RESOLUTION
RESOLUTION APPROVING AND ADOPTING ESTIMATE OF THE COST OF IMPROVEMENTS,,
4, OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS IN THE NATURE OF GRADING, LAYING
CURB AND GUTTER AND PAVING PORTIONS OF CERTAIN STREETS, HIGHWAYS, AVENUES AND/OR
ALLEYS IN THE CITY OF LUBBOCK, TEXAS AND CERTAIN STREETS AND HIGHWAYS, AVENUES
AND/OR ALLEYS ALONG THE BOUNDARY OF SAID CITY, SAID IMPROVEMENTS BEING DESIGNATED
AS GWO No. 2993, FIXING THE TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING
PROPERTY. RAILWAYS, OR RAILWAY COMPANIES USING, OCCUPYING OR CROSSING ANY PORTION
OF STREETS AND/OR ALLEYS AND OTHER PERSONS INTERESTED IN SAID PROPERTY AND'DI-
RECTING THE CITY SECRETARY TO PUBLISH NOTICE ON BEHALF OF THE GOVERNING BODY OF
THE CITY OF LUBBOCK, TEXAS.
WHEREAS, the Governing Body of the City of Lubbock has heretofore ordered
that portions of streets, highways, avenues and/or alleys be improved by grading,
installing concrete curb and gutter, reinforced concrete five (5) inch thick alley
pavement, reinforced concrete railroad crossings and street pavement with caliche
base and five (5) course asphalt surface together with incidentals and appurte-
nances and arrangements therefore have been made and entered into by the City of
Lubbock, Texas with Kerr Construction Company, Contractor, on GWO 2993, streets,
and T. J. Hodges, Inc., on GWO 2993, alleys.
WHEREAS, the Governing Body of the City of Lubbock has caused the City
Engineer to prepare and file estimates of the cost of such improvements and
estimates of the amounts per front foot to be assessed against abutting property
and the owners thereof, and Railways or Railway Companies using, occupying or
crossing any portion of streets and/or alleys, and such estimates have been
prepared and examined;
THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK, TEXAS
I.
Such estimates be and they are hereby adopted and approved.
II.
NOTICE
TO THE OWNERS OF PROPERTY ABUTTING UPON THE HEREINBELOW MENTIONED PORTIONS
OF STREETS, HIGHWAYS,AVENUES AND/OR ALLEYS, RAILWAYS AND/OR RAILWAY COMPANIES
USING, OCCUPYING OR CROSSING ANY PORTION OF STREETS AND/OR ALLEYS AND TO ALL OTHE
AFFECTED:
The Governing Body of the City of Lubbock has heretofore ordered that the
following portions of streets, highways, avenues and/or alleys in and along the
boundary of the said City of Lubbock, Texas, be improved by raising, grading
and filling and installing concrete curbs and gutters, reinforced concrete five (5
inch thick alley pavement, reinforced concrete railroad crossings and street pave-
ment with caliche base, five (5) course asphalt' surface, storm sewers and drains
where necessary on streets, highways, avenues and/or alleys, designated below:
It is hereby found and determined that the cost of the improvements on
such portions of said streets, avenues, highways and/or alleys with the amount or
amounts per front foot proposed to be assessed for such improvements against the
abutting property, the owners thereof, on the portions of said streets, avenues,
highways and/or alleys and railways and/or railway companies, using, occupying or
crossing any portion of said streets, avenues, highways and/or alleys as follows,
to -wit:
The following thirty (30) foot width street is known and designated as
Unit Number 2207, Sub -Unit 1; the total estimated cost of the improvements is
$4,078.25; the estimated amount per front foot to be assessed against the
abutting property and the owners thereof for property owner curb and gutter is
$2.5725; the estimated amount per front foot to be assessed against the
abutting property and the owners thereof for improvements exclusive of property
owner curb and gutter is $4.3280542 for front abutting property and $2.8853694
for side abutting property;
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, Geneva Avenue from 2nd Street to 2nd Place, the estimated
cost of Sub -Unit 1 of Unit 2207 is $4,078.25.
The following thirty-six (36) foot width streets are known and designated
as Unit Number 2208, Sub -Unit 1 through 13, 15 thru 30 (inclusive), the
total estimated cost of the improvements is $254,995.59; the estimated amount
per front foot to be assessed against the abutting property and the owners thereo
for curb and gutter is $2.5725; the estimated amount per front foot to be
assessed against the abutting property and the owners thereof for improvements
exclusive of property owner curb and gutter is $5.9907808 for front abutting and
$3.9938539 for side abutting property.
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, East Stanford Street from North Ash Avenue.to North Cedar
Avenue, the estimated cost of Sub -Unit 1 of Unit 2208 is $13,233.64.
Sub -Unit 2, East Stanford Street from North Cedar Avenue to North Elm
Avenue, the estimated cost of Sub -Unit 2 of Unit 2208 is $11,381.74.
Sub -Unit 3, East Stanford Street from North Elm Avenue to North Globe
Avenue, the estimated cost of Sub -Unit 3 of Unit 2208 is $11,381.74.
Sub -Unit 4, East Stanford Street from North Globe Avenue to North Ivory
Avenue, the estimated cost of'Sub-Unit 4 of Unit 2208 is $11,381.74.
Sub -Unit 5, East Stanford Street from North Ivory Avenue to North King
Avenue, the estimated cost of Sub -Unit 5 of Unit 2208 is $11,381.74.
Sub -Unit 6, East Stanford Street from North King Avenue to North Magnolia
Avenue, the estimated cost of Sub -Unit 6 of Unit 2208 is $11,381.74.
Sub -Unit 7, East Stanford Street from North Magnolia Avenue to North
Oak Avenue, the estimated cost of Sub -Unit 7 0£ Unit 2208 is $11,381.74.
Sub -Unit 8, East Stanford Street from North Oak Avenue to North Quirt
Avenue, the estimated cost of Sub -Unit 8 of Unit 2208 is $8,910.59.
Sub -Unit 9, 46th Street from Avenue D to Avenue A, the estimated cost of
Sub -Unit 9 of Unit 2208 is $26,457.44.
Sub -Unit 10, 48th Street from Avenue D to Avenue C, the estimated cost
of Sub -Unit 10 of Unit 2208 is $5,460.24.
Sub -Unit 11, 80th Street from the alley West of Avenue F to Avenue F,
the estimated cost of Sub -Unit 11 of Unit 2208 is $7,888.58.
Sub -Unit 12, 80th Street from Avenue F to Avenue D, the estimated cost
of Sub -Unit 12 of Unit 2208 is $11,381.74.
Sub -Unit 13, 80th Street from Avenue D to Avenue B, the estimated cost of
Sub -Unit 13 of Unit 2208 is $11,381.74.
Sub -Unit 15, 61st Street from Hartford Avenue to 50 feet East of Geneva
Avenue, the estimated cost of Sub -Unit 15 of Unit 2208 is $3,101.40.
Sub -Unit 16, Geneva Avenue from 61st Street to 62nd Street, the
estimated cost of Sub -Unit 16 of Unit 2208 is $3,401.66.
Sub -Unit 17, 22nd Street from Kewanee Avenue to Juneau Avenue, the
estimated cost of Sub -Unit 17 of Unit 2208 is $10,589.14.
Sub -Unit 18, 22nd Street from LaSalle Avenue to Kewanee Avenue, the
estimated cost of Sub -Unit 18 of Unit 2208 is $7,392.15.
Sub -Unit 19, LaSalle Avenue from 21st Street to 22nd Street, the
estimated cost of Sub -Unit 19 of Unit 2208 is $5,524.12.
Sub -Unit 20, LaSalle Avenue from 20th Street to 21st Street, the
estimated cost of Sub -Unit 20 of Unit 2208 is $6,204.84.
Sub -Unit 21, 20th Street from LaSalle Avenue to Kewanee Avenue, the
estimated cost of Sub -Unit 21 of Unit 2208 is $6,559.54.
Sub -Unit 22, Peoria Avenue from 16th Street to the alley North of 16th
Street, the estimated cost of Sub -Unit 22 of Unit 2208 is $2,237.60.
Sub -Unit 23, 7th Street from Vicksburg Avenue to Toledo Avenue, the
estimated cost of Sub -Unit 23 of Unit 2208 is $19,755.95.
Sub -Unit 24, East 47th Street from Quirt Avenue to Teak Avenue, the
estimated cost of Sub -Unit 24 of Unit 2208 is $8,590.31.
Sub -Unit 25, East 47th Street from Teak Avenue to Ute Avenue, the
estimated cost of Sub -Unit 25 of Unit 2208 is $8,651.05.
Sub -Unit 26, Avenue S from 42nd Street to 43rd Street, the estimated
cost of Sub -Unit 26 of Unit 2208 is $5,355.46.
Sub -Unit 27, Avenue S from 44th Street to 45th Street, the estimated
cost of Sub -Unit 27 of Unit 2208 is $4,809.14.
Sub -Unit 28, Avenue W from Loop 289 to 103.5 feet South of Loop 289, the
estimated cost of Sub -Unit 28 of Unit 2208 is $2,118.73.
Sub -Unit 29, Avenue W from the alley North of 74th Street to 100 feet
South of 74th Street, the estimated cost of Sub -Unit 29 of Unit 2208
is $3,699.42.
Sub -Unit 30, Cypress Road from 63.28 feet South of the South Curb Line
of Bradley Street to 61.68 feet South of the South Lot Line of Lot 7,
Block 1, Oldham's Mesa Addition, the estimated cost of Sub -Unit 30 of Unit 2208
is $4,158.48.
The following forty (40) foot width street is known and designated as
Unit Number 2209, Sub -Unit 1; the total estimated cost of the improvements is
$12,220.68; the estimated amount to be assessed against the Railway Crossing
and the Railway Company for the reinforced concrete railway crossing to be
constructed between the rails and two feet on each side thereof is $8,057.02 for
Sub -Unit 1.
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, 23rd Street from Avenue G to Avenue F, the estimated cost of
Sub -Unit 1 of Unit 2209 is $12,220.68.
The following forty-two (42) foot width streets are known and designated
as Unit Number 2210, Sub -Unit 1 and 3 through 4 (inclusive); the total estimated
cost of the improvements is $41,898.55; the estimated amount per front foot to be
assessed against the abutting property and the owners thereof for curb and gutter
is $2.5725; the estimated amount per front foot to be assessed against the
abutting property and the owners thereof for improvements exclusive of property
owner curb and gutter is $5.5382044 for front abutting property in residential
zones; $3.6921362 for side abutting property in residential zones and
$6.5318255 for business zones.
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, 58th Street from Avenue Q South Drive to Avenue H, the
estimated cost of Sub -Unit 1 of Unit 2210 is $17,595.45.
Sub -Unit 3, 66th Street from Salem Avenue to Quaker Avenue, the estimated
cost of Sub -Unit 3 of Unit 2210 is $12,314.82.
Sub -Unit 4, 66th Street from Toledo Avenue to Salem Avenue, the estimated
cost of Sub -Unit 4 of Unit 2210 is $11,988.28.
The following forty-eight (48) foot width street is known and designated
as Unit Number 2211, Sub -Unit 1; the total estimated cost of the improvements is
$9,991.57; the estimated amount per front foot to be assessed against the
abutting property and the owners thereof for curb and gutter is $2.5725; the
estimated amount per front foot to be assessed against the abutting property and
the owners thereof for improvements exclusive of curb and gutter is $5.2477426
for front abutting property in residential zones and $3.4984950 for side
abutting property in residential zones and $7.2014122 for business zones.
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, Elm Avenue from Broadway to East 14th Street, the estimated
cost of Sub -Unit 1 of Unit 2211 is $9,991.57.
The following fifty-two (52) foot width streets are known and designated
as Unit Number 2212, Sub -Unit 1 through 5 (inclusive); the total estimated cost
of the improvements is $94,243.90; the estimated amount per front foot to be
assessed against the abutting property and the owners thereof for curb and gutter
is $2.5725; the estimated amount per front foot to be assessed against the
abutting property and the owners thereof for improvements exclusive of property
owner curb and gutter is $5.5749178 for front abutting property in residential
zones and $3.7166118 for side abutting property in residential zones; and
$8.1889800 for business zones; the estimated amount to be assessed against the
railway crossing and the railway company for the reinforced concrete railway
crossing to be constructed between the rails and two feet on each side thereof
is $4,356.23 for Sub -Unit 4.
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, East 14th Street from Date Avenue to 400 feet East of Elm
Avenue, the estimated cost of Sub -Unit 1 of Unit 2212 is $21,344.88.
Sub -Unit 2, Ivory Avenue from East 50th Street to East 52nd Street, the
estimated cost of Sub -Unit 2 of Unit 2212 is $12,675.39.
4
Sub -Unit 3, East 52nd Street from Ivory Avenue too King Avenue, the
estimated cost of Sub -Unit 3 of Unit 2212 is $14,827.321
Sub -Unit 4, North Avenue T from Harvard Street to Marshall Street, the
estimated cost of Sub -Unit 4 of Unit 2212 is $35,657.09.
Sub -Unit 5, Harvard Street from North Avenue U to North Avenue T, the
estimated cost of Sub -Unit 5 of Unit 2212 is $9,739.22.
The following ninety (90) foot width street is known and designated as
Unit Number 2213, Sub -Unit 1 the total estimated cost of the improvements is
$21,938.00; the estimated amount per front foot to be assessed against the
abutting property and the owners thereof for curb and gutter is $2.5725; the
estimated amount per front foot to be assessed against the abutting property and
the owners thereof for improvements exclusive of curb and gutter is _$5,19747.64_1
front abutting property in residential zones and $3.4649842 for side abutting
property in residential zones and $9.8081076 for business zones:
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, the East 1/2 of Indiana Avenue from 62nd Street to 66th Street,
the estimated cost of Sub -Unit 1 of Unit 2213 is $21,938.00.
For the following ten (10) foot wide alleys known and designated as Unit
Number A-400, Sub -Unit 1 through 5 and 7 through 21 (inclusive); the total
estimated cost of the improvements is $122,696.49; the estimated amount per front
foot to be assessed against the abutting property, other than that used for
single family or two family residential purposes, and the owners thereof for the
improvements is $4.3538351; the amount to be assessed against the abutting
property used for two family residential purposes and the owners thereof and for
property used for single family purposes (where the property on both sides of the
alley is used for residential purposes) and the owners thereof is $2.4187973.
For abutting property used for single family residential purposes where
the property on the other side of the alley is used for other than residential
purposes, it has been found that the increased property value is not as large as
the improvement cost, therefore no assessment will be made against this property
and the owners thereof.
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, the north -south alley west of Waco Avenue from Auburn Street
to 1st Street, the estimated cost of Sub -Unit 1 of Unit A-400 is $5,664.89.
Sub -Unit 2, the north -south alley between Avenue T and Sherman Avenue from
3rd Street to the east -west alley north of 4th Street, the estimated cost of
Sub -Unit 2 of Unit A-400 is $4,476.82.
Sub -Unit 3, the east -west alley between Broadway and Main Street from
Avenue V to Avenue U, the estimated cost of Sub -Unit 3 of Unit A-400 is
$6,060.56.
Sub -Unit 4, the north -south and east -west alley between Avenue Q and
Paris Avenue from 3rd Street south and east to Paris Avenue, the estimated cost
of Sub -Unit 4 of Unit A-400 is $5,276.28.
Sub -Unit 5, the north -south alley between Avenue R and Avenue S from Main
Street to Broadway, the estimated cost of Sub -Unit 5 of Unit A-400 is $3,454.12.
Sub -Unit 7, the east -west alley between 33rd Street and 34th Street from
Avenue S to 300' east of Avenue S, the estimated cost of Sub -Unit 7 of Unit A-400
is $3,030.24.
Sub -Unit 8, the east -west alley between 38th Street and 39th Street from
Avenue Q to 145' west of Avenue Q, the estimated cost of Sub -Unit 8 of Unit A-400
is $1,555.51.
Sub -Unit 9, the east -west alley between 28th Street and 29th Street from
University Avenue to Akron Avenue, the estimated cost of Sub -Unit 9 of Unit A-400
is $4,870.00.
Sub -Unit 10, the east -west alley between 42nd Street and 43rd Street from
Boston Avenue to 125' east of Boston Avenue, the estimated cost of Sub -Unit 10
of Unit A-400 is $1,174.80.
Sub -Unit 11, the east -west alley between 59th Street and 60th Street from
Gary Avenue to Elgin Avenue, the estimated cost of Sub -Unit 11 of Unit A-400 is
$11,560.87.
Sub -Unit 12, the north -south, east -west alley between Lynnhaven Drive and
Louisville Drive from Memphis Avenue to Louisville Drive and from the east -west
alley south of 61st Street to 62nd Drive, the estimated cost of Sub -Unit 12 of
Unit A-400 is $14,443.04.
Sub -Unit 13, the east -west alley between 44th Street and 45th Street from
Indiana Avenue to Hartford Avenue, the estimated cost of Sub -Unit 13 of Unit
A-400 is $5,479.17.
Sub -Unit 14, the east -west alley between 24th Street and 25th Street from
Flint Avenue to Elgin Avenue, the estimated cost of Sub -Unit 14 of Unit A-400 is
$5,869.82.
Sub -Unit 15, the east -west alley between 21st Street and 22nd Street from
Flint Avenue to Elgin Avenue, the estimated cost of Sub -Unit 15 of Unit A-400 is
$6,024.44.
Sub -Unit 16, the east -west alley between 15th Street and 16th Street from
Utica Avenue to Toledo Avenue, the estimated cost of Sub -Unit 16 of Unit A-400 is
$4,422.39.
Sub -Unit 17, the east -west alley between 45th Street and 46th Street from
Hartford Avenue to Gary Avenue, the estimated cost of Sub -Unit 17 of Unit A-400
is $5,664.89.
Sub -Unit 18, the east -west alley between 33rd Street and 34th Street from
University Avenue to Avenue X, the estimated cost of Sub -Unit 18 of Unit A-400 is
$8,764.83.
FM
Sub -Unit 19, the east -west alley between 26th Street and 27th Street from
Boston Avenue to Akron Avenue, the estimated cost of Sub -Unit 19 of Unit A-400 is
$7,538.15.
Sub -Unit 20, the east -west alley between 49th Street and 50th Street from
Salem Avenue to Quaker Avenue, the estimated cost of Sub -Unit 20 of Unit A-400 is
$11,654.73.
Sub -Unit 21, the east -west alley between 34th Street and 35th Street from
Nashville Avenue to Memphis Avenue, the estimated cost of Sub -Unit 21 of Unit
A-400 is $5,710.94.
And arrangement for the making and construction of such improvements with
pavement of five course asphalt surface treatment (Inverted Penetration Type) and
a six (6) and nine (9) inch compacted caliche base in streets, highways and
avenues, alleys to be constructed with pavement of five (5) inch reinforced
concrete slab has been made and entered into by the City of Lubbock, Texas, and
rolls or statements showing the proposed amounts to be assessed against the
abutting1property, the owners thereof and the Railways and/or Railway Companies,
using occupying or crossing any portion of said streets or alleys, their rails,
tracks, double tracks, turnouts and switches and two (2) feet on each side there-
of for reinforced concrete street crossings and reinforced concrete alley slabs
in said streets or alleys have been filed with the City, such rolls or statements
showing other matters and things, and have been approved and the City Council of
said City has fixed a time and place for hearing to the owners of property
abutting upon said portions of streets, highways, avenues and/or alley and
Railways or Railway Companies using, occupying or crossing any portion of said
streets or alleys, and to all others affected, at which hearing the amounts to be
assessed against the respective parcels of abutting land and the owners thereof
for improvements in the units upon which the particular parcels of property abut,
the amounts of benefits to the respective parcels of property by means of the
improvements in the unit upon which the particular property abuts, the regularity
of the proceedings with reference to such improvements, the apportionment of the
cost of such improvements, and other matters and things will be determined, and
after such hearings assessments will by ordinance be made and levied, and such
hearing will be had and held by and before the City Council of the City of Lubbocl
Texas, in regular Council Meeting Room in the City Hall, in the City of Lubbock,
Texas on the loth day of June 1970, at 10:00 a.m. o'clock. The rolls or state-
ments showing the proposed amounts of such assessments are on file in the
office of the City Secretary and copies thereof are in the office of the City
Engineer of the City of Lubbock and open to inspection of any interested parties
at any time, and of all said matters and things all such owners of property,
as well as any and others in anywise affected or interested, will take due notice,
By order of the City Council of the City of Lubbock, this the 23rd day of
April, 1970.
No notice other than that herein provided for shall be necessary and such
notice shall be due and sufficient notice to any and all persons, firms, corpora-
tions and other parties.
That a hearing be given and held by and before the Governing Body of the
City of Lubbock, Texas, to all persons owning or claiming any property abutting
any part or portion of said streets, highways, avenues and/or alleys or any
Railway or Railway Company using, occupying or crossing any street, avenue or
alley described in Section II, of this Resolution, as well as all owning or claim-
ing any interest in any such property. Such hearing shall be given and held on the
10th day of June, 1970, at 10:00 a.m. o'clock on the second floor in the City Hall,
City of Lubbock, Texas and the City Secretary is hereby directed to give notice
of the time and place of such hearing, and of other matters and facts in accordance
with the terms and provisions of an Act passed at the first called session of the
40th Legislature of the State of Texas and known as Chapter 106 of the Acts of said
Legislature which has been adopted as an amendment to and made a part of the Charte
of the City of Lubbock, Texas, and as amended by Chapter 176 Acts of the 60th
Regular Session of said Legislature. Such notice shall be by advertisement
inserted at least three times in a newspaper published in the City of Lubbock,
Texas; the first publication shall be made at least twenty-one days before the
said hearing; and, additional written notice of the hearing shall be given by
depositing in the United States mail, at least fourteen (14) days before the date
of the hearing, written notice of such hearing, postage prepaid, in an envelope
addressed to the owners of the respective properties abutting such highway,
highways or portion or portions hereof and any railway or street railway using,
occupying or crossing any highway, portion or portions thereof to be improved,
as the names of such owners are shown on the then current rendered tax rolls of the
City of Lubbock and at the addresses so shown, or if the names of such respective
owners do not appear on such rendered tax rolls, then addressed to such owners as
their names are shown on the current unrendered rolls of the city at the addresses
shown thereon. Said notice shall comply with and be in accordance with the terms
and provisions of this resolution and said Act as ameyped.
PASSED AND APPROVED BY UNANINDUS VOTE OF THE GOV BODY OF THE CITY OF
TEXAS, THIS, THE 23RD DAY OF APRIL, 1970.
. H. Granberry, /Hlayor
ATTEST
Laven a Lowe, City Sec tary
APPROVED:
a-
Wilford Watson, City Engineer
APPE,QVED :/�
Fred 0. Senter, Jr., Attorney