HomeMy WebLinkAboutResolution - 010958F - Street Improvements- Elliott Taylor Paving Contractor- Marshall St., Grinnell St - 01/09/1958 RESOLUTION
RESOLUTION ACCEPTING Il•I ROVr;�MIS ON PORTIGNS OF STRE1,TS AS LISTa
ON BELOV1:
Off' WHEREAS,the City of Lubbock pagsed resolutions on August 9, 1956"
and September 12, 1957,,authorizing the cdnstruction of street improvements
by Elliott Taylor, paving contractor, on ,portions of the following streets:
Marshall Street from its intersection with a line 1 foot West of the West
Property Line of North Avenue 'IN" to ite,intersection with a line 3.4 feet
East of the East Right-of Yiay ne of the Panhandle and Santa Fe Railways
known and designated as Unit N�ber 1870.
Grinnell Street from its intersection with a line 1 foot East of the Fast
Property Line of North Avenue "N" to its intersection with the Northwest
Gutter Line of Avenue 'IQ" North Drive, known and designated as Unit Number
1894..
AND UIREREAS, the improvements upon the said portions of the above-
mentioned streets have been inspected and found to have been constructed
according to the approved plans and specifications.
'-' THEREFORE, BE IT RESOLVED BY THE CITY OF, LUBBOCK, TEXAS:
1.
That the improvements on said portions of the abovementioned
streets be, and the same are hereby accepted and the City Engineer be and he.
is hereby authorized to direct the payment of the City's share.
11.
This resolution shall take effect and be in force after its
passage.
PASSED Al,,D APPROVED THIS 9TH DAY OF JANUARY 1958.
S. S. r orrest,�Jt1, Mayor
ATTES :
!L
La enia Lowe, C y ecretary
APPROVED:
06
n T. Hickerson, City Engineer
AP .
Vaughn M. Wilson,, City Attorney
CONSOLIDATED FINAL ESTIlKATE
G.W.0. 2109
Accepted January 9, 1958
QUANTITIES
Unit Location S.Y. S.Y. Sub L.F. S.Y.
Paving grade prep. C & G Alley Ret.
1870 Marshall St; North Ave. "N" to P,& S.F. Ry, 6,652.13 7007.16 20131.69 35.1.2
1894 Grinnell St; North Ave. aN" to Ave. Q N. Dr. 1,354.07 1,566.80 765.86
TOMS 80006.20 873.96 2,897.55 35.12
COST ESTIMATE
8,006.20 S.Y. Paving @ $1.15/S.Y.
$,873.96 S.Y. Subgr. Prep. 0 $0.20/S.Y.
2,897.55 L.F. Curb & gutter Q $1.50/L.F.
35.12 S.Y. Alley Return 0 $4.00 S.Y.
COST DISTRIBUTION
Unit Contract Property City to
Cost Owner Cost Contractor Now
T870 $1.2,449.40 $12,086.21 $ 363.19
1894 _ 3,019.33 2,961.78 57.55
TOTALS $15,468.73 $15,047.99 $ 420•74
CITY OF LUBBOCK aj09S8 p
�o
ex
TEXAS
January 9, 1958
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
1 have examined the paving improvements constructed by Elliott
Taylor, paving contractor, as authorized by a resolution passed ,august 9, 1956,
and September 12,, 1957, and find the improvements on Marshall Street and
Grinnell Street as listed on the final estimate sheet to have been completed
in accordance with the plans and specifications and recommend that you accept
the improvements on said streets authorizing payment to the contractor the
amount shown on the attached consolidated final estimate sheet as due hiss by
the City of .Lubbock.
Yours'.194 very truly,
O
John T. Hickerson
City Engineer
JHS:ba