Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 2022-R0197 - Amendment 2 Contract 14224 with Lee Lewis Construction 4.26.22
Resolution No. 2022-RO197 Item No. 7.32 April 26, 2022 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute and on behalf of the City of Lubbock, Amendment No. 2 to Construction Manager at F Contract No. 14224 for construction services related to three (3) police substations, by between the City of Lubbock and Lee Lewis Construction, Inc., of Lubbock, Texas, and rely documents. Said Contract is attached hereto and incorporated in this Resolution as if fully forth herein and shall be included in the minutes of the City Council. Passed by the City Council on April 26 , 2022. - "I DANIEL M. POPE, MAYOR ATTEST: G?,I, ')c Reb ca Garza, City Secre APPROVED AS TO CONTENT: Leisure, Assistant City Attorney RES.Amend 2 Contract 14224 Lee Lewis Substations 4.14.22 Resolution No. 2022-RO197 Amendment 2 To Agreement Between The City of Lubbock, TX And Lee Lewis Construction, Inc. THIS IS THE SECOND AMENDMENT TO THE AGREEMENT Contract No. 14224 dated and entered into the 12th day of February 2019 by and between the City of Lubbock ("City") and Lee Lewis Construction, Inc. ("LLCI"), of Lubbock Texas, for providing Construction Manager at Risk services for three (3) Police Department Substations, located on three (3) different city -owned properties. WITNESSETH: WHEREAS, in accordance with Article 2, Sections 2.2.1 and 2.2.8 of said agreement LLCI provided the Guaranteed Maximum Price (GMP) of seventeen million nine hundred eight thousand two hundred seventy-seven and 001100 ($17,908,277.00). WHEREAS, now the City desires to engage LLCI for the performance of an additional scope of services, details for which are provided in Exhibits "A" through "U", attached hereto and incorporated herein, additional services include, but are not limited to: construction materials testing; temporary utilities; security, communications and audio/visual systems; and electrical infrastructure. WHEREAS, all other portions of the original Agreement and previous Amendments, if any, shall remain in place and are not altered by this amendment. NOW, THEREFORE, the City and LLCI agree to the following terms in this SECOND AMENDMENT: THAT the GMP shall be increased by three hundred twenty two thousand seven hundred eleven dollars and 651100 ($322,711.65). This amendment includes an extension of ninety-nine (99) calendar days to the contract. The original Contract Amount________________________________________________________________________________ $ 17,908,277.00 The sum of all previous authorized Amendments (unchanged) ............................ $ 0.00 Net Percentage of previous Amendments +0.00% The Contract Amount prior to this Amendment____________________________________________________ $ 17,908,277.00 The Contract Amount will be (increased) by this Amendment____________________________ $ 322,711.65 Net Percentage of this Amendment +1.80% The new Contract Amount...................................................................................... $ 18,230,988.65 Total Percentage of all Amendments +1.80% IN WITNESS HEREOF, the parties have executed this Agreement as of this 26th day of April, 2022. CITY OF L B OCK DA WL NT. POPE; A4AYOR ATTEST: Rebe ca Garza, City Secret ry 3 LEE L RUCTION, INC. Ja on S ith, President APPROVED AS TO CONT NT: a �, — 1) ' r 4 - Wesley D. Ev r tt, Director of Facilities Management TX D S TO FORM: elli Leisure, Assistant City Attorney Exhibit A Lee Lewis Construction, Inc. PCCO #039R2 Lee Lewis Construction Inc. - HQ Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 7810 Orlando Avenue 1901 N. MILK Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #039R2: CCR 039R2 Storefront Admin 120 TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 12/02/2021 CREATED BY Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY. - DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT 7 days EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: To furnish and install additional storefront and window shades per CCR 039R2. ATTACHMENTS: CCR#039R2 (all 31 Add storefront door admin 120 REV 211116.pdf POTENTIAL CHANGE ORDERS IN THIS CHANCF ORDER- PCO # I Tittle Schedule Impact Amount 039R2 I CCR 039R2 Storefront Admin 120 17 days $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO # 039R2: CCR 039R2 Sterafrnnt Admin 120 # Budget Code Description Amount 1 8-400.2 ENTRANCES AND STOREFRONTS.SUBCONTRACTOR Add storefront ore $2,800.00 2 12-520.2 SHADES.SUBCONTRACTOR Add shades $1,151.06 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Cleaning and finish protection $400.00 4 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR deduct CCR 039R2 $(4,351.06) Grand Total: $0.00 The original (Contract Sum) $5,911,358.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,911,358.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,911,358.00 The contract time will be increased by this Change Order by 7 days. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 12/2/2021 12:50 PM Lee Lewis Construction, Inc. Stephen Faulk (M M Architects) City of Lubbock 2022 Broadway 1314 Avenue K 4th Floor Lubbodk, Texas 79401 Lubbock, Texas 79457 PCCO #039R2 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock, Texas 79423 NATURE DATE DATE SIONA RE DATE Lee Lewis Construction Inc. - HO Page 2 of 2 PAnted On- 1202021 12:50 PM Lee Lewis Construction, Inc. PCCO #039R2 Lee Lewis Construction Inc. - HQ Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 7810 Orlando Avenue 5910 Erskine Lubbock, TX Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #039R2: CCR 039R2 Storefront Admin 120 TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 12/02/2021 CREATED BY. Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: No Change Reason PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 7 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract TOTAL AMOUNT $0.00 DESCRIPTION: To furnish and install additional storefront and window shades per CCR 039R2. ATTACHMENTS: CCR#039R2 Call 3] Add storefront door admin 120 REV 21111_ 6"pdf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 8-410.2 ALUMINUM ENTRANCES&STOREFRONTS.SUBCONTRACTOR storefront $2,800.00 2 12-520.2 SHADES.SUBCONTRACTOR shades $1,151.06 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning and finish protection $400.00 4 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct CCR 039R2 $(4,351.06) Grand Total: $0.00 The original (Contract Sum) $5,741,888.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,741,888.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,741,888.00 The contract time will be increased by this Change Order by 7 days. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 12/2/2021 12:50 PM Lee Lewis Construction, Inc. Stephen Faulk (NWM Architects) City of Lubbock 2022 Broadway 1314 Avenue K, 4th Floor Lubbock. Texas 79401 Lubbock, Texas 79457 PCCO #039R2 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock Texas 79423 7-zo" 3(l �t' I - I !::��� NATURE DATElog of 1194 DATE SIGNA RE DATE Lee Lewis Construction Inc. - HQ Page 2 of 2 Printed On- 1212/2021 1210 PM Lee Lewis Construction, Inc. PCCO #039R2 Lee Lewis Construction Inc. - HQ Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 7810 Orlando Avenue 14005 Indiana Lubbock, TX Lubbock, Texas 79423 Phone.806-797-8400 Fax +1.806.797.1034 Prime Contract Change Order #039R2: CCR 039R2 Storefront Admin 120 TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 12/02/2021 CREATED BY. Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: DUE DATE: REVIEWED BY: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: No Change Reason PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT 7 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: TOTAL AMOUNT DESCRIPTION: To furnish and install additional storefront and window shades per CCR 039R2. ATTACHMENTS: CCR#039R2 (all 3) Add storefront_ door admin 120 REV 211116-PdF CHANGE ORDER LINE ITEMS: 1*LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 # Budget Code Description Amount 1 8-400.2 ENTRANCES AND STOREFRONTS.SUBCONTRACTOR storefront $2,800.00 2 12-520.2 SHADES.SUBCONTRACTOR shades $1,151.06 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $400.00 4 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct CCR 039R2 $(4,351.06) Grand Total: $0.00 The original (Contract Sum) $6,255,031.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $6,255,031.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $6,255,031.00 The contract time will be increased by this Change Order by 7 days. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed Ong 12/2/2021 12.50 PM Lee Lewis Construction, Inc. Stephen Faulk (MYYM Architects) City of Lubbock 2022 Broadway 1314 Avenue K 4th Floor Lubbock, Texas 79401 Lubbock, Texas 79457 PCCO #039R2 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock. Texas 79423 ZIT -W"A- PD '4' V-0 NATtlRE DATE DASIGNA RE DATE Lee Lewis Construction Inc. - HQ Page 2 of 2 Printed On- 12=021 12:50 PM LUBBOCK GLASS & MIRROR QUOTED TO: LEE LEWIS CONSTRUCTION PO BOX 65197 LUBBOCK, TX 79464 1 I CCR#039R2 INCLUDES: PROJECT NAME: POLICE STATION'S CCR#039R2 LUBBOCK, TX Plans Dated: -NEW STOREFRONT WITH 114 INCH CLEAR TEMPERED GLAZING(NO DOORS) -COLOR TO MATCH EXISTING -CAULKING OF FRAME INSIDE AND OUT "PLEASE NOTE THIS PRICE IS PER STATION" PROPOSAL PROPOSAL# 4715 Proposal Date: 11/16 2021 BID BY: VINCE G. VALID UNTIL 1211l2021 "ALSO THIS PRICE IS ONLY GOOD FOR 15 DAYS. AFTER THAT INCREASES WILL APPLY IF A DECISION IS NOT MADE." Subtotal 2,800.00 $2,800.00 Sales Tax (8.25%) 1 EXEMPT I Total Phone:806-745-9336 vince@lubbockglass.com $2,800.00 ANDERSON CUSTOM L�BoCK IX7AVE. � 200 WINDOW COVERINGS INC. Phone:806-687-3225 Fax 806-687-3157 accustomwindowcoverings@gmail.com www.andersoncustomwindowcoverings.com CHANGE ORDER PROPOSAL Date:11/18/2021 General Contractor: Lee Lewis Construction Inc. Project Name: Lubbock Police SubStation South City/State: Lubbock, Texas Attn: Clayton Brake Qty Description Total 2 MechoShade Single Manual Roller Shades +$1,151.06 Includes Measure and Installation Original Project Total $18,931.00 Change Order Addition CCO #001-Approved 7/16/2021 $640.37 Change Request #039R2 $1,151.06 [Project Total With Change Orders $20,722A3 Thank You For YourBusiness We Appreciate You!!! MATTHEW 22:37 JESUS REPLIED: "LOVE THE LORD YOUR GOD WITH ALL YOUR HEART AND WITH ALL YOUR SOUL AND WITH ALL YOUR MIND" MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects WM architects CCR#039R2CHANGE REQUEST #039R2 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 11-16-2021 Re: City of Lubbock — East, North and South Police Substation MWM ARCHITECT'S Project No. 18018 Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: Please provide pricing to add an Interior Storefront system and manual Roller Shades to secure Admin Assistant 120 BASED ON THE ATTACHED REVISON Submitted by. Stephen Drewell Attachments- Dewberry written description; A101,A102,A140,A200,A353,A801,A1000 Contractors Response: ❑Add to / ❑Deduct From Contract Sum []Add to / ❑ Deduct From Contingency Allowance ❑Add to / ❑Deduct From Allowance Total CCR Additional days requested for this CCR: $ (Name of Allowance) CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: (Signature) Thank you, Stephen Faulk 11-16-2021 Date: Dewberry Dewberry Architects Inc. 918.587.7283 1350 South Boulder, Suite 600 918,587.0071 fax Tulsa, OK 74119 www.dewberry.com Public Safety Improvement Project, Three PROJECT: Police Substations CCR NUMBER: DATE OF ISSUANCE: OWNER: City of Lubbock ARCHITECTS PROJECT NO.: CONTRACT FOR: Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three substations. 1. Add aluminum storefront to room 120 Admin Assistant along corridor 2. Add manual roller shades to new glazing Refer to the following revised drawings for more information. 1. A101 Floor Plan 2. A102 Finish Schedule and Floor Pattern Plan 3. A140 Enlarged Floor Plan 4. A200 Reflected Ceiling Plan 5. A353 Glazing Key Views 6. A801 Interior Elevations 7. A1000 Door Schedules ,--<<<TTTTTTT-T CCR 039R2, 11/4/2021 r Revise storefront to be 7'-4" long, with three equal sections. Manual roller shades to be included. *The storefront will extend approximately 5" beyond the edge of the admin. assistant's desk, leaving approximately 5'-8" clear at the opening. - Katie Vondrasek CCR 039R 039R 10/18/2021 18018 Construction No Text 1:1 w ooze o xx N 0 m K m z v O m m O M m m m v O C m m c F°n n 0 0 z (N AjLnqmoa • sloalAM DI c I B A u 0 %.M= ME :ME 0 4 0 �ml u I I GLAZING SCHEDULE m architects I 9D VIEW OF GLAZING STRF6"7 STR7.1677 1 3F125T!7f65 11STRF611T - Tom I &�Rl�l ❑ STRF62 ECUIRTYWINDOWELEVATION-S - SW03 3D VIEW OF GLAZING SW03-SW04-STRF63-65 7 -_ 9 —.- 8s... . - 7 ��U!!M WINDOW ELEVATION 6 .� 5 ECUIRIY VANDOW ELEVATION wSW02 SECUIRTY WINDOW ELEVARON � SMI 3D VIEW OF GLAZIl IG SWOI-02 s 11 4 .1 3— 2 N, Yd 3 2 1 7 \77 EW.", 747 'T N 40 Dmbmr Co IO123!8t1ESS-ELEVATIOIB , 11123 FMIESS - ELEVATIA) A I u NQ HIM. Lu LU LU I O1!4!TA�FRR- ELEVATMB 9 125 STAFF RR - ELEVATION A 121 DEPUTY CHIEF- ELEVATION A 19 CONFERENCE RM - ELEVATION 8 711. 19 CONFERENCE RM - ELEVATION A C 1 8 CID ADMIN - ELEVATIOIJ A LLJ LLI Io D o a o I s-'D o I yl 1p 1— 0 —1 —0 1 0 —0 0 ymn 0 a- FL U- DO 2 0 m m —A 116 DNA IIOWAItING-fLEVATION A 4 09 CORRIDOR -ELEVATION 0 2111"., 0 0 _0 0 0 07- o o O o o a I o I WIo o O I CORRIDOR • ELEVATION A 7 6 W DOOR WR FOR EDGE DISTE M NME COORDIMTE VAM DOOR AID HVtpWARE GUPPUERG. A i DOOR PANEL TYPES ------------- c III� lull - OeH Lpnvmml. FRAME SECTIONS 9 HM DOOR HEAD 4 CMUW/ WDVENEERTRAHSOM A I I 0 I L: ALUMINUM DOOR HEAD DETAIL 7 DOOR HEAD 19 CMU DOOR HEAD - HM DOOR HEAD - MIA Km 4II IT. ALUMINUM DOOR JAMB OR JAMB 4 CMU DOOR JAMB - Hm 1 INTERIOR HM DOOR FRAME SILL 3 HmDO.." 2 �:,. - .. --, Al 000 Exhibit B Lee Lewis PCCO #040 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 7810 Orlando Avenue 1901 N. MLK Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #040: CCR 040 Podium Logos TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/02/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT: 1 day REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: �1:LUBBOCK POLICE SUBSTATION EAST Prime Contract DESCRIPTION: To furnish and install interchangeable logos per CCR 040. Note 8 week lead time from approval. ATTACHMENTS: CCR#040 (all 3) lectern logos.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: REVISION: 0 REVIEWED BY: REVIEW DATE: PAID DATE: EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $0.00 PCO # I Title Schedule Impact Amount 040 1 CCR 040 Podium Logos 1 day $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO S nAn- CCR nAn Pndium Lnnns # Budget Code Description Amount 1 16-740.2 VOICE AND DATA logos $1,971.84 SYSTEMS.SUBCONTRACTOR 2 1-004.2 OWNERS deduct ccr 40 $(1,971.84) CONTINGEN CY.SUBCONTRACTOR Grand Total: $0.00 The original (Contract Sum) $5,911,358.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,911,358.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,911,358.00 The contract time will be increased by this Change Order by 1 day. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/22/2021 11:30 AM Lee Lewis Construction, Inc. Stephen Faulk (MYVM Architects) 2022 Broadway Lubbock, Texas 79401 o92?wu 8 MATURE pgTE Lee Lewis Construction Inc. - HO City o1 Lubbock 1314 Avenue K. 4th Floor Lubbock, Texas 79457 PCCO #040 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock, Texas 79423 SIGNATURE iFATE Printed On. 9/=021 11.30 AM Lee Lewis Construction, Inc. PCCO #040 Lee Lewis Construction Inc. - HQ Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 7810 Orlando Avenue 1901 N. MLK Lubbock, TX Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #040: CCR 040 Podium Logos TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/02/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY. DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: 1 day EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: To furnish and install interchangeable logos per CCR 040. Note 8 week lead time from approval. ATTACHMENTS: CCR#040 (all 3) lectern logos.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER- PCO # I Title Schedule Impact Amount 040 1 CCR 040 Podium Logos 11 day $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCn A flan- CCR ndn Pndium I nnnc # Budget Code Description Amount 1 16-740.2 VOICE AND DATA logos $3,790.78 SYSTEMS.SUBCONTRACTOR 2 1-004.2 OWNERS deduct ccr 40 $(3,790.78) CONTINGENCY.SU BCONTRACTOR Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 1 day. $5,911,358.00 $0.00 $5,911,358.00 $0.00 $5,911,358.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/2/2021 01:45 PM Lee Lewis Construction, Inc. Stephen Faulk (MV M Architects) 2022 Broadway Lubbock, Texas 79401 09-27-zou NATURE RATE Lee Lewis Construction Inc. - HO City of Lubbock 1314 Avenue K. 4th Floor Lubbock, Texas 79457 PCCO #040 Lee Lewis Construction - HO 7810 Orlando Ave L.ubboc k , Texas 79423 + . i SIGNATURE DrATE Printed On. 91 =021 11:30 AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #040 Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 5910 Erskine Lubbock, TX Prime Contract Change Order #040: CCR 040 Podium Logos TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/02/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No Amount Based No DESCRIPTION: To furnish and install interchangeable logos per CCR 040. Note 8 week lead time from approval. ATTACHMENTS: CCR#040 (all 3) lectem logos.pdf CHANGE ORDER LINE ITEMS: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: No Change Reason No 1 day 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract $0.00 # Budget Code Description Amount 1 16-740.2 VOICE AND DATA SYSTEMS.SUBCONTRACTOR logos $1,971.84 2 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 40 $(1,971.84) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 1 day. $5,741,888.00 $0.00 $5,741,888.00 $0.00 $5,741,888.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/22/2021 11:29 AM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) 2022 Broadway Lubbock, Texas 79401 o9-2T-Zou MATURE pA� Lee Lewis Construction Inc. - HO City of Lubbock 1314 Avenue K, 4th Floor Lubbock, Texas 79457 PCCO #040 Lee Lewis Constructlon - HO 7810 Orlando Ave Lubbock. Texas 79423 ./+ . ' 1 r. r SIGNATURE VATE Printed On: 9/22/2021 11.30 AM Police Sub -Stations ( East, North & South ) Lubbock, TX City of Lubbock 1901 MLK Lubbock, TX 79403 (806) 775-2275 A note from the manufacturer Rather than aluminum, the material quoted is HDU. HDU is High -Density -Urethane, a polyurethane composite material with a similar density to wood. Because it is water and moisture resistant, it won't rot or splinter and is less in cost than wood. The majority of civic plaques and signs are HDU, as it carves cleaner for smoother, more precise detail. If approved by the city ASW will discuss the layout preferences in detail. Their design team will take over, and they'll send us a custom Factory Proof of the design within 2-3 business days. The city will need to approve it or work with us to make changes until there happy. Once the design is approved, ASW will begin production on the agreed order. Please Note: ASW's current turnaround time is 5-7 weeks after signed Artwork Proof approval. Presented By: Tarpley Media Systems 3737 50th ST Lubbock, Texas 79413 United States (806) 797-5833 www.tarpleymedia.com Number: 6 Modified: 9/2/2021 Todrp�ey MEDIA I ASW Shipping fee - LTL Freight $521.28 Ground Service to TX Wood Crating 7 ASW 12" x 18" Carved City Logo $0.00 [NB] - 12" x 18" x 1.5" HDU "Single -Sided, 2.5D Carved **4-5 Colors **Z-Clip for Mounting ASW 18" Carved Patch 18" x — 18" x 1.5" HDU "Single -Sided, 2.51D w/3D Prism Star **3-4 Colors **Z-Clip for Mounting ASW 18" x —12" Carved Badge 18" x — 12" x 1.5" HDU "Single -Sided, Carved in 3D Bas-Relief **2 Colors to include Chrome Metallic Enamel **Z-Clip for Mounting * Price Includes Accessories $912.77 $895.74 1 ASW 12" x 18" Carved City Logo $0.00 [NB] - 12" x 18" x 1.5" HDU "Single -Sided, 2.5D Carved **4-5 Colors **Z-Clip for Mounting 1 ASW 18" Carved Patch 18" x — 18" x 1.5" HDU "Single -Sided, 2.51D w/3D Prism Star **34 Colors **Z-Clip for Mounting 1 ASW 18" x —12" Carved Badge 18" x —12" x 1.5" HDU "Single -Sided, Carved in 3D Bas-Relief **2 Colors to include Chrome Metallic Enamel **Z-Clip for Mounting 1 ASW 12" x 18" Carved City Logo [NB] - 12" x 18" x 1.5" HDU "Single -Sided, 2.51D Carved **4-5 Colors **Z-Clip for Mounting 1 ASW 18" Carved Patch 18" x —18" x 1.5" HDU "Single -Sided, 2.5D w/3D Prism Star **3-4 Colors **Z-Clip for Mounting 1 ASW 18" x —12" Carved Badge 18" x —12" x 1.5" HDU "Single -Sided, Carved in 3D Bas-Relief **2 Colors to include Chrome Metallic Enamel **Z-Clip for Mounting r i i�c n iuuuc� n��c»vi ic_ $912.77 $895.74 $0.00 $912.77 $895.74 1 ASW 12" x 18" Carved City Logo $0.00 [N13]-12"x18"x1.5"HDU "Single -Sided, 2.51D Carved **4-5 Colors **Z-Clip for Mounting 1 ASW 18" Carved Patch $912.77 18" x — 18" x 1.5" HDU "Single -Sided, 2.5D w/3D Prism Star **3-4 Colors **Z-Clip for Mounting 1 ASW 18" x —12" Carved Badge $895.74 18" x —12" x 1.5" HDU "Single -Sided, Carved in 3D Bas-Relief **2 Colors to include Chrome Metallic Enamel **Z-Clip for Mounting 1 ASW 12" x 18" Carved City Logo $0.00 [NB]- 12" x 18" x 1.5" HDU "Single -Sided, 2.5D Carved **4-5 Colors **Z-Clip for Mounting ASW 18" Carved Patch $912.77 18" x —18" x 1.5" HDU "Single -Sided, 2.51D w/31) Prism Star **3-4 Colors **Z-Clip for Mounting 1 ASW 18" x —12" Carved Badge $895.74 18" x —12" x 1.5" HDU "Single -Sided, Carved in 3D Bas-Relief **2 Colors to include Chrome Metallic Enamel **Z-Clip for Mounting * Price Includes Accessories 1 ASW 12" x 18" Carved City Logo $0.00 [NB] - 12" x 18" x 1.5" HDU "Single -Sided, 2.5D Carved **4-5 Colors **Z-Clip for Mounting ASW 18" Carved Patch 18" x -18" x 1.5" HDU "Single -Sided, 2.51) w/31) Prism Star **3-4 Colors **Z-Clip for Mounting ASW 18" x -12" Carved Badge 18" x -12" x 1.5" HDU "Single -Sided, Carved in 3D Bas-Relief **2 Colors to include Chrome Metallic Enamel **Z-Clip for Mounting Change Order Subtotal: * Price Includes Accessories $912.77 $895.74 $11,372.34 Total Installation Price: $11,372.34 Grand Total: Client: Clayton Brake Date Contractor: Tarpley Media Systems Date $11,372.34 Exhibit C Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #042 Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Change Order #042: Wire shelves in janitors closet TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/22/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1 day 1:LUBBOCK POLICE SUBSTATION EAST Prime Contract DESCRIPTION: To furnish and install wire shelves per CCR 042. ATTACHMENTS: CCR#042 (all 3) Wire shelves in janitors clpsetj&f POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER- REVISION: 0 REVIEWED BY: REVIEW DATE: PAID DATE: EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT. $0.00 PCO # I Title Schedule Impact Amount 042 1 Wire shelves in janitors closet 1 day $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO # 042: Wire shelves in ianitom closet # I Budget Code Description Amount 1 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR shelves $532.00 2 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR deduct ccr 42 $(532.00 ) Grand Total: $0.00 The original (Contract Sum) $5,911,358.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,911,358.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,911,358.00 The contract time will be increased by this Change Order by 1 day. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/22/2021 11.10 AM .? Lee Lewis Construction, Inc. Stephen Faulk (RW M Architects) 2022 Broadway Lubbock, Texas 79401 �.09-27--W" NATURE DATE Lee Lewis Construction Inc. - MO City of Lubbock 1314 Avenue K, 41h Floor Lubbock, Texas 79457 PCCO #042 Les Lewis Construction - NG 7810 Orlando Ave Lubbock. Texas 70423 a12 7-!V DATE SIGNATURE DATE Page of 2 Printed 0n: 9f22/2021 11:10 AM 19 Lee Lewis Construction, Inc. PCCO #042 Lee Lewis Construction Inc. - HQ Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 7810 Orlando Avenue 5910 Erskine Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #042: Wire shelves in janitors closet TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/22/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: No Change Reason No 1 day No CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract TOTAL AMOUNT: $0.00 DESCRIPTION: To furnish and install wire shelves per CCR 042. ATTACHMENTS: CCR#U2 (all J.Wire shelves inianitor's closetRdf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR shelves $532.00 2 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 42 $(532.00) Grand Total: $0.00 The original (Contract Sum) $5,741,888.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,741,888.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,741,888.00 The contract time will be increased by this Change Order by 1 day. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/22/2021 11:10 AM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) 2022 Broadway Lubbock, Texas 79401 9 27-2o2J �. NATURE DATE Lee Lewis Construction Inc. - MO City of Lubbock 1314 Avenue K, 4th Floor Lubbock, Texas 79457 PCCO #042 Lee Lewis Construction - HQ 7610 Orlando Ave Lubbock. Texas 79423 DATE SIGNATURE DATE Page /Of2 Printed On: M2=1 11:10 AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #042 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #042: Wire shelves in janitors closet TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/22/2021 CREATED BY. Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD Amount Based SIGNED CHANGE ORDER RECEIVED nATE- FIELD CHANGE: No DESCRIPTION: To furnish and install wire shelves per CCR 042. ATTACHMENTS: CCR#042 [all 3� _Wire shelves inanitors closetpdf CHANGE ORDER LINE ITEMS: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULEIMPACT. REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: No Change Reason No 1 day 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 # Budget Code Description Amount 1 6-100.2 ROUGH CARPENTRYSUBCONTRACTOR shelves $532.00 2 1-004.1 OWNERS CONTINGENCYMATERIALS deduct ccr 42 $(532.00)' Grand Total: $0.00 The original (Contract Sum) $6,255,031.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $6,255,031.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $6,255,031.00 The contract time will be increased by this Change Order by 1 day. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/22/2021 11:10 AM Lee Lewis Construction, Inc. Stephen Faulk (MYYM Architects) 2022 Broadway Lubbock, Texas 79401 t� 9 27-W" NATURE DATE Lee Lewis Construction Inc. - HO City of Lubbock 1314 Avenue K, 4th Floor Lubbock, Texas 79457 PCCO #042 Les Lmb Construction - HQ 7910 Odando Ave Lubbock, Texas 79423 r'-7 7 DATE SIGNATURE DATE Page /Of2 PdntedOn: 9I22/2021 11:10 AM Continue Shopping Shopping Cart Add Product by Model # Model # Description H-3181 BL Additional Black Wire Shelves - 36 x 18" 2/box H-1748-86 Black Wire Shelving Unit - 36 x 18 x 86" Shipping I Sale Code: Add I Questions? Qty Price Total t $60.00/CT $60.00 1 $173.00/EA $173.00 SUBTOTAL = $233.00 Forward Remove X X Two per station $466.00 material total $300+ orders are eligible for a free item. Two Carpenters at $16.50 per hour for two hours Labor total $66 Grand Total $532 Exhibit D 5 Lee Lewis Con*uctbn Inc. - HO 7810 Ortande Avenue Lubbock, TUN 79423 Phone: WO.797. MM Fax: +1 AM.797A034 PCO #043 P.*ct:19.1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Potential Change Order #043: CCR 043 tops for wire mesh partitions TO: CITY OF LUBBOCK FROM: Lee Lewis Conshv tlon - HQ 1314 Avenue K, Lubbock. TX 794M. USA 7010 Orlm do Are LUBBOCK, Texas 79W Lubbock. Texas 79M POO Enstringm 04310 CONTRACT. 1- LUBBOCK POLICE SUBSTATION EAST Prone Ca drod REQUEST (DIVED FR01B: - CREATED BM (layton Brake pee Levile Condn ction HQJ STATUS: Pending - In Review CREATED DATA OR f2021 REFERENCE: PRIME CONTRACT d043 - CCR 043 tops for whe mesh CHANOEORDER: partitions FIELD CIANOE: No LOCATION: f - — ACCOUNTING METHOD: Amotmt Steed SCNEDULEQMCT- 5daye PAID IN FULL: No EXECUT®: No Si&M CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $0.00 POTENTIAL. CHANGE ORDER TITLE CCR 043 tope for wire mesh pads lone CHANGE REASON: No Chaps Reason POTEMM CHANGE ORDER DESCRIPTION: (rite Contractis Changed As FaBows,I lb fumlah and In iall tops to On wln meth partitions por CCR 043. Note:12 material Isad4he ATTACHMENTS: 3ttrftDl> MMMI a Budget Code Desedption Amount 1 2-M 2 FENCES AND GATES.SUBCONTRACTOR Contrad oonecllon $1,500A0 2 M00.2 ROUGH CARPENTRY.SUBCONTRACTOR labor ixaden. O 8 P SM.00 B I.004.2OWNERS COUTINGENCY.SUBCONTRACTOR deducttor ors49 :(1850.00) GrandTalatl 40A0 Stephan Faulk P IWM AR MITECTS INC4 2022 Broadway Lubbock, Texas 79W1 C. v7 W22- RE DATE Lae t ewb Construction Inc. - HQ CITY OF LVBBOCK 1314 Avenue K Lubbock, TX 79401. USA LURRWX Thmm 79dB7 Lee Lewis Construdlon - HQ 7810 Orlando Ave Lubbock. 79423 ,�- • Z 8 DATE Printed On: 4Mtfm22 04:14 Pat ,. PCCO 1043 Lae Lewis Conalrudlon Ina. - HQ Paged 19.1907 - LUBBOCK POLICE SUBSTATION NORTH 7810Odando Avenue SMO Er&m LuMxmk TX Lubbokc, Texas 79M Phone: 80S-M4 400 Fax: +1 A=797.1034 Prime Contract Change Order #043: CCR 043 tops for wire mesh partitions TO: CW GF L VIIIBOCK FROM: Lee Lewls Construction -NO t314 Avenue K Lubbock TX 70 01. USA 7810 "ndo Ave LUMOCK TUM 79W t ub wak. Um 79423 GATE CREATED: 010112021 CREATED BV: Chyton Brale (Lee Lewis Conabutdon - _ HCO CONTRACT BTATUB: Psndkg - In Review 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: IN11OWM DATE: REFERENCE: PAID IN FULL: No ACCOUNTWO METHOD: Amount Based SIGNED CHANGE ORDER RECEIVM DATE: FIELD CHANGE: No DESCRIPTION: To bvdsh and inale0 "to the wine mesh padMbes per CCR 048. Nah:12 meterisl lead4ims ATTACHMENTS: CCAMMMIIIIa)I MOK CHANOEOSIDER LINE rnM: LOCATION: ltkV R DATE: PAID DATE: CHANGE REASON: No Change Reason MODCUTED1. SCHEDULEIMPACr REVISED SUBSTANTIAL COMPLETION DATE CONTRACTFOR: No 6 devs 1:LUBB0CK POLICE SUBSTATION NORTH Prim Cordrad TOTAL AMOUNT: 80.00 0 Budget Cods Desodptlon Amount 1 2.830.2 FENCES AND GATES.SUBCONTRACTOR CaWad cor edlon f1.500 00 2 6.100.2 ROUGH CARPENTRY SUBCONTRACTOR labor burden. o A p $350.00 3 14104.1 OWNERS COHTINGENCY.MATERIALS deduct for car 43 i0 010AM Grand Tbtak $040 The original (Contract Sum) $5.741.8000 NO change by previously suUwfb ed Change Orders $0 00 Theoorrbrs - pdortolhlsChengaOrderwas $5,741,888.00 The contract sum would be,11 01 d by ft Change Order In Ihs snourd of $0.00 ThenewomM sum bdud+gOde ChargeOrdarwBbe 35.741AMA The ow*ad Iime will be' o i ed by this Charge Order by 5 days Les Lewis Construction Imo. - HO Page 1 of 2 Pekrted On: U11 /201 04.11 PM SISPIM t Faulk IMWM ARCHITECTS INCH 2022 Bmdwsy Lubbock. Tam 79M ATURE DATE CITY OF LUBBOCK 1314 Avenue K, Lubbock. TX 7MI. USA Pcco Aqm Lae Lewis Cambuction - No 7810 Orlando Ave LUBBOCK Tm& 78487 Lubbock. Texas 78423 RE DATE RE DATE Lee Lewis Cow Me. - HO Pegs 2 of 2 Printed On: 4/11 /20?2 04V PM i f 1 Lea Lewis Construction Inc. - NO 78W Orlamb Avenue Lubbock. Texan 79423 Plw :808.79 4WW Fax +1.808.AO7.1034 PCCO OW PwJed:194009 - LUBBOCK POLICE SUBSTATION SOUTH 1400E Wens Lubbock. TX Prime Contract Change Order #043: CCR 043 tops for wire mesh partitions TO: CITY OF LUCK FROM: Lae Lewis Consbucttonn - NQ 1314 Avenue K Lubbock TX 79401. USA 7810 Orlando Ave LUBBOCK lbws 79W Lubbock. Tines 79423 DATE CREATID: 901/2021 CREATED BY: Chyton Brake sea Lewis Construction - "a) CONTRACT STATUS: Pending - In Rmlew SST RECENED FROM: DESIGNATED REVIEVWL DUE DATE: N IMDATE:_-- REFERDICM PAID N FULL: No ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIIIED DATE: FIELD CHANGE: Amount Boxed NO REVISION: 0 LOCATION: REWENIED BY: RENEW DATE: PAID DATE: — CHANGE REASON: EXECUTED: SCHEME IMPACP - -REVISED, SUBSTANTIAL COMPLETION DATE: CONTRACTFOR: TOTAL AMOUNT: DESCRIPTION: lb ILnNah and install tops to 8na wbe mesh pw done per CCR 043. NOis.12 mat 1 isedaim ATTACHMENTS: - - IX�ntA.2) tnoM.tot.wlts;as„� CHANGE ORDER LINE ITEM& No Chops Reason No 5deys VLUBBOCK POLICE SUBSTATION SOUTH Prime Canlraet 11Q00 0 Budget Coda Desor4dion Amount 1 2.830.2 FENCES AND GATES.SUSCONTRACTOR Contract conedion =1.ti A0 2 8-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Isbor burden, o Ri p $350A0 3 1.1"1 OWNERS CONTINGENCY.MATERWLS deduct oor43 $6 AN 00) Gra W Total: $0.00 The ortpinal (Contract Sum) $8.285,031.00 Net change by previously sulhofted Change Orders $0.00 The contract suns prior to this Change Order was 8%=.031.00 The contract sum would be changed by this Change Order In On amount of $0.00 The new oonitrad eum kiclu g 0ta Chow Onderwil be ft=031.00 The contract lms wR be Increased by this change Onder by 5 days. Lae Lewis Construction Inc. - NO Pape 1 of 2 Pdnted On: 4111rAn 0417 PM 16m-- 7mt_�, Stephen Fadk (MWM ARCWMCTS WC.) 2M Broadway Luba ock, Tsxas 794M CRY OF LUBBOCK 1314 Avemie K. labbock 'X 79401, USA 0,11-11 2W22 g DATE i Lee Lewis Conebucdon I= -NO Pap 2 o12 PCCO #043 Les Levrls Constmado n - HR 7810 OAsndo Ave Wbboek , s .2� 7/ ZZ DATE P*ftdon: 4hilrA 2 04:11 PM Exhibit E 19 Lee Lewis Construction, Inc. PCCO #049 Lee Lewis Construction Inc. - HQ Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 7810 Orlando Avenue 1901 N. MLK Lubbock, TX Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #049: Annunciation of panic alarms TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/29/2021 CONTRACT STATUS: Pending - In Review DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 3 days 11UBBOCK POLICE SUBSTATION EAST Prime Contract CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) REVISION: 0 REVIEWED BY. REVIEW DATE: PAID DATE: f EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $0.00 DESCRIPTION: To furnish and install annunciation of panic alarms on the paging system per CCR 049 issued by MWM Architects. ATTACHMENTS: CCR#049_(all 31 annunciation -of panic alarms_on_2agirg_system.udf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # I Title I Schedule Impact Amount 049 1 Annunciation of panic alarms 13 days $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO # 049: Annunciation of panic alarms # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & panic alarms $2,120.00 METHO.SUBCONTRACTOR 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning $100.00 3 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR deduct ccr 49 $(2,220.00) Grand Total: $0.00 The original (Contract Sum) $5,911,358.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,911,358.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,911,358.00 The contract time will be increased by this Change Order by 3 days. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/29/2021 01:54 PM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) 2022 Broadway Lubbock Texas 79401 ellr�io oS-2ou SIGNATURE DATE Lee Lewis Construction Inc. - HO City of Lubbock 1314 Avenue K, 4th Floor Lubbock, Texas 79457 PCCO #049 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock. Tom 79423 DATE SIGNATURE DATE Page 2 of 2 Printed On: 9/29/2021 01:54 PM Lee Lewis PCCO #049 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 7810 Orlando Avenue 5910 Erskine Lubbock, TX Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #049: Annunciation of panic alarms TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/29/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No V ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: No Change Reason EXECUTED: No SCHEDULE IMPACT: 3 days T REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1-.LUBBOCK POLICE SUBSTATION NORTH Prime Contract TOTAL AMOUNT: $0.00 DESCRIPTION: To furnish and install annunciation of panic alarms on the paging system per CCR 049 issued by MWM Architects. ATTACHMENTS: CCR#049 tall 31 annunciation ofganic alarms on paginq system.odf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR panic alarms $2,120.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning $100.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 49 $(2,220.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 3 days. $5,741,888.00 $0.00 $5,741,888.00 $0.00 $5,741,888.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/29/2021 01:54 PM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) 2022 Broadway Lubbock, Texas 79401 110 os Wil SIGNATURE DATE Lee Lewis Construction Inc. - HO City of Lubbock 1314 Avenue K, 4th Floor Lubbock, Texas 79457 PCCO #049 Lee Lewis Construction - HG 7810 Orlando Ave Lubbock, Texas 79423 M78011f GATE SIGNATURE DATE Page 2 of 2 Printed On: 9/29r2021 01:54 PM Fqq Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #049 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #049: Annunciation of panic alarms TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock , Texas 79423 DATE CREATED: 9/29/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULEIMPACT: REVISED SUBSTANTIAL COMPLETION DATE: lfell fTIF-V,[fill Zk4 No Change Reason No 3 days 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 DESCRIPTION: To furnish and install annunciation of panic alarms on the paging system per CCR 049 issued by MWM Architects. ATTACHMENTS: Y` CCR#049 all 3) annunciation of panic alarms on paging system.pdf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR panic alarms $2,120.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning $100.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 49 $(2,220.00) Grand Total: 1$0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 3 days. $6,255,031.00 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On. 9/29/2021 01:54 PM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) 2022 Broadway Lubbock, Texas 79401 1oos2" SIGNATURE DATE Lee Lewis Construction Inc. - HO City of Lubbock 1314 Avenue K, 4th Floor Lubbock, Texas 79457 PCCO #049 Lae Lewis Construction - HO 7810 Orlando Ave Lubbock. Tan 79423 DATE SIGNATURE DATE Page 2 of 2 Printed On: 912W2021 01:54 PM Page No. 1 of 1 Pages Proposal Attn: josh WeemsirkA 9 A991ft&.9;4 PO BOX 3:3671606) 745 7070 LUBBOCK TEXAS 79452 TECL # 17764 Proposal Submitted to Lee Lewis Construction Fax Proposal No. 915212 Street Phone Date September 15, 2021 City, State and Zip Code Job name Lubbock Police Stations Email Address jweems@leelewis.com Date of Plans Job Location Lubbock, TX Job Phone e hereby submit specifications and estimates for: CCR #49 Labor and Material to complete all work for CCR #49. Labor and Material for ESST at East Police Station $1,927.00 10%0&P $193.00 Sub -total $2,120.00 Exclusion: Police South $2,120.00 Police North $2,120.00 We propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: dollars ( $ ) . II material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or Authorized deviation from above specifications involving extra costs will be executed Signature only upon written orders, and will become an extra charge over and above Mike Temple he estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary Note: This proposal may be insurance. Our workers are fully covered by Workmen's Compensation withdrawn by us if not accepted within days. Insurance. Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized o do the work as specified. Payment will be and as outlines above. Signature Date of Acceptance: Signature E�5�T Enterprise Security Solutions of Texas, Inc PO Box 339 Justin, TX 76247 940-320-3778 www.esstexas.com * * Proposal * * to: Temple Electric 8502 Avenue P Lubbock, TX 79423 Tel: 806-745-7070 * * Proposal * * 9/15/2021 Project Number: 15642 For: Temple Electric CCR 49 Panic alarm annunciation Project Site: Temple Electric 8502 Avenue P Lubbock, TX 79423 Tel:806-745-7070 Fax:806-548-2772 Mfr-Part No. Qty Description Unit Price Extended 3 16-Input sub controller Equipment Subtotal 2,679.60 Installation Subtotal 3,060.00 This * * Proposal * * is Valid for 30 Days. Shipping & Handling: 40.19 Shipping & Handling: $40.19 Signature: Date: Jeffrey Goodrich, Vice President Project Total: $5,779.79 This information is proprietary and confidential to Enterprise Security Solutions of Texas, Inc. (ESST) and is only for the use of the individual or entity to whom it was delivered. No part of this document may be distributed, reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying, without permission in writing from ESST. This document is to be returned to ESST upon request of ESST. TXDPS #B11741 9/15/2021 Enterprise Security Solutions of Tx. Project: 15642 Page 1 of 1 MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#049CHANGE REQUEST #049 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 09-09-2021 Re: City of Lubbock —East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: Please provide pricing for MODIFICATIONS: For all three substations: 1. Refer to reissued detail 3 on sheet TY-601 2. Revise equipment and functionality to provide annunciation of panic alarms on the paging system 3. Provide and install new key switch in room 107 for reset 4. Provide and install new paging interfaces, recordings, and programming to allow unique recorded alarm announcements of each of the panic and duress buttons Submitted by. Stephen Drewell Attachments- Dewberry written description, TY-601 Contractors Response: Additional days requested for this CCR: ❑Add to / ❑Deduct From Contract Sum ❑Add to / ❑Deduct From Contingency Allowance ❑Add to / ❑Deduct From Allowance (Name of Allowance) Total CCR CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: (Signature) Thank you, Stephen Faulk 09-09-2021 Date: 0`4Dewberry® Dewberry Architects Inc. 918.587.7283 1350 South Boulder, Suite 600 918.587.0071 fax Tulsa, OK 74119 www.dewberry.com PROJECT: Public Safety Improvement Project, Three CCR NUMBER: Police Substations r_ _ 1 DATE OF ISSUANCE OWNER: City of Lubbock ARCHITECTS PROJECT NO.: CONTRACT FOR: Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three substations. CCR 049 049 9/8/2021 18018 Construction 1. Refer to reissued detail 3 on sheet TY-601 2. Revise equipment and functionality to provide annunciation of panic alarms on the paging system 3. Provide and install new key switch in room 107 for reset 4. Provide and install new paging interfaces, recordings, and programming to allow unique recorded alarm announcements of each of the panic and duress buttons Refer to the following revised drawings for more information. 1. TY-601 Systems Drawings ACCESS CONTROL SYSTEM BLOCK n DIAGRAM a sw.+ _ nPAGINBLOCK DIAGRAM VIDEO SURVEILLANCE SYSTEM s AGIIG r ,, DIAGRAM so. rr-ra Exhibit F Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #050 Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Change Order #060: Add countertop at desk sgt TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/25/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: 7 days EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT. $0.00 Prime Contract DESCRIPTION: To furnish and install additional countertop at the desk sgt as per CCR 050 issued by MWM. ATTACHMENTS: CCR#050 (all 3) add countertop at desk syt df POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # I Title Schedule Impact Amount 050 1 Add countertop at desk sgt 17 days $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO # 050: Add countertop at desk sat # Budget Code Description Amount 1 6-400.2 ARCHITECTURAL WOODWORK. SU BCONTRACTOR countertop $4,644.81 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR sheetrock repair $225.00 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR texture & paint repair $225.00 4 6-100.2 ROUGH CARPENTRYSUBCONTRACTOR cleaning $100.00 5 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR deduct ccr 50 $(5,194.81) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 7 days. $5,911,358.00 $0.00 $5,911,358.00 $0.00 $5,911,358.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/25/2021 09:31 AM Lee Lewis PCCO #050 Construction, Inc. Stephen Fau0k (Nr M Architects) City of Lubbock Lee Lewis Construcftn - HO 2022 Broadway 1314 Avenue K. 4th Floor 7810 OAando Ave Lubbock. Taxes 79401 Lubbock. Texas 79457 Lubb ock. Texas 79423 Io 27 Zou �%E ATE SIG&=&�DA74E4 Lee Lewis Construction Inc, - HO Page 2 of 2 Printed On* IMS2021 09:31 AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #050 Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 5910 Erskine Lubbock, TX Prime Contract Change Order #060: Add countertop at desk sgt TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/25/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No Amount Based No REVISION: 0 LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT. DESCRIPTION: To fumish and install additional countertop at the desk sgt as per CCR 050 issued by MWM. ATTACHMENTS: CCR#050 all 3 add countertgp at desks t.. df CHANGE ORDER LINE ITEMS: No Change Reason No 7 days 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract $0.00 # Budget Code Description Amount 1 6-400.2 ARCHITECTURAL WOODWORK.SU BCONTRACTOR countertop $4,644.81 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR sheetrock, paint, clean $550.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 50 $(5,194.81) Grand Total: $0.00 The original (Contract Sum) $5,741,888.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,741,888.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,741,888.00 The contract time will be increased by this Change Order by 7 days. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/25/2021 09:31 AM Lee Lewis PCCO #060 Construction, Inc. Stephen Faulk (M MAI Architects) City of Lubbock Lee Lewts Construction - NO 2072 Broadway 1314 Avenue K. 41h Floor 7810 Odandc Ave Lubbock. Texas 79401 Lubbock. Texas 79457 Lubbock. Texas 79423 (O"O'- 4� NATURE DATE SIG DATE ATURE GATE Lee Lewis Construction Inc, - HO Page 2 of 2 Printed On: 10/M021 09:31 AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #050 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #050: Add countertop at desk sgt TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/25/2021 '^ CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No LOCATION: — REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: �. TOTAL AMOUNT: DESCRIPTION: To furnish and install additional countertop at the desk sgt as per CCR 050 issued by MWM. ATTACHMENTS: CCR#050 fall 31 add countertop at desk sat..odf CHANGE ORDER LINE ITEMS: No Change Reason No 7 days 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 # Budget Code Description Amount 1 6-400.2 ARCHITECTURAL WOODWORK.SUBCONTRACTOR countertop $4,644.81 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR sheetrock, paint, clean $550.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 50 $(5,194.81) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 7 days. $6,255,031.00 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/25/2021 09:31 AM Lee Lewis PCCO #oso Construction, Inc. Stephen Fault (KM Architects) City of Lubbock Lee Lewis Construction - HO 2022 Broadway 1314 Avenue K. 4th Floor 7810 Orlando Ave Lubbock, Texas 79401 Lubbock, Texas 79457 Lubbock/ , Texas 79423 ZjL 1 TORE DATE SIG DATE L-ATURE Lee Lewfs Construction Inc, - HO Page 2 of 2 Printed On:10/2512021 09.31 AM HUNTER MILLWORKS Fox 806-792-1883 SINCE 1947 Date: September 30, 2021 902 NE LOOP 289 LUBBOCK. TX 79403 P.O. BOX 2513 (79408) Phone 806-792.4864 ■ ■ Change Proposal For: Lubbock Police Substations/North, South and East/ CCR050 Lee Lewis Construction P.O. Box 65197 Lubbock, TX 79464 HMI job#3566,3567,3563 Change Proposal Request Dated: 09/10/2021 We propose to make changes to the millwork as referenced above and in keeping with terms and conditions of original proposal, for the sum of S13.934.42 Exclusive of sales tax and good for 30 days. $4,644.81 per station INCLUDED: Cut and Modify existing Solid Surface countertops and add new countertops with wall brackets at Desk Sargent rooms in all three Substations. Countertop Color is Hi Macs Storm Granite and Brackets are Federal Brace 20"x20" black. EXCLUDED: All items not specifically noted as included above, and/or excluded in original proposal! Accepted: By: Date: HUNTER MILLWORKS, INC. By: Johnny Cruz Please sign and return or reference this proposal and date on purchase / change orders Page 1 of 1 MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#050CHANGE REQUEST #050 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 09-10-2021 Re: City of Lubbock —East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description. Please provide pricing for the additional countertop at the Desk Sergeant area Submitted bye Stephen Drewell Attachments: Dewberry written description, Al 02.A141,A800,A804 Contractors Response: Additional days requested for this CCR: ❑Add to / ❑Deduct From Contract Sum $ ❑ Add to / ❑ Deduct From Contingency Allowance $ [—]Add to / ❑Deduct From Allowance (Name of Allowance) Total CCR CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon reapproved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: Date: (Signature) Thank you, Stephen Faulk 09-10-2021 Dewberry Dewberry Architects Inc. 918.587.7283 1350 South BoWder, Suite 600 918.587.0071 fax Tulsa, OK 74119 www.dewberry.com CCR 050 PROJECT: Public Safety Improvement Project, Three CCR NUMBER: 050 Police Substations DATE OF ISSUANCE: 9/8/2021 OWNER: City of Lubbock ARCHITECTS PROJECT NO.: 18018 CONTRACT FOR: Construction Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three substations. 1. Cut back existing bull nose on full length of front countertop (facing entry doors), including the extension that was added as part of CCR 17. 2. Add 18 %:" deep solid surface countertop extension to existing front countertop (facing entry doors) with minimum 20" deep low -profile countertop support brackets that are anchored to the burnished block wall, spaced 24" o.c. maximum. Include wall cleat and additional framing for full support as necessary. 3. Two grommets to be field cut in solid surface countertop. Coordinate with owner for exact locations. 4. Install impact resistant panel (IRP-1) to this wall below the countertop, full length, corner to corner. S. Support bracket to be Federal Brace Freedom 20"x20" black hidden countertop bracket, or equal. Refer to the following revised drawings for more information. 1. A102 Finish Schedule and Floor Pattern Plan 2. A141 Enlarged Floor Plan 3. A800 Interior Elevations 4. A804 Interior Details I pp P� �- p 'D© 4D .............................................. ........................................... - - --------- H Ix m! n va mom imsombloong go PUBLIC SAFETY IMPROVEMENT PROJECT, THREE POLICE SUBSTATIONS - EAST 1901 MILK W330GK. TEXAS 0 E E 0 DI 0 I IIIIIIIIIIIII[m 0 0 o c 1� _ •.11>�Orr r.K i I i .vry �rr.ra_ 4 107 DESK DGT./PSO-ELEVATION B 1 i[lulaill 1 �108 AAFF BREAK RM- F. EVATION A 1 0107 DESY, DGT�PSO- ELEVATION A [i 105 COMMUNIIY�RAINIIJG-ELEVATION B d � n, ,!tWoRml q- 17 Irt 8 IT COMMUFIRY/TRAINING- ELEVATION A �y 7 102 PUBLIC RESTROOM-ELEVATIONI D L 102 PUBLIC RR- ELEVATION C C 102 PUBLIC RR- ELEVATION B A PUBLIC RESTROOM- ELEVATION A 102 3 101 PUBLIC LOBBY- ELEVATION C 101 PUBLIC LOBBY- ELEVATION B j 101 PUBLIC LOBBY ELEVATION A of I s A 5 WEAPONS LocrER 9 MIL. STUD L T- i Seefion 53 A INTERIOR WALL SECTION 4 INTERIOR WAIL SECTION I 7 1 INTERIOR YYALL SECTION 2 INTERIOR WALL SECTION I 4 Exhibit G Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #051 Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Change Order #051: CCR 051 Enhance presentation systems TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/30/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: DUE DATE: REVIEWED BY: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: 5 days EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: To furnish and install revised configuration of presentation systems in rooms 105 and 140 per CCR 051. ATTACHMENTS: CCR#051 (all 3) Enhance presentation systems.odf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # I Title Schedule Impact Amount 051 1 CCR 051 Enhance presentation systems 15 days $0.00 Total: $0.00 PCn S OS1- CCR OS1 Fnhanra nrasantatinn systems # Budget Code Description Amount 1 16-740.2 VOICE AND DATA reconfig presentation $11,286.42 SYSTEMS.SUBCONTRACTOR 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning $200.00 3 1-004.2 OWNERS deduct ccr 51 $01,486.42) CONTINGENCY.SUBCONTRACTOR Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 5 days. $5,911,358.00 $0.00 $5,911,358.00 $0.00 $5,911,358.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/30/2021 11:05 AM Lee Lewis Construction, Inc. Stephen Faulk (RMM Architects) City of Lubbock 2022 Broadway 1314 Avenue K 4th Floor Lubbock. Texas 79401 Lubbock, Texas 79457 PCCO #051 Lee Lewis Contraction - HQ 7810 Orlando Ave Lubbock. Texas 79423 A GNATIlRE DATE DATE SIGNA RE DATE eel Lee Lewis Construction Inc. - HQ Page 2 of 2 Printed On: 9130/2021 11:05 AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone 806-797-8400 Fax: +1.806.797.1034 PCCO #051 Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 5910 Erskine Lubbock, TX Prime Contract Change Order #051: CCR 051 Enhance presentation systems TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/30/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract $0.00 TOTAL AMOUNT DESCRIPTION: To furnish and install revised configuration of presentation systems in rooms 105 and 140 per CCR 051. ATTACHMENTS: CCR#051 (II 3 Enhancepresentation systems.pdf CHANGE ORDER LINE ITEMS: No Change Reason No 5 days # Budget Code Description Amount 1 16-740.2 VOICE AND DATA SYSTEMS.SUBCONTRACTOR reconfig presentation $11,286.42 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning $200.00 3 1-004.1 OWNERS CONTINGENCYMATERIALS deduct ccr 51 $(11,486.42) Grand Total: 1$0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 5 days. $5,741,888.00 $0.00 $5,741,888.00 $0.00 $5,741,888.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/30/2021 11:05 AM Lee Lewis Construction, Inc. Stephen Faulk SNWW1 Architects) City of Lubbock 2022 Broadway 1314 Avenue K 4th Floor Lubbock. Texas 79401 Lubbock, Texas 79457 PCCO #051 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock • Texas 79423 /O—OS ZDZ/ r //2Z MATURE DATE *aie DATE —SIGNATURE DATE Lee Lewis Construction Inc. - HQ Page 2 of 2 Printed On: 9/3012021 11:05 AM Lee Lewis PCCO #051 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 7810 Orlando Avenue 14005 Indiana Lubbock, TX Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #051: CCR 051 Enhance presentation systems TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/30/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: No Change Reason PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 5 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: TOTAL AMOUNT: DESCRIPTION: To furnish and install revised configuration of presentation systems in rooms 105 and 140 per CCR 051. ATTACHMENTS: CCR.#051 -(all 3) Enhance presentation systems-Adf CHANGE ORDER LINE ITEMS: 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 # Budget Code Description Amount 1 16-740.2 VOICE AND DATA SYSTEMS.SUBCONTRACTOR reconfi presentation g p $11,286.42 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning $200.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 51 $(11,486.42) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 5 days. $6,255,031.03 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/30/2021 11:05 AM Lee Lewis Construction, Inc. Stephen Faulk (N WM Architects) 2022 Broadway Lubbock, Texas 79401 /O-OS ZDZ/ GNATURE DATE City of Lubbock 1314 Avenue K. 4th Floor Lubbock, Texas 79457 PCCO #051 Lee Lewis Construction - HQ 7010 Orlando Ave Lubbock. Texas 79423 DATE SIGNATURE DATE Lee Lewis Construction Inc. - HO Page 2 of 2 Printed On: W30/2021 11:05 AM Police Sub -Stations ( East, Forth & South ) Lubbock, TX City of Lubbock 1901 MLK Lubbock, TX 79403 (806) 775-2275 Presented By: Tarpley Media Systems 3737 50th ST Lubbock, Texas 79413 United States (806) 797-5833 www.tarpleymedia.com Number: 7 Modified: 9/29/2021 Tog ey MEDIA 1 Crestron Electronics UC-CX100-Z-WM $4,200.00 Crestron Flex Advanced Video Conference System Integrator Kit with a Wall Mounted Control Interface for Zoom Rooms Software [Available 3/26/2021] 1 DTI CRESTRON PROGRAMING - 4 $1,200.00 8 Hour Crestron System Programming 1 Lowell Manufacturing VDS-1-1525 $117.21 Rackmount shelf with adjustable depth, steel with black finish, 1 U 1 RCI Custom Custom Input Plate $126.00 Custom Input Plate for FSR-1550 Floor Box. 6 XLR F / 2 XLR M 1 Crestron Electronics UC-CX100-Z-WM $4,200.00 Crestron Flex Advanced Video Conference System Integrator Kit with a Wall Mounted Control Interface for Zoom Rooms Software [Available 3/26/2021] 1 DTI CRESTRON PROGRAMING - 4 $1,200.00 8 Hour Crestron System Programming i Lowell Manufacturing VDS-1-1S25 $117.21 Rackmount shelf with adjustable depth, steel with black finish, 1 U 1 RCI Custom Custom Input Plate $126.00 Custom Input Plate for FSR-1550 Floor Box. 6 XLR F / 2 XLR M * Price Includes Accessories 1 Crestron Electronics UC-CX100-Z-WM $4,200.00 Crestron Flex Advanced Video Conference System Integrator Kit with a Wall Mounted Control Interface for Zoom Rooms Software [Available 3/26/2021] 1 DTI CRESTRON PROGRAMING - 4 $1,200.00 8 Hour Crestron System Programming 1 Lowell Manufacturing VDS-1-1525 $117.21 Rackmount shelf with adjustable depth, steel with black finish, 1 U 1 RCI Custom Custom Input Plate $126.00 Custom Input Plate for FSR-1550 Floor Box. 6 XLR F / 2 XLR M 1 Crestron Electronics UC-CX100-Z-WM $4,200.00 Crestron Flex Advanced Video Conference System Integrator Kit with a Wall Mounted Control Interface for Zoom Rooms Software [Available 3/26/2021] 7 DTI CRESTRON PROGRAMING - 4 $1,200.00 8 Hour Crestron System Programming 1 Lowell Manufacturing VDS-1-1525 $117.21 Rackmount shelf with adjustable depth, steel with black finish, 1 U 1 RCI Custom Custom Input Plate $126.00 Custom Input Plate for FSR-1550 Floor Box. 6 XLR F / 2 XLR M * Price Includes Accessorie 1 Crestron Electronics UC-CX100-Z-WM $4,200.00 Crestron Flex Advanced Video Conference System Integrator Kit with a Wall Mounted Control Interface for Zoom Rooms Software [Available 3/26/2021] 1 DTI CRESTRON PROGRAMING - 4 $1,200.00 8 Hour Crestron System Programming 1 Lowell Manufacturing VDS-1-1525 $117.21 Rackmount shelf with adjustable depth, steel with black finish, 1 U i RCI Custom Custom Input Plate $126.00 Custom Input Plate for FSR-1550 Floor Box. 6 XLR F / 2 XLR M 1 Crestron Electronics UC-CX100-Z-WM $4,200.00 Crestron Flex Advanced Video Conference System Integrator Kit with a Wall Mounted Control Interface for Zoom Rooms Software [Available 3/26/2021] 1 DTI CRESTRON PROGRAMING - 4 $1,200.00 8 Hour Crestron System Programming 1 Lowell Manufacturing VDS-1-1525 $117.21 Rackmount shelf with adjustable depth, steel with black finish, 1 U 1 RCI Custom Custom Input Plate $126.00 Custom Input Plate for FSR-1550 Floor Box. 6 XLR F / 2 XLR M Change Order Subtotal: $33,859.26 Total Installation Price: $33,859.26 Grand Total: $33,859.26 Client: Clayton Brake Date Contractor: Tarpley Media Systems Date MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#051 CHANGE REQUEST #051 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 09-17-2021 Re: City of Lubbock —East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: Please provide pricing for the revisions to the AV presentation systems. Submitted by: Stephen Drewell Attachments: Dewberry written description, TA-601 Contractors Response: Additional days requested for this CCR: ❑Add to / ❑Deduct From Contract Sum ❑ Add to / ❑ Deduct From Contingency Allowance $ ❑ Add to / ❑ Deduct From Allowance $ (Name of Allowance) Total CCR CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the Changes) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: Date: (Signature) Thank you, Stephen Faulk 09-17-2021 Dewberry Dewberry Architects Inc. 918.587.7283 1350 South Boulder, Suite 600 918.587.0071 fax Tulsa, OK 74119 www.dewberry.com CCR 051 PROJECT: Public Safety Improvement Project, Three CCR NUMBER: 051 Police Substations DATE OF ISSUANCE: 9/16/2021 OWNER: City of Lubbock ARCHITECTS PROJECT NO.: 18018 CONTRACT FOR: Construction Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three substations. Revise configuration of A/V presentation systems Community Training Room 105 and Briefing/Training Room 140 to accommodate native Zoom video conferencing. Furnish and install — a. Crestron UC-CX100-Z-WM native zoom conferencing kit. b. New touchscreen control panel surface mounted to upper face of podium. c. Install UC-PR and associated cabling in podium allowing for interface with user laptop. d. Revise floor box AV panel to accommodate new cabling and termination needs for touchscreen and UC-PR. e. Install UC Engine in AV equipment rack. f. Revise HDMI/USB cabling in equipment rack to accommodate connectivity to UC Engine. g. Provide Crestron HD-CNV USB-100 converter with HDMI to DVI converter cable for connectivity between switcher and UC Engine. h. Provide programming, setup, and training. Refer to the following revised drawings for more information. 1. TA-601 Block Diagrams. Lm .n L.M''__________________________J AN BLOCK DIAGRAM - BRIEFING/TRAINING RM 140. FITNESS 123 1 sd.rns AN BLOCK DIAGRAM - CID WORKSTATIONS 116 3 .,w rns AN BLOCK DIAGRAM - CONFERENCE RM 119 94 srnrs AN BLOCK DIAGRAM - COMMUNITY TRAINING RM 105 2 sa. rrts ------------ ------------------------------------- �r----------------- � ' .w.ao..oa .o.a wa•.....a F. urv.a,n.a i i ..,,.,. rromow wo�wu....+. Lnu.. n'__________J L�r�10'�1___.---------------- JLm"ss•b______________J AN CONDUIT BLOCK DIAGRAM - BRIEFING/TRAINING RM 140 � ,krr. rrts AN CONDUIT BLOCK DIAGRAM - nCID WORKSTATIONS 116 sw rrts AN BLOCK DIAGRAM - PUBLIC LOBBY101 AN CONDUIT BLOCK DIAGRAM - 10 ,M ERENCE RM 119 ®� U AN BLOCK DIAGRAM - DEPUTY CHIEF 121 5 sue. xrs AN BLOCK DIAGRAM - SOFT INTERVIEW RM112 s soi. rrts ' ,ate „�..2roa�.,•".... i --------------- --------------a`-�-_------__. AN CONDUIT BLOCK DIAGRAM - a 9tw rrts C0MMUNITY TRAINNG RM 105 AN CONDUIT BLOCK DIAGRAM - DEPsUTY CHIEF 121 11 �, rrr AN CONDUIT BLOCK DIAGRAM - 12SOFT INTERVIEW RM 112 � sur. rrts Em architects r Dewberry 2 O Q m W U 7 d Y U O m m J TA-601 Exhibit H Fqq Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax. +1.806.797.1034 PCCO #053 Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Change Order #053: Reimbursement for testing & utilities TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/29/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: City of Lubbock to reimburse LLCI for cost of testing after $15,000 allowance and for cost of all temporary utilities. See attached cost detail report, invoices, and pay stubs. ATTACHMENTS: 1510-1905.odf, 1410-1905.v_df POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # I Title Schedule Impact Amount 053 1 Reimbursement for testing & utilities $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO # 053: Reimbursement for testing & utilities # Budget Code Description Amount 1 1-410.1 TESTING LAB SERVICES.MATERIALS reimbursement testing $21,195.10 2 1-510.1 TEMPORARY UTILITIES.MATERIALS reimbursement utilities $1,683.00 3 1-004.2 OWNERS CONTINGENCYSUBCONTRACTOR deduct PCCO 53 $(22,878.10) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $5,911,358.00 $0.00 $5,911,358.00 $0.00 $5,911,358.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/29/2021 11 *01 AM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) City of Lubbock 2022 Broadway 1314 Avenue K, 4th Floor Lubbock, Texas 79401 Lubbock, Texas 79457 SIGNATURE Lee Lewis Construction Inc. - HQ DATE PCCO #053 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas 79423 79GNPOKE DATE SIGNATORE DATE Page 2 of 2 Printed On: 912912021 11:02 AM LEE LEWIS CONSTRUCTION, INC. JOB COST DETAIL REPDRT DETAIL TOTALS DO NOT INCLUDE SUPER -PM. -PE -EST COSI NOTE, THIS DETAIL DOES NOT INCLUDE BURDEN COSTS NOTE, THIS DETAIL FINAL TOTAL DOES NOT INCLUDE THESE PHASES 1041 SUPERINTENDENT - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM. LINE TOTAL 1043 PROD M.GMT - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM. LINE TOTAL 1045 ESTIMATING - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM LINE TOTAL 1019 ASST SUPER - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM LINE TOTAL 1049 PROJ ENGINEER - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM LINE TOTAL RPT Name: JCDETAIL ]ate Vendor/Employee 19.1905 LUBBOCK POLICE SUBS 1 - EAST 1-410 TESTING LAB SERVICES 12-09-2019 TERRA TESTING INC 12-19-2019 TERRA TESTING INC 12-23-2019 TERRA TESSTING INC 12-27-2019 TERRA TESTING INC 02-13-2020 TERRA TESTING INC 02-13-2020 TERRA TESTING INC 02-14-2020 TERRA TESTING INC 02-14-2020 TERRA TESTING INC 02-17-2020 TERRA TESTING INC 02-17-2020 TERRA TESTING INC 02-18-2020 TERRA TESTING INC 02-18-2020 TERRA TESTING INC 02-19-2020 TERRA TESTING INC 02-19-2020 TERRA TESTING INC 02-20-2020 TERRA TESTING INC 02-20-2020 TERRA TESTING INC 02-21-2020 TERRA TESTING INC 02-20-2020 TERRA TESTING INC 02-21-2020 TERRA TESTING INC 02-24-2020 TERRA TESTING INC 02-24-2020 TERRA TESTING INC 02-18-2020 TERRA TESTING INC 02-25-2020 LUBBOCK LABS INC 01-15-2020 TERRA TESTING INC 04-24-2020 TERRA TEi TING INC 05-21-2020 TERRA TESTING INC 05-21-2D20 TERRA TESTING INC 05-22-2020 TERRA TESTING INC 05-22,2020 TERRA TESTING INC 06-01-2020 TERRA TESTING INC 06-01-2020 TERRA TESTING INC 06-26-2020 TERRA TESTING INC 07-06-2020 TERRA TESTING INC 07-15-2020 TERRA TESTING INC 07-17-2020 TERRA TESTING INC 01-22-2020 TERRA TESTING INC 07-24-2020 TERRA TESTING INC 09-17-2020 TERRA TESTING INC 09-24-2020 TERRA TESTING INC 10-01-2020 TERRA TESTING INC 01-25-2021 TERRA TESTING INC 01-27-2021 TERRA TESTING INC 01-28-2021 TERRA TESTING INC 02-26-2021 TERRA TESTING INC 03-04-2021 TERRA TESTING INC 031 03-2021 TERRA TESTING INC ❑3-02-2021 TERRA TESTING INC 02-26-2021 TERRA TESTING INC 02-05,-2021 TERRA TESTING INC 02-23-2021 TERRA TESTING INC 06-09-2021 TERRA TESTING INC 06-10-2021 TER RA TESTING INC 06-14-2021 TERRA TESTING INC C9-16-21 Page 1 System Date: 09-16-21 System Time: 1:33 pm Files Used: MASTER.APM MASTER. JCM. CURRENT.JCT MASTER.PRM. Involc, Materials Subcontracts Regular Pay Overtime Pay Tromp 1.4bor Camp Equip Rented Equip Coat 239864 828.25 928.25 239883 800.00 800.00 239888 528.50 528.50 239942 486.50 406.50 239962 497.00 497.00 239964 497.00 497.00 239966 553.70 553.70 239968 719.93 719.93 239972 746.75 746.75 239973 955.33 955.33 239977 591,50 591.50 23997M 594.88 594.88 239980 654.50 654.50 239982 654.50 654.50 239904 654.50 654.50 239985 654.50 654.50 239980 654.50 654.50 239989 661.63 661,63 239992 654.50 654.50 239994 654.50 654.50 239997 664.63 664.63 939976 591.50 591.50 32186 540.00 540.00 239919 295.00 295.00 240169 2,567.75 2,567.75 240295 490.00 490.00 240300 490.00 490.00 240301 490.00 490.00 240302 490.00 490.00 240323 490.00 490.00 240324 490.00 490.00 240414 612.75 612.75 240454 600.00 600.00 240495 195.00 195.00 240505 600.00 600.00 240528 701-25 701.25 240540 637-50 637.50 240662 350:.00 350.00 240670 2,230.00 2,230,00 240701 600..00 600.00 240955 1,093.50 1,083.50 240965 529.50 528.50 210970 520.00 520.00 241031 490.00 490.00 241049 600.00 600.00 241045 490.00 490.00 241041 618.00 618.00 241029 642.75 642.75 240989 655.50 655.50 241021 600.00 600.00 241269 779.00 779.00 241276 801.50 801.50 241286 1,218.50 1,218.50 PCas 1q�10 Total 36,195.10 .00 .00 .DD .00 ,00 .00 34,195.10 Job 191905 Total 36,195.10 .00 ,00 .00 .00 .00 .00 36,195.10 Grand Totals 36,195.10 .00 .00 .00 .00 .00 .00 36,195.10 REMEMBER TO ADD THE PHASES LISTED AT TOP OF PAGE TO OVERALL TOTAL LEE LEWIS CONSTRUCTION, INC. JOB COST DETAIL REPORT DETAIL TOTALS DO NOT INCLUDE SUPER -PM. -PE -EST COST NOTE, THIS DETAIL DOES NOT INCLUDE BURDEN COSTS NOTE, THIS DETAIL FINAL TOTAL DOES NOT INCLUDE THESE PHASES 1041 SUPERINTENDENT - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM LINE TOTAL 1043 PROJ M.GMT - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM. LINE TOTAL 1045 ESTIMATING - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM LINE TOTAL 1048 ASST SUPER - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM LINE TOTAL 1049 PROJ ENGINEER - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM LINE TOTAL 09-16-21 Page 1 System Date: 09-16-21 System Time: 1:35 pm FS les Used: MASTER.APM MASTER.JCM CURRENT.JCT MASTER.PRM. RPT Name: JCDETAIL Date Vendor/Employee Invoice Materials Subcontracts Regular Pay Overtime Pay Temp Labor Comp Equip Rented Equip Coat 19-1905 LUBBOCK POLICE SUBS 1 - EAST 1-510 TEMPORARY UTILITIES 06-24-2020 CITY OF LUBBOCK UTILITIES 9716709 0620 218.06 218.06 07-27-2020 CITY OF LUBBOCK UTILITIES 9716709 0720 192.06 192.06 08-27-2020 CITY OF LUBBOCK UTILITIES 9716709 OB20 227.66 227.66 09-28-2020 CITY OF LUBBOCK UTILITIES 9716709 0920 202.96 202.96 11-03-2020 CITY OF LUBBOCK UTILITIES 9716709 1020 221.16 221.16 11-23-2020 CITY OF LUBBOCK UTILITIES 9716709 1120 192.06 192.06 12-29-2020 CITY OF LUBBOCK UTILITIES 9716709 1220 218.06 218.06 01-27-2021 CITY OF LUBBOCK UTILITIES 9716709 0121 211.56 211.56 Phase 1510 Total 2,435.58 .Do ,p0 Job 191905 Total 2,435.58 .00 .00 Grand Totals 2,435.58 .00 .00 REMEMBER TO ADD THE PHASES LISTED AT TOP OF PAGE TO OVERALL TOTAL .00 .00 .00 .00 2, a 35-Sa ($752.00) tot $1,683.58 .00 .00 .00 .00 2,435.58 .00 .00 .00 .00 2,435.58 [qq Lee Lewis PCCO #053 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 7810 Orlando Avenue 5910 Erskine Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax'. +1.806.797.1034 Prime Contract Change Order #053: Reimbursement for testing & utilities TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/29/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 L REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No Amount Based No LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: No Change Reason NO 11UBBOCK POLICE SUBSTATION NORTH Prime Contract $0.00 NCJI.Klr 1lull: City of Lubbock to reimburse LLCI for cost of testing after $15,000 allowance and for cost of all temporary utilities. See attached cost detail report, invoices, and pay stubs. ATTACHMENTS: 1510-1907pdf, 141M907.pdf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 1410.1 TESTING LAB SERVICESWATERIALS reimbursement testing $7,149.55 2 1-510.1 TEMPORARY UTILITIES. MATERIALS reimbursement utilities $17,593.18 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct PCCO 53 $(24,742.73) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $5,741,888.00 $0.00 $5,741,888.00 $0.00 $5,741,888.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed Orr 9/29/2021 11:01 AM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) City of Lubbock 2022 Broadway 1314 Avenue K, 4th Floor Lubbock, Texas 79401 Lubbock, Texas 79467 SIGNATURE Lee Lewis Construction Inc. - HO DATE PCCO #053 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas 79423 i* j i I SIGN RE DATE SIGNATORE DATE Page 2 of 2 Printed On: 9/29/2021 11:02 AM LIi LEWIS CONSTRUCTION, INC. JOB COST DETAIL REPORT DETAIL TOTALS DO NOT INCLUDE SUPER-?M.-?E-EST COST NOTE, THIS DETAIL DOES NOT INCLUDE BURDEN COSTS NOTE, THIS DETAIL FINAL TOTAL DOES NOT INCLUDE THESE PHASES 1041 SUPERINTENDENT - SEE DETAIL PAGE FOR PRASE TOTAL - ADD TO BOTTOM. LINE TOTAL 1043 PROD MGMT - SEE DETAIL PAGE FOR PRASE TOTAL - ADD TO BOTTOM. LINE TOTAL 1045 Ea TIMATING - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM. LINE TOTAL 1048 A5ST SUPER - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM. LINE TOTAL 1049 PROJ ENGINEER - ZEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM. LINE TOTAL 09-16-21 Page 1 System Dace: 09-16-21 ay.tem Time: 1:34 pm FS 1er Used: MASTER.A?M. MAS TER.JCM. CURRENT.JCT MASTER. ?RM. Date vendor/Employee Invoice Materials sub -tracts Rcgul- P&y Overtime Pay Temp Labor Comp Equip Rented Equip Coic 19-1907 LUBBOCK POLICE SUBST 2-NORTH 1-410 TESTING LAB SERVICES 05-04-2020 TERRA TESTING INC 24Q.10 675.00 675.00 05-06-2020 TERRA TESTING INC 240242 664.20 664.20 05-07-2020 TERRA TESTING INC 240249 600.00 600.00 05-09-2020 TERRA TESTING INC 240259 600.00 600.00 05-08-2020 TERRA TESTING INC 240260 540.00 540.00 05-11-2020 TERRA TESTING INC 240262 600.00 600.00 05-11-2020 TERRA TESTING INC 240266 604.90 604.90 05-12-2020 TERRA TESTING INC 240269 660.00 660.00 05-13-2020 TERM TESTING INC 240271 600.00 600.00 05-13-2020 TERM TESTING INC 240272 600.00 600.00 06-27-2020 TERM TESTING INC 240412 2,449,55 2,449.55 07-10-2020 TERRA TESTING INC 240475 400.00 480.00 07-10-2020 TERM TESTING INC 240476 480.00 460.00 07-13-2020 TERM TESTING INC 240493 480.00 480.00 10-12-2020 TERM TEi TING INC 240719 632.75 632.75 10-12-2020 TERM TESTING INC 240722 590.00 590.00 10-13-2020 TERM TESTING INC 240725 606.10 606.10 10-15-2020 TERM TESTING INC 240731 590.00 590.00 11-09-2020 TERM TESTING INC 240767 $90.00 590.00 12-07-2020 TERM TESTIN.^i INC 240879 591.40 591.40 12-34-2020 TERM TESTING INC 240996 1,070.00 1,070.00 12-16-2020 TERM TESTING INC 240904 630.00 630.00 12-18-2020 TERM TESTING INC 240913 510.00 510.00 12-23-2020 TERM TESTING INC 240916 597.35 597.35 01-04-2021 TERM IESTING INC 240920 590.00 590.00 01-05-2021 TERM TESTING INC 240921 590.00 590.00 01-04-2021 TERM TESTING INC 240922 480.00 480.00 01-06-2021 TERM TESTING INC 240928 590.00 590.00 01-06-2021 TERM TESTING INC 240931 480.00 480.00 01-07-2021 TERM TESTING INC 240929 639.70 639.70 01-20-2021 TERM TESTING INC 240947 480.00 480.00 01-20-2021 TERM TESTING INC 240945 677.50 677.50 01-25-2021 TERM TESTING INC 240952 591.10 591.10 02-03.2021 TERM TESTING INC 240980 590.00 590.00 rrresc!-%)IIk3•i4163a-IIIiO-E@�1i?ME114'' .has' 1410 Total 22.557.54 .00 .00 Job 1% 907 Total 22,557.54 .00 .00 .,rand Totals 22,557.54 .00 .Do REMEMBER TO ADD THE PHASES LISTED AT TOP OF PAGE TO OVERALL TOTAL ,00 ,00 .00 .00 22, 557. 54 ($407.99) tot $22,149.55 .00 .00 .00 ,00 22, 557.54 .00 .00 .00 ,00 22,557954 LEE LEWIS CONSTRUCTION, INC. JOB COST DETAIL REPORT DETAIL TOTALS DO NOT INCLUDE SUPER -PM -PE -EST COST NOTE, THIS DETAIL DOES NOT INCLUDE BURDEN COSTS NOTE, THIS DETAIL FINAL TOTAL DOES NOT INCLUDE THESE PHASES 1041 SUPERINTENDENT - SEE DETAIL PAGE FOR PRASE TOTAL - ADD TO BOTTOM. LINE TOTAL 1043 PROJ MGMT - SEE DETAIL PAGE FOR PHASE TOTAL - A'Dt TO BOTTOM. LINE TOTAL 1045 ESTIMATING - SEE DETAIL PAGE FOR PHASE TOTAL - AGO TO BOTTOM, LINE TOTAL 1048 REST SUPER - SEE DETAIL PAGE FOR PRASE TOTAL - ADD TO BOTTOM LINE TOTAL 1049 PROJ ENGINEER - SEE DETAIL PAGE FOR PRASE TOTAL A30 TO BOTTOM LINE TOTAL RPT Name: JCDETAIL 09-16-21 Page 1 System Date: 09-16-21 System Time: 1:35 pm Files Used: MASTER.APM MASTER.JCM CURRENT.JCT MASTER.PRM Date Vendor/Employee Invoice Materials Subccntroata Regular Pay Overtime Pay Temp Labor Camp Equip Rented Equip Coat 19-1907 LUBBOCK POLICE SUBST 2-NORTH 1-510 TEMPORARY UTILITIES 07-22-2020 CITY OF LUBBOCK UTILITIES 9716310 0720 27.41 07-27-2020 CITY OF LUBBOCK UTILITIES 9716215 0720 198.56 08-20-2020 CITY OF LUBBOCK UTILITIES 9716310 0820 55.60 08-27-2020 CITY OF LUBBOCK UTILITIES 9716215 0920 201.99 09-18-2020 CITY OF LUBBOCK UTILITIES 9716310 0920 46.70 09-28-2020 CITY OF LUBBOCK UTILITIES 9716215 0920 214.66 10-28-2020 CITY OF LUBBOCK UTILITIES 9716215 1020 215.31 30-20-2020 CITY OF LUBBOCK UTILITIES 9716310 1020 42.50 11-23-2020 CITY OF LUBBOCK UTILITIES 9716215 1120 192.06 11-17-2020 CITY OF LUBBOCK UTILITIES 9716310 1120 70.43 12-29-2020 CITY OF LUBBOCK UTILITIES 9716215 1220 224.56 12-21-2020 CITY OF LUBBOCK UTILITIES 9716310 1220 138.04 01-27-2021 CITY OF LUBBOCK UTILITIES 9716215 0121 192.06 01-22-2021 CITY OF LUBBOCK UTILITIES 9716310 0121 200.90 04-26-2021 CITY OF LUBBOCK UTILITIES 6868324681 421 288.09 04-26-2021 CITY OF LUBBOCK UTILITIES 6868324681 421 269.18 04-26-2021 CITY OF LUBBOCK UTILITIES 6868324681 421 286.83 04-26-2021 CITY OF LUBBOCK UTILITIES 6868324681 421 108.66 05-27-2021. CITY OF LUBBOCK UTILITIES 6868324681 0521 101.15 06-24-2021 CITY OF LUBBOCK UTILITIES 6868324681 0621 108.83 06-24-2021 CITY OF LUBBOCK UTILITIES 6868324681 0621 103.33 08-06-2021 CITY OF LUBBOCK UTILITIES 6868324681 0821 132.59 08-19-2021 SOUTH PLAINS ELECTRIC CO-OP. 394753-014 0821 14,070.00 08-24-2021 CITY OF LUBBOCK UTILITIES 6869324681 821 103.74 Phase 1510 Total 17,593.18 .00 ,00 Job 191907 Total 17,593.18 ,00 .00 Grand Totals 17,593.18 .00 .00 REMEMBER TO ADD THE PHASES LISTED AT TOP OF PAGE TO OVERALL TOTAL 27.41 198.56 55.60 201.99 46.70 214.66 215.31 42.50 192.06 70.43 224.56 139.04 192.06 200.90 288.09 269.19 286.93 108.66 101.15 108.83 103.33 132.59 14,070.00 703.74 .00 .00 .00 .00 17,593.18 00 .00 .00 .00 17,593.18 00 .00 .00 .00 17,593.18 Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #053 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #053: Reimbursement for testing & utilities TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 9/29/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: No Change Reason No EXECUTED: v v No �^ Amount Based V SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: No CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract TOTAL AMOUNT. $0.00 DESCRIPTION: City of Lubbock to reimburse LLCI for cost of testing after $15.000 allowance and for cost of all temporary utilities. See attached cost detail report, invoices. and Dav stubs. ATTAGHMENTS: 1510-1909.0f, 1410-1909.pdf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 1-410.1 TESTING LAB SERVICES.MATERIALS reimbursement testing $15,080.50 2 1-510.1 TEMPORARY UTILITIES.MATERIALS reimbursement utilities $5,285.61 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct PCCO 53 $(20,366.11) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $6,255,031.00 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 9/29/2021 11:02 AM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) 2022 Broadway Lubbock, Texas 79401 SIGNATURE DATE Lee Lewis Construction Inc. - HQ City of Lubbock 1314 Avenue K, 4th Floor Lubbock, Texas 79457 PCCO #053 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas 79423 SIG RE DATE SIGNATORE DATE Page 2 of 2 Printed On: 9I29/2021 11:02 AM LEE LEWIS CONSTRUCTION, INC. NOTE, THIS DETAIL DOES NOT NOTE, THIS DETAIL FINAL TOTF 1041 SUPERINTENDENT - SEE DETAIL, PAGE 1043 PRO.: MG - SEE DETAIL PAGE 1045 ESTIMATING - SEE DETAIL. PAGE 104E ASST SUPER - SEE DETAIL. PAGE 1049 PROD ENGINEER - SEE DETAIL. PAGE JOB COST DETAIL REPORT DETAIL TOTALS DO NOT INCLUDE SUPER -PM. -PE -EST COST INCLUDE BURDEN COSTS DOES NOT INCLUDE THESE PHASES FOR PRASE TOTAL - ADD TO BOTTOM LINE TOTAL FOR PHASE TOTAL - ADD TO BOTTOM LINE TOTAL FOR PHASE TOTAL, - ADD TO BOTTOM LINE TOTAL FOR PHASE TOTAL. - ADD TO BOTTOM. LINE TOTAL FOR PRASE TOTAL - ADD TO BOTTOM LINE TOTAL RPT Name: JCOETAIL Date Vendor/Employee Invoice 19-1909 LUBBOCK POLICE SUBST 3 -SOUTH 1-410 TESTING LAB SERVICES 03-12-2020 TERRA TESTING INC 24038 03-06-2020 TERRA TESTING INC 240025 03-11-2020 TERRA TESTING INC 240032 03-12-2020 TERRA TESTING INC 240037 03-12-2020 TERRA TESTING INC 24038 03-12-2020 TERRA TESTING INC 240038 03-23-2020 TERRA TESTING INC 240048 03-24-2020 TERRA TESTING INC 240049 03-25-2020 TERRA TESTING INC 240050 03-25-2020 TERRA TESTING INC 240052 03-26-2020 TERRA TESTING INC 240056 03-26-2020 TERRA TESTING INC 240058 03-27-2020 TERRA TESTING INC 240062 05-05-2020 TERRA TESTING INC 240231 06-23-2020 TERRA TESTING INC 240400 06�24-2020 TERRA TESTING INC 240403 07.02-2020 TERRA TESTING INC 240443 07-15-2020 TERRA TESTING INC 240489 OB-05-2020 TERRA TESTING INC -40586 08-30-2020 TERRA TESTING INC 240594 08-12-2020 TERRA TESTING INC 240601 09-03.2020 TERRA TESTING INC 240641 10-19-2020 TERRA TESTING INC 240741 10-19-2020 TERRA TESTING INC 240744 11-02-2020 TERRA TESTING INC 240765 11-04-2020 TERRA TESTING INC 240770 11-05-2020 TERRA TESTING INC 240714 11-06-2020 TERRA TESTING INC 240779 11-19-2020 TERRA TESTING INC 240782 11-06-2020 TERRA TESTING INC 240780 12-01-2020 TERRA TESTING INC 240965 12-01-2020 TERRA TESTING INC 240867 11-16-2020 TERRA TESTING INC 940815 11-19-2020 TERRA TESTING INC 240835 11-20-2020 TERRA TESTING INC 240841 11-23-2020 TERRA TESTING INC 240844 11-25-2020 TERRA TESTING INC 240851 11-24-2020 TERRA TESTING INC 240853 11-25-2020 TERRA TESTING INC 240854 12-09-2020 TERRA TESTING INC 240883 12-OB-2020 TERRA TESTING INC 240885 't`7-20"2Ri`Y�I'L%AS'IUO.�-AtIT'D0�1T'^M�M'r- -'K2'L5L`1y"1 07-13-2021 TERRA TESTING INC 241374 07-26.2021 TERRA TESTING INC 241400 Pbase 1410 io tal 09-16-21 Page 1 System Date: 09-16-21 Syutem Time: 1:34 pm Fil ea Used: MASTER.APM MASTER.JCM. CURRENT.JCT MASTER. PRM Materials Subcontracts Regulaz Pay Overtime Pay Temp Labor Comp Equip Rented Equip Cost 600.00 1,405.00 630.00 740.00 600.00- 600.00 625.55 600,00 600.00 600.00 600.00 600.00 600.00 2,404.40 480.00 480.00 638.30 590.00 590.70 590.00 510.00 2,322.85 1,770.00 340.00 660.00 660.00 590.00 594.20 622.90 450.00 490.00 591.40 502.50 590.00 510.00 594.90 590.00 699.10 480.00 831.00 480.00 NO ,00 .00 Job 191909 Total 30.583.86 .44 .00 Grand Totals 30 583.86 .00 .00 REMEMBER TO ADD THE PHASES LISTED AT TOP OF PAGE TO OVERALL TOTAL 600.00 1,405.00 630.00 740.00 600.00- 600.00 625.55 600.00 600.00 600.00 600.00 600.00 600.00 2,404.40 480.00 480.00 638.30 590.00 590.70 590.00 510.00 2,322.85 1,770.00 340, 00 660.00 660.00 590.00 594.20 622.90 450.00 480.00 591.40 502.50 590.00 510.00 594.90 590.00 699.10 490.00 831.00 480.00 805.00 1. 032.70 .00 :60 .00 .00 30,593.86 ($503.36) tot $30,080.50 ,00 .00 00 .00 30, 583.8- „00 n00 .-00 .00 30, 583.86 LEE LEWIS CONSTRUCTION, INC. JOi COST DETAIL REPORT 09-16-21 Page 1 DETAIL TOTALS DO NOT INCLUDE SUPER-PM.-PE^EST COST System Date: 09-16-21 System Time: 1:36 pm Files Used: MASTER.APM. MASTER.JCM CURRENT.JCT MASTER.PRM NOTE, THIS DETAIL DOES NOT INCLUDE BURDEN COSTS NOTE, THIS DETAIL FINAL TOTAL DOES NOT INCLUDE THESE PHASES 1041 SUPERINTENDENT - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM. LINE TOTAL 1043 PROJ M.GM.T - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM. LINE IOTA: 1045 ESTIMATING - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM LINE TOTAL 1048 ASST SUPER - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM. LINE TOTAL 1049 PROD ENGINEER - SEE DETAIL PAGE FOR PHASE TOTAL - ADD TO BOTTOM LINE TOTAL RPT Name: JCDETAIL Date Vendor/Employee Invoice Materials Subcontracts Regular Pay Overtime Pay Temp Labor Comp Equip Rented Equip Coat 19-1909 LUBBOCK POLICE SUBST 3 -SOUTH. 1-510 TEMPORARY UTILITIES 05-28-2020 SOUTH PLAINS ELECTRIC CO-OP. NO128855 2,229.57 2,229.57 07-23-2020 SOUTH PLAINS ELECTRIC CO-OP. 394753-002 0720 123.00 123.00 08-20-2020 SOUTH PLAINS ELECTRIC CO-OP. 394753002 0820 79.00 79.00 09-18-2020 SOUTH PLAINS ELECTRIC CO-OP. 394753-002 0920 77.00 77.00 30-28-2020 CITY OF LUBBOCK UTILITIES 9715529 1020 79.92 79.92 30-20-2020 SOUTH PLAINS ELECTRIC CO-OP. 394753002 1020 80.00 80.00 11-17-2020 SOUTH PLAINS ELECTRIC CO-OP. 394753-002 171.00 171.00 12-17-2020 SOUTH PLAINS ELECTRIC CO-OP. 394753002 1220 76.00 76.00 01-20-2021 SOUTH PLAINS ELECTRIC CO-OP. 394753002 0121 275.00 275.00 12-30-2020 CITY OF LUBBOCK UTILITIES 9715529 1220 145.40 145.40 01-29-2021 CITY OF LUBBOCK UTILITIES 9715529 0121 131.59 131.59 02-17-2021 SOUTH PLAINS ELECTRIC CO-OP. 394753002 0221 221.00 221.00 03-19-2021 SOUTH. PLAINS ELECTRIC CO-OP. 394753002 0321 277.00 277.00 04-26-2021 CITY OF LUBBOCK UTILITIES 6868324681 421 89.91 89.91 04-26-2021 CITY OF LUBBOCK UTILITIES 6868324691 421 59.94 59.94 04-26-2021 CITY OF LUBBOCK UTILITIES 6868324681 421 103.43 103.43 04-26-2021 CITY OF LUBBOCK UTILITIES 6868324681 421 64.70 64.70 04-20-2021 SOUTH. PLAINS ELECTRIC CO-OP. 394753-002 0421 172.00 172.00 05-27-2021 CITY OF LUBBOCK UTILITIES 6868324681 0521 131.94 131.94 06-24-2021 CITY OF LUBBOCK UTILITIES 6868324681 0621 132.62 132.62 07-12-2021 SOUTH PLAINS ELECTRIC CO-OP. 394753002 0721 175.00 175.00 08-06-2021 CITY OF LUBBOCK UTILITIES 6868324681 0821 $9.94 59.94 08-06-2021 CITY OF LUBBOCK UTILITIES 6868324681 0821 78.98 78.98 08-19-2021 SOUTH PLAINS ELECTRIC CO-OP. 394753-002 0821 82.00 82.00 08-24-2021 CITY OF LUBBOCK UTILITIES 6868324681 821 85.94 85.94 08-24-2021 CITY OF LUBBOCK UTILITIES 6868324681 821 83.74 83.74 Phase 1510 Total 5,285.62 .00 .00 .00 .00 .00 .00 5,285.62 Job 191909 Total 5,285.62 .00 .00 .00 .00 .00 .00 5,285661 Grand Totals 5,285.62 .00 .00 .00 .00 .00 .00 5,285.61 REMEMBER TO ADD THE PHASES LISTED AT TOP OF PAGE TO OVERALL TOTAL Exhibit I 19 Lee Lewis Construction, Inc. PCCO #054 Lee Lewis Construction Inc. - HQ Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 7810 Orlando Avenue 1901 N. MLK Lubbock, TX Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #054: Ballistic panels rm 118 TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/25/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: _ PAID DATE: SCHEDULE IMPACT: 7 days EXECUTED: No REVISED SUBSTANTIAL 4 SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: To fumish and install ballistic panels at CID admin per CCR 054. ATTACHMENTS: CCR#054 fall 3) ballistic panel at rm 118.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # I Title Schedule Impact Amount 054 1 Ballistic panels rm 118 17 days $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCB # 0_Sd- Rallictir_ nanalc rm I I R # Budget Code Description Amount 1 9-250.2 GYPSUM BOARD.SUBCONTRACTOR ballistic & gyp $1,762.00 2 9-900.2 PAINTING.SUBCONTRACTOR tape, bed, texture, paint $285.00 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $300.00 4 1-004.2 OWNERS CONTINGEN CY.SUBCONTRACTOR deduct ccr 54 $(2,347.00) Grand Total: $0.00 The original (Contract Sum) $5,911,358.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,911,358.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,911,358.00 The contract time will be increased by this Change Order by 7 days. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/25/2021 11:15 AM Lee Lewis Construction, Inc. Stephen Faulk (MV M Architects) City of Lubbock 2022 Broadway 1314 Avenue K, 4th Floor Lubbock, Texas 79401 Lubbock, Texas 79457 PCCO #054 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock, Texas 79423 NATURE DATE SI ATtI - DATE SIO TORE DATE Lee Lewis Construction Inc. - HO P ge 2 of 2 Printed On:10/2512021 11:14 AM 19 Lee Lewis PCCO #054 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 7810 Orlando Avenue 5910 Erskine Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #054: Ballistic panels rm 118 TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/25/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: Pending - In Review NO Amount Based NO DESCRIPTION: To furnish and install ballistic panels at CID admin per CCR 054. ATTACHMENTS: CCR#054 aIL 3]_ballistic panel at rm 118 pdf CHANGE ORDER LINE ITEMS: REVISION: 0 LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: Client Request No 7 days 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract $0.00 # Budget Code Description Amount 1 9-250.2 GYPSUM BOARD.SUBCONTRACTOR ballistic & gyp $1,762.00 2 9-900.2 PAINTING.SUBCONTRACTOR tape, bed, texture, paint $285.00 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $300.00 4 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 54 $(2,347.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 7 days. $5,741,888.00 $0.00 $5,741,888.00 $0.00 $5,741,888.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/25/2021 11:14 AM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) City of Lubbock 2022 Broadway 1314 Avenue K, 4th Floor Lubbock, Texas 79401 Lubbock, Texas 79457 PCCO #054 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas 79423 i O' /Z-ZOZZ 'd NATURE DATE SI A DATE SIO TORE DATE Lee Lewis Construction Inc. - HQ P 2 of 2 Printed On: 10/25/2021 11:14 AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #054 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #054: Ballistic panels rm 118 TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/25/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: Pending - In Review No Amount Based FIELD CHANGE: No DESCRIPTION: To furnish and install ballistic panels at CID admin per CCR 054. ATTACHMENTS: CCR#054 (all 3) ballistic panel at rm 118.Qdf CHANGE ORDER LINE ITEMS: REVISION: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT:~ REVISED SUBSTANTIAL COMPLETION DATE: 0 Client Request No 7 days CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract TOTAL AMOUNT- $0.00 # Budget Code Description Amount 1 9-250.2 GYPSUM BOARD.SUBCONTRACTOR ballistic & gyp $1,762.00 2 9-900.2 PAINTING.SUBCONTRACTOR tape, bed, texture, paint $285.00 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $300.00 4 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 54 $(2,347.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 7 days. $6,255,031.00 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/25/2021 11:14 AM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) City of Lubbock 2022 Broadway 1314 Avenue K, 4th Floor Lubbock, Texas 79401 Lubbock, Texas 79457 PCCO #054 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas 79423 D`� /Z-ZOZZAm 65: �V� NATURE DATE SIG A - DATE SIG ATURE DATE Lee Lewis Construction Inc. - HQ Pel f2 Printed On: 10/25/2021 11:14 AM HAMILTON ACOUSTICAL COMPANY A division of H Construction Systems, Inc. TO Lee Lewis Construction Attn: Clayton Proposal DATE October 21, 2021 JOB Lubbock PD Substations DESCRIPTION We propose to furnish all labor and material to apply all work listed below according to plans and specifications. Special conditions of this bid will be noted below. *** CCR #054 *** -Furnish and install Level 3 Bullet Resistant Panel and 1/4" gypsum board under existing window glazing in room 118 (CID Admin) per CCR. Excluding: Tax, demo, tape, bed, texture, and paint Thank you, Buddy Cronkhite Accepted By Price per Substation: By 71010th Street P.O. Box 2703 Lubbock, Texas79408 806.763.3830 Fax 744.0640 AMOUNT $1, 762.00 This proposal is limited to ten days acceptance. If we are called upon to perfo-rm this work after ten days we reserve the rieht to revise niir nrire in arrnrdanre with enetc in effert at that time MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#054CHANGE REQUEST #054 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 10-14-2021 Re: City of Lubbock —East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: Please provide pricing to add a ballistic panel below the ballistic glazing at 118 CID Admin. Submitted by: Stephen Drewell Attachments: Dewberry written description, Product data, A140, A804 Contractors Response: Additional days requested for this CCR: ❑Add to / ❑Deduct From Contract Sum ❑ Add to / ❑ Deduct From Contingency Allowance ❑Add to / ❑Deduct From Allowance (Name of Allowance) Total CCR CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: (Signature) Thank you, Stephen Faulk 10-14-2021 Date: Dewberry Architects Inc. 918.587.7283 Dewberry 1350 South Boulder, Suite 600 918.587.0071 fax Tulsa, CK 74119 www.dewberry.com Public Safety Improvement Project, Three PROJECT: CCR NUMBER: Police Substations DATE OF ISSUANCE: OWNER: City of Lubbock ARCHITECTS PROJECT NO.: CONTRACT FOR: CCR 054 054 10/13/2021 18018 Construction Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three substations. 1. Add level 3 ballistic protection to the wall below the level 3 ballistic glazing at 118 CID Admin. a. Remove resilient base from walls below counter and set aside for reinstallation later. b. Attach Level 3 Rated Ballistic Resistant fiberglass panel. i. Product by Total Security Solutions or approved equal. Refer to included product specification sheet. ii. Attach panel with adhesive approved by manufacturer. iii. Lap butt joints if joints are required by scoring and removing a portion of the existing gyp board behind so that the face of the BR panels are flush. c. Attach a new layer of gyp board to the face of the BR fiberglass panel with adhesive. d. Reattach resilient base. Refer to the following revised drawings for location and details. 1. A140 Enlarged Floor Plans 2. A804 Interior Details TOTAL PRODUCT SOLu�ONs I SPECIFICATION SHEET FEATURES Fiberglass Armor is a reinforced structural polyester laminate that exhibits unique bullet resisting characteristics. These flat, opaque panels are press molded between plates at high pressure and elevated temperature. Fiberglass structural armor is designed to progressively delaminate as a bullet penetrates. The hard surface and toughness of the material cause the bullet to distort and flatten. As the bullet penetrates, the layers of (fiberglass) reinforcement within the laminate pull apart in a controlled manner such that the energy of the bullet is dissipated within the laminate. More energy is consumed as the bullet 3 penetrates the high -strength glass fibers. No spalling occurs. MARKETS SERVED I Teller Counters I Gas Station I Convenience Store I Pay Counters I Remote Electronic Building I Secure Rooms and Buildings I Judge Benches I Reception Areas I INSTALLATION • For cutting, carbide or ceramic grit saw blades are recommended. Use carbide tooling when drilling, spot facing, or counter boring • Buttjoints are weak. To reinforce, use 4" strip of same material. No rigid high -density material should be used adjacent to panel's inner surface. Allow a minimum gap of 1/4" BALLISTIC RATING • U.L 752 / Level 3 • N.I.J. 0108.01 / Level IIIA STANDAR )S • UL-94 VO Flame Rating AVAILABLE SHEET SIZES I3'X8'l13'X10'114'X8'l14'X10'I Consult TSS representative for custom sheet FIBERGLASS BR OPAQUE ARMOR PRODUCT: BB-3 �,1�•;� 1. UL LISTED BULLET RESISTANT FG PANEL . BATTEN STRIP (CUT ROM FG SHEET, STEEL OR WOOD STUDS JOINTS BETWEEN FIBERGLASS O BE KEPT TIGHT DRYWALL 5. PROPERTIES & SPECIFICATIONS 1/2' 5 44 Mag 1 240 Gram SWGI Vebdty1=1350 FT/S Velocity 2 = 1400 Fr/S TOTAL SECURITY SOLUTIONS P: 517.223.7807 1 info@tssbulletproof.com I F. 517.223.08051935 Garden Lane, Fowlerville, MI Proprietary information not for public distribution 2in/in/°Cx10-' 2 BTU/HR/ft2/in/°F 0 0 A �� Slnxwm L - "oormni �"lmm 0Wmis., SEMI PUBLIC SAFETY IMPROVEMENT PROJECT, THREE POLICE SUBSTATIONS - EAST 1901 MLK LUBBOCK. TEXAS T 5 5 4 3 0 72 =3 C WEAPONS Local? 6 MR. SLUD c w.,K 1161 w�N r i A i Ii A ..... — — »..,. _— L Section 53 INTERIOR WALL SECTION 4 u L7 «. r INTERIOR WAtI SECTION 3 4 1 INTERIOR WALL SECTION 2 INTERIOR WALL SECTION I Exhibit J Lee Lewke Construction Ina - HO 7810 C WWD Avenue Lubbock, T4M 79423 Phwee: 808.7974MW Fee *IAW.787.1034 PCO #057 Project 194905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK LWbmk TX Prime Contract Potential Change Order d057: CCR 067 additional card readers TO: CITY OF LUBBOCK FROM: Lee Lewis Corninxtlon - NO 1314 Avenue K. Lubbook, TX 79401. USA 7810 Orlando Ave _ LUBBOCK Texas 7507 LWAWk . T = 79M PCC NUAtBmIREVISION: W710 �- CONTRACT- 1- LUBBOCK POLICE 8U88TATM RRQURBT RECEIVED FROM: STATUS: 1119FERIMM' FIELDCHIAHIGE:---------- LOCATION: SCHEDULE BIPACT: iiii! o-' EA87' PdM Contract CREATED BY CWjbn Broke (LN Lawle Construction - "M Pendky - In RWAM CREATED DAW-- 10118/J021 PRIME CONTRACT OW - OCR 057 additional card readers CHANGE ORDER: No _.._ Says No POTENTIAL CHANGE ORDER TITLE: OCR 037 sdd7Yxre] tend readers CHANGE REASON: Client Request ACCOUNTING METHOD. Amount Based PAID IN FULL: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: :coo POTENTIAL CHANGE 0RDERDESCRIPTION: (The Con6adtoChoordAsfoib" Tb Awnish end bu tei I additional card madars per CCR 057. AT UMMENTS: crafttw 33 addltlsnaicdr0 refloom tf 0 BudDc Cade Dsserlptioa Amount 1 l"W 2 BASIC ELECT. MATERIALS 8 edd card modem Sl I A1538 METH O.SUBCONTRACTOR 2 6.100.2 ROUGH CARPENTRY.SUBCONTRACTOR deli B 3 Afth protection "KOO 3 00nN SUBCONTRACTOR deduct oar 57 Grand Tbtai: "M Stephen Faulk INIM ARCHITECTS INC.) CITY OF LUBBOCK in Lewis Construction - NQ 2022 8reWM 1314 Avenue K Lubbock, TX 79401. USA 7810 Orlando Ave LA Ck. Testes 79M LUBBOCK, Texas TOW T 79M O7'-// ZOZZ Z19-c7L 4-40 DATE DATE DATE Lee Lewis Construce n Inc. - No Poe 1 all Prkded On: 414I2022 02:48 PM asp, **tx Tampb Eboblc SM Avenue P trubbwk TX 711423 Tel: NS-746.7010 •*FVCIICMW f• PnoJso! Number: ISM vm*Bldft OCR OB% PdWe Sub Stet = ACCESS Tempts Ebddc SM Avenue P Lutlbock TX 784n Tat: 808-746.7070 kv~Nlp6 Q11 CCR O5T CAw% 11f787 hers been Bub" per Lee Lswb oa and Temple ebcMa Thb ravidon b la add Card Rasdwa to doom 11S. G* on all Lubbock po8oe Bub sleR ' East South and Nodh 3 aard roedero total Tito quota mupeimedee d *therm perbidrG to tltb door Coedulb end 120 VAC by otf term it needed. 1 Lloenee - bdudae 10 ed"W*01M (m gym) s 1 Cibnt SWPCwftbm (30 Read=) A 1 SWW ClWd NOWAL 3 Dum reader krfelfaos dub oortbedw Reedem 6 StOwAnd btpua. 6 Rfty OutatL 3 Reader lut►A m SWm MWddaes 3 bfah bolt manlmr RCI I -SW VlAdlh x Ida Depth x O' HOWIL 1 KMMCOMtPOSITEACCE88OONMOLCAMJL YEU.OW.1.000F r R 4 MbcebroM* Hmdwaoe f FOC 8064484M Pd" E>bnded This '' Proposed • • to VWW for!0 Days. i n0a MWMW W;; awnaw�Tole. 1"D Jemhw c9BBdrw woe IN I -met n& kdomwtlort b p aptbbq! end oonAduft b Ertterpras Sea * $Wwbm of TUN. Ina (ESST) and b *ref► for fha use of th* VWhldual er w ft to whom k was dd w s& No hart oflift document mef► be dWbA$C ntpmdwed or utllbed 1n any fam+ a by any ntaeneebWadc er ntedanl - kidudk+g w ape g in 101/6 gt oz9 vrrltlnp from SM. Tilled*atrmenta to be rebrmed b ESBT upon re�uemt of ESST. TOMOTotal $11.315.38 nmf?a ramN ErmBrplM el�aBa 6elueo� dlk aft ay. t ar t 3FARM Exhibit K [I Lee Lewis PCCO #058 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 7810 Orlando Avenue 1901 N. MLK Lubbock, TX Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #058: Add manual roller shades TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/26/2021 CREATED BY. Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT: 7 days REVISION: 0 REVIEWED BY: REVIEW DATE: PAID DATE: EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: To furnish and install additional roller shades per CCR 058. ATTACHMENTS: CCR#058 {all 3] additional roller shades.pf n^TMuTIAI ruAurc nor%COC OU TUIC L`UAIdPF nOrk= - PCO # Title I Schedule Impact Amount 058 1 Add manual roller shades 17 days $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: A — — .-1 -AIL.- w1..- 4-- # Budget Code Description Amount 1 12-520.2 SHADES.SUBCONTRACTOR add shades $2,130.00 2 9-900.2 PAINTING.SUBCONTRACTOR touch up at new shades $350.00 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $700.00 4 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR deduct ccr 58 $(3,180.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 7 days. $5,911,358.00 $0.00 $5,911,358.00 $0.00 $5,911,358.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/26/2021 02:08 PM Lee Lewis Construction, Inc. Stephen Faulk @ WM Architects) City of Lubbock 2022 Broadway 1314 Avenue K 4th Floor Lubbock, Texas 79401 Lubbock, Texas 79457 PCCO #058 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock. Texas 79423 7 10-27-1011 TORE DATE 110 DATE SIGNATURE TE Lee Lewis Construction Inc. - HQ Page 2 of 2 Printed On:10l28I2021 02.08 PM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #058 Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 5910 Erskine Lubbock, TX Prime Contract Change Order #058: Add manual roller shades TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/26/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: ~� PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No DESCRIPTION: To furnish and install additional roller shades per CCR 058. ATTACHMENTS: CCR#058 Lail 3] additional roller shades. df CHANGE ORDER LINE ITEMS: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULEIMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: Client Request No 7 days 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract $0.00 # Budget Code Description Amount 1 12-520.2 SHADES.SUBCONTRACTOR add shades $2,130.00 2 9-900.2 PAINTING.SUBCONTRACTOR touch up at new shades $350.00 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $700.00 4 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 58 $(3,180.00) Grand Total: The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 7 days. $5,741,888.00 $0.00 $5,741,888.00 $0.00 $5,741,888.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/26/2021 02.07 PM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) City of Lubbock 2022 Broadway 1314 Avenue K 4th Floor Lubbock, Texas 79401 Lubbock, Texas 79457 PCCO #058 Lee Lewis Construction - HQ 7810 Odando Ave Lubbock . Texas 79423 TORE DATE DATE SIGNATURE 15ATE Lee Lewis Construction Inc. - HQ Page 2 of 2 Printed On:1012612021 02.08 PM Lee Lewis PCCO #058 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 7810 Orlando Avenue 14005 Indiana Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #058: Add manual roller shades TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/26/2021 CREATED BY: T Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: LOCATION: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Client Request PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 7 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract TOTAL AMOUNT: $0.00 DESCRIPTION: To furnish and install additional roller shades per CCR 058. ATTACHMENTS: CCR#058 [all 31 additional roller shades.pdf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 12-520.2 SHADES.SUBCONTRACTOR add shades $2,130.00 2 9-900.2 PAINTING.SUBCONTRACTOR touch up at new shades $350.00 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $700.00 4 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 58 $(3,180.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 7 days. $6,255,031.00 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/26/2021 02:07 PM Lee Lewis Construction, Inc. Stephen Faulk (RMM Architects) City of Lubbock 2022 Broadway 1314 Avenue K 4th Floor Lubbock. Texas 79401 Lubbock, Texas 79457 PCCO #058 Lae Lewis Construction - HO 7810 Orlando Ave Lubbock. Texas 79423 ��j7 0A11-TORE DATE DATE SIGNATUREATE Lee Lewis Construkdon Inc. - HO Page 2 of 2 Printed On:10/26f2021 02-08 PM ANDERSON CUSTOM L�Bo,A 7 AVE. 9424 UM 200 WINDOW COVERINGS INC. Phone:806-687-3225 Fax:806-687-3157 accustomwindowcoverings@gmail.com www.andersoncustomwindowcoverings.com CHANGE ORDER PROPOSAL Date:10/25/2021 General Contractor: Lee Lewis Construction Inc. Project Name: Lubbock Police Substation South City/State: Lubbock, Texas Atin: Clayton Brake Qty Description Total 7 Mechoshade Systems Manual Roller Shades +$2,130.00 Includes Measure and Installation Thank You For Your Business We Appreciate You!!! MATTHEW 22:37 JESUS REPLIED: "LOVE THE LORD YOUR GOD WITH ALL YOUR HEART AND WITH ALL YOUR SOUL AND WITH ALL YOUR MIND" MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#058CHANGE REQUEST #058 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 10-20-2021 Re: City of Lubbock —East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: Please provide pricing to add manual roller shades (RS2) per the attached description. Submitted by: Stephen Drewell Attachments: Dewberry written description. A140, A141 Contractors Response: Additional days requested for this CCR' ❑ Add to / ❑Deduct From Contract Sum ❑ Add to / ❑ Deduct From Contingency Allowance ❑ Add to / ❑ Deduct From Allowance (Name of Allowance) Total CCR CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: (Signature) Thank you, Stephen Faulk 10-20-2021 Date* Dewberry Dewberry Architects Inc. 918.587.7283 1350 South Boulder, Suite 600 918.587.0071 fax Tulsa, OK 74119 . www.dewberry.com CCR 058 PROJECT: Public Safety Improvement Project, Three CCR NUMBER: 058 Police Substations _ IDATE OF ISSUANCE: 10/18/2021 OWNER: I City of Lubbock ARCHITECTS PROJECT NO.: 18018 CONTRACT FOR: Construction Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three substations. 1. Add manual roller shades (RS2) to the following locations: a. CID Lt. 115: sidelight at door b. CID Sgt. 117: sidelight at door c. Deputy Chief 121: sidelight at door d. Patrol Duty Sgt. 136: window adjacent to Report Writing Stations and sidelight at door e. Patrol Lt. 138: sidelight at door 2. Manual Roller Shades (RS2) to match color and opacity of RS1. Refer to the following revised drawings for location and details. 1. A140 Enlarged Floor Plans 2. A141 Enlarged Floor Plans m Ell m I111111111WINWINNINNIM III IIII III�III�Illl �Illllil III�Il III!II �Ilil ! 1901 MUK LUBBOCK, TEXAS 7 0 5 D C 3 ENLARGED FLOOR PLAN O 0 0 m m' v Fr o © o Cal m T, T memos®©©EW. ®®gym® F Qo � Q it -M .� Q b bb ob 2 ENIARGED FLOOR PLAN O 1 ENLARGED FLOOR PLAN O Exhibit L Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #059 Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Change Order #059: CCR 059 Add phone line in lobby TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/28/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT - REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 3 days EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: To fumish and install an additional phone line in the public lobby per attached CCR 059. ATTACHMENTS: CCR#Q59 (all 3) added phone line for LoblN. POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO # I Title Schedule Impact Amount 059 1 CCR 059 Add phone line in lobby 13 days $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO A 059- CCR n59 Add nhnno lino in Inhhu # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & phone line $247.67 METHO.SUBCONTRACTOR 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $200.00 3 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR deduct ccr 59 $(447.67) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 3 days. $5,911,358.00 $0.00 $5,911,358.00 $0.00 $5,911,358.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/28/2021 01:10 PM Lee Lewis Construction, Inc. Stephen Faulk (MWM Archkects) 2022 Broadway Lubbock, Texas 79401 /0 NATURE DATE City of Lubbock 1314 Avenue K, 41h Floor Lubbock, Texas 79457 PCCO #059 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas M23 DATE SI TURE DATE Lee Levms Constriction Inc. - HQ Page 2 of 2 Printed On 10/ =021 01:10 PM Lee Lewis Construction, Inc. PCCO #059 Lee Lewis Construction Inc. - HQ Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 7810 Orlando Avenue 5910 Erskine Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #059: CCR 059 Add phone line in lobby TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/28/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: Pending - In Review PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: REVISION: 0 LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: Client Request EXECUTED: No SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: 3 days FIELD CHANGE: No CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract TOTAL AMOUNT: $0.00 DESCRIPTION: To furnish and install an additional phone line in the public lobby per attached CCR 059. ATTACHMENTS: CCR#059 (all 3) added phone line for Lobbv.ndf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR add phone line $247.67 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $200.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 59 $(447.67) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 3 days. $5,741,888.00 $0.00 $5,741,888.00 $0.00 $5,741,888.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/28/2021 01:05 PM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) City of Lubbock 2022 Broadway 1314 Avenue K, 4th Floor Lubbock, Texas 79401 Lubbock, Texas 79457 PCCO #059 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas 79423 MATURE DATE DATE SIGIRATURE DATE Lee Lewis Construction Inc. - HO Page 2 of 2 Printed On. 102&2021 01:10 PM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #059 Project: 19-1909 -LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #059: CCR 059 Add phone line in lobby TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Y -CREATED Lubbock, Texas 79423 DATE CREATED: 10/28/2021 BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Client Request PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 3 days SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract TOTAL AMOUNT: $0.00 DESCRIPTION: To furnish and install an additional phone line in the public lobby per attached CCR 059. ATTACHMENTS: CCR#059 ( A 3)-added ithone line for Lobbypdf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR p hone line $247.67 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $200.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 59 $(447.67) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 3 days. $6,255,031.00 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/28/2021 01:03 PM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) 2022 Broadway Lubbock Texas 79401 SIGNATURE DATE Lee Lems Construction Inc. - HO City of Lubbock 1314 Avenue KK 4th Floor Lubbock, Texas 79457 PCCO #059 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas 79423 ode OV R I GATE SIGRATURE rDATE Page 2 of 2 Printed On. 1 O2812021 01:10 PM 4 k Telcom, Inc. TEL,EM corns AEor 1v-.etT* $ Y S T E M S Prepared especially for Temple Electric On Thursday, October 28, 2021 Prepared by Tate Bartlett tbardett@telecolubbock.com Lubbock Telcom, Inc. 8110 19th Street Lubbock, TX 79407 Phone:8067955800 Fax: 806.795.6043 Proposal: 390 Created: 10/20/2021 Printed: 10/28/2021 Proposal for Temple Electric 3 Cat6 wiring run (Plenium) Exclusions: Any work needed from Temple Electric. (if work is need there will be additional cost) Prices are firm until 11/3/2021 Terms: Net 30 Quoted by: Accepted by: Tate Bartlett, tbartlett@telecolubbock.com Proposal: 390 10/20/2021 Page:2 $675.00 Your Price: $675.00 Total: $675.00 Temple's 10% $68 Total $743 Date: 10/20/2021 Date: 8110 19th Street Lubbock, TX 8067955800 telIub@telecolubbock.com MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#059CHANGE REQUEST #059 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 10-07-2021 Re: City of Lubbock —East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: Please provide pricing to add a phone line in the Lobby as per the attached. Submitted by: Stephen Drewell Attachments: Dewberry written description, TT-101 Contractors Response: Additional days requested for this CCR' ❑ Add to / ❑ Deduct From Contract Sum ❑ Add to / ❑ Deduct From Contingency Allowance $ ❑Add to / ❑Deduct From Allowance $ (Name of Allowance) Total CCR CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: Date: (Signature) Thank you, Stephen Faulk 10-07-2021 Dewberry Dewberry Architects Inc. 918.587.7283 1350 South Boulder, Suite 600 918.587.0071 fax Tulsa, OK 74119 www.dewberry.com CCR 059 PROJECT: Public Safety Improvement Project, Three CCR NUMBER: 059 — jjj Police Substations DATE OF ISSUANCE: 10/6/2021 OWNER: City of Lubbock ARCHITECTS PROJECT NO.: 18018 CONTRACT FOR: -� Construction Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three substations. 1. Furnish wall mounted telephone outlet in Public Lobby 101. Locate above card reader at elevation sufficient for clearance between owner furnished and installed phone and card reader. Refer to the following revised drawings for locations and more information. 1. TT-101 First Floor Plan - Telecom 0 R 1 I 3 1 G I E N z , TELECOM SYMBOL LEGEND •.A�.L III- -- IIJJ � III I I<<m'��I®.®U �I II II II II II II II III III I �I-----li-�--�----- I III iai jl Ijl fll '� II lj II li I! !! IE 111 I I III 1 1 �I III I I I I I t 1 1 1 1 I I I I III III I TELECOM FLOOR PLAN IT/DATA 124 ENLARGED PLAN 2 ITI w . ra Em architect, 0 Dewberrsr O w a m w z � ?o h U0,4 wU Y 7 O NgYV m U w f 0 DO w > >2$� J ar-�� Exhibit M Fqq Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax- +1.806.797.1034 PCCO #060 Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Change Order #060: Hardware for interview rooms TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/25/2021 CREATED BY. Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY. - DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: 1 day EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: To furnish and install modifications to lock sets for interview rooms per CCR 060. ATTACHMENTS: CCR#060 (all 3) hardware for interview rooms.pdf POTFNTIAI CHANGF ORDERS IN THIS CHANGE ORDER: PCO # I Title Schedule Impact Amount 060 1 Hardware for interview rooms 1 day $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PM 8 nRn• Hardwara fnr intarviaw ranms # Budget Code Description Amount 1 8-100.2 METAL DOORS AND modify interview rms $949.00 FRAMES.SUBCONTRACTOR 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $200.00 3 1-004.2 OWNERS deduct ccr 60 $(1,149.00) CONTINGENCYSUBCONTRACTOR Grand Total: $0.00 The original (Contract Sum) $5,911,358.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,911,358.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,911,358.00 The contract time will be increased by this Change Order by 1 day. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/25/2021 10.26 AM Lee Lewis Construction, Inc. Stephen Faulk (M1MN Architects) 2022 Broadway Lubbock, Texas 79401 /O 2? ZDZ SIG TORE DATE City of Lubbock 1314 Avenue K, 4th Roar Lubbock, Texas 79457 PCCO #060 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas 79423 Lee Lewis Construction Inc. - HO Page 2 of 2 Printed On: 10/25/2021 10:26 AM [gq Lee Lewis PCCO #060 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 7810 Orlando Avenue 5910 Erskine Lubbock, TX Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #060: Hardware for interview rooms TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/25/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: �^ _ REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: PAID IN FULL: No EXECUTED: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT., SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: TOTAL AMOUNT: DESCRIPTION: To furnish and install modifications to lock sets for interview rooms per CCR 060. ATTACHMENTS: CCR#060 all 3 hardware for interview rooms.f CHANGE ORDER LINE ITEMS: Client Request No 1 day 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract $0.00 # Budget Code Description Amount 1 8-100.2 METAL DOORS AND FRAMES.SUBCONTRACTOR modify interview rms $949.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $200.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 60 $(1,149.00) Grand Total: $0.00 The original (Contract Sum) $5,741,888.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,741,888.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,741,888.00 The contract time will be increased by this Change Order by 1 day. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On. 10/25/2021 10:26 AM Lee Lewis Construction, Inc. Stephen Faulk (MV M Architects) 2022 Broadway Lubbock, Texas 79401 /0��� SIGI ATURE DATE City of Lubbock 1314 Avenue K, 4th Floor Lubbock, Texas 79457 PCCO #060 Lee Lewis Corrstruetion - HO 7810 Orlando Ave Lubbock. Texas 79423 Lee Lewis Construction Ina - HO Page 2 of 2 Printed On: 10/2512021 10,26 AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #060 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #060: Hardware for interview rooms TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/25/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: Pending - In Review REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No REVISION: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: DESCRIPTION: To furnish and install modifications to lock sets for interview rooms per CCR 060. ATTACHMENTS: CCR#06UgII-: ]-hardware for interview rooms.pdf CHANGE ORDER LINE ITEMS: 0 Client Request No 1 day 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 # Budget Code Description Amount 1 8-100.2 METAL DOORS AND FRAMES.SUBCONTRACTOR modify interview rms $949.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $200.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr60 $(1,149.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 1 day. $6,255,031.00 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/25/2021 10:26 AM Lee Lewis Construction, Inc. Stephen Faulk (tI MI Architects) 2022 Broadway Lubbock. Texas 79401 818 A7URE DATE City of Lubbock 1314 Avenue K. 4th Floor Lubbock, Texas 79457 PCCO #oso Lee Lewis Construction - HO 7810 Orlando Ave Lubbock, Texas 79423 Lee Lewis Constnn:don Ina - HO Page 2 of 2 Printed On: 10/25/2021 10,26 AM Clayton Brake From: Marcus Clay <mcclay@rsmbuilderssupply.com> Sent: Wednesday, October 20, 2021 5:09 PM To: Clayton Brake Cc: Josh Weems; Tyson Jones Subject: RE: LBK POLICE CCR 060.pdf This email originated from an external sender. Please exercise caution before clicking on any links or attachments. 2 ea. mortise locks set storeroom function. Add $949.00 per station. Core to be reused in new lock. Thank you �. RSM SUPIPLY �a MARCUS CLAY VICE PRESIDENT 800 CROCKETT AMARILLO, TEXAS 79102 PH:806-372-8322 FX:806-372-3819 From: Clayton Brake <cbrake@leelewis.com> Sent: Wednesday, October 20, 2021 10:34 AM To: Marcus Clay <mcclay@rsmbuilderssupply.com> Cc: Josh Weems <jweems@leelewis.com> Subject: LBK POLICE CCR 060.pdf Importance: High Marcus, The LPD was not happy with the way the interview room door hardware was functioning, so we are pricing this change for them, can you get me numbers on this ASAP? Thanks for the help Thank you, Clayton Brake 1 MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#060CHANGE REQUEST #060 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 10-07-2021 Re: City of Lubbock —East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: Please provide pricing for the revisions to door hardware sets for Interview Rooms 113 and 114. Submitted by: Stephen Drewell Attachments: Dewberry written description Contractors Response: Additional days requested for this CCR-, ❑Add to / ❑Deduct From Contract Sum $ ❑ Add to / ❑ Deduct From Contingency Allowance $ ❑ Add to / ❑ Deduct From Allowance $ (Name of Allowance) Total CCR CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt oapproved document by the ontractor, the ontractor shall proceed with the changes) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: Date: (Signature) Thank you, Stephen Faulk 10-07-2021 Dewberry Dewberry Architects Inc. 918.587.7283 1350 South Boulder, Suite 600 918.587.0071 fax Tulsa, OK 74119 www.dewberry.com CCR 060 PROJECT: Public Safety Improvement Project, Three CCR NUMBER: 060 Police Substations DATE OF ISSUANCE: 10/5/2021 OWNER: City of Lubbock ARCHITECTS PROJECT NO.: 18018 CONTRACT FOR: Construction Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three substations. 1. Revise door hardware sets for Interview Rooms 113 and 114. a. Card reader to remain for entrance into the room b. Modify existing lock set for storeroom function, i.e. locked from the outside but always free egress from the inside. Hardware set 15.1. e Dewberry- Exhibit N [[qq Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #061 Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Change Order #061: CCR 061 Add telecom room 136 TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/28/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT 4 days REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 11UBBOCK POLICE SUBSTATION EAST Prime Contract DESCRIPTION: To furnish and install additional telecom outlets per CCR 061. ATTACHMENTS: 0^TMLTIAI ruAWre f%Dr%CDC IId TYIC L`WAIdGF nomm. REVISION: 0 REVIEWED BY: REVIEW DATE: PAID DATE: EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $0.00 PCO # I Title I chedule Impact Amount 061 1 CCR 061 Add telecom room 136 14 days $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: ni`r%M nod- P/PD n&4 AAA 4.1-- - VQR - ---- # ---- ----------------- Budget Code Description Amount' 1 16-050.2 BASIC ELECT. MATERIALS & add telecom $536.13 METHO.SUBCONTRACTOR 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $400.00 3 1-004.2 OWNERS deduct ccr 61 $(936.13) CONTINGENCYSUBCONTRACTOR Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will be increased by this Change Order by 4 days. $5,911,358.00 $0.00 $5,911,358.00 $0, 00 $5,911,358.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/28/2021 01:26 PM Lee Lewis Construction, Inc. Stephen Faulk (NNVW Amhitecta) 2022 Broadway Lubbock, Texas 79401 NATURE DATE Lee Lewis Construction Inc. - HO City of Lubbock 1314 Avenue K. 4th Floor Lubbock, Texas 79457 •/%ZZ S DATE Page 2 of 2 PCCO #061 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock, Texas 79423 FOO(. A: SIGNATURE DATE Printed Orr 10/28I2021 01:24 PM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #061 Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 5910 Erskine Lubbock, TX Prime Contract Change Order #061: CCR 061 Add telecom room 136 TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/28/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No Amount Based No DESCRIPTION: To furnish and install additional telecom outlets per CCR 061. ATTACHMENTS: CCR#06lLaA l 3) added telecom outlets rm 136. df CHANGE ORDER LINE ITEMS: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: Client Request No 4 days 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract $0.00 # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR add teleco $536.13 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $400.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 61 $(936.13) Grand Total: $0.00 The original (Contract Sum) $5,741,888.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,741,888.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,741,888.00 The contract time will be increased by this Change Order by 4 days. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/28/2021 01:24 PM Lee Lewis Construction, Inc. Stephen Faulk (MWM Architects) 2022 Broadway Lubbock, Texas 79401 ATURE DATE Lee Lewis Construchon Inc. - HO CRY of Lubbock 1314 Avenue K. 4th Floor Lubbock, Texas 79457 SIGN RE DATE Page 2 of 2 PCCO #061 Lee Lewis Construction - HO 7810 Odando Ave Lubbock, Texas 79423 SIGNATURE DATE Printed On, 10128=1 01:24 PM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #061 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #061: CCR 061 Add telecom room 136 TO: City of Lubbock FROM: Lee Lewis Construction - HQ 1314 Avenue K, 4th Floor 7810 Orlando Ave Lubbock, Texas 79457 Lubbock, Texas 79423 DATE CREATED: 10/28/2021 CREATED BY: Clayton Brake (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: Amount Based No DESCRIPTION: To furnish and install additional telecom outlets per CCR 061. ATTACHMENTS: CCR#061(all 31 added telecom outlets rm_136.1 f CHANGE ORDER LINE ITEMS: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT. REVISED SUBSTANTIAL COMPLETION DATE: Client Request No 4 days CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract TOTAL AMOUNT: $0.00 # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR add teleco $536.13 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning & finish protection $400.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 61 $(936.13) Grand Total: $0.00 The original (Contract Sum) $6,255,031.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $6,255,031.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $6,255.031.00 The contract time will be increased by this Change Order by 4 days. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 10/28/2021 01:24 PM Lee Lewis Construction. Inc. Stephen Faulk (MWM Architects) 2022 Broadway Lubbock, Texas 79401 ATURE DATE Lee Lewis Construction Inc. - HO City of Lubbock 1314 Avenue K. 4th FIw Lubbock, Texas 79457 ,a •/%?Z 4WN�&ME DATE Page 2 of 2 PCCO #061 Lee Lewis Consblrktion - HO 7810 Orlando Ave Lubbock, Texas 79423 ce lei SIGNATURE DA Printed On: 10/2812021 01:24 PM 4 L ck Telcom, Inc. TELEGW corvus MmThwJugTak S Y S T M Prepared especially for Temple Electric On Thursday, October 28, 2021 Prepared by Tate Bartlett tbartlett@telecolubbock.com Lubbock Telcom, Inc. 8110 19th Street Lubbock, TX 79407 Phone:8067955800 Fax: 806.795.6043 Proposal: 391 Created:10/20/2021 Printed: 10/28/2021 Proposal for Temple Electric 6 Cat6 wiring run (Plenium) Exclusions: Any work needed from Temple Electric. (if work is need there will be additional cos) Prices are firm until 11/3/2021 Terms: Net 30 Quoted by: Accepted by: Tate Bartlett, tartlett@telecolubbock.com Proposal: 391 10/20/2021 Page:2 $1,350.00 Your Price: $1,350.00 Sales Tax $111.38 SubTotal: $1,461.38 Total: $1,461.38 Temple's 10% $147 Total $1,608.38 Date: 10/20/2021 Date: 8110 1901 Street Lubbock, TX 8067955800 tellub@telecolubbock.com MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#061 CHANGE REQUEST #061 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 10-14-2021 Re: City of Lubbock —East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description. Please provide pricing to furnish and install (2) new wall mount telecommunications outlets in Patrol Duty Sgt. 136. Submitted by: Stephen Drewell Attachments: Dewberry written description, TT-101 Contractors Response: ❑Add to / ❑Deduct From Contract Sum ❑Add to / ❑Deduct From Contingency Allowance ❑Add to / ❑Deduct From Allowance Total CCR Additional days requested for this CCR: $ $ (Name of Allowance) CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: (Signature) Thank you, Stephen Faulk 10-14-2021 Date: Dewberry Architects Inc. 918.587.7283 Dewberry 1350 South Boulder, Suite 600 918.587.0071 fax Tulsa, OK 74119 www.dewberry.com CCR 061 PROJECT: Public Safety Improvement Project, Three CCR NUMBER: 061 Police Substations DATE OF ISSUANCE: 10/13/2021 OWNER: City of Lubbock ARCHITECTS PROJECT NO.: 18018 CONTRACT FOR: Construction Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three substations. 1. Furnish and install (2) new wall mount telecommunications outlets in Patrol Duty Sgt. 136. Each outlet to be equipped with (1) drop. Refer to the following revised drawings for additional information. 1. TT-101 First Floor Plan - Telecom 6 a it N 5 0 2 1 TELECOM SYMBOL LEGEND I III I I II III III II II II II II II !I I@ III I I 1A —_—_— fit:,{•nf-.—�I�IIIII'' I I I I bjI� \ter,_—t_-1 _- i---Tt-r uL__1- 'f___—=Tt'-1•a- l®_-MITI'—_ •-T21�',I®-,®_'Y^•I'—_I—_—_— r-1 e I I. - ---- MP 4:: J�--j} -Al —j--1 l,� ,1T I III _ fill III -= ,(I I I III III ®• �� I ®• c, I I I I���,��, ��� I I I I I I I I III III I I III I IE��..1I®.®uII II II II II II II II III �II I ---! 4----- 1--a-•--•---- I 1p jl I1 III III f� II ! I� ij I� 11 li III I F 11 1! I I I II I I I I I I I I 11 1 I[ II I I OLELECOM FLOOR PLAN s... ,a ,a ELT/DATA 1 ENENLARGED PLAN wr ,.. rc ♦ ".uww,m,e.cv...rvuon.n E.."Wtects - Dewberry' -101 Exhibit O 19 Lee Lewis PCCO #062 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 7810 Orlando Avenue 14005 Indiana Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #062: CCR 062 Roller shade TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock , Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 2/26/2022 CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) CONTRACT STATUS: Draft REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No REVISION: 0 LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: Client Request No CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract TOTAL AMOUNT: $0.00 DESCRIPTION: CE #062 - CCR 062 Roller shades main corridor To furnish and install additional roller shades down the main corridor and staff break room per CCR 062. Option 1 - manual shades (see attached proposal from Anderson Custom Window Coverings) Option 2 - motorized shades (see below pricing and attached subcontractor backup) Note: the pricing on this PCCO is for "Option 1" motorized shades. ATTACHMENTS: CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 12-520.2 SHADES.SUBCONTRACTOR shades $14,693.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning and finish protection $400.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS deduct ccr 062 $(15,093.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $6,255,031.50 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 2/26/2022 12:11 PM Lee Lewis Construction, Inc. Stephen Faulk (MWM ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 79401 CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK. Texas 79457 PCCO #os2 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock. Texas 79423 �03--07 Zo2Z �� TURE DATE SIGN?~' -ATE SIG+V'V—�� Lee Lewis Construction Inc. - HQ Page 2 of 2 Printed On: 2/26f2022 11:46 AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #062 Project: 19-1907 -LUBBOCK POLICE SUBSTATION NORTH 5910 Erskine Lubbock, TX Prime Contract Change Order #062r01: CCR 062r01 Roller Shades TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 2/26/2022 CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) CONTRACT STATUS: Draft REVISION: 1 REQUEST RECEIVED Stephen Drewell LOCATION: building interior>135 corridor FROM: DESIGNATED REVIEWER: Tyler Briney (Lee Lewis Construction - HQ) REVIEWED BY: DUE DATE: INVOICED DATE - REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: Client Request No 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract TOTAL AMOUNT: $0.00 DESCRIPTION: CE #062r01 - CCR 062 Manual Roller shades main corridor To furnish and install additional roller shades down the main corridor and staff break room per CCR 062. Option 1 - manual shades (see attached proposal from Anderson Custom Window Coverings) Option 2 - motorized shades (see below pricing and attached subcontractor backup) Note: the pricing on this PCCO is for "Option 1" manual shades. ATTACHMENTS: CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 12-520.2 SHADES.SUBCONTRACTOR shades $14,693.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning and finish protection $400.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct CCR 062 $(15,093.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $5,741,888.05 $0.00 $5,741,888.00 $0.00 $5,741,888.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 2/26/2022 11:46 AM Lee Lewis Construction, Inc. Stephen Faulk (MWM ARCHITECTS INC.) 2022 Broadway Lubbock. Texas 79401 CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK. Texas 79457 PCCO #os2 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock. Texas 79423 � � I Firwiv,01,mmz, P", t Lee Lewis Construdion Inc. - HO Page 2 of 2 Printed On: 2/2612022 11.46AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #062 Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Change Order #062: CCR 06201 - Roller Shades TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO BOX 7810 Orlando Ave 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 2/26/2022 CONTRACT STATUS: Draft CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: f INVOICED DATE: PAID DATE: SCHEDULE IMPACT: EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: CE #062r01 - Roller Shades To furnish and install additional roller shades down the main corridor and staff break room per CCR 062. Revised to include all three patrol stations. Manual roller shades as directed by COL facilities. ATTACHMENTS: CCR#062R (all 3) -, Roller shades ff POTENTIAL CHANGE nRDFRS IN THIS CHANGE nRIIFR- PCO # I Title Schedule Impact Amount 062r01 I CCR 062r01 - Roller Shades $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PM A nR2rni- CCR nR9rn1 - Rnlinr Rh2dec # Budget Code Description Amount 1 12-520.2 SHADES.SUBCONTRACTOR shades $14,693.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR cleaning and finish protection $400.00 3 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR Deduct CCR 062 $(15,093 .00 ) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $5,911,358.00 $0.00 $5,911,358.00 $0.00 $5,911,358.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 2/26/2022 12:04 PM 19 Lee Lewis Construction, Inc. Stephen Faulk (MYVM ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 79401 CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK, Texas 79457 PCCO #os2 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock. Texas 79423 i elW01"Wen 1-vim '. Lee Lewis Construction Inc. - HO Page 2 of 2 Printed On: 21 W022 11:46 AM ANDERSON CUSTOM 8502 URBANA AVE. SME 200 LUBBOCK, TX 79424 WINDOW COVERINGS INC. Phone:806-687-3225 Fax 806-687-3157 accustomwindowcoverings@gmail.com www.andersoncustomwindowcoverings.com CHANGE ORDER PROPOSAL Date: 02/23/22 General Contractor: Lee Lewis Construction, Inc. Project Name: Lubbock Police Substation North City/State: Lubbock, TX Qty Description Project Total 31 MechoShade Single Manual Roller Shades $14,693.00 Includes Measure and Installation Project Total $42,960.00 Change Order Add #001 $640.37 CCR #062 $14,693.00 Project Total with Change Orders $58,293.37 Thank You For YourBusiness We Appreciate You!!! MATTHEW 22:37 JESUS REPLIED: "LOVE THE LORD YOUR GOD WITH ALL YOUR HEART AND WITH ALL YOUR SOUL AND WITH ALL YOUR MIND" Revised MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#062CHANGE REQUEST #062 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 11-16-2021 Re: City of Lubbock — North Police Substation MWM ARCHITECT'S Project No. 18018 WM tects Manual roller shades for all three patrol stations per request from Darren with COL Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description. Please provide pricing to add either manual or motorized Roller Shades down the main corridor and the staff break room at the north substation only. For motorized shades please Provide 120V power and control wiring connections to the shades as directed by the shade installer. Connect power to the nearest 120V receptacle circuit Submitted by Stephen Drewell Attachments: Dewberry written description. A140, A141 Contractors Response. Additional days requested for this CCR: ❑Add to / ❑Deduct From Contract Sum $ ❑Add to / []Deduct From Contingency Allowance $ ❑Add to / ❑Deduct From Allowance $ (Name of Allowance) Total CCR $ CONSTRUCTION CHANGE RE12UEST APPROVAL When signed by Owner and upon receipt of approved ocumeM by the ontractor, t e ontractor shall proceed with the changes) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: Date: (Signature) Thank you, Stephen Faulk 11-16-2021 W Dewberry PROJECT: Public Safety Improvement Project, Three Police Substations OWNER: City of Lubbock Dewberry Architects Inc. 918.587.7283 1350 South Boulder, Suite 600 918.587.0071 fax Tulsa, OK 74119 www.dewberry.com CCR 062 CCR NUMBER: 062 DATE OF ISSUANCE: 11/4/2021 ARCHITECTS PROJECT NO.: 18018 CONTRACT FOR: Construction Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For North Substation only. Provide pricing for the following 2 options: 1. Furnish and install MANUAL roller shades along 109 Corridor and 108 Staff Break Area 2. Furnish and install MOTORIZED roller shades along 109 Corridor and 108 Staff Break Area * For both options, roller shade metal fascia and fabric to match what is already on the project • Metal Fascia and other metals: Clear Anodized • Shade Fabric: Soho Collection 1% Openness, Color 1119 Sullivan Refer to the following marked up drawings for additional location information. 1. A140- Enlarged Floor Plans 2. A141- Enlarged Floor Plans * Refer to electrical for additional information for motorized roller shades. UUUUUU� III IN ' PUBLIC SAFETY IMPROVEMENT PROJECT THREE pnunsSUBSTATIONS ' NORTH 1910 ERSIGNE STREEI LUBBOCK TDM ---------- ----- - W, PUBLIC SAFETY IMPROVEMENT PROJECT THREE POLICE SUBSTATIONS - NORTH 5910 ERSVJNE STREET UABOCK TEXAS IT I I Exhibit P Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax:+1.806.797.1034 PCCO #063 Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Change Order #063: CCR-063 - Additional Light TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO BOX 7810 Orlando Ave 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/03/2022 CREATED BY: Tyler Briney (Lee Lewis Construction - CONTRACT STATUS DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: Pending - In Review 1:LUBBOCK POLICE SUBSTATION EAST Prime Contract DESCRIPTION: CE #CCR-063 - Additional Light Fixtures Add one 0 fixture over lavatory in staff RR 133 ATTACHMENTS: POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: HQ) REVISION: 0 REVIEWED BY: REVIEW DATE: PAID DATE: EXECUTED: SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: No $0.00 PCO # I Title Schedule Impact Amount 063 1 CCR-063 - Additional Light $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO 9 n63- CCR-nA3 - Additional Licht # Budget Code Description Amount) 1 16-050.2 BASIC ELECT. MATERIALS & Additional Fixture $764.00 METHO.SUBCONTRACTOR 2 6-100.2 ROUGH CARPENTRYSUBCONTRACTOR Finish protection and Cleaning $200.00 3 1-004.2 OWNERS Deduct for CCR 063 $(964.00) CONTINGENCY.SUBCONTRACTOR Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $5,911,358.00 $0.00 $5,911,358.00 $0.00 $5,911,358.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/3/2022 04:57 PM Lee Lewis Construction, Inc. Stephen Faulk (iM WM ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 79401 �03-Ih� 2022 NATURE pA� CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK Texas 79457 PCCO #063 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock, Texas 79423 Lee Lewis Construction Inc. - HO Page 2 of 2 Printed On: 3012022 04:57 PM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #063 Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 5910 Erskine Lubbock, TX Prime Contract Change Order #063: CCR-063 - Additional Light TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/03/2022 CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED LOCATION: FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No DESCRIPTION: CE #CCR-063 - Additional Lght_Fixtures Add one D fixture over lavatory in staff RR 133 ATTACHMENTS: CHANGE ORDER LINE ITEMS: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON EXECUTED: SCHEDULE IMPACT. REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: Client Request No 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract $0.00 # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR Additional Light $764.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish protection and cleaning $200.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct for CCR 063 $(964.00) Grand Total: $0.00 The original (Contract Sum) $5,741,888.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,741,888.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,741,888.00 The contract time will not be changed by this Change Order. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/3/2022 04:57 PM Lee Lewis Construction, Inc. Stephen Faulk (AWN ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 79401 03 -1��2022 eo;?�NATURE DATE PCCO #063 Lee Lewis Construction • HO 7810 Orlando Ave Lubbock, Texas 79423 Y riz SKiNA DATE SIGNATURE DATE CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK Texas 79457 Lee Lewis Construction Inc.. HO Page 2 of 2 Printed On: 3/3/2022 04:57 PM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #063 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #063: CCR-063 - Additional Light TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/03/2022 CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No Amount Based No DESCRIPTION: CE #CCR-063 - Additional Li ht Fixtures Add one D fixture over lavatory in staff RR 133 ATTACHMENTS: CHANGE ORDER LINE ITEMS: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT. Client Request No 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR Additional Light $764.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish protection and cleaning $200.00 3 1-004.1 OWNERS CONTINGENCYMATERIALS Deduct for CCR 063 $(964.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $6,255,031.00 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/3/2022 04:58 PM Lee Lewis Construction, Inc. Stephan Faulk (MtNM ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 79401 03-/�-2c»22 NATURE DATE Lee Lewis Constnrdion Inc. • HQ CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK, Texas 79457 PCCO #os3 Lee Lewis Construction • HQ 7810 Orlando Ave Lubbock. Texas 79423 DATE SIGNATURE DATE Page 2 of 2 Printed On: 3I3I2022 04:57 PM Page No. 1 of 1 Pages Proposal Attn: Josh Weems A, I 99 UUft flV1 I d Option #4 PO BOX 3367 40."A..� 7Ac 7n7n 1 6IaangK TEXPG 70-' TECL # 17764 Proposal Submitted to Fax Proposal No. Lee Lewis Construction 03122 Street Phone Date March 1, 2022 City, State and Zip Code Job name Lubbock Police Stations Email Address Date of Plans job Location ob Phone jweems@leelewiscom Lubbock, TX e hereby submit specifications and estimates for: Type D Can Light Add Labor and Material to add (1) type D can light in restroom 133 above sink which will be off center of existing can light at Police East each of the three police satiations. Fixture Quote 361.00 Labor 270.00 Material 83.00 Total 714.00 Exclusion: removal and replacement of sheetrock painting Police South 714.00 Police North 741.00 Shipping 150.00 We propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: dollars ( $ 2,292.00 ) . II material is guaranteed to be as specified. All work to be completed in a Authorized workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed Signature Mike Temple p only upon written orders, and will become an extra charge over and above he estimate. All agreements contingent upon strikes, accidents or delays Note: This proposal may be beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by workmen's Compensation withdrawn by us if not accepted within days. Insurance. Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized Signature o do the work as specified. Payment will be and as outlines above. Date of Acceptance: Signature Exhibit Q 19 Lee Lewis Construction, Inc. PCCO #064 Lee Lewis Construction Inc. - HQ Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 7810 Orlando Avenue 1901 N. MLK Lubbock, TX Lubbock. Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #064: CCR-064 - Articulating TV TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO BOX 7810 Orlando Ave 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/01/2022 CONTRACT STATUS: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: Pending -In Review 1:LUBBOCK POLICE SUBSTATION EAST Prime Contract CREATED BY: REVISION: REVIEWED BY - REV] FV DATE: PAID DATE: EXECUTED: SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: DESCRIPTION: CE #CCR-064 - Articulating TV Mount Please provide pricing to replace the existing wall mount display fixed mount hardware with Chief/Legrand AV Large Flat Panel Swing Arm Wall Display Mount, model PDRUB. Remove and return existing wall mount display to COL for future use ATTACHMENTS: LBK POLICE CCR 064.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: Tyler Briney (Lee Lewis Construction - HQ) 0 No $0.00 PCO # Trifle Schedule Impact Amount 064 CCR-064 - Articulating TV $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO 9 n6A- CCR.n6d . Artir_ulatinn TV # Budget Code Description Amount 1 16-740.2 VOICE AND DATA Articulating Wall Mount $2,058.00 SYSTEMS.SUBCONTRACTOR 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish protection and cleaning $200.00 3 1-004.2 OWNERS Deduct for CCR 064 $(2,258.00) CONTINGENCY.SUBCONTRACTOR Grand Total: $0.00 The original (Contract Sum) $5,911,358.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,911,358.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,911,358.00 The contract time will not be changed by this Change Order. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/1/2022 10:13 AM Lee Lewis Construction, Inc. Stephen Faulk (MWM ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 79401 CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK, Texas 79457 PCCO #064 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock, Texas 79423 �f * 29m*I- ItAINAA ` / 1r Lee Lewis Construction Inc. - HQ Page 2 of 2 Printed On: 3Hl2022 10.13 AM Lee Lewis PCCO #064 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 7810 Orlando Avenue 5910 Erskine Lubbock, TX Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #064: CCR-064 - Articulating TV TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/01/2022 CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No Amount Based No LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: DESCRIPTION: CE #CCR-064 - Articulating TV Mount Please provide pricing to replace the existing wall mount display fixed mount hardware with Chief/Legrand AV Large Flat Panel Swing Arm Wall Display Mount, model PDRUB. Remove and return existing wall mount display to COL for future use ATTACHMENTS: CHANGE ORDER LINE ITEMS: Client Request No 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract $0.00 # Budget Code Description Amount 1 16-740.2 VOICE AND DATA SYSTEMS.SUBCONTRACTOR TV Mount $2,058.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish Protection and Cleaning $200.00 3 1-004.1 OWNERS CONTINGENCYMATERIALS Deduct for CCR 064 $(2,258.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $5,741,888.00 $0.00 $5,741,888.00 $0.00 $5,741,888.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/1 /2022 10:15 AM Lee Lewis Construction, Inc. Stephen Faulk (MW M ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 79401 PCCO #064 Lee Lewis Construetlon - HO 7810 Orlando Ave Lubbock. Texas 79423 T11RE DATE Sid DATE DATE CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK, Texas 79457 Lee Lewis Construction Inc. - Ho Page 2 of 2 Pnrftd On: 3/1/2022 10713 AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax* +1.806.797.1034 PCCO #064 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #064: CCR-064 - Articulating TV TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/01/2022 CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: No Amount Based FIELD CHANGE: No LOCATION: REVIEWED BY, REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT. DESCRIPTION: CE-#CCR-064 - Articulating TV Mount Please provide pricing to replace the existing wall mount display fixed mount hardware with Chief/Legrand AV Large Flat Panel Swing Arm Wall Display Mount, model PDRUB. Remove and return existing wall mount display to COL for future use ATTACHMENTS: CHANGE ORDER LINE ITEMS: Client Request No 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 # Budget Code Description Amount 1 16-740.2 VOICE AND DATA SYSTEMS.SUBCONTRACTOR TV Mount $2,058.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish Protection and Cleaning $200.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct for CCR 064 $(2,258.00) Grand Total: $0.00 The original (Contract Sum) $6,255,031.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $6,255,031.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $6.255,031.00 The contract time will not be changed by this Change Order. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed Ong 3/1/2022 1022 AM Lee Lewis Construction, Inc. Stephen Faulk JMWM ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 70401 PCCO #064 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock, Texas 79423 03-09 2D22 DATE ] SKI ATi1RE DATE �� r5 q O SI DATE CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK, Texas 79457 Lee Lewis Consbimbon Ina - HQ Page 2 of 2 Pnnted On: 3H /2022 1013 AM MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#064CHANGE REQUEST #064 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 12-10-2021 Re: City of Lubbock — East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: Please provide pricing to replace the existing wall mount display fixed mount hardware with Chief/Legrand AV Large Flat Panel Swing Arm Wall Display Mount, model PDRUB. Remove and return existing wall mount display to COL for future use. Submitted by: Stephen Drewell Attachments: Dewberry written description Contractors Response: ®Add to / ❑Deduct From Contract Sum ❑ Add to / [—]Deduct From Contingency Allowance ❑Add to / ❑Deduct From Allowance Additional days requested for this CCR: 2 $ $6,172.50 (Name of Allowance) Total CCR $ 6,172.50 CONSTRUCTION CHANGE RE12UEST APPROVAL When signed by Owner and upon receipt o approveddocument the contractor, the Contractor shall proceed with the changes) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By. (Signature) Date: Thank you, Stephen Faulk 12-10-2021 Police Sub -Stations ( East, North & South ) Lubbock, TX City of Lubbock 1901 MLK Lubbock, TX 79403 (806) 775-2275 Presented By: Tarpley Media Systems 3737 50th ST Lubbock, Texas 79413 United States (806) 797-5833 www.tarpleymedia.com Number. 8 Modified: 12/20/2021 Ila eyio MEDIA 1 CHIEF CSMP9X12 $57.78 Component Storage Panel, Interface 1 CHIEF PACCC2 $281.47 On -Wall Universal Kiosk Fan Kit 30CFM 1 CHIEF PDRUB $1,118.25 Large Flat Panel Floor Stand (Without Interface) For Sharp LBT422U 42" LCD TV 1 Tarpley Media Labor $600.00 Labor 1 CHIEF CSMP9X12 $57.78 Component Storage Panel, Interface 1 CHIEF PACCC2 $281.47 On -Wall Universal Kiosk Fan Kit 30CFM 1 CHIEF PDRUB $1,118.25 Large Flat Panel Floor Stand (Without Interface) For Sharp LBT422U 42" LCD TV 1 Tarpley Media Labor $600.00 Labor * Price Includes Accessories 1 CHIEF CSMP9X12 $57.78 Component Storage Panel, Interface 1 CHIEF PACCC2 $281.47 On -Wall Universal Kiosk Fan Kit 30CFM 1 CHIEF PDRUB $1,118.25 Large Flat Panel Floor Stand (Without Interface) For Sharp LBT422U 42" LCD TV 1 Tarpley Media Labor $600.00 Labor Change Order Subtotal: $6,172.50 * Price Includes Accessories Total Installation Price: Grand Total: Client: Clayton Brake Date Contractor: Tarpley Media Systems Date NM#50997 $6,172.50 $6,172.50 Exhibit R [[qq Lee Lewis Construction, Inc. PCCO #065 Lee Lewis Construction Inc. - HQ Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 7810 Orlando Avenue 1901 N. MLK Lubbock, TX Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #065: CCR-065 - Exterior Security TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO BOX 7810 Orlando Ave 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/01/2022 CONTRACT STATUS: Pending - In Review DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CREATED BY: REVISION: REVIEWED BY: REVIEW DATE: PAID DATE: Tyler Briney (Lee Lewis Construction - HQ) 0 EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: CE #CCR-065 - Exterior Securi Camera Please provide pricing to ADD (1) One exterior security camera to cover the two doors in the mechanical yard. This is for all three stations ATTACHMENTS: LBK POLICE CCR 065.odf POTENTIAL CHANGE nRnFRS IN THIS CHANf:F nRnRR• PCO # I Title Schedule Impact Amount 065 1 CCR-065 - Exterior Security $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO * O65' CCR.n65 . Fxtarinr Sacuritu # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR Install Security Camera $1,364.22 2 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR Deduct for CCR 065 $(1,364.22) Grand Total: $0.00 The original (Contract Sum) $5,911,358.70 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,911,358.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,911,358.00 The contract time will not be changed by this Change Order. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/1/2022 10:49 AM Lee Lewis Construction, Inc. Stephen Faulk (MWM ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 79401 CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 20W LUBBOCK. Texas 79457 PCCO #065 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock, Texas T9423 ♦ • / ✓//ice _T!!L/ �Bfi►IA\r Lee Le%ms Construction Inc. - HO Page 2 of 2 Printed On: 3/IM= 10:49 AM Lee Lewis Construction, Inc. PCCO #065 Lee Lewis Construction Inc. - HQ Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 7810 Orlando Avenue 5910 Erskine Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #065: CCR-065 - Exterior Securit TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas 79423 DATE CREATED: 3/01/2022 CREATED BY. CONTRACT STATUS: Pending - In Review REVISION: REQUEST RECEIVED FROM: LOCATION: DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No REVIEW DATE: PAID DATE: Tyler Briney (Lee Lewis Construction - HQ) 0 CHANGE REASON: Client Request EXECUTED: No SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract TOTAL AMOUNT $0.00 DESCRIPTION: CE #CCR-065 - Exterior Se uri Camera Please provide pricing to ADD (1) One exterior security camera to cover the two doors in the mechanical yard. This is for all three stations ATTACHMENTS: CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS 8 METHO.SUBCONTRACTOR Security Camera $1,364.22 2 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct for CCR 065 $(1,364.22) Grand Total: $0.00 The original (Contract Sum) $5,741,888.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,741,888.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,741,888.00 The contract time will not be changed by this Change Order. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/1/2022 10:50 AM Lee Lewis Construction, Inc. Stephen Faulk (M1MM ARCHITECTS INC.) 2022 Broadway Lubbock. Texas 79401 CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK. Texas T9457 PCCO #065 Lee Lewis Construction - HO 7810 Orlando Ave Lubbock , Texas T9423 i2'�" 01 1 A Lee Lewis Construction Inc, - HO Page 2 of 2 Printed On: 311/2022 10:49 AM Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #065 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #065: CCR-065 - Exterior Security TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock, Texas 79423 DATE CREATED: 3/01/2022 CONTRACT STATUS: REQUEST RECEIVED FROM: Pending - In Review DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No CREATED BY. Tyler Briney (Lee Lewis Construction - HQ) REVISION: 0 LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: CHANGE REASON: EXECUTED: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: DESCRIPTION: CE #CCR-065 - Exterior Securitv Camera Please provide pricing to ADD (1) One exterior security camera to cover the two doors in the mechanical yard. This is for all three stations ATTACHMENTS: CHANGE ORDER LINE ITEMS: Client Request No 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR Security Camera $1,364.22 2 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct for CCR 065 $(1,364.22) Grand Total: $0,00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $6,255,031.00 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/1/2022 10:51 AM Lee Lewis Construction, Inc. Stephen Faulk (M1MM ARCHITECTS INC.) 2022 Broadway Lubbock. Texas 79401 CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK. Texas 79457 PCCO #065 Lee Lewis Construction - HO 7810 OriarAo Ave Lubbock. Texas 79423 01�1 i i ♦ 1 Lee Lewis Construction Inc. - HO Page 2 of 2 Printed On: 3/1/2022 10:49 AM Page No. 1 of 1 Pages Proposal Attn: Josh Weems ' P.O BOX 3367 (806) 745 7070 LUBBOCK. TEXAS 79452 TECL # 17764 Proposal Submitted to Lee Lewis Construction Fax Proposal No. 011922 Street Phone Date January 19, 2022 City, State and Zip Code job name Lubbock Police Stations Email Address jweems@leelewis.com Date of Plans job Location Lubbock, Tx ob Phone e hereby submit specifications and estimates for: CCR #65 Labor and Material to complete all work for CCR #65. Temple's material $168.00 Temple's Labor $640.00 ESST cost $3,284.68 Exclusion: damaged ceiling tiles painting conduit We propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: dollars ( $ 4,092.68 ) . II material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above he estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen's Compensation Insurance. Authorized Signature Mike Temple p Note: This proposal may be withdrawn by us if not accepted within days. Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized o do the work as specified. Payment will be and as outlines above. Date of Acceptance: Signature Signature MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#065CHANGE REQUEST #065 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 12-27-2021 Re: City of Lubbock — East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description. Please provide pricing to ADD (1) One exterior security camera to cover the two doors in the mechanical yard. This is for all three stations. Submitted by- Stephen Drewell Attachments: Dewberry written description. TY-010, TY-011. TY-012 Contractors Response: ❑ Add to / ❑ Deduct From Contract Sum ❑Add to /❑Deduct From Contingency Allowance ❑Add to / ❑Deduct From Allowance Additional days requested for this CCR: (Name of Allowance) Total CCR $ CONSTRUCTION CHANGE RE12UEST APPROVAL When signed by Owner and upon receipt or approved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By Date: (Signature) Thank you, Stephen Faulk 12-27-2021 Dewberry PROJECT: Public Safety Improvement Project, Three Police Substations OWNER: City of Lubbock Please provide pricing for the following modifications. Dewberry Architects Inc. 918.587.7283 1350 South Boulder, Suite 600 918.587.0071 fax Tulsa, OK 74119 www.dewberry.com CCR 065 CCR NUMBER: 065 DATE OF ISSUANCE: 12/16/2021 ARCHITECTS PROJECT NO.: 18018 CONTRACT FOR: Construction DESCRIPTION OF MODIFICATIONS: For all three division stations. Provide pricing to add the following: 1. Install (1) fixed IP camera to underside of roof overhang/soffit, away from building wall. Pendant housing. a. Direct view toward two doors in mechanical yard. Refer to the following revised drawings for location and details. 1. TY-010 North Site Plan - Security 2. TY-011 East Site Plan - Security 3. TY-012 South Site Plan - Security 7 a i 11 3 P s A al AI nNORTH SITE -NORTH STAFF GATE Sw. ,,SECURITY NORTH SITE PLAN `/ snr i ma nNORTH SITE -SOUTH STAFF GATE sr. r. ioa S1TE SECURITY SYMBOL LEGEND IEW.",'m 1 • Dewberry ■ E ci EAST 19TH STREET rr < _ s _ i - I `� f 9 C f r IM LL I l y, i l a I s.,. .. - fl- 7, f -- SECURITY EAST SITE PLAN 7 rer ,.,na 2 EEA ASTUTE- EAST STAFF GATE aronttects • Dewberry TY-011 u 0 0 i I.a AI 140th Stteet I � e n n W l 11;J _. J z z MIA- Tu 142NO STREET II nSECURITY SOUTH SITE PLAN " sa. mu SITE SECURITY SYMBOL LEGEND slI DESCraPItON g c:wumom�rnaoa.wow c.ua.nw .woa - - - -------- --- rl SwrOUSITE - NE STAFF GATE � s. r.TH ,00 SOUTH SITE - SOUTH GATE t=t �i Wm � Dewberry nSOUTH SITE - WEST STAFF GATE -- TY-012 Exhibit S [[gq Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #066 Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 1901 N. MLK Lubbock, TX Prime Contract Change Order #066: CCR-066 - Evidence Locker TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO BOX 7810 Orlando Ave 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/04/2022 CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULEIMPACT: EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT: $0.00 Prime Contract DESCRIPTION: CE #CCR-066_- Evidence Locker Changes Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three division stations. 1. Refer to attached sketch related to replacement of existing door hardware at (2) Evidence Storage Room doors (X141A and X141 B). The revision is required to allow the owner desired functions for the doors and to also allow intrusion detection alarm function to work correctly. 2. The functions related to evidence storage procedure are by owner's card access (Open Options), representative John Hubbard. 3. The third Evidence Storage Room door (X141 C) is to remain as is, no modifications are necessary. ATTACHMENTS: LBK POLICE CCR O6Gpdf POTENTIAL CHANGE nPnPRS IN TMIR 1-14Aura0 nonFo- PCO # I Title Schedule Impact Amount 066 1 CCR-066 - Evidence Locker $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCn N MR. CCR-nRR - Fvielnnrn 1 .. 1— # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR Locker Hardware $7,408.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish protection and Cleaning $500.00 3 9-900.2 PAINTING.SUBCONTRACTOR Painting $750.00 4 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR Deduct for CCR 066 $(8,658.001 Grand Total: $0.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/4/2022 01:02 PM Lee Lewis Construction, Inc. PCCO #066 The original (Contract Sum) $5,911.368.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract Ume will not be changed by this Change Order. Stephen Faulk (M M ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 79401 CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 LUBBOCK, Texas 79457 $5,911,358.00 $0.00 $6.911.358.00 Lee Lewis Construction - HQ 7810 Orlando Ave Lubbock. Texas 79423 03-07-2022- 110 SKNIA 3 Q Iv, as TURE DATE sKsNA DATEbATt Lee Lewis Construction tion Inc. - HO Page 2 of 2 Printed On: 3/4/2022 01:02 PM [[gq Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 PCCO #066 Project: 19-1907 -LUBBOCK POLICE SUBSTATION NORTH 5910 Erskine Lubbock, TX Prime Contract Change Order #066: CE #CCR-066 - Evidence Locker TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/04/2022 CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) CONTRACT STATUS: Pending - In Review REVISION: 0 REQUEST RECEIVED FROM: DESIGNATED REVIEWER: LOCATION: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: REFERENCE: CHANGE REASON: Client Request PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: SIGNED CHANGE ORDER REVISED SUBSTANTIAL RECEIVED DATE: COMPLETION DATE: FIELD CHANGE: No CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract TOTAL AMOUNT $0.00 VESGRIPTION: CE #CCR-066 - Evidence Locker Changes Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three division stations. 1. Refer to attached sketch related to replacement of existing door hardware at (2) Evidence Storage Room doors (X141A and X141 B). The revision is required to allow the owner desired functions for the doors and to also allow intrusion detection alarm function to work correctly. 2. The functions related to evidence storage procedure are by owner's card access (Open Options), representative John Hubbard. 3. The third Evidence Storage Room door (X141 C) is to remain as is, no modifications are necessary. ATTACHMENTS: LBK POLICE CCR 066.gdf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR Locker Hardware $7,408.00 2 9-900.2 PAINTING.SUBCONTRACTOR Painting $750.00 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish Protection and Cleaning $500.00 4 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct for CCR 066 $(8,658.00) Grand Total: $0.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/4/2022 01:02 PM d' Lee Lewis Construction, Inc. The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to the Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. PCCO #066 Stephen Faulk (IIAUTA 1 ARCHITECTS INC.) CITY OF LUBBOCK Lee Lewis Construction - HO 2022 Broadway ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79401 LUBBOCK, Texas 79457 Lubbock, Texas 79423 $5,911.358.00 $0.00 $5.911,358.00 $0.00 $5.911.358.00 �03-0T 202Z PQ;1— as SI TURE DATE SIGNA DATEbAlt Lee Lewis Construction Ina - HO Page 2 of 2 Printed On: 3/4/2022 01:02 PM E[qq Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #066 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #066: CCR-066 - Evidence Locker TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/04/2022 CONTRACT STATUS: REQUEST RECEIVED FROM: DESIGNATED REVIEWER: Pending - In Review CREATED BY: REVISION: LOCATION: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: Tyler Briney (Lee Lewis Construction - HQ) REFERENCE: CHANGE REASON: Client Request PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No DESCRIPTION: CE #CCR-066 - Evidence Locker Changes Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three division stations. SCHEDULE IMPACT. REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 1. Refer to attached sketch related to replacement of existing door hardware at (2) Evidence Storage Room doors (X141A and X141 B). The revision is required to allow the owner desired functions for the doors and to also allow intrusion detection alarm function to work correctly. 2. The functions related to evidence storage procedure are by owner's card access (Open Options), representative John Hubbard. 3. The third Evidence Storage Room door (X141C) is to remain as is, no modifications are necessary. ATTACHMENTS: LBK POLICE CCR 066.Ddf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 16-050.2 BASIC ELECT. MATERIALS & METHO.SUBCONTRACTOR Locker Hardware $7,408.00 2 9-900.2 PAINTING.SUBCONTRACTOR Painting $750.00 3 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish Protection and Cleaning $500.00 4 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct for CCR 066 $(8,658.00) Grand Total: $0.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/4/2022 01:02 PM Lee Lewis Construction, Inc. The original (Contract sum) Net change by previously authorized Change Orders The contract sum prior to this Change Omer was The contract sum would be changed by this Change Order in the amount of The new contract sum Including this Change Order will be The contract time will not be changed by this Change Order. PCCO #066 Stephen Faulk (MWM ARCHITECTS INC.) CITY OF LUBBOCK Lee Lawls Construction - HQ 2022 Broadway ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock. Texas 79401 LUBBOCK, Texas 79457 Lubbock, Texas 79423 $5,911.358.00 $0.00 $5.911,358.00 $0.00 $6.911.358.00 03-07 2022.014� A-� P1103 =I" E Loo----Y—1 -, )a SIG TORE DATE sIGNA DATE 41bAlt Lee Lewis Constnx lion Inc, - HO Page 2 of 2 Printed On: 3/4/2022 01:02 PM MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#066CHANGE REQUEST #066 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 02-17-2022 Re: City of Lubbock — East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three division stations. 1. Refer to attached sketch related to replacement of existing door hardware at (2) Evidence Storage Room doors (X141A and X141 B). The revision is required to allow the owner desired functions for the doors and to also allow intrusion detection alarm function to work correctly. 2. The functions related to evidence storage procedure are by owner's card access (Open Options), representative John Hubbard. 3. The third Evidence Storage Room door (X141C) is to remain as is, no modifications are necessary. Submitted by: Stephen Drewell Attachments: Refer to the snapshot below and the following sketch for additional details. 1. PRSK05 — CCR 066 Contractors Response: ❑Add to / ❑Deduct From Contract Sum [-]Add to / [:]Deduct From Contingency Allowance ❑ Add to / ❑Deduct From Allowance Total CCR Additional days requested for this CCR: $ (Name of Allowance) $ CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: (Signature) Thank you, Stephen Faulk 02-17-2022 Date: Dewberry Dewberry Architects Inc. 918.587.7283 1350 South Boulder, Suite 600 918.587.0071 fax Tulsa, OK 74119 www.dewberry.com PROJECT: Public Safety Improvement Project, Three CCR NUMBER: Police Substations DATE OF ISSUANCE: OWNER: City of Lubbock 1 ARCHITECTS PROJECT NO. CONTRACT FOR: CCR 066 066 2/8/2022 18018 Construction Please provide pricing for the following modifications. DESCRIPTION OF MODIFICATIONS: For all three division stations. 1. Refer to attached sketch related to replacement of existing door hardware at (2) Evidence Storage Room doors (X141A and X141B). The revision is required to allow the owner desired functions for the doors and to also allow intrusion detection alarm function to work correctly. 2. The functions related to evidence storage procedure are by owner's card access (Open Options), representative John Hubbard. 3. The third Evidence Storage Room door (X141C) is to remain as is, no modifications are necessary. Refer to the snapshot below and the following sketch for additional details. 1. PRSK05 — CCR 066 s0 BRA SYS 6-0 BRA SYS Dewberry rr LENT CONTROL CONDUIT CURRENT DPS TO REMAIN. IEW 3/4" SUFACE MOUNT EMT CONDUIT. NEW ARMORED DOOR CORD PLUG/PATCH EXISTING LOCK LEVER HOLES, SMOOTH METAL AND FINISH PAINT. REMOVE CURRENT INSET ELECTRFIED STRIKE. PROTECT AND EXTEND EXISTING WIRE TO NEW ELECTRIC STRIKE. PATCH HOLE, SMOOTH METAL AND FINISH PAINT. NEW SURFACE MOUNT ELECTRIC STRIKE FOR RIM EXIT DEVICE. HES 9600 OR SIMILAR. NEW SURFACE MOUNT RIM EXIT DEVICE WITH REQUEST TO EXIT SWITCH AND STOREROOM FUNCTION OUTSIDE FIXED PULL TRIM. Subject: EVIDENCE STORAGE DOORS Project: LUBBOCK POLICE SUB -STATION Date: Revision: Sketch No.: 02/08/22 RSK05 P Scale: REFERENCE Project No.: Drawing No.: CCR 066 50105813 Page No. 1 of 1 Pages Proposal Attn: Josh Weems ' PO BOX 3367 (806) i :K. TEXAS 79452 TECL # 17764 Proposal Submitted to Lee Lewis Construction Fax Proposal No. 03422 Street Phone Date March 4, 2022 City, State and Zip Code Job name Lubbock Police Stations Email Address ,jweems@leelewis.com Date of Plans job Location Lubbock, TX ob Phone e hereby submit specifications and estimates for: CCR #66 Labor and Material to complete all work for CCR #66. East Police Station Temple's material $309.00 Temple's Labor $240.00 ESST cost $6,859.00 Total $7,408.00 Exclusion: Patch and repair of door South Police Station $7,408.00 painting conduit North Police Station $7,408.00 e propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: dollars ( $ 22,224.00 ) . II material is guaranteed to be as specified. All work to be completed in a orkmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above he estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by workmen's Compensation Insurance Authorized Signature Mike Temple p Note: This proposal may be withdrawn by us if not accepted within days. Acceptance of Proposal - The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized o do the work as specified. Payment will be and as outlines above. Date of Acceptance: Signature Signature Exhibit T E[gq Lee Lewis Construction, Inc. PCCO #067 Lee Lewis Construction Inc. - HQ Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 7810 Orlando Avenue 1901 N. MLK Lubbock. TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #067: CCR-067 - Collapsible Show TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO BOX 7810 Orlando Ave 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 2/26/2022 CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) CONTRACT STATUS: Draft DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST Prime Contract REVISION: 0 REVIEWED BY: REVIEW DATE: PAID DATE: EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT $0.00 DESCRIPTION: CE #CCR-Q67 - Collapsible Shower Dam Please provide pricing to ADD (1) One Collapsible Water Retainer Shower Dam w/ End dams at Dress/Shower 127 and 128. Manufacture Accessible Construction Inc. Color: White Length: 36" ATTACHMENTS: LBK POLICE C R 067pdf POTENTIAL CHANGE ORDERS IN TZAR f-HA IM mmnGo- PCO # I Title Schedule Impact Amount 062r02 I CCR-067 - Collapsible Show $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: PCO 9 062ro2t CCR.ns7 . Cnllaneihin Chn— # Budget Code Description Amount 1 15-400.2 PLUMBING.SUBCONTRACTOR Shower Dams $488.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish protection and cleaning $200.00 3 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR Deduct for CCR 067 $(688.00) Grand Total: $0.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 2/26/2022 12:26 PM r 19 Lee Lewis PCCO #067 Construction, Inc. The original (Contract Sum) $5,911.358.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Omer was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. Stephen Faulk (MVVM ARCHITECTS INC.) CITY OF LUBBOCK Lee Lewis Corratruction - HC 2022 Broadway ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79401 LUBBOCK Texas 79457 Lubbock, Texas 79423 $5,911, 358.00 $0.00 $5,911,358.00 SKi ATURE DATE S107M DATE RE DATE Lee Lewis Constnxtion Inc. - HO Page 2 of 2 Printed On: 2f=022 12:26 PM Eqq Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #067 Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 5910 Erskine Lubbock, TX Prime Contract Change Order #067: CCR 067 - Collapsible Shower TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 2/26/2022 CONTRACT STATUS: REQUEST RECEIVED FROM: DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: Pending - In Review CREATED BY: REVISION: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: Tyler Briney (Lee Lewis Construction - HQ) 0 CHANGE REASON: Client Request PAID IN FULL: No EXECUTED: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract TOTAL AMOUNT: $0.00 DESCRIPTION: CE #067 - Collapsible Shower Dam Please provide pricing to ADD (1) One Collapsible Water Retainer Shower Dam w/ End dams at Dress/Shower 127 and 128. Manufacture Accessible Construction Inc. Color: White Length: 36" ATTACHMENTS: LBK POLICE CCR 067.odf CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 15-400.2 PLUMBING.SUBCONTRACTOR Shower Dams $488.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish protection and cleaning $200.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct for CCR 067 $(688.00) Grand Total: $0,00 The original (Contract Sum) $5,741,888.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,741,888.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,741,888.00 The contract time will not be changed by this Change Order. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 2/26/2022 12:36 PM 19 Lee Lewis PCCO #067 Construction, Inc. The original (Contract Sum) $5,911700 Net Change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,911,358.00 The contract sum would be changed by this Change Order to the amount of $Q 00 The new contract sum including this Change Order will be $5,911,358.00 The contract time will not be changed by this Change Order. Stephen Faulk (MWM ARCHITECTS INC.) CITY OF LUBBOCK Lee Lewis Construction - HO 2022 Broadway ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79401 LUBBOCK Texas 79457 Lubbock, Texas 79423 SIGIFATURE DATE t>< DATE RE DATE Lee Lewis Construction Inc. - HO Page 2 of 2 Printed On: 2128l2022 12726 PM Fqg Lee Lewis Construction, Inc. Lee Lewis Construction Inc. - HQ 7810 Orlando Avenue Lubbock, Texas 79423 Phone: 806-797-8400 Fax: +1.806.797.1034 PCCO #067 Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 14005 Indiana Lubbock, TX Prime Contract Change Order #067: CCR-067 - Collapsible Show TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: CONTRACT STATUS: REQUEST RECEIVED FROM: 2/26/2022 Draft DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No CREATED BY: REVISION: LOCATION: REVIEWED BY: Tyler Briney (Lee Lewis Construction - HQ) 0 REVIEW DATE: PAID DATE: CHANGE REASON: Client Request EXECUTED: No SCHEDULEIMPACT REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: DESCRIPTION: CE #CCR-067 - Collapsible Shower Dam Please provide pricing to ADD (1) One Collapsible Water Retainer Shower Dam w/ End dams at Dress/Shower 127 and 128. Manufacture Accessible Construction Inc. Color: White Length: 36 ATTACHMENTS: LBK POLICE CCR 067.Ddf CHANGE ORDER LINE ITEMS: 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 # Budget Code Description Amount 1 15-400.2 PLUMBING.SUBCONTRACTOR Shower Dams $488.00 2 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Finish protection and cleaning $200.00 3 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct for CCR 067 $(688.00) Grand Total: $0.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 2/26/2022 12:20 PM 19 Lee Lewis Construction, Inc. The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order In the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. PCCO #067 Stephen Faulk (MYVM ARCHITECTS INC.) CITY OF LUBBOCK Lee Lewis Corratruotion - HO 2022 Broadway ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79401 LUBBOCK Texas 79457 Lubbock, Texas 79423 $5,911.358.00 $0.00 $5,911,358.00 $0.00 $5,911.358.00 03--07 W22 -/r Y �lqh) SIGMATURE DATE WirMDATE DATE Lee Lewis Construction Inc - HO Page 2 of 2 Printed On: 2/26/2022 12726 PM COMFORT MASTERS HEATING, AIR CONDITIONING, INC. 1318 East 50'' Street Lubbock, TX 79404 Telephone 806-749-1000 Fax 806-368-7648 TACLA 003497C M-18772 Proiect Name: City of Lubbock Police Sub -Stations Proiect No: RFP 19-14224TF Location: 1901 MLK East Sub -Station, 5910 Erskin St. North Sub - Station, 14005 Indiana Ave South Sub -Station Architect: MWM Architects, Inc. Date: 2-22-2022 Change Order #6 CCR #067 Add Collapsible Water Retainer Dam with End Dams at Dress/Shower 127 and 128 Collapsible Water Shower Dam - $150.00 Labor 3 Man hours @ $85.00 per hour - $255.00 Labor Burden 15% - $38.25 Labor Sub -Total - $293.25 Job Subtotal - $443.25 OH/Profit 10 % - $44.32 Total - $ 487.57 Each Site Included: Provide and Install Two Collapsible Water Retainer Shower Dam with End Caps. One for each Dress/Shower 127 and 128. Excludes: Anything not mentioned above. Kelly L. Comer MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#067CHANGE REQUEST #067 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 01-20-2022 Re: City of Lubbock — East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: Please provide pricing to ADD (1) One Collapsible Water Retainer Shower Dam w/ End dams at Dress/Shower 127 and 128. Manufacture Accessible Construction Inc. Color: White Length: 36" Submitted by, Stephen Drewell Attachments: N/A Contractors Response: ❑ Add to / ❑ Deduct From Contract Sum ❑Add to / ❑Deduct From Contingency Allowance ❑Add to / ❑Deduct From Allowance Total CCR Additional days requested for this CCR: (Name of Allowance) CONSTRUCTION CHANGE RE UEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the changes) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and istri uted. Approved Additional Time By: Date: (Signature) Thank you, Stephen Faulk 01-20-2022 Exhibit U 19 Lee Lewis Construction, Inc. PCCO #068 Lee Lewis Construction Inc. - HQ Project: 19-1905 - LUBBOCK POLICE SUBSTATION EAST 7810 Orlando Avenue 1901 N. MLK Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #068: CCR-068 - Fire Rated Plywood TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO BOX 7810 Orlando Ave 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/01 /2022 CONTRACT STATUS: Pending - In Review DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CREATED BY: Tyler Briney (Lee Lewis Construction - HQ) REVISION: 0 REVIEWED BY. REVIEW DATE: PAID DATE: EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION EAST TOTAL AMOUNT - Prime Contract DESCRIPTION: CE #CCR-068 - Fire Rates Plywood in E_v_idence Lockers Please provide pricing to ADD CDX Fire Rated Ply. WD. Glued and Screwed to the finished wall surface of the opposing Door side for the following (3) Three Evidence Lockers; 141A, 142B, 141C. Paint to match adjacent wall surfaces. Height to match top of cage structure. ATTACHMENTS: POTENTIAL CHANr:F ARnman IN T411R rtNAW= nonco• $0.00 PCO # I Title Schedule Impact Amount 068 1 CE #CCR-068 - Fire Rated Plywo $0.00 Total: $0.00 CHANGE ORDER LINE ITEMS: pro A M.S. r_F srr_Is-nan - ri— 0.+.A o,.n.,.. # Budget Code Description Amount 1 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Material and Labor for Plywood $5,250.00 2 1-004.2 OWNERS CONTINGENCY.SUBCONTRACTOR Deduct for CCR 068 $(5,250.00) Grand Total: $0.00 The original (Contract Sum) $5,911,358.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,911,358.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,911,358.00 The contract time will not be changed by this Change Order. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/1/2022 11:41 AM Lee Lewis Construction, Inc. Stephen Faulk JMWM ARCHITECTS INC.) 2022 Broadway Lubbock, Texas 79401 t � . CITY OF LUBBOCK ZONING BOARD OF ADJUSTMENT PO BOX 2000 PCCO #068 Lee Lewis Construction . NO 7810 Orlando Ave LUBBOCK, Texas 79457 Lubbock. Texas 79423 SIGTA7DATE SIGNATURE DATE Lee Lewis Construction Inc. - NO Page 2 of 2 Printed On: 3/1/2022 11:41 AM Lee Lewis Construction, Inc. PCCO #068 Lee Lewis Construction Inc. - HQ Project: 19-1907 - LUBBOCK POLICE SUBSTATION NORTH 7810 Orlando Avenue 5910 Erskine Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #068: CCR-068 - Fire Rated Plywood TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/01/2022 CONTRACT STATUS: REQUEST RECEIVED FROM: Pending - In Review DESIGNATED REVIEWER: DUE DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: Amount Based SIGNED CHANGE ORDER RECEIVED DATE: FIELD CHANGE: No CREATED BY: REVISION: LOCATION: REVIEWED BY: REVIEW DATE: PAID DATE: Tyler Briney (Lee Lewis Construction - HQ) 0 CHANGE REASON: Client Request EXECUTED: No SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: 1:LUBBOCK POLICE SUBSTATION NORTH Prime Contract TOTAL AMOUNT. $0.00 DESCRIPTION: CE #CCR-068 - Fire Rated Plywood in Evidence Lockers Please provide pricing to ADD Y2" CDX Fire Rated Ply. WD. Glued and Screwed to the finished wall surface of the opposing Door side for the following (3) Three Evidence Lockers; 141A, 142B, 141C. Paint to match adjacent wall surfaces. Height to match top of cage structure. ATTACHMENTS: CHANGE ORDER LINE ITEMS: # Budget Code Description Amount 1 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Material and Labor for Plywood $5,250.00 2 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct for CCR 068 $(5,250.00) Grand Total: $0.00 The original (Contract Sum) $5,741,888.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $5,741,888.00 The contract sum would be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $5,741,888.00 The contract time will not be changed by this Change Order. Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/1/2022 11:41 AM Lee Lewis Construction, Inc. Stephen Faulk (V1WM ARCHITECTS INC.) CITY OF LUBBOCK 2022 Broadway ZONING BOARD OF ADJUSTMENT PO BOX 2000 PCCO #068 Lee Lewis Construction . HO 7810 Orlando Ave Lubbock. Texas 79401 LUBBOCK. Texas 79457 Lubbock, Texas 79423 V-�.MA �11 IL t,03 ZF� 2022 1 f _-rAV NATURE DATE SIGNATU �OK DATE SIGNATURE DATE Lee Lewis Construction Inc. - HQ JZ Page 2 of 2 Printed On: 3/1/2022 11:41 AM [[qq Lee Lewis PCCO #068 Construction, Inc. Lee Lewis Construction Inc. - HQ Project: 19-1909 - LUBBOCK POLICE SUBSTATION SOUTH 7810 Orlando Avenue 14005 Indiana Lubbock, TX Lubbock, Texas 79423 Phone:806-797-8400 Fax: +1.806.797.1034 Prime Contract Change Order #068: CCR-068 - Fire Rated Plywood TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ ZONING BOARD OF ADJUSTMENT PO 7810 Orlando Ave BOX 2000 Lubbock, Texas 79423 LUBBOCK, Texas 79457 DATE CREATED: 3/01/2022 CONTRACT STATUS: REQUEST RECEIVED FROM: Pending - In Review CREATED BY: REVISION: LOCATION: DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: REFERENCE: PAID IN FULL: No ACCOUNTING METHOD: SIGNED CHANGE ORDER RECEIVED DATE: Amount Based FIELD CHANGE: No PAID DATE: Tyler Briney (Lee Lewis Construction - HQ) 0 CHANGE REASON: Client Request EXECUTED: No SCHEDULE IMPACT: REVISED SUBSTANTIAL COMPLETION DATE: CONTRACT FOR: TOTAL AMOUNT: DESCRIPTION: CE #CCR-068 - Fire Rated _Plywood in Evidence Lockers Please provide pricing to ADD'/2" CDX Fire Rated Ply. WD. Glued and Screwed to the finished wall surface of the opposing Door side for the following (3) Three Evidence Lockers; 141A, 142B, 141C. Paint to match adjacent wall surfaces. Height to match top of cage structure. ATTACHMENTS: CHANGE ORDER LINE ITEMS: 1:LUBBOCK POLICE SUBSTATION SOUTH Prime Contract $0.00 # Budget Code Description Amount 1 6-100.2 ROUGH CARPENTRY.SUBCONTRACTOR Labor and Material For Plywood Install $5,250.00 2 1-004.1 OWNERS CONTINGENCY.MATERIALS Deduct for CCR 068 $(5,250.00) Grand Total: $0.00 The original (Contract Sum) Net change by previously authorized Change Orders The contract sum prior to this Change Order was The contract sum would be changed by this Change Order in the amount of The new contract sum including this Change Order will be The contract time will not be changed by this Change Order. $6,255,031.00 $0.00 $6,255,031.00 $0.00 $6,255,031.00 Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 3/1/2022 11:41 AM Lee Lewis Construction, Inc. Stephan Faulk (MWM ARCHITECTS INC.) CITY OF LUBBOCK 2022 Broadway ZONING BOARD OF ADJUSTMENT PO BOX 2000 PCCO #068 Lee Lewis Construction . Ho 7810 Orlando Ave Lubbock, Texas 79401 LUBSOCK, Texas 79457 Lubbock. Texas 79423 3-28-2022 t f�-'� NATURE p ATE TU DATE SIGNATURE DATE Lee Lewis Construction Inc. - HO Page 2 of 2 Printed On: 3/1/2022 11:41 AM MWM Architects, Incorporated 2022 Broadway Ave Lubbock, Texas 79401 806.745.7707 Fax: 806.745.7620 Members of the American Institute Architects CCR#068CHANGE REQUEST #068 To: Josh Weems Lee Lewis Construction From: Stephen Faulk CC: Wes Everett Date: 01-20-2022 Re: City of Lubbock — East, South and North Police Substation MWM ARCHITECT'S Project No. 18018 WM architects Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed modification to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN UNTIL APPROVED BY THE OWNER. Description: Please provide pricing to ADD Y2" CDX Fire Rated Ply. WD. Glued and Screwed to the finished wall surface of the opposing Door side for the following (3) Three Evidence Lockers; 141A, 142B, 141C. Paint to match adjacent wall surfaces. Height to match top of cage structure. Submitted by: Stephen Drewell Attachments: Contractors Response: ❑Add to / ❑Deduct From Contract Sum ❑Add to / ❑Deduct From Contingency Allowance ❑Add to / ❑Deduct From Allowance Additional days requested for this CCR: $ (Name of Allowance) Total CCR $ CONSTRUCTION CHANGE REQUEST APPROVAL When signed by Owner and upon receipt of approved document by the Contractor, the Contractor shall proceed with the change(s) described above. If CCR is changing the Contract Sum by cost or time, an official Change Order will be executed and distributed. Approved Additional Time By: Date: (Signature) Thank you, Stephen Faulk 01-20-2022 Lee Lewis Construction, Inc. Lubbock Police Substations CCR 068 Description: Please provide pricing to ADD %" CDX Fire Rated Ply. WD. Glued and Screwed to the finished wall surface of the opposing Door side for the following (3) Three Evidence Lockers; 141A, 14213, 141C. Paint to match adjacent wall surfaces. Height to match top of cage structure. Materials: $3,500.00 Labor: $1,750.00 Total: $5,250.00 Pricing includes materials for %" fire rated plywood, screws, masking tape and plastic, paint brushes, and labor to complete all applicable work as listed above. LUBBOCK DALLAS 7810 Orlando Ave 17177 Preston Road, Suite 160 Lubbock, Texas 79423 Dallas, Texas 75248 P 806.797.8400 P 972.818.0700 AUSTIN P.O. Box 92405 Austin, TX 78709 P 512.369.3921 leelewis.com GENERAUNOTES, M architects ..............�w,.T..,,.... • Dowborrr 01 1-1 IN I A Jf rZ -j ----------- IF 46 Its I rr rTr a {PUBLIC SAFETY IMPROVEMENT PROJECT, THREE POLICE SUBSTATIONS -EAST QD- MLK LUBBOCK TEXAS