Loading...
HomeMy WebLinkAboutResolution - 010870C - Street Improvements - Frank Hoges - Multiple Locations - 01_08_1970,. RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF ALLEYS AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMENTS LEVIED. WHEREAS, the City of Lubbock heretofore passed various alley improvement ordinances and resolutions and entered into contract with Frank Hodges Cement Contractor (G.W.O. 2970) for the making and construction of alley improvements on portions of numerous alleys in said City including among others the following: The East-West alley between 9th Street and loth Street from its intersection with a line 12.0 feet East of the West Property Line of Avenue S to its intersection with a line 350.0 feet West of the West Property Line of Avenue S, known and designated as Sub -Unit Number 11 of Unit Number A-396. The East-West alley between Broadway and Main Street from its intersection with the East Property Line of Avenue Q to its intersection with a line 150.0 feet West of the alley West of Avenue 0, known and designated as Sub -Unit Number 12 of Unit Number A-396. The North -South alley between Avenue Q and Avenue R from its intersection with a line 12.0 feet North of the South Property Line of 15th Street to its intersection with the North Property Line of 16th Street, known and designated as Sub -Unit Number 17 of Unit Number A-396. AND WHEREAS, the improvements upon the said portions of the abovementioned alleys have been inspected and found to have been constructed in accordance with terms of said contract (G.W.O. 2970). THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned alleys be and the same are hereby accepted, and the City Engineer be and he is hereby authorized to direct payment of the City's portion of the cost. II. That the Mayor and City Secretary be, and they are hereby instructed to execute and deliver certificates in evidence of the assessments levied against the parcels of property abutting upon the said portions of the alleys listed above and against the owners of such property in accordance with law and in the manner pro- vided in said contract, and the proceedings with reference to said improvements and assessments where such assessments were levied. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 8TH DAY C LaVenia Lowe, City -Secretary APPROVED: A)LeLs LA15!—'2� TJ7lfo'kYD. Watson, City Engineer AP COVED: Fred 0. Senter, Jr., 2 Attorney i=F== L-VBE3OGK PORTER 2-6411 BOX 2000 LUBBOCK.TEXAS 7 9 4 0 E January 8, 1970 Honorable Mayor and City Council Lubbock, Texas Gentlemen: I have examined the alley paving improvements constructed by Frank Hodges Cement Contractor, paving contractor, under his contract dated November 15, 1968, designated as G.W.O. 2970 and find the improvements on the East-West alley between 9th Street and loth Street from its intersection with a line 12.00 feet East of the West Property Line of Avenue S to its intersection with a line 350.00 feet West of the West Property Line of Avenue S, the East-West alley between Broadway and Main Street from its intersection with the East Property Line of Avenue Q to its intersection with a line 150.00 feet West of the alley West of Avenue Q and the North -South alley between Avenue Q and Avenue R from its intersection with a line 12.0 feet North of the South Property Line of 15th Street to its intersection with the North Property Line of 16th Street as listed on the final estimate and assessment sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said alleys, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due him by the City of Lubbock and issue assignable certificates against property owners for the respective amounts shown on the attached final assessment sheets as being due against them and their respective properties. Yours very ruly, s Wil d D. Watson City ngineer CONSOLIDATED FINAL ESTIMATE G.W.O. 2970 Accepted January 8, 1970 UANTITIES S.Y. Unit & L.F. Alley Sub -Unit Location C & G Return A-396-11 The E W alley between 9th St. and 36.00 405.00 loth St. from 12' E. of the WPL of Ave. S to 350' West of the West Property Line of Avenue S A-396-12 The E-W alley between Broadway and Main Street from the EPL of Avenue Q to 150' W. of the alley West of Ave. 0 A-396-17 The N-S alley between Ave. Q and Ave. R from 12' N. of the SPL of 15th St. to the NPL of 16th St. COST ESTIMATE 73.31 L.F. Curb & Gutter @ $2.00 1,240.00 S.Y. Alley Return @ $6.76 CONTRACT COST COST DISTRIBUTION 505.56 37.31 329.44 73.31 1,240.00 $ 146.62 8,382.40 $8,529.02 Property City Unit & Contract Owner to Sub -Unit Cost Cost Contractor A-396-11 2,809.80 1,809.18 1,000.62 A-396-12 3,417.59 2,539.19 878.40 A-396-17 2.301.63 2.094.82 206.81 TOTALS 8,529.02 6,443.19 2,085.83 A-30.92 Acceptance Date 1-8-70 G.W.O. 2970 FINAL PAVING ASSESSMENT THE E-W ALLEY BETWEEN 9TH & 10TH STREETS Sheet No. 1 of 1 CITY OF LUBBOCK Sub -Unit No. 11 of Width 10 Feet From 12' E. of the WPL of Ave. S to 350' W. of the WPL of Avenue S Unit No. A-396 Paving Blk. Total Owner Lots No. Addition No. Ft. Different Rate Cost NORTH SIDE Goodacre & Adams 1 and 2 28 Overton 100.00 2.115973 $ 211.60 Archie Sims 3 28 Overton 50.00 2.115973 105.80 A. L. Featherston 4 28 Overton 50.00 2.115973 105.80 Claude B. Martin 5 28 Overton 50.00 2.115973 105.80 • Henry Diebel 6 28 Overton 50.00 2.115973 105.80 R. E. Mann 7 28 Overton 50.00 3.808751 190.44 SOUTH SIDE S. R. Williams 19 and the East 45 feet of 18 28 Overton 95.00 2.115973 201.02 Sam J. Roberts* 20 and 21 28 Overton 100.00 2.115973 211.60 Marvin Armstrong 22 and the West 1/2 of 23 28 Overton 75.00 3.808751 285.66 Mrs. J. M. Hobbs 24 and the East 1/2 of 23 28 Overton 75.00 3.808751 285.66 TOTAL PROPERTY OWNER COST $ 1,809.18 CITY'S SHARE 1,141.11 TOTAL FINAL SUB UNIT COST $ 2,950.29 *City agreed to purchase paving certificates on March 27,1969,Item 16. A-30.91 Acceptance Date 1-8-70 G.W.O. 2970 FINAL PAVING ASSESSMENT E-W ALLEY BETWEEN BROADWAY & MAIN STREET Sheet No. 1 of 1 CITY OF LUBBOCK Sub -Unit No. 12 of Width 10 Feet From the EPL of Avenue Q to 150' West of the alley West of Ave. 0 Unit No. A-396 Paving Total Owner Lots Addition No.Ft. Different Rate Cost SOUTH SIDE NO ASSESSMENT 4 Neal & Alexander NO ASSESSMENT Virginia Bacon 5 and 6 Neal & Alexander 100.00 3.808751 $ 380.88 Fern Cone & Edna Parks Crawford 7 and 8 Neal & Alexander 100.00 3.808751 380.88 Ruth Wagner Laing & Helen 9 and the East 1/2 of 10 Neal & Alexander 75.00 2.115973 158.70 Willey & M. M. Laing Humble Oil & Refining Co. West 1/2 of 10 and all of 11 Neal & Alexander 125.00 3.808751 476.09 and 12 NORTH SIDE Texaco, Inc. 13 Neal & Alexander 50.OQ 3.808751 190.44 Mrs. George Clifton 14 Neal & Alexander 50.00 2.115973 105.80 F. M. Maddox 15 and 16 Neal & Alexander 100.00 2.115973 211.60 Lewis C. Ellis III 17 and the West 1/2 of 18 Neal & Alexander 75.00 2.115973 158.70 A. R. Hanna East 1/2 of 18 and all of 19 Neal & Alexander 75.00 3.808751 285.66 NO ASSESSMENT 20 Neal & Alexander NO ASSESSMENT A. E. James 21 Neal & Alexander 50.00 3.808751 190.44 TOTAL PROPERTY OWNER COST $ 2,539.19 CITY'S SHARE 1,049.28 TOTAL FINAL SUB UNIT COST $ 3,588.47 A-30.93 Acceptance Date 1-8-70 G.W.O. 2970 FINAL PAVING ASSESSMENT N-S ALLEY BETWEEN AVENUE Q & AVENUE R Sheet No. 1 of 1 CITY OF LUBBOCK Sub -Unit No. 17 of Width 10 Feet From 12' N. of the SPL of 15th Street to the NPL of 16th Street Unit No. A-396 Paving Blk. $3.808751 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost EAST SIDE J. A. Hodges Enter- North 50 feet of 1 8 Overton 50.00 $ 190.44 prises, Inc. Mrs. Ira Elliot et al South 5 feet of 1 8 Overton 5.00 19.04 American State Bank 2 8 Overton 55.00 209.48 Mrs. Ira Elliot et al 3 and the North 35 feet of 4 8 Overton 90.00 342.79 Mrs. J. A. Fortenberry South 20 feet of 4 and all of 5 8 Overton 75.00 285.66 WEST SIDE American State Bank East 1/2 of 6, 7, 8, 9 and 10 8 Overton 275.00 1,047.41 TOTAL PROPERTY OWNER COST $ 2,094.82 CITY'S SHARE 321.89 TOTAL FINAL SUB UNIT COST $ 2,416.71