. 1=('t' "00f.11�ht'. 8y-�� isy Date A-., 2-7. /f7a December 17, 1970 Fam a .a , �+h Aftarriq. s: