HomeMy WebLinkAboutResolution - 111165K - Pavement Improvements - Kerr Construction Co - Plainsmen Addition - 11_11_1965 RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Plainsmen Addition, Lots 84-93, made arrangement
with Kerr Construction Company for the construction of paving improvements on a
certain street dedicated in said subdivision under the provisions of said Ordinance
prior to the recording of the subdivision plat of Plainsmen Addition, Lots 84-93
including the following street:
56th Street from its intersection with the East Line of Lot 28, Plainsmen Addition
to its intersection with the East Property Line of Quaker Avenue, known and
designated as New Subdivision Unit Number 1601.
AND WHEREAS, the construction of the above improvements on the above-
mentioned street was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with the
provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to release
escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 11TH DAY OF NOVEMBER, 1965.
Max Tidmore, Mayor
ATTEST*
r
La nia Lowe, City Secretary
APPR VED
`Samuel W. Wahl, City Engineer
APPROVED:
/ r
e^ Fred 0. Senter, Jr. , Ci ttorney
QZ e I
PORT IER 3 - 3 4 9 1
P , O 6 0 X 2 0 0 O
LUBBOCK . TEXAS 79408
November 11, 1965
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Kerr
Construction Company, paving contractor, under their contract with the
subdividers of Plainsmen Addition, Lots 84-93, and find the improvements
on 56th Street from 300 feet West of Peoria Avenue to Quaker Avenue as
listed on the final estimate sheet to have been completed in accordance
with the plans and specifications and recommend that you accept the
improvements on said street, authorizing payment to the contractor the
amount shown on the attached consolidated final estimate sheet as due them
by the City of Lubbock.
You s very u ,
Samuel W. Wahl
BRG:wm City Engineer
CONSOLIDATED FINAL ESTIMATE
PLAINSMEN ADDITION
LOTS 24-35 and 84-93
Accepted November 11, 1965
QUANTITIES
S.Y. S.Y. Drainage
Unit & Paving Alley Channel
Sub-Unit Location 6" Base L.F. Return Traffic
C & G Drainage Block
Channel
1601 56th Street from the east lot
line of Lot 28 Plainsmen
Addition to the East Property
Line of Quaker Ave.
Roy Jennings 1,114.08 642.47 20.00 1/2
Thomas J. Drury 1,114.09 642.47 20.00 1/2
TOTAL 2,228.17 1,284.94 40.00 1
COST ESTIMATE
2228.17 S.Y. Paving @ 1.45 $ 3,230.84
1284.94 L.F. Curb & Gutter @ $1.40 1,798.92
40.00 S.Y. Drainage Channel @ 4.50 180.00
1. Each Drainage Channel Traffic Block @
$15.00 15.00
CONTRACT COST $5,224.76
COST DISTRIBUTION
Unit & Contract Property
Sub-Unit Cost Owner Cost
NS 1601 $ 5,224.76 $ 5,224.76
Roy Jennings $ 2,612.38
Thomas J. Drury $ 2,612.38