Loading...
HomeMy WebLinkAboutResolution - 092354A - Pavement Improvements - City Engineer - East 3Rd Place - 09_23_1954 ', . RWOLUT IGN Fri WHE RYAS, the City Commission has heretofore determined that the City would contribute the customary city portion of from ten (10) to forty (4.0) per cent of the cost of street paving Improvements, as determined by side and front property, 1 to be constructed in accordance with the standard City of Lubbock street plans and specifications as approved by the City Engineer, and the owners of property abutting East 3rd Street and East 3rd Place from David Avenue to Fig Avenue, have requested permission to have pavement improvements constructed on the aforemention- ed 3rd Street and 3rd Place, and the paving of said 3rd Street and 3rd Place is needed to provide access to the area during its construction period, and the City Engineer has approved the plans and specifications for such improvements, and, WHEREAS, Ray W. Pace, and the other owners of the property abutting on the herein described streets will contract separately with a competent contractor for the above street Improvements, and said improvements will be constructed in accordance with the abovementioned plans and specifications under the supervision I� of the City Engineer, and the said owners desire that the City contribute its customary share towards such paving, and, WHEREAS, the contract cost of the paving improvements will not exceed 68781.73, the total cost not over 99220.82., and the Cityte share in connection therewith would not exceed $575.53, leaving the property owner's portion not to exceed t8645.29, such costs .being well within the current prices for paving obtained by competitive bidding, and that such payment to be made by the City is reasonable fair and just to the abutting property owners, the City and all other. persons affected thereby, and that the sum of $573.55 will be duly budgeted in the , 1954-1955 budget, THEREFORE, BE IT RESOLVED BY THE CITY COMISSION OF THE CITY OF LUBBOCK: Section 1. THAT, the City Engineer be and he is hereby authorized to approve plans and specifications for paving on the streets herein described, pro- vided that such plans and specifications meet the usual requirements for paving on streets within the corporate limits of the City of Lubbock; said streets being as follows, to-wit: Unit go. 1641 East 3rd Place from EPL David Avenue to the EPL Fig Avenue Unit No. i1642 East 3rd Street from EPL David Avenue to the EPL Fig Avenue The City Engineer 1s further authorized and directed to duly inspect said paving construction on said East 3rd Street and 'East 3rd Place and to require strict compliance with the approved plans and specifications, and upon completion of said paving, and upon final approval by the City Engineer and acceptance of such improvements by the City Commission, the City Engineer is authorized to pay the ' contractor in full and final payment of the Cityts share of the cost. of the above- mentioned improvements a sum not to exceed ,613644 which is the City share $575.53 less 6439.09 engineering, leaving the amount due the contractor from the property owners not to exceed t8645.29. Section 2. This authority is conditioned that Ray W. Pace and the other owners of abutting property and the contractor will pay for all material and labor and costs incidental to such ,construction, indemnify the City of Lubboc against any costs,, claims or damages of every nature pertaining thereto, and that the Contractor furnish the City Engineer with acceptable evidence that the contractor and his sub-contractors, if any, are adequately covered by public liability and property damage insurance policies, that the said Ray W. Pace and i other owners of abutting property will cause such paving to continue to be done according to the approved plans and specifications, and that upon completion thereof and final approval of the City Engineer, all improvements designated herein shall be a permanent part of said East 3rd Street and East 3rd Place and the property of the City of Lubbock, without any liability whatsoever, except for the payment of a sum $136.44 to the contractor after December 15, 1954. On motion of Commissioner Forrest , seconded by Commissioner Carpenter the foregoing resolution was unanimously passed by the City Commission this,_,.?3rcLday of SSeptember , 19 . f u Mur 1�RPp, ATTEST: Lavenid Lowe, City gecretari I, Ray W. Pace, representing myself and the remaining owners' of abutting property on the abovementioned streets, and Kerr and Middleton, Contractor, do hereby accept and agree to filly abide by the foregoing provis Wions for he considera— tions therein stated. i RAY W. By KERR 4DDLL70N loll By ,,.. Approved: W. B. Holmes, City Engineer tugh ven . Wi on, City Attorney