Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution - 2017-R0404 - Utility Contractors Of America - 11/02/2017
Resolution No. 2017-RO404 Item No. 6.3 November 2, 2017 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 13613 for construction of the Kent Street Water Line as per ITB 18-13613-TF, by and between the City of Lubbock and Utility Contractors of America, Inc., of Lubbock, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on November 2, 2017 DANIEL M. POPE, MAYOR ATTEST: -iLut+a(K -f--Dv- Re cca Garza, City Secretary APPROVED AS TO CONTENT: Mark Ye ood, ssistant City Manager APPROVED AS TO FORM: 1�atlxto-� K lli Leisure, Assistant City Attorney ccdocs/RES.Public Works Contract 13613.Kent Street Water Line 10.23.2017 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. 2017-277372 Utility Contractors of America, Inc. Lubbock, TX United States Date Filed: 10/27/2017 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 10/30/2017 3 Provide the identification number used by the governmental entity or state agency to track or identify description of the services, goods, or other property to be provided under the contract. the contract, and provide a 13613 Kent Street Water Line 4 Name of Interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling I Intermediary Ziegner, Jonathan Lubbock, TX United States X Lane, Ty Lubbock, TX United States X T- 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said this the day of 20 , to certify which, witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos. 1- a and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. 2017-277372 Utility Contractors of America, Inc. Lubbock, TX United States Date Filed: 10/27/2017 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. 13613 Kent Street Water Line q Nature of interest Name of Interested Party City, State, Country (place of business) (check applicable) Controlling Intermediary Ziegner, Jonathan Lubbock, TX United States X Lane, Ty Lubbock, TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. TAMMY VAN UREN Notary Public, State of Texas /in ID# 12506869-2 0 My Commission Expires 'V September 27. 2020 Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and sub d efore me, b aid Chris Balios this the 30th day of October 20 17 ce fy whi ness my hand and seal of office. Tammy VanBuren Signature of offic inisterin ath Printed name of officer administering oath Title of officer administering oath r Iu "r I-- �U111 � % V]1111IIJ5]uf7 www.etnlcs.state.tX.us Version V1.0.3337 ,W� Liberty Mutual Insurance Company - Company Profile - Best's Credit Rating Center Page 1 of 3 A.M. Best Rating Services Liberty Mutual Insurance Company (.?) A.M. Best #: 002283 NAIC #: 23043 FEIN #: 041543470 Domiciliary Address 175 Berkeley Street Boston, MA 02117 United States Web: www.LibertyMutualGroup.com Phone: 617-357-9500 Fax:617-574-5955 Fimme al auigth Ratin ;. BEST A )rit-W..t h, Assigned to insurance companies that have, in our opinion, an excellent ability to meet their ongoing insurance obligations. View additional news, reports and products for this company. Based on A.M. Best's analysis, 051114 - Liberty Mutual Holding Company Inc. is the AMB Ultimate Parent and identifies the topmost entity of the corporate structure. View a list of operating insurance entities in this structure. Best's Credit Ratings Financial Strength Rating View Definition Rating: Affiliation Code: Financial Size Category: Outlook: Action: Effective Date: Initial Rating Date: Long -Term Issuer Credit Rating View Definition Long -Term: Outlook: Action: Effective Date: Initial Rating Date: u Denotes Under Review Best's Rating Best's Credit Rating Analyst Rating Issued by: A.M. Best Rating Services, Inc. Senior Financial Analyst: Gregory Dickerson Senior Director: Michael J. Lagomarsino, CFA, FIRM A (Excellent) p (Pooled) XV ($2 Billion or greater) Stable Affirmed March 08, 2017 June 30, 1922 a Stable Affirmed March 08, 2017 November 23, 2004 Disclosure Information onView A.M. Best's Rating Disclosure Form Guarantor(s) - also see the Rating Disclosure Form for the following companies, as they guarantee rated debt issues for this company. 051114 - Liberty Mutual Holding Company Inc. A.M. Best Affirms Credit Ratings of Liberty Mutual Holding Company Inc. and Its Subsidiaries _j March 08, 2017 http://ratings.ambest.com/SearchResults.aspx?AltSrc=9 11/17/2017 BOND CHECK BEST RATING: LICENSED IN TEXAS DATE: BY: CONTRACT AWARD DATE: November 2, 2017 CITY OF LUBBOCK SPECIFICATIONS FOR Kent Street Water Line ITB 18-13613-TF CONTRACT 13613 PROJECT NUMBER: 92454.9241.30000 Plans & Specifications may be obtained from BidSync.com � �,ty tLtib o k iFMA3 CONTRACT PREPARED BY: PURCHASING AND CONTRACT MANAGEMENT OFFICE I Patie Intentionally Left Blank I 11 I i I I City of Lubbock Bid ITS 18-13613-TF City of Lubbock, TX ITB 18-13613-TF Kent Street Water Line Contractor Checklist Before submitting your bid, please ensure you have completed and included the f'olloxving documents in the order they° are list * The contractor is only to submit (1) one original unbound copy of every item listed. 1. Carefully read and understand the plans and specifications and properly complete the BID SUBMITTAL FORM. Bid submittal form MUST be completed in blue or black ink or by typewriter. Signatures must be original, in blue or black ink, and by hand. The bidder binds himself on acceptance of his bid to execute a contract and any required bonds, according to the accompanying forms, for performing and completing the said work within the time stated and for the prices stated below. In case of a discrepancy between the Unit Price and the Extended Total for a Bid item, the Unit Price will be taken."Include corporate seal and Secretary's signature. Identify addenda received (if any). Include firm's FEDERAL TAX ID number or Owner's SOCIAL SECURITY number. 2. Include BID BOND or CASHIER'S OR CERTIFIED CHECK as your bid surety. Failure to provide a bid surety WILL result in automatic rejection of your bid. 3. Complete and sign the CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT. Contractor's signature must be original. 4. Clearly mark the bid number, title, due date and time and your company name and address on the outside of the envelope or container. 5. Ensure your bid is RECEIVED by the City of Lubbock Purchasing and Contract Management Office prior to the deadline. Late bids will not be accepted. 6. Complete and sign the SAFETY RECORD QUESTIONNAIRE. All "YES" responses must be explained in detail and submitted with Bid. 7. Complete and sign the SUSPENSION AND DEBARMENT CERTIFICATION. Include firm's FEDERAL TAX ID number or Owner's SOCL4L SECURITY number. 8. Complete and submit the CONFLICT OF INTEREST QUESTIONNAIRE. 9. Chapter 2270 Prohibition on Contracts with Companies Boycotting Israel 10. Complete and submit the LIST OF SUB -CONTRACTORS. 11. V Complete and submit the FINAL LIST OF SUB -CONTRACTORS. -r DOCUMENTS REQUIRED BEFORE CONTRACT IS FINALIZED: f 12. Please acknowledge and submit the ONLINE DISCLOSURE OF INTERESTED PARTIES FORM E 1295 within the specified time according to Texas Government Code 2252908 using the Texas L Ethics Commission website. FAILURE TO PROVIDE ANY OF THE ABOVE MAY RESULT IN YOUR BID BEING DEEMED NON -RESPONSIVE AND, THEREFORE, NOT FURTHER EVALUATED. PLEASE INCLUDE THIS COMPLETED PAGE AS THE FIRST PAGE OF YOUR BID SUBMITTAL. n.,.Wilily Contractors of America.. Inc. (Type or Print Company Name) 9125/2017 7:27 AM p. 4 Page Intentionally Left Blank INDEX 1. NOTICE TO BIDDERS 2. GENERAL INSTRUCTIONS TO BIDDERS 3. BID SUBMITTAL — (must be submitted by published due date & time) 3-1. UNIT PRICE BID SUBMITTAL FORM 3-2. CITY OF LUBBOCK INSURANCE REQUIREMENT AFFIDAVIT 3-3. SAFETY RECORD QUESTIONNAIRE -s 3-4. SUSPENSION AND DEBARMENT CERTIFICATION 3-5. PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING ISRAEL VERIFICATION 4. LIST OF SUB -CONTRACTORS 5. PAYMENT BOND 6. PERFORMANCE BOND 7. CERTIFICATE OF INSURANCE 8. CONTRACT 9. CONFLICT OF INTEREST QUESTIONNAIRE CHAPTER 176 10. CHAPTER 46. DISCLOSURE OF INTERESTED PARTIES 11. GENERAL CONDITIONS OF THE AGREEMENT 12. DAVIS BACON WAGE DETERMINATIONS 13. SPECIAL CONDITIONS (IF APPLICABLE) 14. SPECIFICATIONS Lv i 2 I Page Intentionally Left Blank P I I NOTICE TO BIDDERS ITB 18-13613-TF Sealed bids addressed to Marta Alvarez, Director of Purchasing and Contract Management, City of Lubbock, Texas, will be received in the office of the Purchasing and Contract Management Office, City Hall, 1625 13th Street, Room 204, Lubbock, Texas, 79401, until 3:00 p.m. on October 12, 2017, or as changed by the issuance of formal addenda to all planholders, to furnish all labor and materials and -- perform all work for the construction of the following described project: Kent Street Water Line -- After the expiration of the time and date above first written, said sealed bids will be opened in the office of the Purchasing and Contract Management Office and publicly read aloud. It is the sole responsibility of the bidder to ensure that his bid is actually in the office of the Purchasing and Contract i Management Office for the City of Lubbock, before the expiration of the date above first written. # Bids are due at 3:00 p.m. on October 12, 2017, and the City of Lubbock City Council will consider f the bids on November 2, 2017, at the City Hall, 1625 13th Street, Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or all bids and waive any formalities. The successful bidder will be required to furnish a performance bond in accordance with Chapter 2253, - Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful bidder will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $50,000. Said statutory bonds should be issued by a company carrying a current Best Rating of "A" or better. THE BONDS MUST BE IN A FORM ACCEPTABLE TO THE CITY ATTORNEY AND MUST BE DATED THE SAME DATE THAT THE CONTRACT WAS AWARDED. The estimated budget for the construction phase of this project is $450,000. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and execute all necessary bonds (if required) within ten (10) business days after notice of award of the contract to him. FAILURE OF THE BIDDER TO INCLUDE BID SECURITY WITH THE BID SUBMITTAL SHALL CONSTITUTE A NONRESPONSIVE BID AND RESULT IN DISQUALIFICATION OF THE BID SUBMITTAL. It shall be each bidder's sole responsibility to inspect the site of the work and to inform himself regarding all local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the bid submitted. There will be a non -mandatory pre -bid conference on October 3, 2017, at 10:00 a.m., at 1625 1311 Street, Purchasing and Contract management, Rm 204, Lubbock, TX. Copies of plans and specifications may be obtained at bidder's expense from the City of Lubbock Purchasing and Contract Management office. Plans and specifications can be viewed online and downloaded from http://www.bidsync.com at no cost. In the event of a large file size, please be patient when downloading or viewing. BUSINESSES WITHOUT INTERNET ACCESS may use computers available at most public libraries. Attention of each bidder is particularly called to the schedule of general prevailing rate of per �- diem wages included in the contract documents on file in the office of the Purchasing and Contract Management Office of the City of Lubbock, which document is specifically referred to in this Notice to , Bidders. Each bidder's attention is further directed to Texas Government Code, Chapter 2258, Prevailing Wage Rates, and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale. The City of Lubbock hereby notifies bidders that in regard to any contract entered into pursuant to this advertisement, minority and women business enterprises shall be afforded equal opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, disability, or national origin in consideration for an award. The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -bid meetings and bid openings are available to all persons regardless of disability. If you require special assistance, please contact the Purchasing and Contract Management Office at (806) 775-2572 or write to Post Office Box 2000, Lubbock, Texas 79457 at least 48 hours in advance of the meeting. CITY OF LUBBOCK Alarta ACvareZ DIRECTOR OF PURCHASING AND CONTRACT MANAGEMENT _U 4 �- t> GENERAL INSTRUCTIONS TO BIDDERS 1 BID DELIVERY TIME & DATE 1.1 The City of Lubbock is seeking written and sealed competitive bids to furnish Kent Street Water Line per the attached specifications and contract documents. Sealed bids will be received no later than 3:00 p.m., on October 12, 2017, at the office listed below. Any bid received after the date and hour specified will be rejected and returned unopened to the bidder. Each bid and supporting { documentation must be in a sealed envelope or container plainly labeled in the lower left-hand corner: "ITB 18-13613-TF, Kent Street Water Line" and the bid opening date and time. Bidders must also include their company name and address on the outside of the envelope or container. Bids must be addressed to: Marta Alvarez, Director of Purchasing and Contract Management City of Lubbock 1625 13th Street, Room 204 Lubbock, Texas 79401 9 1.2 Bidders are responsible for making certain bids are delivered to the Purchasing and Contract Management Office. Mailing of a bid does not ensure that the bid will be delivered on time or delivered at all. If bidder does not hand deliver bid, we suggest that he/she use some sort of delivery -- service that provides a receipt. 1.3 Bids will be accepted in person, by United States Mail, by United Parcel Service, or by private courier service. No bids will be accepted by oral communication, telephone, electronic mail, telegraphic transmission, or telefacsimile transmission. THE CITY WILL NOT ACCEPT FAX BIDS. 1-= 1.4 The City of Lubbock reserves the right to postpone the date and time for opening bids through an addendum. 2 PRE -BID MEETING 2.1 For the purpose of familiarizing bidders with the requirements, answering questions, and issuing addenda as needed for the clarification of the Invitation to Bid (ITB) documents, a non -mandatory pre -bid meeting will be held October 3, 2017, at 10:00 a.m., at 1625 13th Street, Purchasing and Contract management, Rm 204, Lubbock, TX.. All persons attending the meeting will be asked to identify themselves and the prospective bidder they represent. 2.2 It is the bidder's responsibility to attend the pre -bid meeting though the meeting is not mandatory. The City will not be responsible for providing information discussed at the pre -bid meeting to bidders who do not attend the pre -bid meeting. 3 ADDENDA & MODIFICATIONS 3.1 Any changes, additions, or clarifications to the ITB are made by ADDENDA information available over the Internet at www.bidsync.com. We strongly suggest that you check for any addenda a minimum of forty-eight hours in advance of the response deadline. BUSINESSES WITHOUT INTERNET ACCESS may use computers available at most public libraries. 3.2 Any bidder in doubt as to the true meaning of any part of the specifications or other documents may request an interpretation thereof from the Purchasing and Contract Management Office. At the request of the bidder, or in the event the Purchasing and Contract Management Office deems the interpretation . r to be substantive, the interpretation will be made by written addendum issued by the Purchasing and Contract Management Office. Such addenda issued by the Purchasing and Contract Management Office will be available over the Internet at www.bidsync.com and will become part of the bid package having the same binding effect as provisions of the original ITB. NO VERBAL EXPLANATIONS OR INTERPRETATIONS WILL BE BINDING. In order to have a request for interpretation considered, the request must be submitted in writing and must be received by the City of Lubbock Purchasing and Contract Management Office no later than five (5) calendar days before the bid closing date. 0 G7 3.3 All addenda, amendments, and interpretations of this solicitation shall be in writing. The City of Lubbock shall not be legally bound by any amendment or interpretation that is not in writing. Only information supplied by the City of Lubbock Purchasing and Contract Management Office in writing or in this ITB should be used in preparing bid responses. All contacts that a bidder may have had before or after receipt of this ITB with any individuals, employees, or representatives of the City and any information that may have been read in any news media or seen or heard in any communication facility regarding this bid should be disregarded in preparing responses. 3.4 The City does not assume responsibility for the receipt of any addendum sent to bidders. EXAMINATION OF DOCUMENTS AND REQUIREMENTS 4.1 Each bidder shall carefully examine all ITB documents and thoroughly familiarize itself with all requirements before submitting a bid to ensure that their bid meets the intent of these specifications. 4.2 Before submitting a bid, each bidder shall be responsible for making all investigations and examinations that are necessary to ascertain conditions and requirements affecting the requirements of this Invitation to Bid. Failure to make such investigations and examinations shall not relieve the bidder from obligation to comply, in every detail, with all provisions and requirements of the Invitation to Bid. 4.3 Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Purchasing and Contract Management Office and a clarification obtained before the bids are received, and if no such notice is received by the Purchasing and Contract Management Office prior to the opening of bids, then it shall be deemed that the bidder fully understands the work to be included and has provided sufficient sums in its bid to complete the work in accordance with these plans and specifications. If bidder does not notify Purchasing and Contract Management Office before bidding of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It is further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the bid closing date. BID PREPARATION COSTS 5.1 Issuance of this ITB does not commit the City of Lubbock, in any way, to pay any costs incurred in the preparation and submission of a bid. 5.2 The issuance of this ITB does not obligate the City of Lubbock to enter into contract for any services or equipment. 5.3 All costs related to the preparation and submission of a bid shall be paid by the bidder. TRADE SECRETS CONFIDENTIAL INFORMATION AND THE TEXAS PUBLIC INFORMATION ACT 6.1 If you consider any portion of your bid to be privileged or confidential by statute or judicial decision, including trade secrets and commercial or financial information, clearly identify those portions. rill 6.2 The City of Lubbock will honor your notations of trade secrets and confidential information and decline to release such information initially, but please note that the final determination of whether a particular portion of your bid is in fact a trade secret or commercial or financial information that may be withheld from public inspection will be made by the Texas Attorney General or a court of competent jurisdiction. In the event a public information request is received for a portion of your bid that you have marked as being confidential information, you will be notified of such request and you will be required to justify your legal position in writing to the Texas Attorney General pursuant to Section 552.305 of the Government Code. In the event that it is determined by opinion or order of the Texas Attorney General or a court of competent jurisdiction that such information is in fact not privileged and confidential under Section 552.110 of the Government Code and Section 252.049 of the Local Government Code, then such information will be made available to the requester. 6.3 Marking your entire bid CONFIDENTIAL/PROPRIETARY is not in conformance with the Texas Open Records Act. J. i 7. 7 LICENSES, PERMITS, TAXES The price or prices for the work shall include full compensation for all taxes, permits, etc. that the bidder is or may be required to pay. 8 UTILIZATION OF LOCAL BUSINESS RESOURCES Prospective bidders are strongly encouraged to explore and implement methods for the utilization of local resources, and to outline in their bid submittal how they would utilize local resources. 9 CONFLICT OF INTEREST 9.1 The bidder shall not offer or accept gifts or anything of value nor enter into any business arrangement with any employee, official or agent of the City of Lubbock. 9.2 By signing and executing this bid, the bidder certifies and represents to the City the bidder has not offered, conferred or agreed to confer any pecuniary benefit or other thing of value for the receipt of special treatment, advantage, information, recipient's decision, opinion, recommendation, vote or any other exercise of discretion concerning this bid. 10 CONTRACT DOCUMENTS 10.1 All work covered by the contract shall be done in accordance with contract documents described in the General Conditions. 10.2 All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for the construction of this project and shall be responsible for the satisfactory completion of all work contemplated by said contract documents. 11 PLANS FOR USE BY BIDDERS It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without charge or forfeiture of deposit. The contract documents may be examined without charge as noted in the Notice to Bidders. 12 BIDDER INQUIRIES AND CLARIFICATION OF REQUIREMENTS 12.1 It is the intent and purpose of the City of Lubbock that this request permit competitive bids. It shall be the bidder's responsibility to advise the Purchasing and Contract Management Office if any language, requirements, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this ITB to a single source. Such notification must be submitted in writing and must be received by the City of Lubbock Purchasing and Contract Management Office no later than five (5) calendar days before the bid closing date. A review of such notifications will be made. 12.2 NO BIDDER SHALL REQUEST ANY INFORMATION VERBALLY. ALL REQUESTS FOR I ADDITIONAL INFORMATION OR CLARIFICATION CONCERNING THIS INVITATION TO BID (ITB) MUST BE SUBMITTED IN WRITING NO LATER THAN FIVE (5) CALENDAR DAYS PRIOR TO THE BID CLOSING DATE AND ADDRESSED TO: Teofilo Flores, Sr. Buyer City of Lubbock Purchasing and Contract Management Office t 1625 13th Street, Room 204 Lubbock, Texas 79401 ' Fax: 806-775-2164 Email: tkflores@mylubbock.us Bidsync: www.bidsyne.com i., 13 14 15 16 17 TIME AND ORDER FOR COMPLETION 13.1 The construction covered by the contract documents shall be substantially completed within 120 Calendar Days from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful bidder. 13.2 The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, however, the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated by the contract documents. In the event the City requires a progress schedule to be submitted, and it is determined by the City that the progress of the work is not in accordance with the progress schedule so submitted, the City may direct the Contractor to take such action as the City deems necessary to ensure completion of the project within the time specified. PAYMENT All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of the contract documents. AFFIDAVITS OF BILLS PAID The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of which the Contractor has been notified. MATERIALS AND WORKMANSHIP The intent of these contract documents is that only materials and workmanship of the best quality and grade will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve the Contractor of full responsibility for providing materials of high quality and for protecting them adequately until incorporated into the project. The presence or absence of a representative of the City on the site will not relieve the Contractor of full responsibility of complying with this provision. The specifications for materials and methods set forth in the contract documents provide minimum standards of quality, which the Owner believes necessary to procure a satisfactory project. GUARANTEES 17.1 All equipment and materials incorporated in the project and all construction shall be guaranteed against defective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear within TWO years from date of final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of Lubbock). 17.2 Notwithstanding any provisions contained in the contractual agreement, the Contractor represents and warrants fault -free performance and fault -free result in the processing date and date -related data (including, but not limited to calculating, comparing and sequencing) of all hardware, software and firmware products delivered and services provided under this Contract, individually or in combination, as the case may be from the effective date of this Contract. Also, the Contractor warrants calculations will be recognized and accommodated and will not, in any way, result in hardware, software or firmware failure. The City of Lubbock, at its sole option, may require the Contractor, at any time, to demonstrate the procedures it intends to follow in order to comply with all the obligations contained herein. 17.3 The obligations contained herein apply to products and services provided by the Contractor, its sub- contractor or any third party involved in the creation or development of the products and services to be delivered to the City of Lubbock under this Contract. Failure to comply with any of the obligations contained herein, may result in the City of Lubbock availing itself of any of its rights under the law and under this Contract including, but not limited to, its right pertaining to termination or default. 17.4 The warranties contained herein are separate and discrete from any other warranties specified in this^ Contract, and are not subject to any disclaimer of warranty, implied or expressed, or limitation to the 0 Contractor's liability which may be specified in this Contract, its appendices, its schedules, its annexes or any document incorporated in this Contract by reference. 18 PLANS FOR THE CONTRACTOR The contractor will, upon written request, be furnished up to five sets of plans and specifications and related contract documents for use during construction. Plans and specifications for use during construction will only be furnished directly to the Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Contractor. 19 PROTECTION OF THE WORK The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the date the City issues its certificate of completion to Contractor. The City reserves the right, after the bids have been opened and before the contract has been awarded, to require of a bidder the following information: (a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by the intended contract and all work in progress with bond amounts and percentage completed. (b) A sworn statement of the current financial condition of the bidder. (c) Equipment schedule. 20 TEXAS STATE SALES TAX 20.1 This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act. 20.2 The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy i., the materials to be incorporated into the work without paying the tax at the time of purchase. 21 PROTECTION OF SUBSURFACE LINES AND STRUCTURES It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or other underground structures which might or could be damaged by Contractor during the construction of the project contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the location of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such underground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense. 22 BARRICADES AND SAFETY MEASURES The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, and shall take such other precautionary measures for the protection of persons, property and the work as may be necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and replaced by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barricades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of acceptance of the project. 23 EXPLOSIVES 23.1 The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from the City. In all cases where written permission is obtained for the use of explosives, the Contractor shall assume full responsibility for all damage, which may occur as a direct or indirect result of the blasting. In addition, in all cases where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger life or property and the Contractor shall further I "- NU 25 W use only such methods as are currently utilized by persons, firms, or corporations engaged in similar type of construction activity. 23.2 Explosive materials shall not be stored or kept at the construction site by the Contractor. 23.3 In all cases where explosives are to be used during the construction of the project contemplated by this contract, it shall be the duty of the Contractor to notify each utility company having structures (above or below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and such notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem necessary to protect their property from injury. Such notice, however, shall not relieve the Contractor of responsibility for any damage resulting from his blasting operations. CONTRACTOR'S REPRESENTATIVE The successful bidder shall be required to have a responsible local representative available at all times while the work is in progress under this contract. The successful bidder shall be required to furnish the name, address and telephone number where such local representative may be reached during the time that the work contemplated by this contract is in progress. INSURANCE 25.1 The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or change. All policies shall contain an agreement on the part of the insurer waiving the right to subrogation. The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverages shall be submitted before contract execution. 25.2 PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. COPIES OF THE ENDORSEMENTS ARE REQUIRED. LABOR AND WORKING HOURS 26.1 Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages included in these contract documents. The wage rate that must be paid on this project shall not be less than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The bidders' attention is further directed to the requirements of Texas Government Code, Chapter 2258, Prevailing Wage Rates providing for the payment of the wage schedules above mentioned and the bidder's obligations thereunder. The inclusion of the schedule of general prevailing rate of per diem wages in the contract documents does not release the Contractor from compliance with any wage law that may be applicable. Construction work under the contract requiring an inspector shall not be performed on weekends or holidays unless the following conditions exist: 26.1.1 The project being constructed is essential to the City of Lubbock's ability to provide the necessary service to its citizens. 10 26.1.2 Delays in construction are due to factors outside the control of the Contractor. The Contractor is approaching the penalty provisions of the contract and Contractor can show he has made a diligent effort to complete the contract within the allotted time. 26.2 Before construction work requiring an inspector is to be performed on Sunday or holidays, the f Contractor must notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires to do work and obtain written permission from the Owner's Representative to do such work. The final decision on whether to allow construction work requiring an inspector on Sunday or holidays will be made by the Owner's Representative. 26.3 In any event, if a condition should occur or arise at the site of this project or from the work being done under this contract which is hazardous or dangerous to property or life, the Contractor shall -, immediately commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer dangerous to property or life. 27 PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not less often than once each week. The Contractor and each of his subcontractors shall keep a record showing the name and occupation of each worker employed by the Contractor or subcontractor in the construction of the public work and the actual per diem wages paid to each worker. This record shall be open at all reasonable hours to inspection by the officers and agents of the City. The Contractor must classify employees according to one of the classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule is included in the contract documents. The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, sixty dollars ($60) for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such laborer, workman or mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of general prevailing rate of per diem wages included in these contract documents. 28 PROVISIONS CONCERNING ESCALATION CLAUSES Bids submitted containing any conditions which provide for changes in the stated bid price due to increases or decreases in the cost of materials, labor or other items required for the project will be rejected and returned to the bidder without being considered. 29 PREPARATION FOR BID 29.1 The bidder shall submit his bid on forms furnished by the City, and all blank spaces in the form shall be correctly filled in, stating the price in numerals for which he intends to do the work contemplated or <, r furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten. In case of discrepancy between the unit price and the extended total for a bid item, the unit price will be taken. A bid that has been opened may not be changed for the purpose of correcting an error in the ! bid price. 29.2 If the bid is submitted by an individual, his name must be signed by him or his duly authorized agent. If a bid is submitted by a firm, association, or partnership, the name and address of each member must be given and the bid signed by a member of the firm, association or partnership, or person duly authorized. If the bid is submitted by a company or corporation, the company or corporate name and - business address must be given, and the bid signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign bids must be properly certified and must be in writing and submitted with the bid. The bid shall be executed in ink. 29.3 Each bid shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and endorsed on the outside of the envelope in the following manner: 29.3.1 Bidder's name: } 29.3.2 Bid for "ITB 18-13613-TF, KENT STREET WATER LINE" 31 29.3.3 Bid submittals may be withdrawn and resubmitted at any time before the time set for opening of the bids, but no bid may be withdrawn or altered thereafter. 29.4 Pursuant to Texas Local Government Code 252.043(g), a competitive sealed bid that has been opened may not be changed for the purpose of correcting an error in the bid price. THEREFORE, ANY CORRECTIONS TO THE BID PRICE MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR TO BID OPENING. BOUND COPY OF CONTRACT DOCUMENTS Bidder understands and agrees that the contract to be executed by bidder shall be bound and will include the following: (a) Notice to Bidders. (b) General Instructions to Bidders. (c) Bidder's Submittal. (d) Statutory Bonds (if required). (e) Contract Agreement. (f) General Conditions. (g) Special Conditions (if any). (h) Specifications. (i) Insurance Certificates for Contractor and all Sub -Contractors. (j) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders. If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered incorporated by reference into the aforementioned contract documents. QUALIFICATIONS OF BIDDERS The bidder may be required before the award of any contract to show to the complete satisfaction of the City of Lubbock that it has the necessary facilities, ability, and financial resources to provide the service specified therein in a satisfactory manner. The bidder may also be required to give a past history and references in order to satisfy the City of Lubbock about the bidder's qualifications. The City of Lubbock may make reasonable investigations deemed necessary and proper to determine the ability of the bidder to perform the work, and the bidder shall furnish to the City of Lubbock all information for this purpose that may be requested. The bidder's bid may be deemed not to meet specifications or the bid may be rejected if the evidence submitted by, or investigation of, the bidder fails to satisfy the City of Lubbock that the bidder is properly qualified to carry out the obligations of the contract and to complete the work described therein. Evaluation of the bidder's qualifications shall include: (a) The ability, capacity, skill, and financial resources to perform the work or provide the service required. (b) The ability of the bidder to perform the work or provide the service promptly or within the time specified, without delay or interference. (c) The character, integrity, reputation, judgment, experience, and efficiency of the bidder. (d) The quality of performance of previous contracts or services. (e) The safety record of the Contractor and proposed Sub -Contractors Before contract award, the recommended contractor for this project may be required to show that he has experience with similar projects that require the Contractor to plan his work efforts and equipment needs with City of Lubbock specifications in mind. Demonstration of experience shall include a complete list of ALL similar municipal and similar non -municipal current and completed projects for the past three (3) years for review. This list shall include the names of supervisors and type of equipment used to perform work on these projects. In addition, the Contractor may be required to provide the name(s) of supervisor(s) that will be used to perform work on this project in compliance with City of Lubbock specifications herein. 12 32 BID AWARD 32.1 The City of Lubbock reserves the right to reject any or all bids, reject any particular item on a bid, and J to waive immaterial formalities and to accept the offer most advantageous to the City of Lubbock in its sole discretion. Unless otherwise specified herein, the City shall award the bid based on the total bid for Bid Items 1 through 16 plus the sum of any Alternate Bids or Options the City may select. 32.2 All bids are evaluated for compliance with specifications before the bid price is considered. Response to specifications is primary in determining the best low bid. Failure to comply with the specifications may result in disqualification of the bid. 32.3 In case of tie bids, preference will be given to local bidders. Consistent and continued tie bidding may be cause for rejection of bids by the City of Lubbock and/or investigation by the Attorney General to determine possible Anti -Trust violations. 32.4 Before the City may award a bid to a nonresident bidder, the nonresident bidder's bid must be lower than lowest bid submitted by a responsible Texas bidder by the same margin or amount that a Texas bidder would be required to underbid the nonresident bidder in the nonresident bidders' home state. 32.5 Any contract made, or purchase order issued, as a result of this Invitation to Bid, shall be entered into the State of Texas and under the laws of the State of Texas. In connection with the performance of work, the Bidder agrees to comply with the Fair Labor Standard Act, Equal Opportunity Employment Act, and all other applicable Federal, State, and Local laws, regulations, and executive orders to the extent that the same may be applicable. 32.6 NO INDIVIDUAL OF ANY USING DEPARTMENT HAS THE AUTHORITY TO LEGALLY AND/OR FINANCIALLY COMMIT THE CITY TO ANY CONTRACT, AGREEMENT OR PURCHASE ORDER FOR GOODS OR SERVICES, UNLESS SPECIFICALLY SANCTIONED BY THE REQUIREMENTS OF THIS INVITATION TO BID. 33 ANTI -LOBBYING PROVISION 33.1 DURING THE PERIOD BETWEEN THE BID CLOSE DATE AND THE CONTRACT AWARD, BIDDERS, INCLUDING THEIR AGENTS AND REPRESENTATIVES, SHALL NOT DIRECTLY DISCUSS OR PROMOTE THEIR BID WITH ANY MEMBER OF THE LUBBOCK CITY COUNCIL OR CITY STAFF EXCEPT IN THE COURSE OF CITY - SPONSORED INQUIRIES, BRIEFINGS, INTERVIEWS, OR PRESENTATIONS, UNLESS REQUESTED BY THE CITY. 33.2 This provision is not meant to preclude bidders from discussing other matters with City Council members or City staff. This policy is intended to create a level playing field for all potential bidders, assure that contract decisions are made in public, and to protect the integrity of the bid process. Violation of this provision may result in rejection of the bidder's bid. - 34 PREVAILING WAGE RATES 34.1 Bidders are required to comply with Texas Government Code, Chapter 2258, Prevailing Wage Rates, with respect to the payment of prevailing wage rates for the construction of a public work, including a building, highway, road, excavation, and repair work or other project development or improvement, paid for in whole or in part from public funds, without regard to whether the work is done under public supervision or direction. A worker is employed on a public work if the worker is employed by the contractor or any subcontractor in the execution of the contract for the project - 34.2 A worker employed on a public work by or on behalf of the City of Lubbock shall be paid not less than the general prevailing rate of per diem wages for the work of a similar character in 13 the locality in which the work is performed, and not less than the general prevailing rate of per diem wages for legal holiday and overtime work. 34.3 The State of Texas has adopted the Federal Davis -Bacon wage rates for use in Texas pursuant to and in accordance with the Texas Government Code, Section 2258.022. Bidders may access the U. S. Department of Labor web site at the following web address to obtain the rates to be used in Lubbock County: hqp://www.wdol.gov/dba.aspx 34.4 It shall be the responsibility of the successful bidder to obtain the proper wage rates from the web site for the type of work defined in the bid specifications. 34.5 A contractor or subcontractor who violates Texas Government Code Section 2258.023 shall pay to the City of Lubbock sixty dollars ($60) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the contract. F 14 BID SUBMITTAL FORM Page Intentionally Left Blank City of Lubbock Bid ITS 18-13613-TF BID SUBMITTAL FORM UNIT PRICE BID CONTRACT DATE: 10/12/2017 PROJECT NUMBER: ITB 18-13613-TF, Kent Street Water Line Bid of -.__Utility Contractors of America, Inc. (hereinafter called Bidder) To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called Owner) Ladies and Gentlemen: The Bidder, in compliance with your Invitation to Bid for the construction of Kent Street Water Line, having carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other related contract documents and the site of the intended work, and being familiar with all of the conditions surrounding the construction of the intended project including the availability of materials and labor, hereby intends to furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifications and contract documents, within the time set forth therein and at the price stated below. The bidder binds himself on acceptance of his bid to execute a contract and any required bonds, according to the accompanying forms, for performing and completing the said work within the time stated and for the prices stated below. ITEM NO. DESCRIPTION UNIT OF MEASURE ESTIMATED QUANTITY UNIT PRICE EXTENDED AMOUNT Mobilization - Contractor mobilization 1 including move -in and move -out cost from 1 LS i 00 S101M +� each site location. . Provide and maintain a Traffic Control 2 Plan - Preparation, approval from COL I LS M qp-b) oe Traffic Engineering to all sites, and all other work considered incidental to this item. Provide and maintain a SWPPP - 3 Including preparation, NOI, NOT, and all I LS D FjGg.ea other work considered incidental to this 1 I. item. Furnish and install 12" C-900 DR-18 4 approved water pipe in open cut trench, backfilled to 95% compaction, and tested as 7950 LF OD ► +ri"t� herein specified, including all equipment, tools, and labor to perform work. Furnish and install 6" C-900 DR-18 approved water pipe in open cut trench, 5 backfilled to 95% compaction, and tested as 50 LF,�7y herein specified, including all equipment, tools, and labor to 2erform work. Furnish and install 20" steeI encasement with 12" C-900 DR-18 pvc pipe by open 6 cut, provide all casing spacers and backfilled to 95% compaction, and tested 110 LF as . herein specified, including all equipment, 1� tools, and labor to perform work, as herein s ecified. 912512017 7:27 AM p.19 1 E City of Lubbock Bid ITS 18-13613-TF t ITEM NO. DE.SCIMITION UNIT of MEASURE ES` 1MKIED QUANTITY UNIT' PRICI: EXTENDED AMOUNT' Furnish and install 20" jack and bore 7 steel encasement with 12" C-900 DR-18 pvc pipe at BNSF, provide all casing 110 LF spacers as herein specified, including all equipment, tools, and labor to perform work. Furnish and install air relief valve and 8 vault, as herein specified, including all i EA1 �( 4e1 t(� 0e equipment, tools, and labor to perform work. Furnish and install Fire Hydrant and 9 reconnect, as herein specified, including all 3 EA 09 °b equipment, tools, and labor to perform work.l t Remove and salva a existi2a Fire Hydrant. Furnish and install 12" gate valve and I0 box as herein specified, including all 7 EA equipment, tools, and labor to perform work. Furnish and install 6" gate valve and box 11 as herein specified, including all equipment, 3 EA �1 tools, and labor to perform work. ��r 12 Fittings as approved, complete and in place 3500 LBS `� � 44 �� �� per Specifications. 1 , 13 Flowable backfill as approved, complete in 90 CY and place per Specifications. t Saw cut and remove existing asphalt 14 paving, including all material, equipment and labor to perform removal, disposal and 1000 SF i c 09 all other work considered incidental to this item. Repair asphalt paving, including all 15 material, equipment and labor to perform sub grade compaction and testing. HMAC 1000 SF installation per COL Specifications and all 1 other work considered incidental to this item Caliche Driveway, including all material, equipment and labor to perform sub grade 16 compaction and testing. Flex Base 500 SF d M installation per COL Specifications and all 1 other work considered incidental to this item. Total Base Bid, Items (1-16) $ 110 Bidder's Initials: 6 0 9/25/2017 T.27 AM P. 20 f_, City of Lubbock Bid ITB 18-13613-TF Offeror hereby agrees to commence the work on the above project on a date to be specified in a written "Notice to Proceed" of the Owner and to substantially complete the project within 120 Consecutive Calendar Days with final completion within 150 Consecutive Calendar Days as stipulated in the specification and other contract documents. Offeror hereby further agrees to pay to Owner as liquidated damages in the sum of $250 for each consecutive calendar day after substantial completion set forth herein above for completion of this project, all as more fully set forth in the General Conditions of the Agreement. Bidder understands and agrees that this bid submittal shall be completed and submitted in accordance with instruction number 28 of the General Instructions to Bidders. bidding. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 70 calendar days after the scheduled closing time for receiving bids. The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the plans, specifications and contract documents pertaining to the work covered by this bid, and he further agrees to �- commence work on or before the date specified in the written notice to proceed, and to substantially complete the work on which he has bid; as provided in the contract documents. Bidders are required, whether or not a payment or performance bond is required, to submit a cashier's check or certified check issued by a bank satisfactory to the City of Lubbock, or a bid bond from a reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less than five percent (5%) of the total amount of the bid submitted as a guarantee that bidder will enter into a contract, obtain all required insurance policies, and execute all necessary bonds (if required) within 10 business days after notice of award of the contract to him 6-- Bidder's Initials 9126MO17 7:27 AM p. 21 City of Lubbock Bid ITB 18-13613-TF H t Enclosed with this bid is a Cashier's Check or Certified Check for Dollars {$ ) or a Bid Bond in the sum of -5% - ;~ Dollars (S 5% ), which it is agreed shall be collected and retained by the Owner as liquidated damages in the event the bid is accepted by the Owner and the undersigned rails to execute the necessary contract documents, insurance certificates, and the required bond (if any) with the Owner within 10 business days after the date of receipt of written notification of acceptance of said bid; otherwise, said check or bond shall be returned to the undersigned upon demand. Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all contract documents made available to him for his inspection in accordance with the Notice to Bidders. Pursuant to Texas Local Government Code 252.043(g), a competitive scaled bid that has been opened may not be changed for the purpose of correcting an error In the bid price. THEREFORE, ANY CORRECTIONS TO THE BID PRICE MUST BE MADE ON THE BID SUBMITTAL FORM PRIOR TO BID OPENING. (Seal if Bidder is a Corporation) Bidder acknowledges receipt of the following addenda: Addenda No. Date Addenda No. Date Addenda No. Date Addenda No. Date Date: 1.0/12/2017 Auth . d Signature Chris Balios Vice President (Printed or Typed Name) UtiliLy CQntractors of Amerka. Inc. Company 5805 CR 7700 Address Lubock Lubbock City, County Texas 7942 State Zip Code Telephone: 806 - 863-2642 Fax: 806 - 863-4132 FEDERAL TAX ID or SOCIAL SECURITY No. 75-2214193. EMAIL: projeects@ucatexas.com MlWBE Firm: I I Woman Black American I I Native American Hispanic American I Asian Pacific American I I Other S cif FOR CITY USE ONLY Bid Form Item Number(s) Awarded to Above Named FimVindividual: Date of Award by City Council (for bids over ,S50, 000): Date P.OJContract Issued: RETURN COMPLETED & SIGNED BID FORM ALONG WITH CITY OF LUBBOCK SPECIFICATIONS. LABEL THE OUTSIDE OF YOUR SEALED BID WITH THE ITB NUMBER, THE CLOSING DATE AND TIME, AND YOUR COMPANY NAME AND ADDRESS. 9/25/2017 7:27 AM p. 22 rLibertX Bid Bond CONTRACTOR: Document A310Tm -- 2010 Conforms with The American Institute of Architects AIA Document 310 (Name, legal status and address) UTILITY CONTRACTORS OF AMERICA, INC. 5805 CR 7700 LUBBOCK, TEXAS 79424 OWNER: (Name, legal status and address) CITY OF LUBBOCK 162513th ST., ROOM 204 LUBBOCK, TEXAS 79401 SURETY: (Name, legal status and principal place of business) Liberty Mutual Insurance Company 175 Berkeley Street Boston, MA 02116 Mailing Address for Notices Liberty Mutual Insurance Company Attention: Surety Claims Department 1001 4th Avenue, Suite 1700 Seattle, WA 98154 This document has Important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. BOND AMOUNT: FIVE PERCENT OF THE GREATEST AMOUNT BID --------------------------- PROJECT: (Name, location or address, and Project number, anj) KENT STREET WATER LINE ITB 18-13613-TF The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days, If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 12th day of OCTOBER e (ititne MARLA HILL ,2017 UTILITY CONTRACTORS OF AMERICA, INC. (Prrnei (seal) (7'lt Libe_q Mutual Insurance Company ti tt+su °'�yP a 6 sn 1912 (Title) HOWARD COWAN, ATTORNEY -IN -FACT d�4' J'rcwu°dao 1M5-1UU*0 U9l70 �s Im V� O J R rA b air O 41 C i cc� t .d+ E THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT iS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. 7574158 Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY P] KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual insurance Company is a corporation duly organized under the taws of the Stale of Massachusetts, and West American Insurance Company Is a corporation duty organized under the laws of the State of Indiana (herein collectively called the `Companies'}, pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Howard Cowan,• Marla Hill all of the city of Lubbock state of TX each individually if there be more than one named, its true and lawful aifaney-in-fact to make, execute, seal, acknowledge and deriver, for and on its behalf as surety and as its act and dead, any and all undertakings, bonds, recognizances and other surety obliigations, in pursuance of these presents and shall be as binding upon the Companies as it they have been duly signed by the president and attested by the secretary of the Companies in their on proper parsons. IN WITNESS WHEREOF this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto ttds 19th day of December . 2416 -;`t INS& r� tNSUq truuR� 0 1919 o i 1412 1991 a'aAIA Y STATE OF PENNSYLVANIA Its COUNTY OF MONTGOMERY The Ohio Casualty insurance Company Liberty Mutual Insurance Company p,. West an insurance Company By David M. Care , Assistant Secretary On this 19th day of December 2016 , before me persorially appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of liberty Mutual insurance Company, The Ohio Casualty Company, and West American Insurance Company: and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above wrrineen. yP pgSr COMMONWEALTH OF PENNSYLYANIA Q� �µonw� �{� Notarial Seal Teresa Pastella. Notary Public By: OF Upper Merton Twp., Montgomery County Teresa Pastella, Notary Public v My Commission Expires March 28, 2011 �j L LVpf Member. Pennsviven s Association of Notaries riY This Power of Attorney is made and executed pursuant to and by authority of the following Bylaws and Authorizations of The Ohio Casually Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows. ARTICLE IV — OFFICERS — Section 12. Power of Attorney, Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attomeysain-fact, as may be necessary to act in behalf of the Corporation to make, execute, seat, acknowledge and deliver as surety any and all undertakings, bonds, recogn'izances and other surety obligations. Such attorneys -In -fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seat of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the provisions of this article may be revoked at any time by the Board, the Chaimman, the President or by the officer or officers granting such power or authority. ARTICLE XIII — Execution of Contracts — SECTION 5. Surety Bonds and Undertakings- Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-ia-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deriver as surety any and all undertakings, bonds, recognizances and other surety obligations, Such attomeys•in-fact subject to the limitations set forth In their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as 9 signed by the president and attested by the secretary. Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attomeys4n- fad as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deriver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bowls, shall be valid and binding upon the Company with the same force and effect as though manually affixed. 1, Renee C. Llewellyn. the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insuran s Company, and West Amanoan Insurance Company do hereby certify that the crigtnet power of attomay of which the foregoing is a fitri, We and correct copy of the Power of Attorney executed by said Companies, is in U force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my had and affixed the seals of said Companies this 12TH day of OCTOBER 20 17 --INS& J'�tNSu.rll4 t tNSVgRr 0 1919 O a 1912 3 „�. 1941 By: Renee C. nt Secretary y 186 Of 250 LMSa12873_4a2016 City of Lubbock Bid ITS 18.13613-TF 1 City of Lubbock, TX Insurance Requirement Affidavit To Be Completed by Bidder Must be submitted with Bid f� 1, the undersigned Bidder, certify that the insurance requirements contained in this bid document have been reviewed by me and my Insurance Agent/Broker. if I am awarded this contract by the City of Lubbock, I will be able to, within ten _v (10) business days after being notified of such award by the City of Lubbock, furnish a valid insurance certificate to the City meeting all of the requirements defined in this bid. n a 4 Chris Balios Vice President actor (Orig nal Signature) Contractor (Print) CONTRACTOR'S BUSINESS NAME: Utili Contractors of America, Inc. (Print or Type) CONTRACTOR'S FIRM ADDRESS: 5805 CR 7700 Lubbock, TX 79424 NOTE TO CONTRACTOR If the time requirement specified above is not met, the City has the right to reject this bid and award the contract to another contractor. If you have any questions concerning these requirements, please contact the director of Purchasing & Contract Management Office for the City of Lubbock at (8061775-2572. ITB 18-13613-TF Kent Street Water Line 9/2&2017 7:27 AM p 23 1 PaEe Intentionally Left Blank City of Lubbock Bid (TB 18-13613-TF City of Lubbock, TX Safety Record Questionnaire The City of Lubbock City Council desires to avail itself of the benefits of Section 252.0435 of the Local Government Code, and consider the safety records of potential contractors prior to awarding bids on City contracts. Pursuant to Section 252.0435 of the Local Government Code, City of Lubbock has adopted the following written definition and criteria for accurately determining the safety record of bidder prior to awarding bids on City contracts. The definition and criteria for determining the safety record of a bidder for this consideration shall be: The City of Lubbock shall consider the safety record of the bidders in determining the responsibility thereof. The City may consider any incidents involving worker safety or safety of the citizens of the City of Lubbock, be it related or caused by environmental, mechanical, operational, supervision or any other cause or factor. Specifically, the City may consider, among other things: a. Complaints to, or final orders entered by, the Occupational Safety and Health Review Commission (OSHRC), against the bidder for violations of OSHA regulations within the past three (3) years. b. Citations (as defined below) from an Environmental Protection Agency (as defined below) for violations within the past five (5) years. Environmental Protection Agencies include, but are not necessarily limited to, the U.S. Army Corps of Engineers (USACOE), the U.S. Fish and Wildlife Service (USFWS), the Environmental Protection Agency (EPA), the Texas Commission on Environmental Quality (TCEQ), the Texas Natural Resource Conservation Commission (TNRCC) (predecessor to the TCEQ), the Texas Department of State Health Services (DSHS), the Texas Parks and Wildlife Department (TPWD), the Structural Pest Control Board (SPCB), agencies of local governments responsible for enforcing environmental protection or worker safety related laws or regulations, and similar regulatory agencies of other states of the United States. Citations include notices of violation, notices of enforcement, suspension/revocations of state or federal licenses or registrations, fines assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments. C. Convictions of a criminal offense within the past ten (10) years, which resulted from bodily harm or death. d. Any other safety related matter deemed by the City Council to be material in determining the responsibility of the bidder and his or her ability to perform the services or goods required by the bid documents in a safe environment, both for the workers and other employees of bidder and the citizens of the City of Lubbock. In order to obtain proper information from bidders so that City of Lubbock may consider the safety records of potential contractors prior to awarding bids on City contracts, City of Lubbock requires that bidders answer the following three (3) questions and submit them with their bids: QUESTION ONE Has the bidder, or the firm, corporation, partnership, or institution represented by the bidder, or anyone acting for such firm, corporation, partnership or institution, received citations for violations of OSHA within the past three (3) years? YES NO X If the bidder has indicated YES for question number one above, the bidder must provide to City of Lubbock, with its bid submission, the following information with respect to each such citation: Date of offense, location of establishment inspected, category of offense, final disposition of offense, if any, and penalty assessed. C2 6 Bidder's Initials � 1 9/25/2017 7:27 AM p. 24 City of Lubbock Bid ITB 18.13613-TF Fill, UESTION TWO Fill Has the bidder, or the firm, corporation, partnership, or institution represented by the bidder, or anyone acting for such firm, corporation, partnership or institution, received citations for violations of environmental protection laws or regulations, of any kind or type, within the past five years? Citations include notice of violation, notice of enforcement, suspension/revocations of state or federal licenses, or registrations, fines assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments. YES NO X If the bidder has indicated YES for question number two above, the bidder must provide to City of Lubbock, with its bid submission, the following information with respect to each such conviction: Date of offense or occurrence, location where offense occurred, type of offense, final disposition of offense, if any, and penalty assessed. QUESTION THREE Has the bidder, or the firm, corporation, partnership, or institution represented by bidder, or anyone acting for such firm, corporation, partnership, or institution, ever been convicted, within the past ten (10) years, of a criminal offense which resulted from serious bodily injury or death? YES NO X If the bidder has indicated YES for question number three above, the bidder must provide to City of Lubbock, with its bid submission, the following information with respect to each such conviction: Date of offense, location where offense occurred, type of offense, final disposition of offense, in any, and penalty assessed. ACKNOWLEDGEMENT THE STATE OF TEXAS COUNTY OF LUBBOCK 1 certify that I have made no willful misrepresentations in this Questionnaire nor have I withheld information in my statements and answers to questions. I am aware that the information given by me in this questionnaire shall be investigated, with my full permission, and that any misrepresentations or omissions may cause my bid to be rejected. Signature Chris Balios Vice President Title N 9/2512017 7:27 AM L p. 25 City of Lubbock Bid ITB 18-13613-TF City of Lubbock, TX Suspension and Debarment Certification Federal Law (A-102 Common Rule and OMB Circular A -I 10) prohibits non -Federal entities from contracting with or making sub -awards under covered transactions to parties that are suspended or debarred or whose principals are suspended or debarred. Covered transactions include procurement contracts for goods or services equal to or in excess of $25,000 and all non -procurement transactions (e.g., sub -awards to sub -recipients). Contractors receiving individual awards of $25,000 or more and all sub -recipients must certify that their organization and its principals are not suspended or debarred by a Federal agency. Before an award of $25,000 or more can be made to your firm, you must certify that your organization and its principals are not suspended or debarred by a Federal agency. I, the undersigned agent for the firm named below, certify that neither this firm nor its principals are suspended or debarred by a Federal agency. COMPANY NAME: Utility Contractors of America, Inc. FEDERAL TAX ID or SOCIAL SECURITY No. a' Signature ofCom an Official: ' E Company Printed name of company official signing above: Chris Balios Vice President Date Signed: 10/12/2017 t, 9125/2017 7:27 AM F. 28 t City of Lubbock Bid ITB 18-13613-TF City of Lubbock, TX Chapter 2270 Prohibition on Contracts with Companies Boycotting Israel House Bill 89, adopted by the 8511' Legislature, created §2270.001, Texas Government Code, Section Subtitle F, Title 10, requires a company entering to a contract with a governmental entity or state agency to verify that the company: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. (Effective September 1, 2017) I, the undersigned agent for the company named below, certify that the Company does not boycott Israel and will not boycott Israel during the term of the contract. COMPANY NAME: Utility Contractors of America, Inc. Signature of Company O Date Signed: 10/12/2017 Printed name of company official signing above: Chris Balios Vice President 0 9/2512017 727 AM P. 27 LIST OF SUB -CONTRACTORS 'k� I Page Intentionally Left Blank I u I u m .....,...........— owIIO 90.1J01.3.Ir ITB 18-13613-TF Kent Street Water Line LIST OF SUB CONTRACTORS Minority Owned Company Name Location Services Provided Yes No 1. Lone Star Lubbock, TX Paving D 2. Driver Amarillo, TX lack & Bore D 3. ❑ 4. D 5. ❑ ❑ 6. ❑ D 7. D ❑ 8. D ❑ 9. D D 10. D ❑ 11. ❑ ❑ 12. ❑ ❑ 13. D ❑ 14. D D 15. D ❑ 16. D ❑ Utility Contractors of America, Inc. Company 5805 CR 7700 Address Lubbock Lubbock City, County Texas 79424 State Zip Code Telephone: _ 806 - 863-2642 Fax: 806 - 863-4132 THIS FORM SHALL BE COMPLETED AND RETURNED ALONG WITH YOUR PROPOSAL IF NO SUB -CONTRACTORS WILL BE USED PLEASE INDICATE SO M 9/2512017 7.27 AM 30 I Page Intentionally Left Blank I u J, u s L. Ky OF LUCCOGN Bid ITB 18-13613-TF ITB 19-13613-TF Kent Street Water Line FINAL LIST OF SUB CONTRACTORS Minority Owned Company Name Location Services Provided Yes No 1. Lone Star Lubbock. TX Paving 0 x 2. Driver -Amarillo. TX lack & Bare Q x 3. 0 0 4. 0 0 5. 0 0 6. 7. 0 0 8. 0 0 9. 0 0 10. 0 0 11. 0 0 _ n, 12. 0 0 13. 0 0 14. 0 0 15. 0 0 16. 0 0 Utility Contractors of America, Inc. Company 5805 CR 7700 Address Lubbock Lubbock City, County Texas 79424 State Zip Code Telephone: 806 863-2642 Fax: 906 - 963-Al 32 I ' THIS FORM SHALL BE COMPLETED AND RETURNED WITHIN 7 DAYS OF BID CLOSING. IF NO SUB —CONTRACTORS WILL BE USED PLEASE INDICATE SO. 3 SM51=7 7:27 AM r�m Page Intentionally Left Blank PERFORMANCE BOND Page Intentionally Left Blank PAYMENT BOND Page Intentionally Left Blank BOND NO. 022058347 I STATUTORY PERFORMANCE BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNMENT CODE (CONTRACTS MORE THAN $100,000) KNOW ALL MEN BY THESE PRESENTS, that Utility Contractors of America, Inc. (hereinafter called the Principal(s), as Principal(s), and LIBERTY MUTUAL INSURANCE COMPANY (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of Four Hundred Ten Thousand Two Hundred Fifty Dollars $410 250 lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the 2"d day of November, 2017, to ITB 18-13613-TF Kent Street Water Line and said principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this 14TH day of NOVEMBER , 2017. LIBERTY MUTUAL INSURANCE COMPANY Surety 7 *By j (Title) MARLA HILL ATTORNEY -IN -FACT UTILITY CONTRACTORS OF AMERICA INC (Company Name) By: (Pri Name) t ( ignature) d (Title) Pau Intentionally Left Blank I I BOND NO. 022058347 STATUTORY PAYMENT BOND PURSUANT TO SECTION 2253.021(a) OF THE TEXAS GOVERNMENT CODE (CONTRACTS MORE THAN $50,000) KNOW ALL MEN BY THESE PRESENTS, that Utility Contractors of America, Inc. (hereinafter called the Principal(s), as Principal(s), and LIBERTY MUTUAL INSURANCE COMPANY (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter called the Obligee), in the amount of Four Hundred Ten Thousand Two Hundred Fifty Dollars $410 250 lawful money of the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the 2"d day of November, 2017, to ITB 18-13613-TF Kent Street Water Line and said Principal under the law is required before commencing the work provided for in said contract to execute a bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. - NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to P remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Section 2253.021(a) of the Texas Government Code, and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this 14TH day of NOVEMBER , 2017. LIBERTY MUTUAL INSURANCE COMPANY Surett~y! By. (Title) MARLA HILL ATTORNEY -IN -FACT UTILITY CONTRACTORS OF AMERICA, INC. (Company Name) (Title) Page Intentionally Left Blank The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby designates HOWARD COWAN an agent resident in Lubbock County to whom any requisite notices may be delivered and on whom service of process may be had in matters arising out of such suretyship. LIBERTY MUTUAL INSURANCE COMPANY Surety r,., *B } (Title) MART HILL ATTORNEY -IN -FACT Approved as to form: City of L bbock By: Cit Attorney * Note: If signed by an Office of the Surety Company there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy of power of attorney for our files. K Page Intentionally Left Blank vr•�� MU `r SURET TEXAS IMPORTANT NOTICE To obtain information or make a complaint: You may call toll -free for information or to make a complaint at 1-877-751-2640 You may also write to: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439 You may write the Texas Department of Insurance Consumer Protection (111-IA) P. O. Box 149091 Austin, TX 78714-9091 FAX: (512) 490-1007 Web: http://w\,,-w.tdi..texas.gov E-mail: ConsumerProtection@tdi texas ov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should first contact the agent or call 1-800-843-6446. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. N'P70680901 LMS-15292 10115 TEXAS AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede llamar al numero de telefono gratis para informacion o para someter una queja al 1-877-751-2640 Usted tambien puede escribir a: 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos o quejas al 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas Consumer Protection (I I I-1A) P. O. Box 149091 Austin, TX 78714-9091 FAX # (512) 490-1007 Web: http://,,vww.tdi..texas.gov E-mail: ConsumerProtection&,tdi.texas.gov DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiena una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI) UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condition del documento adjunto. THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. 7574199 Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the 'Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Howard Cowan; Marla Hill all of the city of Lubbock state of TX each individually if there be more than one named, its true and lawful attomey-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations; in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own:properpersons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the.corporate seals of the Companies have been affixed thereto this 19th day of December 2016 b P�ZY INSI, �IONSUO ,'AMSU/l,,l h° c� r2 0�+�. �� � � �� The Ohio Casualty Insurance Company a Q. 0 � J �`' O F 4 Liberty Mutual Insurance Company a p� 1919 o a 1912 1991 t Wesmerican Insurance Company _ g fN dy i �rsd¢�a��/7 9srpCm S? -roo1AxP F * s By ^ STATE OF PENNSYLVANIA ss David M. Cate , Assistant Secretary o L COUNTY OF MONTGOMERY to dOn this 19th day of December 2016 t<s t ` pf y , before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance v F. v N Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes >,CO p 2 therein contained by signing on behalf of the corporations by himself as a duly authorized officer. (D D L M. E l; ,d > IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written. O ! t0 P PAS) COMMONWEALTH OF PENNSYLVANIA + C Q��oNw� Flf Notarial Seal ,Q r uo t1 9 Teresa Pastella, Notary Public By: �/� '� �" a"" 0 Z OF Upper Marion Twp., Montgomery County Teresa Pastella, Notary Public L. t L �,w My Commission Expires March 28. 2017 3 t C y� L`1+ JG Member, Pennsylvania Association of Notaries 0 IL f EEEIII C L This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual W C Cs^ Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: w tL ARTICLE IV OFFICERS — Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject O a t II y to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal,+ 00 acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective 'a j E g powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so t wexecuted, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under > C the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. s to G ARTICLE XIII — Execution of Contracts — SECTION 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, C iLand subject to such limitations as the chairman or the president may prescribe, shall appoint such allomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, r O seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such aflomeys-in-fact subject to the limitations set forth in their E a ttt to respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so v C executed such instruments shall be as binding as if signed by the president and attested by the secretary. O q Certificate of Designation — The President of the Company; acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in- ~ ! fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings; bonds, recognizances and other surety obligations. Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the 6 Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked, IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 14TH day of NOVEMBER 20 17 ycv INSU y1NSUR ty tNSUq hJ�-o4soxgr�g2 �J�osroksro�'�F ����-�,o:sor„U�rcc _ 0 1914 o 1912 1991 a By:� N Renee C. Llewellyn, sistant Secretary - 227 of 250 LMS_12873_082016 ACOR 7 0 �/l CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 11/15/2017 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER K&S Insurance Agency 2255 Ridge Road, Ste. 333 P . O. BOX 277 Rockwall TX 75087 CONTACT Cheryl Rogers NAME: y g FAX fAIPHCN o . (972) 771-4071 (ACNo: (972)771-4695 ADORIess:crogers@kandeins.com INSURERS AFFORDING COVERAGE NAIC # INSURERA:National Trust Insurance Co. INSURED Utility Contractors of America, Inc., DBA: Utility Contractors of America, Ltd. 5805 CR 7700 Lubbock TX 79424 INSURERB:Texas Mutual Insurance Co. 22945 INSURERC:COntinental Casualty Insurance 20443 INSURERD: INSURERE: INSURERF: COVERAGES CERTIFICATE NUMBER:17/18 Std REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADD UBR POLICY NUMBER POLICY EFF MM/DD/YYYY POLICY EXP MM/DD/YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A CLAIMS -MADE ❑X OCCUR DA AGE( RENTED PREMISESSEa occurrence $ 100,000 MED EXP (Any one person) $ 5,000 CPP0019154 9/5/2017 9/5/2018 PERSONAL & ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY a JERT El LOG PRODUCTS - COMP/OP AGG $ 2,000,000 $ OTHER: AUTOMOBILE LIABILITY COMBINED SIN LE LIMIT Ea accident $ 1,000,000 BODILY INJURY (Per person) $ A ANY AUTO ALL OWNED SCHEDULED AUTOS AUTOS CA100005345 9/5/2017 9/5/2018 IX BODILYINJURY(Peraccident) $ PROPERTY DAMAGE Per accident $ NON -OWNED HIRED AUTOS N AUTOS Uninsured/Underinsured $ 1,000,000 X UMBRELLA LIAB OCCUR EACH OCCURRENCE $ 10,000,000 N AGGREGATE $ 10, 000, 000 A EXCESS LIAR CLAIMS -MADE DED I X I RETENTION$ 10,000 $ 1 UMB100017035 9/5/2017 9/5/2018 WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y / N ANY PROPRIETOR/PARTNER/EXECUTIVE X PER TH- STATUTE ER E.L. EACH ACCIDENT $ 1,000,000 B OFFICER/MEMBER EXCLUDED? (Mandatory in NH) N / A 0001204282 9/5/2017 9/5/2018 E.L. DISEASE - EA EMPLOYEE $ 1,000,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ 1,000,000 C Leased/Rented Equipment 5086411620 9/5/2017 9/5/2018 $315,000w/$1,000Deductible DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Re: Kent Street Water Line Please see attached for additional information. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE The City of Lubbock THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 1625 13th Street, Room 204 ACCORDANCE WITH THE POLICY PROVISIONS. Lubbock, TX 79401 AUTHORIZED REPRESENTATIVE Johnny Moss/CHERYL''r� ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25 (2014/01) INS026 (201401) The ACORD name and logo are registered marks of ACORD COMMENTS/REMARKS The following Applies to the General Liability Policy: Additional Insured Form #CGL084 10/13 for Ongoing Operations and Completed Operations; Additional Insured Form #CGL088 10/13 for Lessor of Leased Equipment; Primary & Non -Contributory Form #CGL025 11/08; Waiver of Subrogation Form #CGL088 10/13. The following Applies to the Businss Auto Policy: Additional Insured Form #CAU058 1/15; Waiver of Subrogation Form #CAU058 1/15; Primary & Non -Contributory Form #CAU042 1/15 The following Applies to the Worker's Compensation Policy: Waiver of Subrogation Form #WC420304B *ALWAYS REFER TO THE ATTACHED POLICY FORMS FOR SPECIFIC WORDING OF SUCH COVERAGE, LIMITS, CONDITIONS & EXCLUSIONS. I OFREMARK COPYRIGHT 2000, AMS SERVICES INC. I COMMERCIAL GENERAL LIABILITY CGL 084 (10 13) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS -- AUTOMATIC STATUS WHEN REQUIRED IN CONSTRUCTION AGREEMENT WITH YOU -- ONGOING OPERATIONS AND PRODUCTS -COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM SCHEDULE Name of Additional Insured Persons or Organizations (As required by written contract or agreement per Paragraph A. below.) As required by written contract or agreement. Locations of Covered Operations (As per the written contract or agreement, provided the location is within the "coverage territory".) As per the written contract or agreement, provided the location is within the coverage territory. (Information required to complete this Schedule, if not shown above, will be shown in the Declarations.) A. Section II —Who Is An Insured is amended to include as an additional insured: 1. Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement in effect during the term of this policy that such person or organization be added as an additional insured on your policy; and 2. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph 1. above; and 3. The particular person or organization, if any, scheduled above. Such person(s) or organization(s) is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" occurring after the execution of the contract or agreement described in Paragraph 1. above and caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf in the performance of your ongoing operations for the additional insured; or 3. Your work" performed for the additional insured and included in the "products -completed operations hazard" if such coverage is specifically required in the written contract or agreement. CGL 084 (10 13) Includes copyrighted material of the Insurance Services Offices, Inc. with its permission. Page 1 of 3 Copyright 2013 FCCI Insurance Group. COMMERCIAL GENERAL LIABILITY CGL 084 (10 13) However, the insurance afforded to such additional insured(s) described above: 1. Only applies to the extent permitted by law; 2. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured; 3. Will not be broader than that which is afforded to you under this policy; and 4. Nothing herein shall extend the term of this policy. B. The insurance provided to the additional insured does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: 1. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or 2. Supervisory, inspection, architectural or engineering activities. C. This insurance is excess over any other valid and collectible insurance available to the additional insured whether on a primary, excess, contingent or any other basis; unless the written contract or agreement requires that this insurance be primary and non-contributory, in which case this insurance will be primary and non-contributory relative to insurance on which the additional insured is a Named insured. D. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits of Insurance: The most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement described in Paragraph A.1.; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. E. Section IV — Commercial General Liability Conditions is amended as follows: The Duties In The Event of Occurrence, Offense, Claim or Suit condition is amended to add the following additional conditions applicable to the additional insured: An additional insured under this endorsement must as soon as practicable: 1. Give us written notice of an 'occurrence" or an offense which may result in a claim or "suit" under this insurance, and of any claim or "suit' that does result; 2. Send us copies of all legal papers received in connection with the claim or "suit", cooperate with us in the investigation or settlement of the claim or defense against the "suit", and otherwise comply with all policy conditions; and 3. Tender the defense and indemnity of any claim or "suit" to any provider of other insurance which would cover the additional insured for a loss we cover under this endorsement and agree to make available all such other insurance. However, this condition does not affect Paragraph C. above. CGL 084 (10 13) Includes copyrighted material of the Insurance Services Offices, Inc. with its permission. Page 2 of 3 Copyright 2013 FOCI Insurance Group. COMMERCIAL GENERAL LIABILITY CGL 084 (10 13) We have no duty to defend or indemnify an additional insured under this endorsement until we receive from the additional insured written notice of a claim or "suit". F. This endorsement does not apply to any additional insured or project that is specifically identified in any other additional insured endorsement attached to the Commercial General Liability Coverage Form. CGL 084 (1013) Includes copyrighted material of the Insurance Services Offices, Inc. with its permission. Page 3 of 3 Copyright 2013 FCCI Insurance Group. FIRST CHOICE CONTRACTORS LIABILITY ENDORSEMENT TABLE OF CONTENTS DESCRIPTION PAGE Additional Insured Coverage....................................................................................................................................10 BailBonds...................................................................................................................................................................9 BlanketWaiver of Subrogation.................................................................................................................................16 BodilyInjury and Property Damage............................................................................................................................1 Care, Custody or Control............................................................................................................................................3 Contractors Errors and Omissions...............................................................................................................7 Contractual Liability (Personal & Advertising Injury)..................................................................................................2 ElectronicData Liability..............................................................................................................................................1 GeneralLiability Conditions......................................................................................................................................14 IncidentalMalpractice...............................................................................................................................................10 Insured......................................................................................................................................................................10 LimitedProduct Withdrawal Expense.........................................................................................................................4 Limitsof Insurance ............................................. .......................................................................................................12 Loss of Earnings.......................................................... ...............10 NewlyFormed or Acquired Organizations................................................................................................................12 Non -Owned Watercraft...............................................................................................................................................1 Property Damage Liability — Borrowed Equipment.....................................................................................................1 Tenant's Property and Premises Rented To You.......................................................................................................9 Voluntary Property Damage .................................................... ...............2 .................................................................... COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. FIRST CHOICE CONTRACTORS LIABILITY ENDORSEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM NOTE: The following are additions, replacements and amendments to the Commercial General Liability Coverage Form, and will apply unless excluded by separate endorsement(s) to the Commercial General Liability Coverage Form. The COMMERCIAL GENERAL LIABILITY COVERAGE FORM is amended as follows: SECTION 1- COVERAGES, COVERAGE A. BODILY INJURY AND PROPERTY DAMAGE is amended as follows: 1. Extended "Property Damage" Exclusion 2.a., Expected or Intended Injury, is replaced with the following: a. "Bodily injury" or "property damage" expected or intended from the standpoint of the insured. This exclusion does not apply to "bodily injury" or "property damage" resulting from the use of reasonable force to protect persons or property. 2. Non -owned Watercraft Exclusion 2.g. (2) (a) is replaced with the following: (a) Less than 51 feet long; and 3. Property Damage Liability — Borrowed Equipment The following is added to Exclusion 2.j. (4): Paragraph (4) of this exclusion does not apply to "property damage" to borrowed equipment while at a jobsite and not being used to perform operations. The most we will pay for "property damage" to any one borrowed equipment item under this coverage is $25,000 per "occurrence". The insurance afforded under this provision is excess over any other valid and collectible property insurance (including deductible) available to the insured, whether primary, excess, contingent or on any other basis. 4. Limited Electronic Data Liability Exclusion 2.p. is replaced with the following: p. Electronic Data Damages arising out of the loss of, loss of use of, damage to, corruption of, inability to access, or inability to manipulate "electronic data" that does not result from physical injury to tangible property. The most we will pay under Coverage A for "property damage" because of all loss of "electronic data" arising out of any one "occurrence" is $10,000. CGL 088 (1013) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 1 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) We have no duty to investigate or defend claims or "suits" covered by this Limited Electronic Data Liability coverage. The following definition is added to SECTION V — DEFINITIONS of the Coverage Form: "Electronic data" means information, facts or programs stored as or on, created or used on, or transmitted to or from computer software (including systems and applications software), hard or floppy disks, CD- ROMS, tapes, drives, cells, data processing devices or any other media which are used with electronically controlled equipment. For purposes of this Limited Electronic Data Liability coverage, the definition of "Property Damage" in SECTION V — DEFINITIONS of the Coverage Form is replaced by the following: 17. 'Property damage" means: a. Physical injury to tangible property, including all resulting loss of use of that property. All such loss of use shall be deemed to occur at the time of the physical injury that caused it; b. Loss of use of tangible property that is not physically injured. All such loss of use shall be deemed to occur at the time of the "occurrence" that caused it; c. Loss of, loss of use of, damage to, corruption of, inability to access, or inability to properly manipulate "electronic data", resulting from physical injury to tangible property. All such loss of "electronic data" shall be deemed to occur at the time of the "occurrence" that caused it. For purposes of this insurance, "electronic data" is not tangible property. SECTION 1— COVERAGES, COVERAGE B. PERSONAL AND ADVERTISING INJURY LIABILITY is amended as follows: Paragraph 2.e. Exclusions — the Contractual Liability Exclusion is deleted. SECTION I — COVERAGES, the following coverages are added: COVERAGE D. VOLUNTARY PROPERTY DAMAGE 1. insuring Agreement We will pay, at your request, for "property damage" caused by an "occurrence", to property of others caused by you, or while in your possession, arising out of your business operations. The amount we will pay for damages is described in SECTION III LIMITS OF INSURANCE. 2. Exclusions This insurance does not apply to: "Property Damage" to: a. Property at premises owned, rented, leased or occupied by you; b. Property while in transit; c. Property owned by, rented to, leased to, loaned to, borrowed by, or used by you; CGL 088 (1013) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 2 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) d. Premises you sell, give away, or abandon, if the "property damage" arises out of any part of those premises; e. Property caused by or arising out of the "products -completed operations hazard"; f. Motor vehicles; g. "Your product" arising out of it or any part of it; or h. "Your work" arising out of it or any part of it. 3. Deductible We will not pay for loss in any one "occurrence" until the amount of loss exceeds $250. We will then pay the amount of loss in excess of $250 up to the applicable limit of insurance. 4. Cost Factor In the event of a covered loss, you shall, if requested by us, replace the damaged property or furnish the labor and materials necessary for repairs thereto at your actual cost, excluding profit or overhead charges. The insurance afforded under COVERAGE D is excess over any other valid and collectible property or inland marine insurance (including the deductible applicable to the property or inland marine coverage) available to you whether primary, excess, contingent or any other basis. Coverage D covers unintentional damage or destruction, but does not cover disappearance, theft, or loss of use. The insurance under COVERAGE D does not apply if a loss is paid under COVERAGE E. COVERAGE E. CARE, CUSTODY OR CONTROL 1. Insuring Agreement We will pay those sums that the insured becomes legally obligated to pay as damages because of "property damage" caused by an 'occurrence", to property of others while in your care, custody, or control or property of others as to which you are exercising physical control if the "property damage" arises out of your business operations. The amount we will pay for damages is described in SECTION III LIMITS OF INSURANCE. 2. Exclusions This insurance does not apply to: "Property Damage" to: a. Property at premises owned, rented, leased or occupied by you; b. Property while in transit; c. Premises you sell, give away, or abandon, if the "property damage" arises out of any part of those premises; d. Property caused by or arising out of the "products -completed operations hazard"; CGL 088 (1013) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 3 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) e. Motor vehicles; f. "Your product' arising out of it or any part of it; or g. "Your work" arising out of it or any part of it. 3. Deductible We will not pay for loss in any one "occurrence" until the amount of loss exceeds $250. We will then pay the amount of loss in excess of $250 up to the applicable limit of insurance. 4. Cost Factor In the event of a covered loss, you shall, if requested by us, replace the damaged property or furnish the labor and materials necessary for repairs thereto at your actual cost, excluding profit or overhead charges. The insurance afforded under COVERAGE E is excess over any other valid and collectible property or inland marine insurance (including the deductible applicable to the property or inland marine coverage) available to you whether primary, excess, contingent or any other basis. The insurance under COVERAGE E does not apply if a loss is paid under COVERAGE D. COVERAGE F. LIMITED PRODUCT WITHDRAWAL EXPENSE 1. Insuring Agreement a. If you area "seller", we will reimburse you for "product withdrawal expenses" associated with "your product' incurred because of a "product withdrawal' to which this insurance applies. The amount of such reimbursement is limited as described in SECTION III - LIMITS OF INSURANCE. No other obligation or liability to pay sums or perform acts or services is covered. a, This insurance applies to a "product withdrawal' only if the "product withdrawal' is initiated in the "coverage territory" during the policy period because: (1) You determine that the "product withdrawal' is necessary; or (2) An authorized government entity has ordered you to conduct a "product withdrawal'. c. We will reimburse only those "product withdrawal expenses" which are incurred and reported to us within one year of the date the "product withdrawal' was initiated. d. The initiation of a "product withdrawal' will be deemed to have been made only at the earliest of the following times: (1) When you have announced, in any manner, to the general public, your vendors or to your employees (other than those employees directly involved in making the determination) your decision to conduct a "product withdrawal' This applies regardless of whether the determination to conduct a "product withdrawal' is made by you or is requested by a third party; (2) When you received, either orally or in writing, notification of an order from an authorized government entity to conduct a "product withdrawal; or CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 4 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) (3) When a third party has initiated a "product withdrawal" and you communicate agreement with the "product withdrawal", or you announce to the general public, your vendors or to your employees (other than those employees directly involved in making the determination) your decision to participate in the "product withdrawal", whichever comes first. e. "Product withdrawal expenses" incurred to withdraw "your products" which contain: (1) The same "defect" will be deemed to have arisen out of the same "product withdrawal'; or (2) A different "defect" will be deemed to have arisen out of a separate "product withdrawal" if newly determined or ordered in accordance with paragraph 1.b of this coverage. 2. Exclusions This insurance does not apply to "product withdrawal" expenses" arising out of. a. Any "product withdrawal" initiated due to: (1) The failure of "your products" to accomplish their intended purpose, including any breach of warranty of fitness, whether written or implied. This exclusion does not apply if such failure has caused or is reasonably expected to cause "bodily injury" or physical damage to tangible property. (2) Copyright, patent, trade secret or trademark infringements; (3) Transformation of a chemical nature, deterioration or decomposition of "your product", except if it is caused by: (a) An error in manufacturing, design, processing or transportation of "your product'; or (b) "Product tampering". (4) Expiration of the designated shelf life of "your product". b. A "product withdrawal", initiated because of a "defect" in "your product" known to exist by the Named Insured or the Named Insured's "executive officers", prior to the inception date of this Coverage Part or prior to the time "your product" leaves your control or possession. c. Recall of any specific products for which "bodily injury" or "property damage" is excluded under Coverage A - Bodily Injury And Property Damage Liability by endorsement. d. Recall of "your products" which have been banned from the market by an authorized government entity prior to the policy period. e. The defense of a claim or "suit" against you for "product withdrawal expenses". 3. For the purposes of the insurance afforded under COVERAGE F, the following is added to 2. Duties In The Event Of Occurrence, Offense, Claim Or Suit Condition under SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS: e. Duties In The Event Of A "Defect" Or A "Product Withdrawal" (1) You must see to it that we are notified as soon as practicable of any actual, suspected or threatened "defect" in "your products", or any governmental investigation, that may result in a "product withdrawal". To the extent possible, notice should include: CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 5 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) (a) Now, when and where the "defect" was discovered; (b) The names and addresses of any injured persons and witnesses; and (c) The nature, location and circumstances of any injury or damage arising out of use or consumption of "your product". (2) If a "product withdrawal" is initiated, you must: (a) Immediately record the specifics of the "product withdrawal" and the date it was initiated; (b) Send us written notice of the "product withdrawal" as soon as practicable; and (c) Not release, consign, ship or distribute by any other method, any product, or like or similar products, with an actual, suspected or threatened defect. (3) You and any other involved insured must: (a) Immediately send us copies of pertinent correspondence received in connection with the "product withdrawal (b) Authorize us to obtain records and other information; and (c) Cooperate with us in our investigation of the "product withdrawal". 4. For the purposes of this Coverage F, the following definitions are added to the Definitions Section: a. "Defect" means a defect, deficiency or inadequacy that creates a dangerous condition. b. "Product tampering" is an act of intentional alteration of "your product" which may cause or has caused "bodily injury" or physical injury to tangible property. When "product tampering" is known, suspected or threatened, a "product withdrawal" will not be limited to those batches of "your product" which are known or suspected to have been tampered with. c. "Product withdrawal" means the recall or withdrawal of "your products", or products which contain "your products", from the market or from use, by any other person or organization, because of a known or suspected "defect" in "your product", or a known or suspected "product tampering", which has caused or is reasonably expected to cause "bodily injury" or physical injury to tangible property. d. "Product withdrawal expenses" means those reasonable and necessary extra expenses, listed below paid and directly related to a "product withdrawal": (1) Costs of notification; (2) Costs of stationery, envelopes, production of announcements and postage or facsimiles; (3) Costs of overtime paid to your regular non -salaried employees and costs incurred by your employees, including costs of transportation and accommodations; (4) Costs of computer time; (5) Costs of hiring independent contractors and other temporary employees; (6) Costs of transportation, shipping or packaging; CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 6 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) (7) Costs of warehouse or storage space; or (8) Costs of proper disposal of "your products", or products that contain "your products", that cannot be reused, not exceeding your purchase price or your cost to produce the products; but "product withdrawal expenses" does not include costs of the replacement, repair or redesign of "your product", or the costs of regaining your market share, goodwill, revenue or profit. e. "Seller' means a person or organization that manufactures, sells or distributes goods or products. "Seller"does not include a "contractor' as defined elsewhere in this endorsement. The insurance under COVERAGE F does not apply if a loss is paid under COVERAGE G. COVERAGE G. CONTRACTORS ERRORS AND OMISSIONS 1. Insuring Agreement If you are a "contractor', we will pay those sums that you become legally obligated to pay as damages because of "property damage" to "your product', "your work" or "impaired property", due to faulty workmanship, material or design, or products including consequential loss, to which this insurance applies. The damages must have resulted from your negligent act, error or omission while acting in your business capacity as a contractor or subcontractor or from a defect in material or a product sold or installed by you while acting in this capacity. The amount we will pay for damages is described in SECTION Ill LIMITS OF INSURANCE. We have no duty to investigate or defend claims or "suits" covered by this Contractors Errors or Omissions coverage. This coverage applies only if the "property damage" occurs in the "coverage territory" during the policy period. This coverage does not apply to additional insureds, if any. Supplementary Payments — Coverage A and B do not apply to Coverage G. Contractors Errors and Omissions. 2. Exclusions This insurance does not apply to: a. "Bodily injury" or "personal and advertising injury", b. Liability or penalties arising from a delay or failure to complete a contractor project, or to complete a contract or project on time. c. Liability because of an error or omission: (1) In the preparation of estimates or job costs; (2) Where cost estimates are exceeded; (3) In the preparation of estimates of profit or return on capital; (4) In advising or failure to advise on financing of the work or project; or (5) In advising or failing to advise on any legal work, title checks, form of insurance or suretyship. CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 7 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) d. Any liability which arises out of any actual or alleged infringement of copyright or trademark or trade dress or patent, unfair competition or piracy, or theft or wrongful taking of concepts or intellectual property. e. Any liability for damages: (1) From the intentional dishonest, fraudulent, malicious or criminal acts of the Named Insured, or by any partner, member of a limited liability company, or executive officer, or at the direction of any of them; or (2) Which is in fact expected or intended by the insured, even if the injury or damage is of a different degree or type than actually expected or intended. f. Any liability arising out of manufacturer's warranties or guarantees whether express or implied. g. Any liability arising from "property damage" to property owned by, rented or leased to the insured. h. Any liability incurred or "property damage" which occurs, in whole or in part, before you have completed "your work." "Your work" will be deemed completed at the earliest of the following times: (1) When all of the work called for in your contract or work order has been completed; (2) When all the work to be done at the job site has been completed if your contract calls for work at more than one job site; or (3) When that part of the work done at a job site has been put to its intended use by any person or organization other than another contractor or subcontractor working on the same project. Work that may need service or maintenance, correction, repair or replacement, but which is otherwise complete, will be treated as complete. i. Any liability arising from "property damage" to products that are still in your physical possession. j. Any liability arising out of the rendering of or failure to render any professional services by you or on your behalf, but only with respect to either or both of the following operations: (1) Providing engineering, architectural or surveying services to others; and (2) Providing or hiring independent professionals to provide engineering, architectural or surveying services in connection with construction work you perform. Professional services include the preparing, approving or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders, or drawings and specifications. Professional services also include supervisory or inspection activities performed as part of any related architectural or engineering activities. But, professional services do not include services within construction means, methods, techniques, sequences and procedures employed by you in connection with construction work you perform. k. Your loss of profit or expected profit and any liability arising therefrom. 1. "Property damage" to property other than "your product," "your work" or "impaired property." m. Any liability arising from claims or "suits" where the right of action against the insured has been relinquished or waived. CGL 088 (1013) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 8 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) n. Any liability for "property damage" to "your work" if the damaged work or the work out of which the damage arises was performed on your behalf by a subcontractor. o. Any liability arising from the substitution of a material or product for one specified on blueprints, work orders, contracts or engineering specifications unless there has been written authorization, or unless the blueprints, work orders, contracts or engineering specifications were written by you, and you have authorized the changes. p. Liability of others assumed by the insured under any contractor agreement, whether oral or in writing. This exclusion does not apply to liability for damages that the insured would have in the absence of the contract or agreement. 3. For the purposes of Coverage G, the following definition is added to the Definitions section: a. "Contractor" means a person or organization engaged in activities of building, clearing, filing, excavating or improvement in the size, use or appearance of any structure or land. "Contractor" does not include a "seller" as defined elsewhere in this endorsement. 4. Deductible We will not pay for loss in any one "occurrence" until the amount of loss exceeds $250. The limits of insurance will not be reduced by the application of the deductible amount. We may pay any part or all of the deductible amount to effect settlement of any claim or "suit", and upon notification of the action taken, you shall promptly reimburse us for such part of the deductible amount as has been paid by us. 5. Cost Factor In the event of a covered loss, you shall, if requested by us, replace the damaged property or furnish the labor and materials necessary for repairs thereto at your actual cost, excluding profit or overhead charges. The insurance under COVERAGE G does not apply if a loss is paid under COVERAGE F. EXPANDED COVERAGE FOR TENANT'S PROPERTY AND PREMISES RENTED TO YOU The first paragraph after subparagraph (6) in Exclusion j., Damage to Property is amended to read as follows: Paragraphs (1), (3) and (4) of this exclusion do not apply to "property damage" (other than damage by fire) to premises, including the contents of such premises, rented to you. A separate limit of insurance applies to Damage To Premises Rented To You as described in Section III — Limits Of Insurance. SECTION I - COVERAGES, SUPPLEMENTARY PAYMENTS — COVERAGE A and B is amended as follows: All references to SUPPLEMENTARY PAYMENTS — COVERAGES A and B are amended to SUPPLEMENTARY PAYMENTS — COVERAGES A, B, D. E, and G. 1. Cost of Bail Bonds Paragraph 1.b. is replaced with the following: b. Up to $2,500 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 9 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) 2. Loss of Earnings Paragraph 1.d. is replaced with the following: d. All reasonable expenses incurred by the insured at our request to assist us in the investigation or defense of the claim or "suit", including actual loss of earnings up to $500 a day because of time off from work. SECTION 11— WHO IS AN INSURED is amended as follows: 1. Incidental Malpractice Paragraph 2.a.(1)(d) is replaced with the following: (d) Arising out of his or her providing or failing to provide professional health care services. However, this exclusion does not apply to a nurse, emergency medical technician or paramedic employed by you to provide medical services, unless: (i) You are engaged in the occupation or business of providing or offering medical, surgical, dental, x-ray or nursing services, treatment, advice or instruction; or (ii) The "employee" has another insurance that would also cover claims arising under this provision, whether the other insurance is primary, excess, contingent or on any other basis. 2. Broadened Who Is An Insured The following are added to Paragraph 2.: Subsidiaries e. Your subsidiaries if: (1) They are legally incorporated entities; and (2) You own more than 60% of the voting stock in such subsidiaries as of the effective date of this policy. If such subsidiaries are not shown in the Declarations, you must report them to us within 180 days of the inception of your original policy. Additional Insureds f. Any person or organization described in paragraphs g. through k. below whom you are required to add as an additional insured on this policy under a written contract or agreement in effect during the term of this policy, provided the written contract or agreement was executed prior to the "bodily injury", "property damage" or"personal and advertising injury" for which the additional insured seeks coverage. However, the insurance afforded to such additional insured(s): (1) Only applies to the extent permitted by law; (2) Will not be broader than that which you are required by the contract or agreement to provide for such additional insured; (3) Will not be broader than that which is afforded to you under this policy; (4) Is subject to the conditions described in paragraphs g. through k. below; and CGL 088 (1013) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 10 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (1013) (5) Nothing herein shall extend the term of this policy. g. Owner, Lessor or Manager of Premises If the additional insured is an owner, lessor or manager of premises, such person or organization shall be covered only with respect to liability arising out of the ownership, maintenance or use of that part of any premises leased to you and subject to the following additional exclusions: (1) Any "occurrence" that takes place after you cease to occupy those premises; or (2) Structural alterations, new construction or demolition operations performed by or on behalf of such person or organization. h. State or Governmental Agency or Subdivision or Political Subdivision —Permits or Authorizations If the additional insured is the state or any political subdivision, the state or political subdivision shall be covered only with respect to operations performed by you or on your behalf for which the state or political subdivision has issued a permit or authorization. This insurance does not apply to: (1) "Bodily injury", "property damage", or "personal and advertising injury" arising out of operations performed for the federal government, state or municipality; or (2) "Bodily injury" or "property damage" included within the "products -completed operations hazard". i. Lessor of Leased Equipment If the additional insured is a lessor of leased equipment, such lessor shall be covered only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person(s) or organization(s). With respect to the insurance afforded to these additional insureds, this insurance does not apply to any "occurrence" which takes place after the equipment lease expires. j. Mortgagee, Assignee, or Receiver If the additional Insured is a mortgagee, assignee, or receiver of premises, such mortgagee, assignee or receiver of premises is an additional insured only with respect to their liability as mortgagee, assignee, or receiver and arising out of the ownership, maintenance, or use of the premises by you. This insurance does not apply to structural alterations, new construction and demolition operations performed by or for that person or organization. k. Vendor If the additional insured is a vendor, such vendor is an additional insured only with respect to "bodily injury" or "property damage" caused by "your products" which are distributed or sold in the regular course of the vendor's business, subject to the following additional exclusions: (1) The insurance afforded to the vendor does not apply to: (a) "Bodily injury" or "property damage" for which the vendor is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in absence of the contract or agreement. (b) Any express warranty unauthorized by you; CGL 088 (1013) Includes copyrighted material of the Insurance Services Office, Inc., with its -permission. Page 11 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) (c) Any physical or chemical change in "your product" made intentionally by the vendor; (d) Repackaging, unless unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container; (e) Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products; (f1 Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product; (g) Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor; or (h) "Bodily injury" or "property damage" arising out of the sole negligence of the vendor for its own acts or omissions or those of its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to: i. The exceptions contained in Subparagraphs d. or f.; or ii. Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. (2) This insurance does not apply to any insured person or organization, from whom you have acquired such products, or any ingredient, part or container, entering into, accompanying or containing such products. 3. Newly Formed or Acquired Organizations Paragraph 3. is amended as follows: a. Coverage under this provision is afforded until the end of the policy period. d. Coverage A does not apply to product recall expense arising out of any withdrawal or recall that occurred before you acquired or formed the organization. SECTION III — LIMITS OF INSURANCE is amended as follows: 1. Paragraph 2. Is replaced with the following: 2. The General Aggregate Limit is the most we will pay for the sum of: a. Medical expenses under Coverage C; b. Damages under Coverage A, except damages because of "bodily injury" or "property damage" included in the "products -completed operations hazard'; c. Damages under Coverage B; d. Voluntary "property damage" payments under Coverage D; and e. Care, Custody or Control damages under Coverage E. CGL 088 (1013) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 12 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) 2. Paragraph 5. is replaced with the following: 5. Subject to Paragraph 2. or 3. above, whichever applies, the Each Occurrence Limit is the most we will pay for the sum of: a. Damages under Coverage A; b. Medical expenses under Coverage C; c. Voluntary "property damage" payments under Coverage D; d. Care, Custody or Control damages under Coverage E; e. Limited Product Withdrawal Expense under Coverage F; and f. Contractors Errors and Omissions under Coverage G. because of all "bodily injury" and "property damage" arising out of any one "occurrence". 3. Paragraph 6. is replaced with the following: 6. Subject to Paragraph 5. above the Damage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of "property damage" to any one premises, while rented to you, or in the case of damage by fire or explosion, while rented to you or temporarily occupied by you with permission of the owner. The Damage to Premises Rented to You Limit is the higher of the Each Occurrence Limit shown in the Declarations or the amount shown in the Declarations as Damage To Premises Rented To You Limit. 4. Paragraph 7. is replaced with the following: 7. Subject to Paragraph 5. above, the higher of $10,000 or the Medical Expense Limit shown in the Declarations is the most we will pay under Coverage C for all medical expenses because of "bodily injury" sustained by any one person. 5. Paragraph 8. is added as follows: 8. Subject to Paragraph 5. above, the most we will pay under Coverage D. Voluntary Property Damage for loss arising out of any one `occurrence" is $1,500. The most we will pay in any one -policy period, regardless of the number of claims made or suits brought, is $3,000. 6. Paragraph 9. is added as follows: 9. Subject to Paragraph 5. above, the most we will pay under Coverage E. Care, Custody or Control for "property damage" arising out of any one 'occurrence" is $1,000. The most we will pay in any one -policy period, regardless of the number of claims made or suits brought, is $5,000, 7. Paragraph 10. is added as follows: 10. Subject to Paragraph 5. above, the most we will pay under Coverage F. Limited Product Withdrawal Expense for "product withdrawal expenses" in any one -policy period, regardless of the number of insureds, "product withdrawals" initiated or number of "your products" withdrawn is $10,000. CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 13 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) 8. Paragraph 11. is added as follows: 11. Subject to Paragraph 5. above, the most we will pay under Coverage G. Contractors Errors and Omissions for damage in any one -policy period, regardless of the number of insureds, claims or "suits" brought, or persons or organizations making claim or bringing "suits" is $10,000. For errors in contract or job specifications or in recommendations of products or materials to be used, this policy will not pay for additional costs of products and materials to be used that would not have been incurred had the correct recommendations or specifications been made. 9. Paragraph 12. is added as follows: 12. The General Aggregate Limit applies separately to: a. Each of your projects away from premises owned by or rented to you; or b. Each "location" owned by or rented to you. "Location" as used in this paragraph means premises involving the same or connecting lots, or premises whose connection is interrupted only by a street, roadway, waterway or right-of-way of a railroad. 10. Paragraph 13. is added as follows: 13. With respect to the insurance afforded to any additional insured provided coverage under this endorsement: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: a. Required by the contract or agreement; or b. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS is amended as follows: 1. Subparagraph 2.a. of Duties In The Event Of Occurrence, Offense, Claim, or Suit is replaced with the following: a. You must see to it that we are notified as soon as practicable of an "occurrence" or an offense which may result in a claim. This requirement applies only when the "occurrence" or offense is known to the following: (1) An individual who is the sole owner; (2) A partner, if you are a partnership or joint venture; (3) An "executive officer" or insurance manager, if you are a corporation; (4) A manager, if you are a limited liability company; CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 14 of 16 Copyright 2013 FCC[ Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (1013) (5) A person or organization having proper temporary custody of your property if you die; (6) The legal representative of you if you die; or (7) A person (other than an "employee") or an organization while acting as your real estate manager. To the extent possible, notice should include: (1) How, when and where the "occurrence" or offense took place; (2) The names and addresses of any injured persons and witnesses; and (3) The nature and location of any injury or damage arising out of the occurrence" or offense. 2. The following is added to Subparagraph 2.b. of Duties In The Event Of Occurrence, Offense, Claim, or Suit: The requirement in 2.b.applies only when the occurrence" or offense is known to the following: (1) An individual who is the sole owner; (2) A partner or insurance manager, if you are a partnership or joint venture; (3) An "executive officer" or insurance manager, if you are a corporation; (4) A manager or insurance manager, if you are a limited liability company; (5) Your officials, trustees, board members or insurance manager, if you are a not -for -profit organization; (6) A person or organization having proper temporary custody of your property if you die; (7) The legal representative of you if you die; or (8) A person (other than an "employee") or an organization while acting as your real estate manager. 3. The following is added to paragraph 2, of Duties in the Event of Occurrence, Offense, Claim or Suit: e. If you report an 'occurrence" to your workers compensation carrier that develops into a liability claim for which coverage is provided by the Coverage Form, failure to report such an "occurrence" to us at the time of the "occurrence" shall not be deemed a violation of paragraphs a., b., and c, above. However, you shall give written notice of this 'occurrence" to us as soon as you become aware that this 'occurrence" may be a liability claim rather than a workers compensation claim. 4. Paragraph 6. is replaced with the following: 6. Representations By accepting this policy, you agree: a. The statements in the Declarations are accurate and complete; b. Those statements are based upon representations you made to us; and c. We have issued this policy in reliance upon your representations. CGL 088 (1013) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 15 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) Any error or omission in the description of, or failure to completely describe or disclose any premises, operations or products intended to be covered by the Coverage Form will not invalidate or affect coverage for those premises, operations or products, provided such error or omission or failure to completely describe or disclose premises, operations or products was not intentional. You must report such error or omission to us as soon as practicable after its discovery. However, this provision does not affect our right to collect additional premium charges or exercise our right of cancellation or nonrenewal. 5. The following is added to paragraph 8. Transfer Of Rights Of Recovery Against Others To Us: However, we waive any right of recovery we may have because of payments we make for injury or damage arising out of your ongoing operations or "your work" included in the "products -completed operations hazard" under the following conditions,. a) Only when you have agreed in writing to waive such rights of recovery in a contract or agreement; b) Only as to the person/entity as to whom you are required by the contract to waive rights of recovery; and c) Only if the contract or agreement is in effect during the term of this policy, and was executed by you prior to the loss. 6. Paragraph 10. is added as follows: 10. Liberalization If we revise this Coverage Form to provide more coverage without additional premium charge, your policy will automatically provide the additional coverage as of the day the revision is effective in the applicable state(s). CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 16 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 025 (11 08) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSUREDS -- PRIMARY/NON-CONTRIBUTORY COVERAGE WHEN REQUIRED BY CONTRACT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM The following is added to SECTION IV — Commercial General Liability Conditions, Paragraph 4, entitled "Other Insurance", subsection b. entitled "Excess Insurance", paragraph (1): This insurance is excess over: (v) Any other insurance naming an additional insured as an insured on a primary basis, excess, contingent or on any other basis unless a written contract specifically requires that this insurance be primary and noncontributing. The written contract must be currently in effect or become effective during the term of this policy and must be executed prior to the "bodily injury", "property damage" or "personal and advertising injury." CGL 025 (11 08) Includes copyrighted material of Insurance Services Office, with its permission. Page 1 of 1 Copyright 2008 FCCI Insurance Group. POLICY NUMBER: CA100005345 COMMERCIAL AUTOMOBILE CAU 042 (01 15) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED DESIGNATED PERSON OR ORGANIZATION PRIMARY/NON-CONTRIBUTORY COVERAGE This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM This endorsement is subject to the terms, conditions, exclusions and any other provisions of the BUSINESS AUTO COVERAGE FORM or any endorsement attached thereto unless changes or additions are indicated below. For the purpose of this endorsement, Section II. A. 1. Who Is An Insured is amended by adding the following: 1. Any person or organization designated in the schedule below is an "insured" for Liability Coverage but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the Coverage Form. 2. This insurance is primary and non-contributory to other coverages of the person or organization shown in the Schedule when so required in a written contract or agreement that is executed prior to the loss for which coverage is sought. CAU042 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 1 of 1 Copyright 2013 FCCI Insurance Group. TABLE OF CONTENTS DESCRIPTION PAGE AirbagCoverage.......................................................................................................................................................3 AutoLoan/Lease Gap Coverage.............................................................................................................................. 3 BroadForm Insured..................................................................................................................................................1 Concealment, Misrepresentation or Fraud............................................................................................................... 4 Deductible................................................................................................................................................................. 3 Duties in the Event of Accident, Claim, Suit or Loss................................................................................................ 4 FellowEmployee......................................................................................................................................................2 FireDepartment Service Charge.............................................................................................................................. 2 Other Insurance for Hired Auto Physical Damage Coverage...................................................................................4 Lossof Earnings.......................................................................................................................................................2 Lossof Use Expenses..............................................................................................................................................2 SupplementaryPayments........................................................................................................................................2 Transfer of Rights of Recovery against Others to Us...............................................................................................4 TransportationExpenses..........................................................................................................................................2 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AUTO FIRST CHOICE COVERAGE ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM NOTE: The following are additions, replacements and amendments to the Business Auto Coverage Form, and will apply unless excluded by separate endorsement(s) to the Business Auto Coverage Form. With respect to coverages provided by this endorsement, the provisions of the Business Auto Coverage Form apply unless modified by this endorsement. The Business Auto Coverage Form is amended as follows: SECTION II — COVERED AUTOS LIABILITY COVERAGE is amended as follows: A. Paragraph 1. Who Is An Insured in section A. Coverage is amended by the addition of the following: d. Any legally incorporated subsidiary of yours in which you own more than 50% of the voting stock on the effective date of this coverage form. However, "insured" does not include any subsidiary that is an "insured" under any other liability policy or would be an "insured" under such a policy but for its termination or the exhaustion of its limits of insurance. In order for such subsidiaries to be considered insured under this policy, you must notify us of such subsidiaries within 60 days of policy effective date. e. Any organization you newly acquire or form during the policy period, other than a partnership or joint venture, and over which you maintain sole ownership or a majority interest. However, coverage under this provision: (1) Does not apply if the organization you acquire or form is an "insured" under another liability policy or would be an "insured" under such a policy but for its termination or the exhaustion of its limits of insurance; (2) Does not apply to "bodily injury" or "property damage" that occurred before you acquired or formed the organization; and (3) Is afforded only for the first 90 days after you acquire or form the organization or until the end of the policy period, whichever comes first. f. Any person or organization who is required under a written contract or agreement between you and that person or organization, that is signed and executed by you before the "bodily injury" or "property damage" occurs and that is in effect during the policy period, to be named as an additional insured is an "insured" for Liability Coverage, but only for damages to which this insurance applies and only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Section II. g. Any "employee" of yours using: (1) a covered "auto" you do not own, hire or borrow, or a covered "auto" not owned by an "employee" or a member of his or her household, while performing duties related to the conduct of your business or your personal affairs; or (2) an "auto" hired or rented under a contract or agreement in that "employee's" name, with your permission, while performing duties related to the conduct of your business. However, your "employee" does not qualify as an insured under this paragraph (2) while using a covered "auto" rented from you or from any member of the "employee's" household CAU 058 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 1 of 4 Copyright 2015 FCCI Insurance Group. COMMERCIAL AUTO CAU 058 (01 15) h. Your members, if you are a limited liability company, while using a covered "auto" you do not own, hire or borrow, while performing duties related to the conduct of your business or your personal affairs. B. Paragraphs (2) and (4) under section 2. Coverage Extensions, a. Supplementary Payments are deleted and replaced by the following: (2) Up to $3,000 for cost of bail bonds (including bonds for related traffic violations) required because of an "accident" we cover. We do not have to furnish these bonds. (4) All reasonable expenses incurred by the "insured" solely at our request, including actual loss of earnings up to $500 a day because of time off from work. C. Paragraph 5. under section B. Exclusions is deleted and replaced by the following: 5. Fellow Employee "Bodily injury" to: a. Any fellow "employee" of the "insured" arising out of and in the course of a fellow "employee's" employment or while performing duties related to the conduct of your business. However, this exclusion does not apply to your "employees" that are officers or managers if the "bodily injury" results from the use of a covered "auto" you own, hire or borrow. Coverage is excess over any other collectible insurance; or b. The spouse, child, parent, brother or sister of that fellow "employee" as a consequence of Paragraph a. above. SECTION III — PHYSICAL DAMAGE COVERAGE is amended as follows: A. Paragraph 4. Coverage Extensions under section A. Coverage is deleted and replaced by the following: 4. Coverage Extensions a. Transportation Expenses We will pay up to $75 per day to a total maximum of $2,000 for temporary transportation expense incurred by you due to covered loss to any covered auto. We will pay only for those covered "autos" for which you carry either Comprehensive or Specked Causes Of Loss Coverage. We will pay for temporary transportation expenses incurred during the period beginning 24 hours after a loss and ending, regardless of the policy's expiration, when the covered "auto" is returned to use or we pay for its "loss". b. Loss of Use Expenses For Hired Auto Physical Damage, we will pay expenses for which an "insured" becomes legally responsible to pay for loss of use of a vehicle rented or hired without a driver under a written rental contract or agreement. We will pay for loss of use expenses if caused by: (1) Other than collision only if the Declarations indicate that Comprehensive Coverage is provided for hired "autos'; (2) Specified Causes of Loss only if the Declarations indicate that Specified Causes of Loss Coverage is provided for hired "autos'; or (3) Collision only if the Declarations indicate that Collision Coverage is provided for hired "autos". However, the most we will pay for any expenses for loss of use to any one vehicle is $75 per day, to a total maximum of $2,000. B. The following is added to paragraph 4. Coverage Extensions under section A. Coverage: c. Fire Department Service Charge When a fire department is called to save or protect a covered "auto", its equipment, its contents, or occupants from a covered cause of loss, we will pay up to $1,000 for your liability for fire department service charges assumed by contractor or agreement prior to loss. No deductible applies to this additional coverage. CAU 058 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 2 of 4 Copyright 2015 FCCI Insurance Group. COMMERCIAL AUTO CAU 058 (01 15) d. Auto Loan/Lease Gap Coverage The following provisions apply: (1) If a long term leased "auto", under an original lease agreement, is a covered "auto" under this coverage form and the lessor of the covered "auto" is named as an additional insured under this policy, in the event of a total loss to the leased covered "auto", we will pay any unpaid amount due on the lease, less the amount paid under the Physical Damage Coverage Section of the policy; and less any: (a) Overdue lease or loan payments including penalties, interest, or other charges resulting from overdue payments at the time of the "loss"; (b) Financial penalties imposed under a lease for excessive use, abnormal wear and tear or high mileage; (c) Security deposits not refunded by the lessor; (d) Costs for extended warranties, Credit Life Insurance, Health Accident or Disability Insurance purchased with the loan or lease; and (e) Carry-over balances from previous loans or leases. (2) If an owned "auto" is a covered "auto" under this coverage form and the loss payee of the covered "auto" is named a loss payee under this policy, in the event of a total loss to the covered "auto", we will pay any unpaid amount due on the loan, less the amount paid under the Physical Damage Coverage Section of the policy; and less any; (a) Overdue loan payments at the time of the "loss"; (b) Costs for extended warranties, Credit Life Insurance, Health Accident or Disability Insurance purchased with the loan; and (c) Carry-over balances from previous loans. C. Paragraph 3. under section B. Exclusions is deleted and replaced by the following: 3. We will not pay for "loss" due and confirmed to: a. Wear and tear, freezing, mechanical or electrical breakdown b. Blowouts, punctures or other road damage to tires This exclusion does not apply to such "loss" resulting from the total theft of a covered "auto". However, this exclusion does not include the discharge of an airbag in a covered "auto" you own that inflates due to a cause other than a cause of "loss" set forth in Paragraphs A.1.b and A.1.c.but only: a. If that "auto" is a covered "auto" for Comprehensive Coverage under this policy; b. The airbags are not covered under any warranty; and c. The airbags were not intentionally inflated We will pay up to a maximum of $1,000 for any one "loss". D. Section D. Deductible is deleted and replaced by the following: D. Deductible For each covered "auto", our obligation to pay for, repair, return or replace damaged or stolen property will be reduced by the applicable deductible shown in the Declarations subject to the following: Any Comprehensive Coverage deductible shown in the Declarations does not apply to: (1) "Loss" caused by fire or lightning; and (2) "Loss" arising out of theft of your vehicle if your vehicle is equipped with an active GPS tracking system. CAU 058 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 3 of 4 Copyright 2015 FCC[ Insurance Group. COMMERCIAL AUTO CAU 058 (01 15) (3) Glass damage to the side or rear windows if the glass is repaired rather than replaced. However, no deductible shall apply to damage to the windshield of any covered "auto" or to safety glass. SECTION IV — BUSINESS AUTO CONDITIONS is amended as follows: A. The following is added to paragraph a. under section A. Loss Conditions, 2. Duties in the Event of Accident, Claim, Suit or Loss: This duty applies when the "accident", claim, "suit" or "loss" is first known to: (a) You, if you are an individual; (b) A partner, if you are a partnership; (c) An executive officer or insurance manager, if you are a corporation; or (d) A member or manager, if you are a limited liability company. B. Condition S. Transfer of Rights of Recovery against Others to Us under section A. Loss Conditions is deleted and replaced by the following: 5. Transfer of Rights of Recovery against Others to Us If a person or organization to or for whom we make payment under this coverage form has rights to recover damages from another, those rights are transferred to us. That person or organization must do everything necessary to secure our rights and must do nothing after "accident" or "loss" to impair them. However, if the insured has waived rights to recover through a written contract, or if your work was commenced under a letter of intent or work order, subject to a subsequent reduction in writing of such a waiver with customers whose customary contracts require a waiver, we waive any right of recovery we may have under this coverage form. C. The following is added to Condition 2. Concealment, Misrepresentation or Fraud under section B. General Conditions: However, if you unintentionally fail to disclose any hazards at the inception of your policy, we will not deny coverage under this coverage form because of such failure. This provision does not affect our right to collect additional premium or exercise our right of cancellation or non -renewal. D. Paragraph b. of Condition 5.Other Insurance under section B. General Conditions is deleted and replaced by the following: b. For Hired Auto Physical Damage Coverage, the following are deemed to be covered "autos" you own; (1) Any covered "auto" you lease, hire, rent or borrow; and (2) Any covered "auto" hired or rented by your "employee" under a contract in that individual "employee's" name, with your permission, while performing duties related to the conduct of your business. However, any "auto" that is leased, hired, rented or borrowed with a driver is not a covered "auto", nor is any "auto" you hire from any of your "employees", partners (if you are a partnership), members (if you are a limited liability company), or members of their households. CAU 058 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 4 of 4 Copyright 2015 FCCI Insurance Group. Te"XaSMutuar WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND WC 42 03 04 B EMPLOYERS LIABILITY POLICY Agent copy TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization (X) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: ALL TEXAS OPERATIONS 3. Premium: The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Included, see Information Page This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 915l17 at 12:01 a.m. standard time, forms a part of: Policy no. 0001204282 of Texas Mutual Insurance Company effective on 9/5117 Issued to: UTILITY CONTRACTORS OF AMERICA INC 111111 . .. NCCI Carrier Code: 29939 PO Box 12058, Austin, TX 78711-2058 1 of 1 texasmutual.com ( (800) 859-5995 1 Fax (800) 359-0650 Authorized representative 8/29f 17 WC420304B CERTIFICATE OF INSURANCE 1- CERTIFICATE OF INSURANCE TO: CITY OF LUBBOCK DATE: P.O. BOX 2000, Room 204 LUBBOCK, TX 79457 TYPE OF PROJECT: THIS IS TO CERTIFY THAT (Name and Address of Insured) is, at the date of this certificate, insured by this Company with respect to the business operations hereinafter described, for the typed of insurance and in accordance with the provisions of the standard policies used by this company, the further hereinafter described. Exceptions to standard policy noted hereon. _r TYPE OF INSURANCE POLICY NUMBER EFFECTIVE EFFECTIVE LIMITS DATE DATE GENERAL LIABILITY v, Commercial General Liability General Aggregate $ Claims Made Products-Comp/Op AGG $ Occurrence Personal & Adv. Injury $ Owner's & Contractors Protective Each Occurrence $ ❑ Fire Damage (Any one Fire) $ Med Exp (Any one Person) $ AUTOMOTIVE LIABILITY _. Any Auto Combined Single Limit $ _ All Owned Autos Bodily Injury (Per Person) $ _ Scheduled Autos Bodily Injury (Per Accident) $ :. Hired Autos Property Damage $ l Non -Owned Autos GARAGE LIABILITY Any Auto Auto Only - Each Accident $ D Other than Auto Only: Each Accident $ Aggregate $ BUILDER 'S RISK ID 100% of the Total Contract Price $ 11, INSTALLATIONFLOATER $ EXCESS LIABILITY Umbrella Form Each Occurrence $ Aggregate $ L Other Than Umbrella Form $ WORKERS COMPENSATION AND EMPLOYERS' LIABILITY The Proprietor/ 0 Included Statutory Limits Partners/Executive D Excluded Each Accident $ Offices are: Disease Policy Limit $ Disease -Each Employee $ OTHER The above policies either in the body thereof or by appropriate endorsement provide that they may not be changed or canceled by the insurer in less than the legal time required after the insured has received written notice of such change or cancellation, or in case there is no legal requirement, in less than five days in advance of cancellation. FIVE COPIES OF THE CERTIFICATE OF INSURANCE (Name of Insurer) MUST BE SENT TO THE CITY OF LUBBOCK ; By: Title: The Insurance Certificates Furnished shall name the City of Lubbock as Additional Insured on Auto /General Liability and provide a Waiver of Subrogation in favor of the City of Lubbock. IT SHALL BE THE CONTRACTOR'S. THE ADDITIONAL INSURED ENDORSEMENT SHALL INCLUDE PRODUCTS AND COMPLETE OPERATIONS. �t I l.J CONTRACTORCHECKLIST A CONTRACTOR SHALL: (1) provide coverage for its employees providing services on a project, for the duration of the project based 1 on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (2) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (3) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project; (4) obtain from each person providing services on a project, and provide to the governmental entity: (A) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (B) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (6) notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (7) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed in at least 19-point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. COPIES OF THE ENDORSEMENTS ARE REQUIRED. REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must (see reverse) be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment and materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at 512-305-7238 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." and (8) contractually require each person with whom it contracts to provide services on a project, to: (A) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (B) provide a certificate of coverage to the contractor prior to that person beginning work on the project; ki (C) include in all contracts to provide services on the project the language in subsection (e) (3) of this rule; (D) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (E) obtain from each other person with whom it contracts, and provide to the contractor: (i) a certificate of coverage, prior to the other person beginning work on the project; and (ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (F) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (G) notify the governmental entity in writing by certified mail or personal delivery, within (ten) 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (H) contractually require each other person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services._3 CONTRACT Contract 13613 STATE OF TEXAS COUNTY OF LUBBOCK THIS AGREEMENT, made and entered into this 211 day of November, 2017, by and between the City of Lubbock, County of Lubbock, State of Texas, acting by and through the Mayor, City of Lubbock, thereunto authorized to do so, hereinafter referred to as OWNER, and Utility Contractors of America, Inc. of the City of Lubbock, County of Lubbock and the State of Texas hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CONTRACTOR hereby agrees with OWNER to commence and complete the construction of certain improvements described as follows: ITB 18-13613-TF Kent Street Water Line and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to complete the said construction in accordance with the contract documents as defined in the General Conditions of Agreement. Utility Contractors of America, Inc.'s bid dated October 12. 2017 is incorporated into and made a part of this agreement. The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been given to him and to substantially complete same within the time specified in the contract documents. The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the bid submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment on account thereof as provided therein. IN WITNESS WHEREOF, the parties to these presents have executed this agreement in Lubbock, Lubbock County, Texas in the year and day first above written. CONTRACTOR: Utility Contractors of America, Inc. B v� �� f� Y� PRINTED NAME: h v TITLE: COMPLETE ADDRESS: Utility Contractors of America, Inc. 5805 CR 7700 Lubbock, TX 79424 ATTEST: I_� sk", Corporat9 Secretary CITY OF UBBO , TEXAS (OWNER): By: Daniel M. Pope, Mayor ATTEST: f Re ecca Garza, City S cretary APPROVED AS TO CONTENT: Utilities Engineer WoocT F/`ankliro.E., Dire—ctvr- &ftblic Works AS )�) FORM: Ir Leisure, Assistant City Attorney CONFLICT OF INTEREST OUESTIONNAIR CHAPTER 176 FOR VENDOR DOING BUSINESS WITH LOCAL GOVERNMENTAL ENTITY This questionnaire reflects changes made to law by H.B. 23, 841h Leg., Regular Session Businesses and individuals doing business with the City need to file conflict of interest questionnaires with the Office of the City Secretary's Office. Local government officers are also required to file when a conflict exists. The questionnaire is to be filed in accordance with Chapter 176, Local Government Code, by a vendor who has a business relationship as defined by Section 176.001 (1-a) with a local governmental entity and the vendor meets the requirements under Section 176.006(a). By law this questionnaire must be filed with the City Secretary's Office of the local governmental entity no later than the Vh business day after the date the vendor becomes aware of the facts that require the statement to be filled. Chapter 176 of the Local Government Code requires the City Manager and Council Members to file a Conflicts Disclosure Statement regarding their relationships with City vendors (including bidders and potential vendors). The law also requires that any vendor who contracts, or seeks to contract, with the City for the sale or purchase of property, goods or services (including a bidder on a City contract) file a "Conflict of Interest Questionnaire" regarding the vendor's business relationships, if any, with Council Members or the City Manager. Compliance is the responsibility of each individual, business or agent who is subject to the law's filing requirement. Questions about compliance should be directed to your legal counsel. Office of the City Secretary 1625 13th Street, Room 206 Lubbock, TX 79401 t__, Questionnaire is available at http://www.ci.lubbock.tx.us/doartmental- websites/departments/purchasing/vendor-information Texas Government Code 2252.908 Disclosure of Interested Parties ~' Form 1295 House Bill 1295, adopted by the 84th Legislature, created §2252.908, Texas Government Code. Section 2252.908 requires a business entity entering into certain contracts with a governmental entity or state agency to file with the governmental entity or state agency a disclosure of interested parties at the time the business entity submits the signed contract to the governmental entity or state agency. §2252.908, Texas Government Code requires the commission to adopt rules necessary to implement the new disclosure requirement and to prescribe the disclosure form. Section 2252.908 requires the disclosure form to be signed by the authorized agent of the contracting business entity, acknowledging that the disclosure is made under oath and under penalty of perjury. Section 2252.908 applies only to a contract that requires an action or vote by the governing body of the governmental entity or state agency before the contract may be signed or has a value of at least $1 million. Section 2252.908 provides definitions of certain terms occurring in the section. House Bill 1295 provides that §2252.908 applies only to a contract entered into on or after January 1, 2016. An interested party is defined as a person who has a controlling interest in a business entity with whom a governmental entity or state agency contracts or who actively participates in facilitating the contract or negotiating the terms of the contract, including a broker, intermediary, adviser, or attorney for the business entity. Contractors are required to acquire Form 1295 via the Texas Ethics Commission website. This requires registration, generation of Form 1295 with a unique Certificate Number & filing date, printing the form, notarizing and returning the form to City of Lubbock Purchasing & Contract Management Department. Once the form is received by the Purchasing and Contract Management Department, the Buyer associated with - the project will log -in to the Texas Ethics Commission portal and acknowledge receipt of the form not later than the 30th day after the date the contract for which the form was filed binds all parties to the contract. This will complete the form for the contract with which the form is associated. The completed form will be made available via the Texas Ethics Commission website. Form 1295 can be generated via the Texas Ethics Commission web portal. The website and detailed instructions are located at: https://www.ethics.state.tx.us/whatsnew/elf info forml295.htm GENERAL CONDITIONS OF THE AGREEMENT Page Intentionally Left Blank GENERAL CONDITIONS OF THE AGREEMENT 1. OWNER Whenever the word Owner, or First Party, are used in this contract, it shall be understood as referring to the City of Lubbock, Texas. 2. CONTRACTOR Whenever the word Contractor, or Second Parry, is used, it shall be understood to mean the person, persons, co- partnership or corporation, to wit Utility Contractors of America, Inc., who has agreed to perform the work embraced in this contract, or their legal representative. 3. OWNER'S REPRESENTATIVE Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as referring to, City of Lubbock, or its representative John Turpin, P.E., Chief Water Utilities Engineer, so -; designated who shall inspect constructions; or to such other representatives, supervisors, architects, engineers, or inspectors as may be authorized by said Owner to act in any particular manner under this agreement. Engineers, supervisors or inspectors shall act for the Owner under the direction of Owner's Representative, but shall not X directly supervise the Contractor or persons acting on behalf of the Contractor. - 4. CONTRACT DOCUMENTS The contract's documents shall consist of the Notice to Bidders, General Instructions to Bidders, Bid, Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement (if any), Specifications, Plans, Insurance Certificates, and all other documents made available to Bidder for inspection in accordance with the Notice to Bidders. The above described materials are sometimes referred to herein as the "contract" or "contract documents". Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed," or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory to the Owner's Representative. i_ 6. SUBCONTRACTOR The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for performance of work on the project contemplated by these contract documents. Owner shall have no responsibility to any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract documents, but said Subcontractors shall look exclusively to Contractor for any payments due Subcontractor. The City reserves the right to approve or disapprove the selection of any subcontractor(s). 7. WRITTEN NOTICE -- Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an Office of the corporation for whom it is intended, or if delivered at or sent certified mail to the last business address known to the party who gives the notice. �_u G] 10 11 12. CONTRACTOR'S RESPONSIBILITIES Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have well known, technical or trade meaning shall be held to refer such recognized standards. All work shall be done and all materials furnished in strict conformity with the contract documents. SUBSTANTIALLY COMPLETED The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents has been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. LAYOUT Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative shall check the Contractor's layout of all major structures and any other layout work done by the Contractor at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly locating all work in accordance with the Plans and Specifications. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE The Contractor shall be furnished copies of all Plans and Specifications without expense to Contractor and Contractor shall keep one copy of same consistently accessible on the job site. RIGHT OF ENTRY The Owner's Representative may make periodic visits to the site to observe the progress or quality of the executed work and to determine, in general, if the work is proceeding in accordance with the contract documents. Owner's Representative shall not be required to make exhaustive or continuous onsite inspections to check the quality or quantity of the work, nor shall Owner's Representative be responsible for the construction means, methods, techniques, sequences or procedures, or the safety precautions incident thereto. Notwithstanding the Owner's Representative's rights of entry hereunder, the Owner's Representative shall not be responsible for the Contractor's failure to perform the work in accordance with the Contract Documents. 13. LINES AND GRADES All lines and grades shall be furnished whenever Owner's Representative deems said lines and grades are necessary for the commencement of the work contemplated by these contract documents or the completion of the work contemplated by these contract documents. Whenever necessary, Contractor shall suspend its work in order to permit Owner's Representative to comply with this requirement, but such suspension shall be as brief as practical and Contractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's Representative ample notice of the time and place where lines and grades are needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by Contractor, its Subcontractors, or its employees, such stakes, marks, etc., shall be replaced by the Owner's Representative at Contractor's expense. 14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's Representative has the authority to review all work included herein. The Owner's Representative has the authority to stop the work whenever such stoppage may be necessary to ensure the proper execution of the contract. The Owner's Representative shall, in all cases, determine the amounts and quantities of the several kinds of work which are to be paid for under the contract documents, and shall determine all questions in relation to said work and the construction thereof, and shall, in all cases, decide every question which may arise relative to the execution of this contract on the part of said Contractor. The decision of the Owner's Representative shall be conclusive in the absence of written objection to same delivered to Owner's Representative within fifteen (15) calendar days of any decision or direction by Owner's Representative. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. 15. SUPERINTENDENCE AND INSPECTION It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative may deem proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is furnished and said work is done in accordance with the specifications therefore. The Contractor shall furnish all reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey the directions and instructions of any subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are consistent with the obligations of this Agreement and accompanying plans and specifications provided, however, should the Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within fifteen (15) calendar days make written appeal to the Owner's Representative for its decision. In the absence of timely written objection by Contractor, as provided herein, any and all objection or objections shall be deemed waived. f 1 16. CONTRACTOR'S DUTY AND SUPERINTENDENCE The Contractor shall give personal attention to the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to Owner's Representative. The superintendent shall represent the Contractor in its absence and all directions given to superintendent shall be binding as if given to the Contractor. It is expressly agreed that adequate supervision by competent and reasonable representatives of the Contractor is essential to the proper performance of the work and lack of such supervision shall be grounds for suspending operations of the Contractor. The work, from its commencement to completion, shall be under the exclusive charge and control of the Contractor and all risk in connection therewith shall be borne by the Contractor. The Owner or Owner's Representatives shall not be responsible for the acts or omissions of the Contractor, or any subcontractors, or any of Contractor's agents or employees, or any other persons performing any of the work. 17. CONTRACTOR'S UNDERSTANDING It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and location of the work, the confirmation of the ground, the character, quality and quantity of materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, and the general and local conditions, and all other matters which in any way affect the work under the contract documents. No oral agreement or conversation with any Office, agent, or employee of the Owner, or Owner's Representative either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained. Subject to the rights of Owner as set forth in Paragraph 23 hereof, all 19 F1 modifications and/or amendments to the contract documents, shall be in writing, and executed by Owner's Representative and Contractor. Unless otherwise specified herein, all loss, expense or damage to Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the work, shall be sustained and borne by the Contractor at its own cost and expense. -, CHARACTER OF WORKERS t ' The Contractor agrees to employ only orderly and competent workers, skillful in the performance in the type of work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform Contractor in writing that any man or men on the work, are, in Owner's Representative's sole opinion, incompetent, unfaithful, disorderly, or otherwise unacceptable to Owner or Owner's Representative, such man or men shall be discharged from the work and shall not again be employed on the work without the Owner's Representative's written consent. CONSTRUCTION PLANT The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution and completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and it is also understood that Owner shall not be held responsible for the care, preservation, conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted.r3i The building of structures for the housing of men or equipment are permitted only at such places as the Owner's Representative shall consent or direct, and the sanitary conditions of the grounds in or about such structure shall at all times be maintained in a manner satisfactory to the Owner's Representative. H. SANITATION rill Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public observation, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Owner's Representative and their use shall be strictly enforced. 1 21. OBSERVATION AND TESTING The Owner or Owner's Representative shall have the right at all times to observe and test the work. Contractor shall make necessary arrangements and provide proper facilities and access for such observation and testing at any location wherever such work is in preparation or progress. Contractor shall ascertain the scope of any observation that may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time each part of the work shall be ready for such observation. Owner or Owner's Representative may reject any such work found to be defective or not in accordance with the contract documents, regardless of the stage of its completion or the time or place of discovery of such errors and regardless of whether Owner's Representative has previously accepted the work through oversight or otherwise. If any such work should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Representative, be uncovered for examination at , Contractor's expense. In the event that any part of the work is being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representative to make observations of such work or require testing of said work, then in such event Owner or Owner's Representative may require Contractor to furnish Owner or Owner's Representative certificates of inspection, testing or approval made by persons competent to perform such tasks at the location where that part of the work is being manufactured or fabricated. All such tests L-i shall be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the contract documents. t If any such work which is required to be inspected, tested, or approved is covered up without written approval or consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representative, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspections, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of any such tests, inspections or approvals, and any work which meets the requirements of any such tests or approvals but does not meet the requirements of the contract documents shall be considered defective, and E shall be corrected at the Contractor's expense. Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by Owner, Owner's Representative, or other persons authorized under the contract documents to make such inspections, tests, or approvals shall relieve the Contractor from its obligation to perform the work in accordance with the requirements of the contract documents. 22. DEFECTS AND THEIR REMEDIES It is expressly agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the Owner or Owner's Representative as unsuitable or not in conformity with plans, specifications and/or contract documents, the Contractor shall, after receipt of written notice thereof from the Owner's Representative, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with the contract documents. It is further agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense. 23. CHANGES AND ALTERATIONS The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in the line, grade, form dimensions, plans or materials for the work herein contemplated, or any part thereof, either _.: before or after the beginning of the construction, without affecting the validity of this contract and the accompanying bond. If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of work, and the increased work can fairly be classified under the specifications, such increase shall be paid according to the quantity actually done and at the unit price established for such work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In case the Owner shall make such changes or alterations as shall make useless any work already done or material already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for actual expenses incurred in preparation for the work as originally planned. 24. EXTRA WORK The term "extra work" as used in this contract shall be understood to mean and include all work that may be required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, alteration or addition to the work as shown on the plans and specifications or contract documents and not covered by Contractor's bid, except as provided under Changes and Alterations herein. It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representative when presented with a written work order signed by the Owner's Representative; subject, however, to the right of the Contractor to require written confirmation of such extra work order by the Owner. It is also agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined by the following methods: Method (A) - By agreed unit prices; or s Method (B) - By agreed lump sum; or Method (C) - If neither Method (A) or Method (B) be agreed upon before the extra work is commenced, then the Contractor shall be paid the lesser of the following: (1) actual field cost of the extra work, plus fifteen (15%) percent; or (2) the amount that would have been charged by a reasonable and prudent Contractor as a reasonable and necessary cost for performance of the extra work. In the event said extra work be performed and paid for under Method (C)(1), then the provisions of this paragraph shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together with all expenses incurred directly on account of such extra work, including Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workers' Compensation and all other insurances as may be required by law or ordinances or directed by the Owner or Owner's Representative, or by them agreed to. Owner's Representative may direct the form in which accounts of the actual field cost shall be kept and records of these accounts shall be made available to the Owner's Representative. The Owner's Representative may also specify in writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where practical, the terms and prices for the use of machinery and equipment shall be incorporated in the written extra work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and compensate Contractor for its profit, overhead, general superintendence and field office expense, and all other elements of cost and expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same shall be included in the "actual field cost." No claim for extra work of any kind shall be allowed unless ordered in writing by Owner's Representative. In case any orders or instructions appear to the Contractor to involve extra work for which Contractor should receive compensation or an adjustment in the construction time, Contractor shall prior to commencement of such extra work, make written request to the Owner's Representative for a written order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute extra work or as to the payment therefore, and the Owner's Representative insists upon its performance, the Contractor shall proceed with the work after making written request for written order and shall keep adequate and accurate account of the actual field cost thereof, as provided under Method (C) (1). If Contractor does not notify Owner's Representative before the commencement of any extra work, any claim for payment due to alleged extra work shall be deemed waived. 25. DISCREPANCIES AND OMISSIONS It is further agreed that it is the intent of the contract documents that all work described in the bid, the specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that such price shall include all appurtenances necessary to complete the work in accordance with the intent of these contract documents as interpreted by Owner's Representative. Notices of any discrepancies or omissions in these plans, specifications, or contract documents, shall be given to the Owners' Representative and a clarification obtained before the bids are received, and if no such notice is received by the Owner's Representative prior to the opening of bids, then it shall be deemed that the Contractor fully understands the work to be included and has provided sufficient sums in its bid to complete the work in accordance with these plans and specifications. If Contractor does not notify Owner's Representative before bidding of any discrepancies or omissions, then it shall be deemed for all purposes that the plans and specifications are sufficient and adequate for completion of the project. It is further agreed that any request for clarification must be submitted no later than five (5) calendar days prior to the opening of bids. j 26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of work with the rate of progress required under this contract, the Owner or Owner's Representative may order the Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall comply with such order. If, at any time, the working force of the Contractor is inadequate for securing the progress herein specified, the Contractor shall, if so ordered in writing, increase its force or equipment, or both, to such an extent as to give reasonable assurance of compliance with the schedule of progress. 27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC AND GENERAL INDEMNITY The Contractor shall take out and procure a policy or policies of Workers' Compensation Insurance with an insurance company licensed to transact business in the State of Texas, which policy shall comply with the Workers' Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the safety of employees and others on or near the work and shall comply with all applicable provisions of federal, state and municipal laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in Construction" of Associated General Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The Contractor, its sureties and insurance carriers shall defend, indemnify and hold harmless the Owner and all of its Offices, agents and employees against any all losses, costs, damages, expenses, liabilities, claims and/or causes of action, whether known or unknown, fixed, actual, accrued or contingent, liquidated or unliquidated, including, but not limited to, attorneys' fees and expenses, in connection with, incident to, related to, or arising out of, the Contractor's or any subcontractor's, agent's or employee's, in any manner whatsoever, omission, execution and/or supervision of this contract, and the project which is the subject matter of this contract. The safety precautions taken shall be the sole responsibility of the Contractor, in its sole discretion as an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses, are intended as reminders to the Contractor of its duty and shall not be construed as any assumption of duty to supervise safety precautions by either the Contractor or any of its subcontractors. 28. CONTRACTOR'S INSURANCE The Contractor shall not commence work under this contract until he has obtained all insurance as required in the General Conditions of the contract documents, from an underwriter authorized to do business in the State of - Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation or any material change shall be provided ten (10) calendar days in advance of cancellation or change. All policies of insurance, required herein, including policies of insurance required to be provided by Contractor and its subcontractors, shall contain a waiver of any and all of the insurer's or payor's, in the event of self- insurance, rights to subrogation that any such insurer or payor, in the event of self-insurance, may acquire by virtue of payment of any loss under such insurance or self-insurance. All certificates of insurance submitted to the City in conformity with the provisions hereof shall establish such waiver. The Contractor shall procure and carry at its sole cost and expense through the life of this contract, insurance 9J protection as hereinafter specified. Coverage in excess of that specified herein also shall be acceptable. Such insurance shall be carried with an insurance company authorized to transact business in the State of Texas and shall cover all operations in connection with this contract, whether performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of each subcontractor. A certificate of insurance specifying each and all coverage's shall be submitted prior to contract execution. PROOF OF COVERAGE SHALL BE FURNISHED TO THE CITY OF LUBBOCK IN THE FORM OF A CERTIFICATE OF INSURANCE. THE INSURANCE CERTIFICATES FURNISHED SHALL NAME i THE CITY OF LUBBOCK AS ADDITIONAL INSURED ON AUTO/GENERAL LIABILITY ON A PRIMARY AND NON-CONTRIBUTORY BASIS TO INCLUDE PRODUCTS OF COMPLETE OPERATIONS. PROVIDE A WAIVER OF SUBROGATION IN FAVOR OF THE CITY OF LUBBOCK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE TO THE OWNER ALL PROOF OF COVERAGE INSURANCE DOCUMENTS INCLUDING WORKERS COMPENSATION COVERAGE FOR EACH SUBCONTRACTOR. COPIES OF THE ENDORSEMENTS ARE REQUIRED. ,. A. Commercial General Liability Insurance (Primary Additional Insured and Waiver of Subrogation required) The contractor shall have Comprehensive General Liability Insurance with limits of $1,000,000 Combined Single Limit in the aggregate and per occurrence to include: Products & Completed Operations Hazard Contractual Liability Personal Injury & Advertising Injury XCU With Heavy Equipment B. Owner's and Contractor's Protective Liability Insurance. - NOT REQUIRED. C. Comprehensive Automobile Liability Insurance (Waiver of Subrogation Required) The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than; Bodily Injury/Property Damage, $500,000 Combined Single Limit, per occurrence, to include all owned and non -owned cars including: Employers Non -ownership Liability Hired and Non -owned Vehicles. _1 D. Builder's Risk Insurance/Installation Floater Insurance - NOT REQUIRED. E. Umbrella Liability Insurance - NOT REQUIRED. F. Worker's Compensation and Employers Liability Insurance (Waiver of Subrogation required) Fill Worker's Compensation Insurance covering all employees whether employed by the Contractor or any Subcontractor on the job with Employers Liability of at least $500,000 1. Definitions: Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC- t - 82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project - includes the time from the beginning of the work on the project until the Contractor's/person's work on the project has been completed and accepted by the governmental } entity. I Persons providing services on the project ("subcontractor" in Section 406.096, Texas Labor Code) - includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner - operators, employees of any such entity, or employees of any entity which furnishes persons to - provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a i. project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 2. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. 3. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. 4. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. The Contractor shall obtain from each person providing services on the project, and provide to the governmental entity: (a) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity shall have on file certificates of coverage showing coverage for all persons providing services on the project; and (b) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 6 The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. 7. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. 8. The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. The Contractor shall contractually require each person with whom it contracts to provide services on the project, to: (a) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; (b) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; (c) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; t (d) obtain from each other person with whom it contracts, and provide to the Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and (2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and (g) contractually require each person with whom it contracts to perform as required by paragraphs (a) - (g), with the certificates of coverage to be provided to the person for whom they are providing services. F, 10. By signing this contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who T- shall provide services on the project shall be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the Contractor to � g g Y J administrative penalties, criminal penalties, civil penalties, or other civil actions. 11. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. G. Proof of Coverage Before work on this contract is commenced, each Contractor and subcontractor shall submit to the Owner for approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of compliance with the above insurance requirements, signed by an authorized representative of the insurance company setting forth: (1) The name and address of the insured. (2) The location of the operations to which the insurance applies. (3) The name of the policy and type or types of insurance in force thereunder on the date borne by such certificate. (4) The expiration date of the policy and the limit or limits of liability thereunder on the date borne by such certificate. L_ i 4 i; t..,t (5) A provision that the policy may be canceled only by mailing written notice to the named insured at the address shown in the bid specifications. (6) A provision that written notice shall be given to the City ten days prior to any change in or cancellation of the policies shown on the certificate. (7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the job specifications. No substitute of nor amendment thereto will be acceptable. (8) If policy limits are paid, new policy must be secured for new coverage to complete project. (9) A Contractor shall: (a) provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements; (b) provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project; (c) provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project; V (d) obtain from each person providing services on a project, and provide to the governmental entity: (i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (ii) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (e) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (f) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; (g) post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text provided by the commission on the sample notice, without any additional words or changes: REQUIRED WORKERS' COMPENSATION COVERAGE .; "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee. " 0 (h) "Call the Texas Workers' Compensation Commission at 800-372-7713 or 512-804- 4000 (www.tdi.state.tx.us) to receive information of the legal requirements for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage; " and contractually require each person with whom it contracts to provide services on a project, to: (i) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project; (ii) provide a certificate of coverage to the Contractor prior to that person beginning work on the project; (iii) include in all contracts to provide services on the project the following language: "By signing this contract or providing or causing to be provided a certificate of coverage, the person signing this contract is representing to the governmental entity that all employees of the person signing this contract who will provide services on the project will be covered by workers' compensation coverage for the duration of the project, that the coverage will be based on proper reprinting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions."; (iv) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (v) obtain from each other person with whom it contracts, and provide to the Contractor: (1) a certificate of coverage, prior to the other person beginning work on the project; and U (2) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (vi) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (vii) notify the governmental entity in writing by certified mail or personal delivery, y, within 10 days after the person knew or should have known, of any change that -1 materially affects the provision of coverage of any person providing services on the project; and t (viii) contractually require each other person with whom it contracts, to perform as required by paragraphs (i)-(viii), with the certificate of coverage to be provided to the person for whom they are providing services. z 1 29. DISABLED EMPLOYEES Contractors having more than fifteen (15) employees agree to comply with the Americans with Disabilities Act of Po' 1990, and agree not to discriminate against a qualified individual with a disability because of the disability of such individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee compensation, job training, and other terms, conditions, and privileges of employment. 30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS LABORERS MATERIALMEN AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees that it will indemnify and save the Owner and all of its Offices, agents and employees, harmless against any and all claims, liabilities, losses, damages, expenses and causes of action arising out of, in any way, manner or form, the demands of subcontractors, laborers, workmen, mechanics, material men and furnishers of machinery and parts thereof, equipment, power tools, and supplies, incurred in the performance of this contract and the project which is the subject matter of this contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. 31. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material or process covered by letters patent or copyright by suitable legal agreement with the Patentee or owner thereof. Without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall indemnify and save the Owner, and all of its Offices, agents and employees harmless from any loss on account thereof, except that Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is specified or required in these contract documents by Owner; provided, however, if choice of alternate design, device, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner, and all of its Offices, agents and employees harmless from any loss on account thereof. Notwithstanding anything herein to the contrary, if the material or process specified or required by Owner and/or this contract is an infringement, the Contractor shall be responsible for such loss unless it gives written notice of such infringement to the Owner's Representative prior to bidding. 32. LAWS AND ORDINANCES The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and regulations, which in any manner affect the contract or the work, and without limiting, in any way, manner or form, the indemnity provided by Contractor in paragraph 27 hereof, Contractor shall indemnify and save harmless the Owner, and all of its Offices, agents, and employees against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the Contractor, its employees, or subcontractors. If the Contractor observes that the plans and specifications are at variance therewith, he shall notify the Owner's Representative in writing prior to bidding and any necessary changes shall be adjusted as provided in the contract for changes in the work. In the absence of timely written notification to Owner's Representative of such variance or variances within said time, any objection and/or assertion that the plans and specifications are at variance with any federal, state or local laws, ordinances or regulations shall be deemed waived. If the Contractor, its employees or subcontractors perform any work contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner's Representative, Contractor shall bear all costs arising therefrom. The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as the same regulates the objects for which, or the manner in which, or the conditions under which the Owner may 33 919 35. enter into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though embodied herein. SUBCONTRACTING The Contractor agrees that it will retain personal control and will give its personal attention to the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from its full obligations to the Owner, as provided by the contract documents. TIME FOR SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning and time for completion as specified in the contract documents, of work to be done hereunder are essential conditions of this contract; and it is further mutually understood and agreed that the work embraced in this contract shall be commenced as provided in the contract documents. If the Contractor should neglect, fail, or refuse to substantially complete the work within the time herein specified, then the Contractor does hereby agree as part of the consideration for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum of $250 PER DAY, not as a penalty, but as liquidated damages for the breach of the contract as herein set forth for each and every working day that the Contractor shall be in default after the time stipulated for substantially completing the work. It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the substantial completion of the work described herein is reasonable time for the completion of the same, taking into consideration the average climatic range and conditions and usual industrial conditions prevailing in this locality. The amount is fixed and agreed upon by and between the Contractor and the Owner because the actual damages _t the Owner would sustain in such event would be difficult and/or impossible to estimate, however, the amount agreed upon herein is a reasonable forecast of the amount necessary to render just compensation to Owner, and is expressly agreed to be not disproportionate to actual damages as measured at time of breach. It IT IS FURTHER AGREED AND UNDERSTOOD BETWEEN THE CONTRACTOR AND OWNER THAT TIME IS OF THE ESSENCE OF THIS CONTRACT. TIME AND ORDER OF COMPLETION It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor shall be allowed to prosecute its work at such time and sessions, in such order of precedence, and in such manner as shall be most conductive to economy of construction; provided, however, that the order and time of prosecution shall be such that the work shall be substantially completed as a whole and in part, in accordance with this f contract, the plans and specifications, and within the time of completion designated in the bid; provided, also, that when the Owner is having other work done, either by contract or by its own force, the Owner's Representative 1 may direct the time and manner of constructing work done under this contract so that conflicts will be avoided l and the construction of the various works being done for the Owner shall be harmonized. The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative, schedules which shall show the order in which the Contractor intends to carry on the work, with dates at which the Contractor will start the several parts of the work and estimated dates of completion of the several parts. 36. TIME OF PERFORMANCE The Contractor agrees that it has submitted its bid in full recognition of the time required for the completion of this project, taking into consideration the average climatic range and industrial conditions prevailing in this i {{f i_. locality, and has considered the liquidated damage provisions of paragraph 34 hereinabove set forth and expressly agrees that it shall not be entitled to, nor will it request, an extension of time on this contract, except when its work has been delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or other contractors employed by the Owner, or by changes ordered in the work, or by strike, walkouts, acts of God or the public enemy, fire or flood. Any request for extension shall be in writing with the written request for same i x setting forth all justifications, in detail, for the request, and submitted to Owner's Representative within twenty (20) calendar days of the occurrence of the event causing said delay. A failure by Owner's Representative to g " affirmatively grant the extension no later than twenty (20) calendar days of written submission by Contractor shall be deemed a denial, and final. Further, in the absence of timely written notification of such delay and request for extension, as provided herein, any request for extension by Contractor shall be deemed waived. 37. HINDRANCE AND DELAYS In executing the contract, the Contractor agrees that in undertaking to complete the work within the time herein fixed, Contractor has taken into consideration and made allowances for all hindrances and delays incident to such work, whether growing out of delays due to unusual and unanticipated circumstances, difficulties or delays in securing material or workmen, or any other cause or occurrence. No charge shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this contract except where the work is stopped by order of the Owner or Owner's Representative for the Owner's convenience, in which event, such expense as in the sole judgment of the Owner's Representative that is caused by such stoppage shall be paid by Owner to Contractor. g 38. QUANTITIES AND MEASUREMENTS No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract, including the specifications, plans and other contract documents are intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown, and only when same are expressly stated to be estimates, for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing their bids offered for the work. In the event the amount of work to be done and materials to be furnished are expressly stated to be estimated, and only when same are expressly stated to be estimated, it is understood and agreed that the actual amount of work to be done and the materials to be furnished under this contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of work done and materials furnished on the project. 39. PROTECTION OF ADJOINING PROPERTY The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which may be injured or seriously affected by any process of construction to be undertaken under this agreement, from any damage or injury by reason of said process of construction; and Contractor shall be liable for any and all claims for such damage on account of his failure to fully protect all adjacent property. Without limiting, in any way, manner and form, the indemnity provided by Contractor in paragraph 27 hereof, the Contractor agrees to indemnify, save and hold harmless the Owner, and any of its Offices, agents and employees, against any and all claims or damages due to any injury to any adjacent or adjoining property, related to, arising from or growing out of the performance of this contract. C__ 40. PRICE FOR WORK In consideration of the furnishing of all necessary labor, equipment and material and the completion of all work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the price set forth in the M i-- i 41 42. 43 .93 bid proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to j receive such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all expenses incurred by Contractor and for well and truly performing the same and the whole thereof in the manner and according to this agreement, the attached specifications, plans, contract documents and requirements of Owner's Representative. PAYMENTS No payments made or certificates given shall be considered as conclusive evidence of the performance of the contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective work. Contractor shall at any time requested during the progress of the work furnish the Owner or Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all claims against Owner, Owner's agents and employees, which have not theretofore been timely filed as provided in this contract. PARTIAL PAYMENTS On or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application for partial payment or, if the Contractor does not submit such application, the Owner's Representative shall �- determine the amount to be partially paid. Owner's Representative shall review said application for partial payment if submitted, and the progress of the work made by the Contractor and if found to be in order, shall prepare a certificate for partial payment showing as completely as practical the total value of the work done by the Contractor up to and including the last day of the preceding month. The determination of the partial payment by the Owner's Representative shall be in accordance with Paragraph 14 hereof. _1 The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be retained until final payment, and further, less all previous payments and all further sums that may be retained by Owner under the terms of the contract documents. Any partial payment made hereunder shall not constitute a waiver by the Owner of any and all other rights to El enforce the express terms of the contract documents, and all remedies provided therein, as to any and all work performed, to be performed and/or materials delivered hereunder, including, but limited to, work to which said t partial payment is attributable. SUBSTANTIAL COMPLETION Contractor shall give Owner's Representative written notice of substantial completion. Within thirty-one (31) tj working days after the Contractor has given the Owner's Representative written notice that the work has been substantially completed, the Owner's Representative and/or the Owner shall inspect the work and within said time, I if the work be found to be substantially completed in accordance with the contract documents, the Owner's 3 Representative shall issue to the Owner and Contractor a certificate of substantial completion. Notwithstanding the issuance of a certificate of substantial completion, Contractor shall proceed with diligence to finally complete F , the work within the time provided in this contract. FINAL COMPLETION AND PAYMENT The Contractor shall give written notice to Owner's Representative of final completion. Upon written notice of -? final completion, the Owner's Representative shall proceed to make final measurement to determine whether final completion has occurred. If the Owner's Representative determines final completion has occurred, Owner's Representative shall so certify to the Owner. Upon certification by Owner's Representative of final completion, ___ i a *' Owner shall pay to the Contractor on or before the 31st working day after the date of certification of final completion, the balance due Contractor under the terms of this agreement. Neither the certification of final completion nor the final payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required in the contract documents and/or any warranty or warranties implied by law or otherwise. 45. CORRECTION OF WORK Contractor shall promptly remove from Owner's premises all materials condemned by the Owner's Representative on account of failure to conform to the contract documents, whether actually incorporated in the work or not, and Contractor shall at its own expense promptly replace such condemned materials with other materials conforming to the requirements of the contract documents. Contractor shall also bear the expense of restoring all work of other contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative, Owner may remove and replace it at Contractor's expense. Neither the final payment, nor certification of final completion or substantial completion, nor any provision in the contract documents shall relieve the Contractor of responsibility for faulty materials or workmanship, and Contractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom, which shall appear within a period of two (2) years from the date of certification of final completion by Owner's Representative. 46. PAYMENT WITHHELD The Owner or Owner's Representative may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certification to such extent as may be necessary to protect itself from loss on account of: (a) Defective work not remedied and/or work not performed. (b) Claims filed or reasonable evidence indicating possible filing of claims. (c) Damage to another contractor. When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, in the amount withheld, payment shall be made for amounts withheld because of them. 47. CLAIM OR DISPUTE It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) calendar days after the Owner's Representative has given any direction, order or instruction to which the Contractor desires to take exception. Timely written notice of dispute as provided in this contract of any decision by Owner's Representative or Owner shall be a condition precedent to the bringing and/or assertion of any action or claim by Contractor of any right under this Contract. If the matters set forth in the notice of dispute are not granted or otherwise responded to by Owner's Representative within fifteen (15) calendar days of receipt of notice of dispute by Owner's Representative, said objections shall be deemed denied. Any decision by the Owner's Representative, or deemed denial by the Owner's Representative, shall be final and conclusive in the absence of fraud. It is further agreed that the acceptance by the Contractor of the final payment shall be a bar to any and all claims of the Contractor, and constitute a waiver of the right to assert any claim against Owner, Owner's agents and employees and Owner's Representative, by Contractor. 48. NON-COMPLIANCE AND/OR ABANDONMENT BY CONTRACTOR In case the Contractor should (1) abandon and fail or refuse to resume work within fifteen (15) calendar days after written notification from the Owner or the Owner's Representative, or (2) if the Contractor fails to comply with the written orders of the Owner's Representative, when such orders are consistent with this contract, then the Surety on the bond shall be notified in writing and directed to complete the work and a copy of said notice shall be delivered to the Contractor. In the event a bond is not required by law, or otherwise obtained by the Contractor, no further notice of such non-compliance to Contractor shall be required. After receiving said notice of abandonment or non-compliance , the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore (except when used in connection with Extra Work, where credit shall be allowed as provided for under paragraph 24 of this contract); it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. In the event the Contractor, or Surety, whichever is applicable, should fail to commence compliance with the notice hereinbefore provided within ten (10) calendar days after service of such notice, and/or shall fail to proceed with diligence to complete the project as contemplated and in compliance with all terms and provisions of the contract documents, then the Owner may exercise any and all remedies available to it pursuant to law, contract, equity or otherwise, including, but not limited to, providing for completion of the work in either of the following elective manners: (a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and supplies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would have been payable under this contract, if the same had been completed by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been completed by said Contractor, then the Contractor and/or its Surety shall pay the amount of such excess to the Owner; or (b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspaper having a general circulation in the County of location of the work, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case of any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain bound therefore. Should the cost to complete any such new contract prove to be less than that which would have been the cost to complete the work under this contract, the Contractor or his Surety shall be credited therewith. In the event the Owner's Representative elects to complete the work, as described above, when the work shall have been finally completed, the Contractor and his Surety shall be so notified and certification of completion as provided in paragraph 44 hereinabove set forth, shall be issued. A complete itemized statement of the contract accounts, certified to by Owner's Representative as being correct shall then be prepared and delivered to Contractor and his Surety, if applicable, whereon the Contractor or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of certification of completion. In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when the Contractor and/or his Surety, if applicable, shall pay the balance shown to be due by them to the Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and/or his Surety, if applicable. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety, if applicable, fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials shall be mailed to the Contractor and his Surety, if applicable, at the respective addresses designated in this contract; provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety, if applicable, subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) calendar days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety, if applicable. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery, equipment, tools, materials, or supplies that remain on the jobsite and belong to persons other than the Contractor or his Surety, if applicable, to their proper owners. The remedies provided to Owner by law, equity, contract, or otherwise, shall be cumulative, to the extent permitted by law. It is expressly agreed and understood that the exercise by Owner of the remedies provided in this paragraph shall not constitute an election of remedies on the part of Owner, and Owner, irrespective of its exercise of remedies hereunder, shall be entitled to exercise concurrently or otherwise, any and all other remedies available to it, by law, equity, contract or otherwise, including but not limited to, liquidated damages, as provided in paragraph 34, hereinabove set forth. 49. LIMITATION ON CONTRACTOR'S REMEDY The remedies of Contractor hereunder shall be limited to, and Owner shall be liable only for, work actually performed by Contractor and/or its subcontractors as set forth in the contract documents, and Owner shall not be liable for any consequential, punitive or indirect loss or damage that Contractor may suffer in connection with the project which is the subject matter of this contract. 50. BONDS The Contractor is required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the Contractor is required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $50,000. All bonds shall be submitted on forms supplied by the Owner, and executed by an approved Surety Company authorized to do business in the State of Texas. It is further agreed that this contract shall not be in effect until such bonds are so furnished. ti-a 51. SPECIAL CONDITIONS In the event special conditions are contained herein as part of the contract documents and said special conditions conflict with any of the general conditions contained in this contract, then in such event the special conditions shall control. i_. 52. LOSS OR EXPENSE DUE TO UNUSUAL OR UNANTICIPATED CIRCUMSTANCES Unless otherwise specified herein, all loss, expense or damage to the Contractor arising out of the nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance or from unusual obstructions or difficulties, naturally occurring, man made or otherwise, which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. 53. INDEPENDENT CONTRACTOR Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority to direct, supervise, and control its own employees and to determine the method of the performance of the work a l covered hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's work during Contractor's performance and to carry out the other prerogatives which are expressly reserved to and vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or corporation. 54. CLEANING UP The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at the completion of the work Contractor shall remove all such debris and also its tools, scaffolding, and surplus materials and shall leave the work room clean or its equivalent. The work shall be left in good order and condition. In case of dispute Owner may remove the debris and charge the cost to the Contractor. 55. HAZARDOUS SUBSTANCES AND ASBESTOS Hazardous Substances (herein so called), as defined in the Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C.S. §9601(14)) and the regulations promulgated thereunder, as same may be amended from time to time, hydrocarbons or other petroleum products or byproducts and/or asbestos, in any form, shall not (i) be utilized, in any way, manner or form, in the construction of, or incorporation into, the Project; or (ii) be brought upon, placed, or located, by any party, on the Project site, or any other property of the City, without the written consent of the Owner's Representative. If Contractor believes that the utilization of a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos is necessary in the construction of the Project, or that it is necessary to place and/or otherwise locate upon the site of the Project or other property of the City, a Hazardous Substance, hydrocarbons or other petroleum products or byproducts and/or asbestos, Contractor shall notify the Owner's Representative, and request consent therefrom, at least twenty (20) days prior to such action. Owner's Representative may grant or deny the request of Contractor and provide whatever requirements such consent, if granted, is conditioned upon, in its sole and absolute discretion. If the request of Contractor is not granted, or otherwise not responded to, by Owner's Representative within five (5) days of the receipt of said request, said request shall be deemed to be denied. In the event Owner's Representative shall consent to the request of Contractor, Contractor shall be responsible for ensuring that all personnel involved in the Project are (i) trained for the level of expertise required for proper performance of the actions contemplated by this Contract and, in particular, in all aspects of handling, storage, disposal and exposure of Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos; and (ii) are provided and utilize all protective equipment, including without limitation, personal protective gear, necessary to provide protection from exposure to Hazardous Substances, hydrocarbons or other petroleum products or byproducts and/or asbestos. 56. NONAPPROPRIATION All funds for payment by the City under this contract are subject to the availability of an annual appropriation for this purpose by the City. In the event of non -appropriation of funds by the City Council of the City of Lubbock for the goods or services provided under the contract, the City will terminate the contract, without termination charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this contract is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the Seller on thirty (30) days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this contract beyond the date of termination. 57. THE CITY RIGHT TO AUDIT At any time during the term of this Contract and for a period of four (4) years thereafter the City or a duly 1 ' authorized audit representative of the City, or the State of Texas, at its expense and at reasonable times, reserves t J F, �t l, the right to audit Contractor's records and books relevant to all services provided under this Contract. In the event such an audit by the City reveals any errors/overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30) days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. 58. NON -ARBITRATION The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control. M 59. HOUSE BILL 2015 House Bill 2015, signed by the Governor on June 14, 2013 and effective on January 1, 2014, authorizes a penalty to be imposed on a person who contracts for certain services with a governmental entity and who fails to properly classify their workers. This applies to subcontractors as well. Contractors and subcontractors who fail to properly classify individuals performing work under a governmental contract will be penalized $200 for each individual that has been misclassified (Texas Government Code Section 2155.001). 60. HOUSE BILL 1295: DISCLOSURE OF INTERESTED PARTIES House Bill 1295, adopted by the 84th Legislature, created §2252.908, Texas Government Code. Section 2252.908 - requires a business entity entering into certain contracts with a governmental entity or state agency to file with the governmental entity or state agency a disclosure of interested parties at the time the business entity submits the signed contract to the governmental entity or state agency. Section 2252.908 requires the disclosure form to be signed by the authorized agent of the contracting business entity, acknowledging that the disclosure is made under oath and under penalty of perjury. Section 2252.908 applies only to a contract that requires an action or vote by the governing body of the governmental entity or state agency before the contract may be signed or has a value of at least $1 million. Instructions for completing Form 1295 are available at: http://www.ci.lubbock.tx.us/departmental-websites/departments/purchasing/vendor-information Pate Intentionally Left Blank a DAVIS BACON WAGE DETERMINATIONS Page Intentionally Left Blank General Decision Number: TX170007 01/06/2017 TX7 Superseded General Decision Number: TX20160007 i State: Texas I. Construction Types: Heavy and Highway Counties: Armstrong, Carson, Crosby, Ector, Irion, Lubbock, Midland, Potter, Randall, Taylor and Tom Green Counties in Texas. HEAVY & HIGHWAY CONSTRUCTION PROJECTS Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis -Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/06/2017 * SUTX2011-002 08/02/2011 Rates Fringes CEMENT MASON/CONCRETE -- FINISHER (Paving & Structures) ... $ 13.55 ELECTRICIAN ...................... $ 20.96 Paving & Curb ............... $ 12.36 Structures .................. $ 13.52 I • eI' Asphalt Raker ............... $ 12.28 Flagger.....................$ 9.30 Laborer, Common .............$ 10.30 Laborer, Utility ............ $ 11.80 Work Zone Barricade Servicer.................... $ 10.30 POWER EQUIPMENT OPERATOR: Asphalt Distributer ......... $ 14.87 Asphalt Paving Machine ...... $ 13.40 Broom and Sweeper ........... $ 11.21 Crane, Lattice Boom 80 Tons or Less ................ $ 16.82 Crawler Tractor Operator .... $ 13.96 Excavator, 50,000 lbs or less..$ 13.46 Front End Loader Operator, Over 3 CY................... $ 12.77 Front End Loader, 3CY or less ......... $ 12.28 Loader/Backhoe.............. $ 14.18 Mechanic .................... $ 20.14 Milling Machine .............$ 15.54 Motor Grader, Rough ........ $ 16.15 Motor Grader, Fine .......... $ 17.49 Pavement Marking Machine .... $ 16.42 Reclaimer/Pulverizer........ $ 12.85 Roller, Asphalt ............. $ 10.95 Roller, Other ............... $ 10.36 Scraper ..................... $ 10.61 Spreader Box ................ $ 12.60 Servicer ......................... $ 13.98 Steel Worker (Reinforcing) ....... $ 13.50 1 1ILei eowl, kfI7 Lowboy -Float ................ $ 14.46 Single Axle ................. $ 12.74 Single or Tandem Axle Dump..$ 11.33 Tandem Axle Tractor with Semi ........................ $ 12.49 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis -Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health - related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health - related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non -union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION EXHIBIT B Prevailing Wage Rates Overtime Rate The rate for overtime (in excess of forty hours per week) shall be as required by the Fair Labor Standards Act. EXHIBIT C Prevailing Wage Rates Legal Holiday Rate The rate for legal holidays shall be as required by the Fair Labor Standards Act. SPECIFICATIONS I Page Intentionally Left Blank I I I u iM L I vas, va Jubbock TExAs KENT STREET WATER LINE TECHNICAL SPECIFICATIONS May, 2017 TABLE OF CONTENTS CITY OF LUBBOCK KENT STREET WATER LINE EXTENSION DIVISION I — GENERAL REQUIREMENTS 01010 Summary of Work--------------------------------------------------------4 01019 Contract Considerations -------------------------------------------------- 1 01028 Change Order Procedures------------------------------------------------3 01039 Coordination and Meetings----------------------------------------------2 01140 Work Restrictions---------------------------------------------------------3 01300 Submittal Procedures-----------------------------------------------------4 01310 Progress Schedules -------------------------------------------------------- 2 01356 Storm Water Pollution Prevention Plan--------------------------------4 01380 Project Photographs------------------------------------------------------2 01400 Quality Requirements ----------------------------------------------------- 4 01410 Testing Laboratory Services---------------------------------------------3 01555 Barricades, Signs, and Traffic Handling-------------------------------1 01576 Waste Material Disposal-------------------------------------------------2 01700 Contract Closeout---------------------------------------------------------2 DIVISION 2 — SITE WORK 02082 Pre -Cast Concrete Vaults------------------------------------------------3 02221 Removing & Replacing Existing Pavements--------------------------2 02240 Dewatering----------------------------------------------------------------3 02257 Controlled Low Strength Material — Flowable Fill ------------------3 02260 Excavation Support and Protection-------------------------------------3 02317 Excavation and Backfill for Utilities-----------------------------------10 02320 Utility Backfill Materials ------------------------------------------------- 4 02445 Boring and Encasing-----------------------------------------------------4 02449 Jack & Bore Under Railroads & Streets-------------------------------9 02665 Water Piping, Valves, and Fittings-------------------------------------14 DIVISION 3 — CONCRETE 03300 Cast -in -Place Concrete---------------------------------------------------9 Kent Street Water Line Extension Table of Contents May 2017 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL 1.1 SUMMARY A. This section covers the description of the Work to be completed under these Specifications. B. The OWNER is the City of Lubbock. (1) The Owner's Representative is: John Turpin, P.E. Chief Water Utilities Engineer Public Works Engineering City of Lubbock O: (806) 775-2342 (2) Engineer of Record is: Josh Kristinek, P.E. Civil Engineer Public Works Engineering City of Lubbock O: (806) 775-3397 (3) The Project Manager is: Adam Nixon, E.I.T. Civil Engineer Associate Public Works Engineering City of Lubbock O: (806) 775-2344 C. Section includes: (1) Definitions (2) Project description (3) Permits and licenses (4) Access to site (5) Contractor's use of the premises (6) Project schedule (7) Security Procedures (8) Coordination requirements (9) Pre -construction meeting (10) Warranty 1.2 DEFINITIONS Kent Street Water Line Extension 01010-1 May 2017 A. Furnish: To supply products to the project site, including delivering ready for unloading and replacing damaged and rejected products. B. Install: To put products in place in the work ready for the intended use, including unloading, unpacking, handling, storing, assembling, installing, erecting, placing, applying, anchoring, working, finishing, curing, protecting, cleaning, and similar operations. C. Provide: To furnish and install products. D. Indicated: Shown, noted, scheduled, specified, or drawn, somewhere in the contract documents. 1.3 PROJECT DESCRIPTION A. The purpose of this project is to connect an existing 12" water line located at University Avenue to an existing 10" water line located at Mesa Road by providing a new 12" potable water line along a Kent Street including 100 feet of jack and bore under BNSF Railroad right-of-way. B. Major work items are: (1) Provide new 12" PVC water line along Kent Street form University Avenue to Mesa Road. (2) Jack and bore under BNSF Railroad right-of-way and provide 12" PVC water line in casing. (3) Resort three existing driveways 7 days after pipe installation crosses the driveway. C. The Contractor shall furnish all labor, equipment, and materials required for the complete construction of the work as shown on the drawings and specified herein. D. All work shall be performed in accordance with the most recent City of Lubbock Design Standards for Water and Sanitary Sewer construction. E. A maximum of 500 feet of trench open at a time. 1.4 Work shall also include restoration or replacement of all removed or damaged pavement, curb, sidewalk, gutter, driveways, shrubbery, fence, sod or other disturbed surfaces or structures in a condition equal to that before the work began to the satisfaction of the Engineer. 1.5 PERMITS AND LICENSES A. Contractor shall provide qualifications to the Owner upon request to display evidence of competency and authority to perform required work. B. Contractor shall be responsible for obtaining all required permits. C. Contractor shall submit copies of all permits, licenses, and similar permissions obtained, and receipts for fees paid, to the Owner. 1.6 ACCESS TO SITES A. Contractor shall limit access to the site to authorized personnel only. B. Contractor shall adequately barricaded open excavations and construction material and equipment as to prevent unauthorized personnel from accessing. Kent Street Water Line Extension 01010-2 May 2017 ' C. The Owner shall locate and designate all manhole access points open and accessible for the work, and provide rights of access to these points. D. Contractor shall coordinate with the City Solid Waste Services to maintain trash pickup schedules when working with in the alley right of way. 1.7 CONTRACTOR'S USE OF THE PREMISES A. The space available to the Contractor for the performance of the work, either exclusively or in conjunction with others performing other construction as part of the project, is restricted to the area shown on the site plan of the contract drawings unless the Contractor makes arrangements to use additional space with the Owner. B. The contractor shall ensure that any disturbed area is left in a condition equal to or better condition before finishing construction in the area. 1.8 PROJECT SCHEDULE A. The Work summarized above shall be substantially completed within 120 calendar days from the date of the Notice to Proceed. l B. There will be a $200.00 per day liquidated damages for each day that exceeds the 30 day ` limit. t" C. Within five (5) business days after the date of the Substantial Completion Certificate, the Engineer shall issue a Final Punch List of items to be corrected prior to Final Completion. D. Punch list items shall be complete within 30 calendar days from the date of the Final Punch List. There shall be $200 per day liquidated damages assessed for each day that exceeds the - 30 day limit. i PART 2 PRODUCTS Not used. PART 3 EXECUTION 3.1 SECURITY PROCEDURES A. Contractor shall limit access to the site to persons involved in the work. B. Contractor shall provide secure storage for materials for which the owner has made payments and which are stored on site. C. Contractor shall secure completed work as required to prevent loss or damage. D. Contractor shall secure sites by means of fencing, security guards, or other means to prevent damage, theft, safety hazards, or other problems on the site. E. The use of security personnel shall be cleared with the Owner. 3.2 COORDINATION REQUIREMENTS A. Contractor shall inform the Owner when coordination of the work is required. B. If necessary, inform each party involved, in writing, of procedures required for coordination; include requirements for giving notice, submitting reports, and attending meetings. C. Coordinate shop drawings prepared by separate entities. Kent Street Water Line Extension 01010-3 May 2017 D. Show installation sequence when necessary for proper installation. 3.3 PRE -CONSTRUCTION MEETING A. A pre -construction meeting will be held at City Hall within ten (10) days of the date of Notice to Proceed and prior to any construction taking place. 3.4 WARRANTY A. Contractor shall warrant 100% of the project for one (1) year after the date of substantial acceptance of the work. B. On the eleventh (11) month from the date of final acceptance, an Owner's representative will schedule an inspection with the presence of the Contractor to inspect for defects and assessment of the work performed. C. Any work that is considered defective by the Owner's representative will be repaired. D. The Contractor shall remedy any defects in workmanship, and pay for any and all damages of any nature whatsoever resulting in defects at no cost to the Owner. END OF SECTION 9 ri 9 9 Kent Street Water Line Extension 010104 May 2017 [f SECTION 01019 CONTRACT CONSIDERATIONS PART1 GENERAL 1.1 SUMMARY A. This section covers the method for the Contractor to request payment for completed work. B. Section includes: (1) Schedule of Values (2) Application for Payment (3) Payment Retainage 1.2 SCHEDULE OF VALUES A. Contractor shall submit a Schedule of Values on Engineer approved Contractor's form within five (5) days after receiving the bid tabulation. B. Revise schedule to include approved Change Orders, with each Application for Payment. 1.3 APPLICATIONS FOR PAYMENT A. Submit two (2) copies of each application on Engineer approved Contractor's form. B. Utilize Schedule of Values for listing items in Application for Payment. C. Monthly, submit application for payment on or about the 10th day of each month. D. Include an updated construction progress schedule, materials received, and manifest with each Application for Payment E. Submit the following along with the application for final payment: (1) The documentation for the completed project. (2) Signed affidavit from a Notary Public that all claims on this job have been settled and that all bills owed by the Contractor for the project including materials and labor have been paid. (3) One (1) year Contractor Warranty for work performed, signed and sealed by a Notary Public. 1.4 PAYMENT RETAINAGE A. The Owner will retain five (5) percent of each payment. B. Retainage will be released as final payment, upon completion of the Final Punch List. PART 2 PRODUCTS Not used. PART 3 EXECUTION Not used END OF SECTION Kent Street Water Line Extension 01019-1 May 2017 t i.�, SECTION 01028 CHANGE ORDER PROCEDURES PART GENERAL 1.1 SUMMARY A. This section covers the procedures to be followed for a change in Contract price or time. B. Section Includes: (1) Submittals (2) Documentation Of Change In Contract Sum/Price And Contract Time (3) Change Procedures (4) Construction Change Authorization (5) Stipulated Price Change Order (6) Unit Price Change Order (7) Time And Material Change Order (8) Execution Of Change Orders (9) Correlation Of Contractor Submittals 1.2 SUBMITTALS A. Submit the name of the individual authorized to receive change documents, and be responsible for informing others in Contractor's employ or Subcontractors of changes to the Work. B. Change Order Forms. 1.3 DOCUMENTATION OF CHANGE IN CONTRACT SUM/PRICE AND CONTRACT TIME A. Contractor shall maintain detailed records of work done on a time and material basis. B. Provide full information required for evaluation of proposed changes and to substantiate costs of changes in the Work. C. Document each quotation for a change in a cost or time with sufficient data to allow evaluation of the quotation. D. On request, provide additional data to support computations, including but not limited to: (1) Quantities of products, labor, and equipment. (2) Taxes, insurance, and bonds. (3) Overhead and profit. (4) Justification for any change in Contract Time. (5) Credit for deletions from Contract, similarly documented. E. Support each claim for additional costs, and for work done on a time and material basis, with additional information: (1) Origin and date of claim. (2) Dates and times work was performed, and by whom. (3) Time records and wage rates paid. (4) Invoices and receipts for products, equipment, and subcontracts, similarly documented. 1.4 CHANGE PROCEDURES Kent Street Water Line Extension 01028-1 May 2017 A. Changes to Contract Sum/Price or Contract Time can only be made by issuance of an official Construction Change Authorization or Contract Change Order. Discussions in the field or by phone or email, without proper documentation, do not authorize Contractor to perform tasks outside the scope of Work. Changes must be authorized as described in this Section. B. The Engineer will advise of minor changes in the Work not involving an adjustment to Contract Sum/Price or Contract Time as authorized by the Contract by issuing supplemental instructions by letter. C. The Engineer may issue a Proposal Request which includes a detailed description of a proposed change with supplementary or revised Drawings and Specifications. The Contractor shall prepare and submit an estimate within seven (7) days, or as specified in the Proposal Request. Estimate shall include the proposed change's full effect on the Work and the effect on the Contract Sum/Price and Contract Time, with full documentation and a statement describing the effect on Work by separate or other contractors. D. The Contractor may request clarification of Drawings, Specifications, or Contract documents or other information by submitting a Request for Information to the Engineer. Engineer may request a Proposal Request in response to a Request for Information. 1.5 CONSTRUCTION CHANGE AUTHORIZATION A. The Engineer may issue a document, signed by the Owner, instructing the Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order. B. The document will describe changes in the Work, and will designate the method of determining any change in Contract Sum/Price or Contract Time. C. The Contractor shall promptly execute the change in the Work. 1.6 STIPULATED PRICE CHANGE ORDER A. Based on accepted Proposal Request. 1.7 UNIT PRICE CHANGE ORDER A. For pre -determined unit prices and quantities, the Change Order will be executed on a fixed unit price basis. B. For unit costs or quantities of units of work which are not pre -determined, execute Work under a Construction Change Authorization. C. Changes in Contract Sum/Price or Contract Time will be computed as specified for Time and Material Change Order. 1.8 TIME AND MATERIAL CHANGE ORDER A. Submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract. B. The Engineer will determine the change allowable in Contract Sum/Price and Contract Time as provided in the Contract Documents. C. Maintain detailed records of work done on Time and Material basis. D. Provide full information required for evaluation of proposed changes, and to substantiate costs for changes in the Work. 1.9 EXECUTION OF CHANGE ORDERS A. The Engineer will issue Change Orders for signatures of parties as provided in the Conditions of the Contract. 1.10 CORRELATION OF CONTRACTOR SUBMITTALS Kent Street Water Line Extension 01028-2 May 2017 A. Promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Sum/Price. B. Promptly revise progress schedules to reflect any change in Contract Time, revise sub - schedules to adjust time for other items of work affected by the change, and resubmit. C. Promptly enter changes in Project Record Documents. PART 2 PRODUCTS Not used PART 3 EXECUTION Not used END OF SECTION Kent Street Water Line Extension 01028-3 May 2017 SECTION 01039 COORDINATION AND MEETINGS PART1 GENERAL 1.1 SUMMARY A. Section Includes: (1) Coordination (2) Field Engineering (3) Pre -Construction Meeting (4) Progress Meetings 1.4 COORDINATION A. Coordinate scheduling, submittals, and Work of the various Sections of the Project to assure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later. B. Coordinate completion and cleanup of Work of separate Sections in preparation for Substantial Completion. C. After Owner occupancy of premises, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner's activities. 1.5 FIELD ENGINEERING A. Locate and protect survey control and reference points. B. Verify set -backs and easements; confirm drawing dimensions, and elevations. C. Provide field engineering services. D. Establish elevations, lines, and levels, utilizing recognized engineering survey practices. E. Submit a copy of registered site drawing and certificate signed by Land Surveyor that the elevations and locations of the Work are in conformance with the Contract Documents. 1.6 PRE -CONSTRUCTION MEETING A. Schedule meeting within ten (10) days of date of Notice to Proceed. B. Procedures and processing of field decisions, submittals, and substitutions, applications for payments, RFIs, proposal request, Change Orders and Contract closeout procedures. C. Tentative agenda: (1) Use of premises by Owner and Contractor. (2) Distribution of executed Contract Documents. (3) Submission of list of Subcontractors, list of products and progress schedule. (4) Designation of personnel representing the parties in Contract and the Engineer. (5) Owner's requirements. (6) Construction facilities and controls provided by Owner. (7) Survey and layout. (8) Security and housekeeping procedures. (9) Schedules. (10) Procedures for testing. (11) Procedures for maintaining record documents. (12) Inspection and acceptance of products put into service during construction period. Kent Street Water Line Extension 01039-1 May 2017 D. Record minutes and distribute copies within five (5) days after meeting to Engineer, participants, and those affected by decisions made. A. Schedule and administer meetings throughout progress of the Work at minimum monthly intervals. B. Make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings. C. Attendance Required: Job superintendent, major Subcontractors and suppliers, Engineer, as appropriate to agenda topics for each meeting. D. Tentative agenda: (1) Review minutes of previous meetings. (2) Review of Work progress. (3) Field observations, problems, and decisions. (4) Identification of problems which impede planned progress. (5) Review of submittals schedule and status of submittals. (6) Review of off -site fabrication and delivery schedules. (7) Maintenance of progress schedule. (8) Corrective measures to regain projected schedules. (9) Planned progress during succeeding work period. (10) Coordination of projected progress. (11) Maintenance of quality and work standards. (12) Effect of proposed changes on progress schedule and coordination. (13) Other business related to Work. E. Record minutes and distribute copies within five (5) days after meeting to Engineer, participants, and those affected by decisions made. PART PRODUCTS Not used PART 3 EXECUTION Note used END OF SECTION Kent Street Water Line Extension 01039-2 May 2017 SECTION 01140 WORK RESTRICTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: (1) Use Of Premises i (2) Special Scheduling Requirements (3) Working Period (4) Utility Cutovers And Interruptions (5) Noise Restrictions (6) Advance Notice (7) Water For Construction (8) Work Area Limits 1.2 USE OF PREMISES A. Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated. B. Confine construction operations to within the limits of Right of Way, Alley Easements and Manhole locations, as shown on plans. C. Keep driveways and entrances serving premises clear and available to tenants, residents and emergency vehicles at all times, except when construction is immediately at that vicinity. Do not use these areas for parking or storage of materials. D. Schedule construction to minimize obstruction of driveways and entrances. 1.3 SPECIAL SCHEDULING REQUIREMENTS A. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the Work. B. Permission to interrupt utility service shall be requested in writing a minimum of fourteen (14) calendar days prior to the desired date of interruption. 1.4 WORKING PERIOD A. Regular working hours shall be within an eleven (11) hour period between 7:00 a.m. and 6:00 p.m., Monday through Friday, and an eight (8) hour period between 9:00 a.m. and 5:00 p.m. on Saturday. (1) Saturday work shall be restricted to those activities that do not require observation by the Owner. (2) The Owner reserves the right, at the Owner's discretion, to disallow work when it interferes with holiday times and traffic. B. No work shall be performed on the following holiday periods or days: (1) New Year's Day (2) Good Friday Holiday a (3) Memorial Day Holiday (4) Independence Day Holiday 11 Kent Street Water Line Extension 01140-1 May 2017 (5) Labor Day Holiday (6) Thanksgiving Day Holiday plus the day before and the three days following Thanksgiving Day.'. (7) Christmas Week. If Christmas Day falls on Saturday, this will be defined as the week leading to Christmas Day. If Christmas Day falls on Sunday, this will be defined as the week following Christmas Day plus the Friday and Saturday prior to Christmas Day. C. Work outside regular working hours requires Owner's approval. (1) Make application twenty-one (21) calendar days prior to such work to allow arrangements to be made by the Owner for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. (2) Based on the justification provided, the Owner may approve work outside regular hours. (3) During periods of darkness, the different parts of the Work shall be lighted in a manner approved by the Owner. Lighting shall be such that it does not cause nuisance conditions. D. The Drawings contain specific requirements that affect certain areas of the Work. 1.5 UTILITY CUTOVERS AND INTERRUPTIONS A. Sanitary sewer flow shall not be interrupted upstream of the Work. Bypass pumping of sanitary sewer flow upstream of the Work shall be the responsibility of the Contractor. B. Sanitary sewer service connections shall be re -connected in a timely manner following installation of the new sanitary sewer pipe. 1.6 NOISE RESTRICTIONS i A. 75 dB limit at face of nearest structure during normal daylight hours. B. 65 dB limit at face of nearest structure during evening and nighttime hours in or near residential areas and for 24-hour working conditions that have received Owner approval. Evening and nighttime hours shall be defined as 6:00 p.m. to 7:00 a.m. C. The Contractor shall keep on -site a hand portable sound measurement device for both the Owner's and the Contractor's use for measuring noise levels. 1.7 ADVANCE NOTICE A. The Contractor shall provide a minimum of five (5) days advance written notice of construction to businesses and residences along the construction route. B. The advance written notice shall be in the form of a single page flyer to be placed by hand by the Contractor's forces in mailboxes, door handles, or handed to applicable individuals at f? each route building. j C. The text for the advance written notice will be approved by the Owner. D. Reproduction shall be at the Contractor's expense. ' E. Distribution shall be at the Contractor's expense. '-' F. Single page flyers shall be of a paper or post card color other than white to direct the recipient's attention to the information. G. The text shall contain the anticipated beginning date of inconvenience to the recipient and the anticipated duration of that inconvenience. H. The dates shall encompass the duration of driveway inconveniences and potential noise to the recipients on a single city block (i.e., the dates and durations shall reflect the time that the city block of interest will be affected by non-trafficability). Kent Street Water Line Extension 01140-2 May 2017 c s _ F1.8 WATER FOR CONSTRUCTION A. Obtaining water for construction is the Contractor's sole responsibility. B. Water is available from the potable water system of the City of Lubbock for construction purposes. (1) The Contractor is responsible for all charges and arrangements for water consumption from the potable water system. (2) The Contractor shall make such arrangements directly with the City of Lubbock Water Utilities Department. (3) The City will not furnish potable water free of charge for the construction work. (4) The Contractor is responsible for any required metering and hauling. C. Water from park area lakes shall not be used for construction. D. This section does not preclude the Contractor from seeking other water sources for use in construction. Such water resources shall meet the purity requirements for the intended use. Such arrangements for water from other sources are the responsibility of the Contractor. PART 2 PRODUCTS Not used PART 3 EXECUTION 3.1 WORK AREA LIMITS A. Prior to any construction, the Contractor shall mark the areas that need not be disturbed under this contract. B. Isolated areas within the general work area which are to be saved and protected shall also be marked or fenced. C. Monuments and markers shall be protected before construction operations commence. D. Where construction operations are to be conducted during darkness, the markers shall be visible at all times. E. The Contractor's personnel shall be knowledgeable of the purpose for marking and/or protecting particular objects. END OF SECTION Kent Street Water Line Extension 01140-3 May 2017 SECTION 01300 SUBMITTAL PROCEDURES PART1 GENERAL 1.1 SUMMARY A. Section includes: (1) Submittal Procedures (2) Re -Submittal Requirements (3) Action Submittals (4) Proposed Products List (5) Shop Drawings (6) Information Submittals (7) Contractor's Review (8) Owner And Engineer Action 1.2 SUBMITTAL PROCEDURES A. Transmit each submittal with Contractor's standard transmittal letter including Contractor's name, address, and phone number. B. Identify Project, Contractor, Subcontractors or Suppliers, pertinent Drawings sheet and detail number(s), and specification Section number, as appropriate. C. Schedule submittals to expedite the Project and coordinate submission of related items. D. The Owner and Engineer reserve the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. E. Submittals may be delivered to the Engineer at the following address: Water Utilities Engineering 1625 13th Street Lubbock, Texas 79457 F. Allow enough time for submittal review, including time for re -submittals, as follows: (1) Time for review shall commence on the Owner or Engineer's receipt of submittal. (2) Allow fifteen (15) days for initial review of each submittal. (3) Allow additional time if processing must be delayed to permit coordination with subsequent submittals. (4) The Owner or Engineer will advise the Contractor when a submittal being processed must be delayed for coordination. (5) If more than five (5) submittals are transmitted for review within any five (5) day period, the time allowed for review will be increased to twenty-one (2 1) days. (6) Where concurrent review of submittals by the Engineer, Owner, or other parties is required, allow twenty-one (21) days for initial review of each submittal. (7) If intermediate submittal is necessary, process it in same manner as initial submittal. (8) Allow fifteen (15) days for processing each resubmittal. G. No extension of the Contract Time will be authorized because of failure to transmit submittals sufficiently in advance of the Work to permit processing. H. Identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work. Kent Street Water Line Extension 01300-1 May 2017 I. Provide space for Contractor and Engineer review stamps. J. Distribute copies of reviewed submittals to concerned parties. Instruct parties to promptly report any inability to comply with provisions. - K. Use only final submittals with mark indicating action taken by Owner or Engineer in connection with the construction. L. Submittals not requested will not be recognized or processed. 1.3 RE -SUBMITTAL REQUIREMENTS A. Revise initial submittal as required and re -submit to meet requirements as specified. B. Identify all changes made since previous submittal. C. Mark as RESUBMITTAL. D. Re -use original transmittal number and supplement with sequential alphabetical suffix for each re -submittal (ie. 0001-A). PART 2 PRODUCTS 2.1 ACTION SUBMITTALS A. Prepare and submit Action Submittals required by individual Specification Sections. B. Submit three (3) copies of each submittal, unless otherwise indicated. (1) The three (3) copies will be retained by the Owner's representative. (2) Any additional copies that the Contractor may need for his operations will be in addition to the three (3) copies required. 2.2 PROPOSED PRODUCTS LIST A. Within fifteen (15) days after date of Notice to Proceed, submit complete list of major ( products proposed for use, with name of manufacturer, trade name, and model or catalog designation, and reference standards. B. For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards. C. Collect information into a single submittal for each element of construction and type of product or equipment. D. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information unique to this Project. E. Include recommendations for application and use, compliance with specified standards of trade associations and testing agencies. F. Include notation of special coordination requirements for interfacing with adjacent work. G. After review, distribute in accordance with Article on Procedures above and provide copies for Record Documents described in Section 01700 — Contract Closeout. 2.3 SHOP DRAWINGS l_ A. Prepare Project specific information, drawn accurately to scale. B. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. C. Include the following information, as applicable: (1) Dimensions Kent Street Water Line Extension 01300-2 May 2017 i (2) Identification of products (3) Fabrication and installation drawings (4) Schedules (5) Design calculations (6) Compliance with specified standards (7) Notation of coordination requirements (8) Notation of dimensions established by field measurement D. For drawings larger than I x 17 inches, submit in the form of one reproducible transparency and one opaque reproduction. s E. For drawings 11 x 17 inches and smaller, submit the number of opaque reproductions which Contractor requires, plus three (3) copies which will be retained by Engineer. F. Drawing size shall be minimum of 8 '/2 x 11 inches and a maximum of 24 x 36 inches. G. Draw details to a minimum size of'h inch equal to 1 foot. H. After review, produce copies and distribute in accordance with SUBMITTAL PROCEDURES article above and for record document purposed described in Section 01700 - - Contract Closeout. 2.4 INFORMATION SUBMITTALS A. Manufacturer's Instructions: (1) When specified in individual specification Sections, submit manufacturers' printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and 1 finishing, in quantities specified for Product Data. (2) Identify conflicts between manufacturers' instructions and Contract Documents. (3) Indicate special procedures, conditions requiring special attention and special environmental criteria required for application or installation. B. Manufacturer's Certificates (1) When specified in individual specification Sections, submit manufacturers' certificate to Engineer for review, in quantities specified for Product Data. (2) Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference date, affidavits, and certifications as appropriate. (3) Certificates may be recent or previous test results on material or Product, but must be acceptable to the Engineer. C. Insurance Certificates and Bonds: (1) Prepare written information indicating current status of insurance or bonding coverage. (2) Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage. PART 3 EXECUTION 3.1 CONTRACTOR'S REVIEW A. Review each submittal and check for compliance with the Contract Documents. B. Note corrections and field dimensions. C. Mark with approval stamp before submitting to the Owner or Engineer. (1) Stamp each submittal with a uniform approval stamp. Kent Street Water Line Extension 01300-3 May 2017 (2) Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that the submittal has been reviewed, checked, and approved for compliance with the Contract Documents. 3.2 OWNER AND ENGINEER'S ACTION A. The Owner or Engineer will not review submittals that do not bear the Contractor's approval stamp and will return them without action. B. The Owner or Engineer will review each submittal, make marks to indicate corrections or modifications required, and return it. C. The Owner or Engineer will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken, as follows: (1) No exception taken (2) Make correction noted (3) Revise and resubmit (4) Rejected D. The submittal stamp by the Owner or Engineer will also contain the following: (1) Checking is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. (2) Any action shown is subject to the requirements of the plans and specifications. (3) The Contractor is responsible for confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; and performing the Work in a satisfactory manner. E. The Owner or Engineer will review each submittal and will not return it, or will reject and return it, if it does not comply with the requirements. END OF SECTION Kent Street Water Line Extension 01300-4 May 2017 SECTION 01310 PROGRESS SCHEDULES PART1 GENERAL 1.1 SUMMARY A. Section Includes: (1) Format (2) Content (3) Revisions To Schedules (4) Submittals (5) Distribution 1.2 FORMAT A. Sequence of Listings: The chronological order of the start of each item of Work. B. Scale and Spacing: To provide space for notations and revisions. C. Sheet Size: Minimum 8 1/2 x 11 inches D. Submit only if requested by the Engineer or Owner at preconstruction or coordination meeting. E. Maintain monthly updates to schedule. 1.3 CONTENT A. Show complete sequence of construction by activity, with dates for beginning and completion of each element of construction. B. Identify each item by specification Section number. C. Provide sub -schedules to define critical portions of the entire Schedule. D. Show accumulated percentage of completion of each item, and total percentage of Work completed, as of the first day of each month. E. Provide separate schedule of submittal dates for shop drawings, product data, samples, and dates reviewed submittals will be required from the Engineer. Indicate decision date for selection of finishes. 1.4 REVISIONS TO SCHEDULES A. Indicate progress of each activity to date of submittal, and projected completion date of each activity. B. Identify activities modified since previous submittal, major changes in scope, and other identifiable changes. C. Provide narrative report to define problem areas, anticipated delays, and impact on Schedule. Report corrective action taken, or proposed, and its effect. 1.5 SUBMITTALS A. Submit initial Schedules within ten (10) days after date established in Notice to Proceed. After review, resubmit required revised data within ten (10) days. B. Submit revised Progress Schedules with each Application for Payment. C. Submit the number of opaque reproductions which the Contractor requires, plus two (2) copies which will be retained by the Engineer. Kent Street Water Line Extension 01310-1 May 2017 1.6 DISTRIBUTION A. Distribute copies of reviewed Schedules to project site file, Subcontractors, suppliers, and other concerned parties. B. Instruct recipients to promptly report, in writing, problems anticipated by projections indicated in Schedules. ' PART 2 PRODUCTS Not used PART 1 EXECUTION Not used END OF SECTION Kent Street Water Line Extension 01310-2 May 2017 SECTION 01356 STORM WATER POLLUTION PREVENTION MEASURES PART1 GENERAL 1.1 SUMMARY A. Section Includes: (1) Contractor Responsibilities (2) Erosion and Sediment Controls (3) Components for Silt Fences (4) Components for Straw Bales (5) Storm Water Pollution Prevention Plan 1.2 CONTRACTOR RESPONSIBILITIES A. The Contractor shall implement, maintain, and update the Storm Water Pollution Prevention measures specified in the Storm Water Pollution Prevention Plan (SWP3) in a manner, which will meet the requirements of the Texas Pollution Discharge Elimination System (TPDES) General Permit No.TXR150000. B. The Contractor shall be responsible for any fines or penalties assessed by the appropriate regulatory agency for failure to make required inspections, failure to properly document those inspections, failure to adequately implement and adjust the storm water pollution prevention measures specified in the SWP3 to adequately control pollutants, and/or any other fines or penalties assess by TCEQ or the EPA for failure to comply with any part of the permit requirements. C. The Contractor shall submit a Notice of Intent and a Notice of Termination independently of the Owner. D. Fines leveled against the Owner by the TCEQ or the EPA for the Contractor's failure to comply with and maintain the SWP3 shall be paid by the Contractor. 1.3 EROSION AND SEDIMENT CONTROLS A. General (1) Structural measures shall be implemented to divert flows from exposed soils, temporarily store flows, or otherwise limit run-off and the discharge of pollutants from exposed areas of the site. (2) Structural practices shall be implemented as specified in the SWP3 and in a timely manner during the construction process to minimize erosion and sediment run-off. B. Stabilized Ingress/Egress (1) Stabilized access to and from the construction site will be installed by the Contractor as soon as practical and in accordance with the SWP3. (2) In all cases, the Contractor shall ensure that any soil tracked off -site is cleaned from existing roads, alleys, and any adjacent properties as soon as possible. (3) The Contractor or other responsible party shall check for any pollutants (mud, silt, sand, cement, construction materials, etc.) tracked or washed off -site and perform necessary clean-up measures at the end of each work day. C. Silt Fences/Diversion Berms Kent Street Water Line Extension 01356-1 May 2017 f_., (1) The Contractor shall provide silt fences and/or diversion berms as a temporary structural practice to minimize erosion and sediment runoff. (2) Silt fences and/or diversion berms shall be properly installed to effectively retain sediment immediately after completing each phase of work where erosion would occur in the form of sheet and rill erosion (e.g., clearing and grubbing, excavation, embankment, and grading.) (3) Silt Fences/Diversion Berms shall be kept in good and functional condition for as long as they are required and until they are removed from the site. D. Sand/Gravel Bags 1- (1) The Contractor may provide sand/gravel bags as a temporary structural practice to minimize erosion and sediment runoff. (2) Bags shall be properly placed to effectively retain sediment immediately after completing each phase of work (e.g., after clearing and grubbing in an area between a ridge and drain, bags shall be placed as work progresses, bags shall be removed/replaced/relocated as needed for work to progress in the drainage area). (3) Sand/gravel bags must remain in good condition, or they shall be replaced. E. Site Stabilization (1) The Contractor shall disturb the least amount of site area as possible. (2) Stabilization measures to be implemented by the Contractor may include any of the following measures: (a) Temporary or permanent seeding or sodding (b) Mulching (c) Geotextiles (d) Vegetative buffer strips (e) Paving (f) Stabilization measures shall be implemented in accordance with the SWP3. PART 2 PRODUCTS 2.1 COMPONENTS FOR SILT FENCES A. Filter Fabric (1) The geotextile shall comply with the requirements of ASTM D 4439, and shall consist of polymeric filaments, which are formed into a stable network such that filaments retain their relative positions. (2) The filament shall consist of a long -chain synthetic polymer composed of at least eight - five (85) percent by weight of ester, propylene, or amide, and shall contain stabilizers and/or inhibitors added to the base plastic to make the filaments resistant to deterioration due to ultraviolet and heat exposure. (3) Synthetic filter fabric shall contain ultraviolet ray inhibitors and stabilizers to provide a Y minimum of six (6) months of expected usable construction life at a temperature range of 0 to 120 degrees Fahrenheit. Kent Street Water Line Extension 01356-2 May 2017 i (4) The filter fabric shall meet the following requirements: FILTER FABRIC FOR SILT FENCE PHYSICAL PROPERTY TEST PROCEDURE REQUIREMENT Grab Tensile ASTM D 4632 100 lbs. min. Elongation ASTM D 4632 30 % max. Trapezoid Tear ASTM D 4533 551bs. min. Permittivity ASTM D 4491 0.2 sec-1 AOS(U.S. Std. Sieve ASTM D 4751 20 — 100 B. Silt Fence Stakes and Posts (1) The Contractor may use either wooden stakes or steel posts for fence construction. (2) Wooden stakes utilized for silt fence construction shall have a minimum cross section of two (2) inches by two (2) inches when hardwood is used and two (2) inches by four (4) inches when pine is used, and shall have a minimum length of four (4) feet. (3) Steel posts (standard "U" or "T" section) utilized for silt fence construction shall have a minimum weight of 1.33 pounds per linear foot and a minimum length of four (4) feet. C. Identification, Storage, and Handling\ (1) Filter fabric shall be identified, stored, and handled in accordance with ASTM D 4873. 2.2 COMPONENTS FOR STRAW BALES A. Straw Bales (1) The straw in the bales shall be stalks from oats, wheat, rye, barley, rice, or from grasses such as Byhalia, Bermuda, etc., furnished in air-dry condition. (2) The bales shall have a standard cross section of fourteen (14) inches by eighteen (18) inches. All bales shall be either wire -bound or string -tied. (3) The Contractor may use either wooden stakes or #3 rebars to secure the straw bales to the ground. (4) Wooden stakes utilized for this purpose shall have minimum dimensions of two (2) inches by two (2) inches in cross section and shall have a minimum length of three (3) feet. (5) Rebar utilized for securing straw bales shall have a minimum diameter of 3/8 of an inch and a minimum length of three (3) feet. PART 3 EXECUTION 3.1 STORM WATER POLLUTION PREVENTION PLAN A. Storm Water Pollution Prevention Plan will be provided by the Contractor. B. The Contractor must keep a copy of the SWP3 on site at all times. C. A completed Notice of Intent (NOI) form must be submitted a minimum of forty-eight (48) hours prior to start of construction. D. No work will be permitted until NOI is filed. E. The SWP3 shall be continually updated as necessary to reflect current and changing conditions on site. F. Additional measures not specifically shown in the SWP3 may be used to control erosion from leaving the site. 9 Kent Street Water Line Extension 01356-3 May 2017 G. A completed Notice of Termination (NOT) form must be submitted prior to finalization of this contract. H. The Contractor shall furnish the Owner with a copy of the NOI and NOT. END OF SECTION Kent Street Water Line Extension 01356-4 May 2017 ., SECTION 01380 PROJECT PHOTOGRAPHS PART 1— GENERAL 1.1 WORK INCLUDED A. This section covers the description of the Work to be completed under these Specifications B. All project photography shall follow the specifications listed herein. 1.2 DEFINITIONS A. CD — compact disk; electronic media for storing digital information such as photos; B. jpeg — a specific photographic file format utilizing file compression with minimal loss of image quality; C. Megapixels — defined as one million pixels; used for image density rating; D. Picture — synonymous with photograph; E. Pixel — the smallest indivisible color element of a raster image; F. USB — the Universal Serial Bus is a standard for cable connections and 1.3 QUALITY ASSURANCE A. The Contractor shall verify image quality through camera's on -screen display after taking photos. B. Photos shall not utilize digital zooms. f1LO T11161F.1110 A. The following elements of construction shall have a minimum of 10 photos each from multiple angles: (1) Pre -construction conditions (2) Excavation & shoring (3) Concrete formwork & reinforcement placement (4) Precast vault installation (S) Meter setting (6) Backfilling & compaction (showing method of compaction at each change in material) B. Submittals are due in conjunction with each pay app cycle; photos may be used to corroborate materials or progress verification. C. Photos shall be submitted in digital format on any of the following hard media: (1) Photo CD (2) USB Drive D. Emailed photo submittals will not be accepted. Kent Street Water Line Extension 01380-1 May 2017 is I, E. External hard drives for file transfer will not be accepted. PART 2 — PRODUCTS 1.5 PHOTOGRAPHS A. All photography shall be digital. B. File format for all pictures shall be jpeg. C. All photos shall be of a size of 2.0 megapixels or greater. D. Naming Convention (1) All digital photo files will be re -named according to the following standard: [ContractNumber]-[Description] Example: 011035-Precast Concrete Vault Installation of 3"dSection (a) Station numbering shall appear in the description when applicable. (b) Camera's date settings must be correct and automatic date information shall not be tampered with or altered after photos are taken. PART 3 — EXECUTION 1.6 RESTRICTIONS A. In secure areas, permission will be required prior to access. B. Pictures taken from outside secure areas (through or over fence) will not be allowed. A. Photos shall be taken during on -going work, unless requested by Engineer. B. Number of photos per construction element may change based on complexity of construction or due to unforeseen circumstances. 1.8 OTHER REQUIREMENTS A. The Engineer reserves the right to request additional pictures. B. The City's Senior Inspector may also request additional photos in special circumstances. END OF SECTION Kent Street Water Line Extension 01380-2 May 2017 SECTION 01400 QUALITY REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: (1) Definitions (2) Testing Requirements (3) Submittals (4) Quality Control (5) Repair and Protection 1.2 DEFINITIONS A. Quality Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and ensure that proposed construction complies with requirements. B. Quality Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that completed construction complies with requirements. 1.3 TESTING REQUIREMENTS A. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve the Contractor of responsibility for compliance with the Contract Document requirements. B. Specific quality control requirements for individual construction activities are specified in the sections that specify those activities. Requirements in those Sections may also cover production of standard products. C. Specified tests, inspections, and related actions do no limit the Contractor's quality control procedures that facilitate compliance with the Contract Document requirements. 1.4 SUBMITTALS A. Qualification Data: (1) For individuals employed by the Contractor who will perform testing as required by the various specification Sections, submit at least fourteen (14) days prior to being used on the project the capabilities and experience of such individuals and the types of tests that the individual will perform. (2) For outside testing agency employed by the Contractor, submit at least fourteen (14) days prior to being used on the project the name, address, and manager of such testing agency and the types of tests that the agency will perform. (a) Such testing agency shall be acceptable to the Owner prior to being used on the project. B. Reports: (1) Prepare and submit written reports within fourteen (14) days following the date of the test that include the following: (a) Date of issue (b) Project title and number. Kent Street Water Line Extension 01400-1 May 2017 (c) Name, address, and telephone number of testing agency. If the individual is employed by the Contractor, use Contractor's name, address, and telephone number. (d) Dates and locations of samples and test (e) Names of individuals making tests (f) Description of the work and test method (g) Identification of material, product, and specification Section. (h) Complete test or inspection data (i) Test results and interpretation of test results (j) Ambient conditions at time of sample taking and testing. (k) Comments and opinion on whether tested Work complied with the Contract Document requirements and the applicable specification Section. 1- (1) Name and signature of individual performing the test if employee of the Contractor, or name and signature of testing agency responsible person. (m) For failing tests, recommendations on retesting unless specification Sections provide procedure for retesting. C. Professional Engineer Qualifications: (1) Where a Professional Engineer is required in the specification Sections, this means a Professional Engineer who is legally qualified to practice in the jurisdiction where the project is located and who is experienced in providing engineering services of the kind indicated. D. Test Agency Qualifications: (1) An agency with the experience and capability to conduct testing indicated, as documented by ASTM E 548, and that has the capability and experience in the types of tests to be performed. E. Preconstruction Testing: (1) Testing agency shall perform preconstruction testing with specified requirements for performance and test methods. (2) The Contractor shall not perform preconstruction testing except through a third party testing agency. F. Testing Agency Responsibilities: (1) Submit certified written report of each test and similar Quality Assurance service to the Contractor. (2) Interpret tests and state in each report whether tested work complies with or deviates from the Contract Document requirements. 1.5 QUALITY CONTROL A. Owner Responsibilities: (1) Where quality control services are indicated as Owner or Engineer's responsibility, such services may be performed by the Owner's forces or by a qualified testing agency to perform these services. (2) The Owner or Engineer will furnish the Contractor with names, addresses, and telephone numbers of testing agencies engaged by the Owner. B. Contractor Responsibilities: (1) Provide quality control services required in the various specification Sections. Kent Street Water Line Extension 01400-2 May 2017 (2) Where third party testing is engaged by the Contractor, notify testing agency sufficiently in advance of the time and date when work that requires testing will be performed. (3) The Contractor shall not engage the same testing agencies as the Owner, unless Owner agrees in writing to such engagement. (4) Where testing is indicated as the Contractor's responsibility, submit certified written reports in duplicate of each testing service, whether performed by the Contractor's personnel or Contractor engaged testing agency. (5) Such reports shall include failing tests and retests. (6) Testing requested by the Contractor and not required by the Contract Documents are the Contractor's responsibility. (7) Where the Contractor's personnel are performing tests, provide individuals with appropriate equipment to perform the tests in accordance with the test method requirements. (8) Provide alternate equipment where the specified test method cannot be applied, and where alternative test methods and equipment must be employed to provide the necessary quality control. C. Retesting: (1) Regardless of whether original tests were the Contractor's responsibility, provide quality control services, including retesting, for construction that revised or replaced work that failed to comply with requirements established by the Contract Documents. D. Testing Agency Responsibilities: (1) Cooperate with the Engineer and Contractor in performance of duties. (2) Provide qualified personnel and necessary equipment to perform required tests and inspections. (3) Notify the Engineer or Contractor promptly of irregularities or deficiencies observed in the work during performance of its services. (4) Interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the requirements. (5) Submit a certified written report, in triplicate, of each test, inspection, and similar quality control service through the Contactor. (6) Do not release, revoke, alter, or increase requirements of the Contract Documents or approve or accept any portion of the Work. (7) Do not perform any duties of the Contractor. E. Associated Services: (1) Cooperate with agencies performing required tests, inspections, and similar quality control services, and provide reasonable auxiliary services as requested. (2) Notify agency sufficiently in advance of operations to permit assignment of personnel. (3) Provide the following: (a) Access to the Work. (b) Incidental labor and facilities necessary to facilitate tests and inspections. (c) Adequate quantities of representative samples of materials that require testing and inspecting. (d) Assist agency in obtaining samples. (e) Facilities for storage and field curing of test samples. Kent Street Water Line Extension 01400-3 May 2017 (f) Additional associated services required of the Contractor for testing access are listed in the specification Sections. (g) Delivery of samples to testing agencies. i (h) Preliminary design mix proposed for use for material mixes that require control by testing agency. (i) Security and protection for samples and for testing and inspecting equipment at Project site. F. Coordination: (1) Coordinate sequence of activities to accommodate required quality assurance and quality control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting. 6' (2) Schedule times for tests, inspections, obtaining samples, and similar activities. PART 2 PRODUCTS Not used PART 1 EXECUTION 1.1 REPAIR AND PROTECTION A. On completion of testing, inspecting, sample taking, and similar services, repair damaged construction, and restore substrates and finishes. B. Provide materials and comply with installation requirements specified in other Sections of these Specifications. C. Restore patched areas and extend restoration into adjoining areas in a manner that eliminates evidence of patching. D. Protect construction exposed by or for quality control service activities. E. Repair and protection are the Contractor's responsibility, regardless of the assignment of responsibility for quality control services. END OF SECTION 1. Kent Street Water Line Extension 01400-4 May 2017 e SECTION 01410 TESTING LABORATORY SERVICES PARTl GENERAL 1.1 SUMMARY A. Section Includes: (1) Selection and Payment (2) Quality Assurance (3) Laboratory Responsibilities (4) Laboratory Reports (5) Limits on Testing Laboratory Authority (6) Contractor Responsibilities (7) Schedule of Inspections and Tests B. References: (1) ANSUASTM D3740 — Practice for Evaluation of Agencies Engaged in Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction. (2) ANSI/ASTM E329 — Recommended Practice for Inspection and Testing Agencies for Concrete, Steel, and Bituminous Materials as Used in Construction. 1.2 SELECTION AND PAYMENT A. An independent firm, provided at the Contractor's expense, will perform inspection, tests, and other services specified in individual specification Sections and as required by the Engineer. B. Reports will be submitted by the independent firm to the Engineer, in triplicate, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents. C. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested. D. Notify the Engineer and independent firm forty-eight (48) hours prior to expected time for operations requiring services. E. Make arrangements with independent firm and pay for additional samples and tests required for Contractor's use. F. Testing or inspecting does not relieve Contractor from performing Work to contract requirements. G. The cost associated with compliance testing shall be paid by the Contractor. H. Re -testing required because of non-conformance to specified requirements shall be performed by the same independent firm on instructions by the Engineer. I. Payment for re -testing will be paid by the Contractor. 1.3 QUALITY ASSURANCE A. Comply with requirements of ANSUASTM D3740R and ANSUASTM E329. B. Testing laboratory shall maintain a full time registered Engineer on staff to review services. Kent Street Water Line Extension 01410-1 May 2017 C. Testing equipment shall be calibrated at reasonable intervals with devices of an accuracy traceable to either National Bureau of Standards (NBS) standards or accepted values of ` natural physical constants. 1.4 LABORATORY RESPONSIBILITIES A. Test samples of mixes submitted by Contractor. B. Provide qualified personnel at site. C. Cooperate with the Engineer and Contractor in performance of services. D. Perform specified inspection, sampling, and testing of Products in accordance with specified standards. E. Ascertain compliance of materials and mixes with requirements of Contract Documents. F. Promptly notify Engineer and Contractor of observed irregularities or non-conformance of Work or Products. G. Perform additional inspections and tests required by the Engineer. 1.5 LABORATORY REPORTS A. After each inspection and test, promptly submit three (3) copies of laboratory report to the Engineer and to the Contractor. B. Laboratory test reports shall include: (1) Date issued (2) Project title and number (3) Name of inspector (4) Date and time of sampling or inspection (5) Identification of product and Specification Section (6) Location in the Project (7) Type of inspection or test (8) Date of test (9) Results of tests (10) Conformance with Contract Documents C. When requested by the Engineer, provide interpretation of test results. 1.6 LIMITS ON TESTING LABORATORY AUTHORITY A. Laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents. B. Laboratory may not approve or accept any portion of the Work. C. Laboratory may not assume any duties of the Contractor. D. Laboratory has no authority to stop the Work. 1.7 CONTRACTOR RESPONSIBILITIES A. Deliver to laboratory at designated location, adequate samples of materials proposed to be used which require testing, along with proposed mix designs. B. Cooperate with laboratory personnel, and provide access to the Work. C. Provide incidental labor and facilities to provide access to Work to be tested, to obtain and handle samples at the site or at source of products to be tested, to facilitate tests and inspections, storage and curing of test samples. Kent Street Water Line Extension 01410-2 May 2017 D. Notify the Engineer and laboratory 24 hours prior to expected time for operations requiring i inspection and testing services. 1.8 SCHEDULE OF INSPECTIONS AND TESTS` A. As indicated in individual Specification Sections. PART 2 PRODUCTS Not used PART 3 EXECUTION Not used END OF SECTION Kent Street Water Line Extension 01410-3 May 2017 r i ';f SECTION 01555 BARRICADES, SIGNS, AND TRAFFIC HANDLING PART1 GENERAL 1.1 SUMMARY A. This item shall govern for providing, installing, moving, replacing, maintaining, cleaning, and removing upon completion of work, all barricades, portable barriers, signs, portable changeable message signs, cones, lights, and other such type devices and of handling traffic as indicated on the plans or as directed by the Engineer or Owner. B. Section Includes: (1) Description (2) Construction Methods (3) Traffic Control Plan (4) Maintenance PART 2 PRODUCTS t 2.1 CONSTRUCTION METHODS A. All barricades, signs, and other types of devices shall conform to details shown on the plans or those indicated in the latest version of the Texas Manual on Uniform Traffic Control Devices (TMUTCD). B. All traffic control devices shall be crashworthy according to the guidelines set forth in the National Cooperative Highway Research Program (NCHRP) Report 350. PART 3 EXECUTION 3.1 TRAFFIC CONTROL PLAN A. The Contractor shall propose his own Traffic Control Plan (TCP) as necessary for phased construction. B. This plan must be approved in writing by the Engineer or Owner in order to be used. C. Prior to beginning work, the Contractor shall designate, in writing, a competent person who will be responsible and available on this project site or in the immediate area to insure compliance with the TCP. 3.2 MAINTENANCE A. All retro-reflective traffic control devices such as barricades, vertical panels, signs, etc., shall be maintained by cleaning, replacing, or a combination thereof such that during darkness and rain the retro-reflective characteristics shall equal or exceed the retro-reflective characteristics of traffic industry standard reflective panels. END OF SECTION Kent Street Water Line Extension 01555-1 May 2017 SECTION 01576 PART1 GENERAL 1.1 SUMMARY A. Section Includes: (1) Submittals (2) Salvageable Material (3) Excess Material 1.2 SUBMITTALS A. Obtain and submit disposal permits for proposed disposal sites if required by local ordinances. B. Submit a copy of written permission from property owner, along with a description of property, prior to disposal of excess material adjacent to the Project. C. Submit a written and signed release from property owner upon completion of disposal work. D. Both written permission and signed release shall include hold -harmless clauses naming the City of Lubbock, Texas as the entities to be held harmless in any subsequent legal proceeding. E. Both property permissions and signed releases shall be attested to by a notary public. PART 2 PRODUCTS Not used PART 3 EXECUTION 1.1 SALVAGEABLE MATERIAL A. Asphalt Pavement and Asphalt Stabilized Base shall conform to requirements of Section 02221 — Removing Existing Pavements. 1.2 EXCESS MATERIAL A. Vegetation, rubble, broken concrete, debris, asphaltic concrete pavement, excess soil, and other materials not designated for salvage, shall become the property of the Contractor and shall be removed from the job site and legally disposed of at a proper facility such as the West Texas Region Disposal Facility (WTRDF). B. Excess material may be disposed at the WTRDF at no additional cost to the Owner. (1) There will be a tipping fee per ton for construction debris and for excess uncontaminated soil. (2) There will also be a fee per load for every truck that is not covered properly when coming to the landfill. (3) For a complete list of fees associated with the WTRDF, please go to the City's website at http://solidwaste.ci.lubbock.tx.us/disposal/fees.aspx. Kent Street Water Line Extension 01576-1 May 2017 (4) All tipping fees shall be considered to be included in the Contractor's bid prices. C. Excess soil may be deposited on private property adjacent to the Project if approved by the Owner and when written permission is obtained from the property owner. D. Waste materials shall be removed from the site on a daily basis, such that the site is maintained in a neat and orderly condition. END OF SECTION Kent Street Water Line Extension 01576-2 May 2017 SECTION 01700 CONTRACT CLOSEOUT PART1 GENERAL 1.1 SUMMARY A. Section Includes: (1) Closeout Procedures (2) Final Cleaning (3) Adjusting (4) Project Record Documents (5) Warranties (6) Spare Parts and Maintenance Materials. 1.2 CLOSEOUT PROCEDURES A. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Engineer's inspection. B. Should the Engineer consider the work incomplete or defective: (1) The Engineer will promptly notify the Contractor in writing, listing the incomplete or defective work. (2) The Contractor shall take immediate steps to remedy the stated deficiencies and submit a second written certification that the work is complete. (3) The Engineer will re -inspect the Work. C. Provide submittals to the Engineer that are required by governing or other authorities. D. Submit final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due. 1.3 FINAL CLEANING A. Execute final cleaning prior to final inspection. B. Clean site, sweep paved areas, rake clean landscaped surfaces. C. Remove waste and surplus materials, rubbish, and construction facilities from the site. D. Repair, patch, and touch-up marred surfaces to match adjacent finishes. 1.4 ADJUSTING A. Adjust operating Products and equipment to ensure smooth and unhindered operation. 1.5 PROJECT RECORD DOCUMENTS A. Maintain on site, one set of the following record documents; record actual revisions to the Work: (1) Contract Drawings (2) Specifications (3) Addenda (4) Change Orders and other Modifications to the Contract (5) Reviewed shop drawings, product data, and samples. [I Kent Street Water Line Extension 1700-1 May 2017 B. Store Record Documents separate from documents used for construction. C. Record information concurrent with construction progress. D. Specifications: (1) Legibly mark and record at each Product section description of actual Products installed, including the following: (a) Manufacturer's name and product model and number. (b) Product substitutions or alternates utilized. (c) Changes made by Addenda and Modifications. E. Record Documents and Shop Drawings: (1) Legibly mark each item to record actual construction including: (a) Measured horizontal and vertical locations of underground utilities and appurtenances referenced to permanent surface improvements. (b) Field changes of dimension and detail. (c) Details not on original Contract Drawings. (d) Changes made by Addenda and Modifications. 1.6 WARRANTIES A. Provide duplicate notarized copies. B. Execute and assemble documents from Subcontractors, suppliers, and manufacturers. C. Provide Table of Contents and assemble with metal prong binder in durable plastic presentation cover. D. Submit prior to final Application for Payment. E. For items of Work delayed beyond date of Substantial Completion, provide updated submittal within ten (10) days after acceptance, listing date of acceptance as start of warranty period. 1.7 SPARE PARTS AND MAINTENANCE MATERIALS A. Provide products, spare parts, maintenance and extra materials in quantities specified in individual specification Sections. B. Deliver to project site and place in location as directed; obtain receipt prior to final payment. PART 2 PRODUCTS Not used PART 3 EXECUTION Not used END OF SECTION Kent Street Water Line Extension 1700-2 May 2017 SECTION 02082 PRE -CAST CONCRETE VAULTS PART GENERAL 1.1 RELATED DOCUMENTS A. Drawings, General Conditions of the Contract for Construction, Supplementary Conditions and Division 1 — General Requirements apply to work of this section. 1.2 SECTION INCLUDES A. This section of the specifications pertains to pre -cast concrete vaults and related items. 1.3 RELATED SECTIONS A. Section 02317 — Excavation and Backfill for Vaults and Utilities. B. Section 02084 — Frames, Grates, Rings, and Covers. 1.4 REFERENCES A. ASTM C 270 — Standard Specification for Mortar for Unit Masonry. B. ASTM C 478 - Standard Specification for Precast Reinforced Concrete Manhole Sections. C. ASTM C 857 — Minimum Structural Design Loading for Underground Precast Concrete Utility Structures. D. ASTM C 858 — Underground Precast Concrete Utility Structure. E. ASTM C 990 — Standard Specification for Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants. F. ASTM C 1107 -Packaged Dry, Hydraulic -Cement Grout (Nonshrink). G. ASTM C 1244 — Standard Test Method for Concrete Sewer Manholes by the Negative Air Pressure (Vacuum) Test. H. ASTM D 698 - Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lb/ft3) 1.5 SUBMITTALS A. Conform to requirements of Section 01330 - Submittal Procedures. B. Submit manufacturer's data and details of following items for approval: (1) Shop drawings of precast concrete vault, including reinforcement, jointing, methods, materials, and dimensions. (2) Summary of criteria used in the vault design including, as a minimum, material properties, loadings, load combinations, and dimensions assumed. Include certification from manufacturer that precast manhole design is in full accordance with ASTM C 857 and ASTM C 858 latest revisions, except as modified herein and on the drawings for internal pressure requirements. (3) Materials to be used for pipe connections at manhole/vault walls. (4) Materials to be used for stubs and stub plugs, if required. (5) Material to be used for sealing of riser joints. 1.6 DELIVERY, STORAGE AND HANDLING A. Deliver number of units needed in a timely manner to the project site to ensure installation continuity. Each section or part of vault shall be labeled with the vault designation from the drawings to which that section or part belongs. Each section or part shall be labeled prior to Kent Street Water Line Extension 02082 — 1 May 2017 being shipped from the manufacturer's plant. Any vault section arriving from the manufacturer without a manhole designation applied to it shall not be unloaded. B. Store and handle the units at the project site to prevent cracking, distortion, staining, or other physical damage, and so that markings are visible. Lift and support units at designated lift points. C. Deliver anchorage items that are to be embedded in other construction before starting such work. Provide setting diagrams, templates, instructions, and directions, as required, for installation. PART 2 PRODUCTS 2.1 PRE -CAST CONCRETE VAULTS A. Provide precast concrete vaults as indicated on plans, conforming to ASTM C 857 and ASTM C 858 latest revision. Vault should be of Type VCP 80100, or as shown on plans, as manufactured by Vaughn Concrete Products, Hanson Pre -Cast, or approved equal. Openings shall be precast as shown on plans. B. The minimum clear distance between any two wall penetrations shall be 12 inches, half the diameter of the smaller penetration, or as specified by the manufacturer, whichever is most stringent. C. For sealants used between concrete riser sections, refer to Section 02082, 2.7 A. D. Lifting holes in manhole sections and bases are not permissible unless such openings can be made watertight under 15 psi internal pressure, with only minor weeping over 15 psi internal pressure. Such watertightness shall be proven by a hydrostatic test of four hours duration. 2.2 TRAFFIC -RATED VAULTS A. Traffic -rated vaults shall meet or exceed AASHTO HS-20-44 (H-20 S-16) load rating. B. For water line alignments in the roadway, all vaults are to be traffic -rated. 2.3 CAST -IN -PLACE CONCRETE A. The vault base slab shall be Cast -in -Place Concrete, placed to the dimension and grades shown on the plans. Slab penetrations should be provided at specified locations. B. Conform to requirements of Section 03300 — Cast -in -Place Concrete. 2.4 REINFORCING STEEL A. Reinforcing steel shall conform to requirements of Section 03300 — Cast -in -Place Concrete. 2.5 MORTAR A. Conform to requirements of ASTM C 270, Type S using Portland Cement. 2.6 MISCELLANEOUS METALS A. Provide gray -iron frames, rings, and covers conforming to requirements of Section 02084 — Frames, Grates, Rings and Covers. -= 2.7 PIPE TO VAULT CONNECTIONS FOR STORM SEWERS A. Grout space between the pipe and vault -wall conforming to ASTM C 1107 for all pipe materials. 2.8 SEALANT MATERIALS A. Seal joints between sections with ConSeal CS-202 Butyl Sealant or approved equal conforming to ASTM C 990. 2.9 BACKFILL MATERIALS Original Lubbock Water Line Replacement 02082 — 2 March 2014 A. Backfill materials shall conform to the requirements of Section 02317 - Excavation and Backfill for Utilities. 2.10 NON -SHRINK GROUT A. Provide prepackaged, inorganic, flowable, non -gas -liberating, non-metallic, cement -based grout requiring only the addition of water. B. Grout shall meet the requirements of ASTM C 1107 and shall have a minimum 28-day compressive strength of 7000 psi. PART 3 EXECUTION 3.1 EXAMINATION A. Verify that lines and grades are correct. B. Determine if the subgrade, when scarified and recompacted, can be compacted to 95 percent of maximum Standard Proctor Density according to ASTM D 698 prior to placement of foundation material and base section. If it cannot be compacted to that density, the subgrade shall be moisture conditioned until that density can be reached or shall be treated as an unstable subgrade. 3.2 VAULT BASE SECTIONS AND FOUNDATIONS A. Scarify and compact base material to 95% ASTM D698 standard proctor density. If the subgrade cannot be compacted to the required density or if it contains organic materials, then excavate to stable subgrade, then backfill with lean concrete backfill to required elevation. 3.3 PRE -CAST VAULT SECTIONS A. Install sections, joints, and gasket material in accordance with manufacturer's printed recommendations. B. Seal any lifting holes with non -shrink grout where lifting holes have been allowed by the Engineer. Pressure and leakage requirements in paragraph 2.1 apply. Rol 7.1ty.4a10a A. A. Place and compact backfill materials in the area of excavation surrounding vaults in accordance with requirements of Section 02317 - Excavation and Backfill for Utilities. 3.5 PROTECTION A. Protect vaults from damage until work has been finally accepted. Repair damage to vaults at no additional cost to Owner. END OF SECTION Kent Street Water Line Extension 02082 — 3 May 2017 SECTION 02221 REMOVING EXISTING PAVEMENTS PART1 GENERAL 1.1 SUMMARY A. This section of the specifications covers the removal of existing pavements, including, but not r- limited to, concrete paving, brick paving, asphaltic paving, concrete curb and/or gutter, and concrete sidewalks. B. Section Includes: (1) Regulatory Requirements (2) Preparation (3) Protection (4) Removals (5) Backfill i-, (6) Disposal 1.2 REGULATORY REQUIREMENTS A. Conform to applicable codes for disposal of debris. Refer to Section 01576 —Waste Material Disposal. B. Coordinate removal work with utility companies. PART 2 PRODUCTS Not used PART 3 EXECUTION 3.1 PREPARATION A. Obtain advance approval from the Engineer for dimensions and limits of removal work. B. Identify known utilities below grade. C. Paint, stake and flag locations. 3.2 PROTECTION A. Protect the following from damage or displacement: (1) Adjacent public and private property. (2) Trees, plants, and other landscape features designated to remain. (3) Utilities not designated to be removed. (4) Pavement and utility structures not designated to be removed. (5) Benchmarks, monuments, and existing structures not designated to be removed. 3.3 REMOVALS A. Remove pavements and structures by methods that will not damage underground utilities. B. Do not use a drop hammer near existing underground utilities. _ C. Minimize amount of earth loaded during removal operations. Kent Street Water Line Extension 02221-1 May 2017 D. Where existing pavement is to remain, make straight saw cuts in existing pavement to provide clean breaks prior to removal. E. Do not break concrete pavement or base with drop hammer. F. Where street and driveway saw cut locations coincide or fall within three (3) feet of existing construction or expansion joints, break out to existing joint. G. Remove sidewalks and curbs to nearest existing dummy, expansion, or construction joint. H. Any existing concrete, which is damaged or destroyed beyond the neat lines so established, l 1 shall be replaced at the Contractor's expense. I. Remaining concrete shall be mortared to protect the reinforcing steel and provide a neat, clean appearance. i- 3.4 BACKFILL A. Backfill of removal zones shall be in accordance with requirements of Section 02317 — Excavation and Backfill for Utilities as applicable to the specific portion of the Work. 3.5 DISPOSAL A. Remove from the site debris resulting from work under this section in accordance with requirements of Section 01576 — Waste Material Disposal. END OF SECTION H Kent Street Water Line Extension 02221-2 May 2017 ;—, SECTION 02240 DEWATERING PART 1 GENERAL 1.1 SUMMARY A. This Section includes construction dewatering procedures and requirements. (1) A geotechnical survey has not been performed at the site. (2) This Section shall be applicable only if ground water begins to enter the trench. (3) Any required dewatering for this project shall be considered subsidiary to pipeline and manhole installation and no separate compensations will be paid. B. Section Includes: (1) Submittals (2) Performance Requirements (3) Quality Assurance (4) Project Conditions (5) Preparation (6) Installation (7) Observation Wells 1.2 SUBMITTALS A. Shop Drawings for Information: (1) For dewatering system, show arrangements, locations, and details of wells and well points; locations of headers and discharge lines; and means of discharge and disposal of water. (2) Include layouts of piezometers and flow -measuring devices for monitoring performance of dewatering system. (3) Include written report outlining control procedures to be adopted if dewatering problems arise. (4) Photographs or videotape, sufficiently detailed, of existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by dewatering operations. (5) Record drawings at Project closeout identifying and locating capped utilities and other _' subsurface structural, electrical, or mechanical conditions performed during dewatering. (6) Note locations and capping depth of wells and well points. B. Field Test Reports: (1) Before starting excavation, submit test results and computations demonstrating that dewatering system is capable of meeting performance requirements. 1.3 PERFORMANCE REQUIREMENTS A. Design, furnish, install, test, operate, monitor, and maintain dewatering system of sufficient scope, size, and capacity to control ground water flow into excavations and permit construction to proceed on dry, stable ground. B. Maintain dewatering operations to ensure erosion control, stability of excavations and constructed slopes, that excavation does not flood, and that damage to subgrades and permanent structures is prevented. Kent Street Water Line Extension 02240-1 May 2017 C. Prevent surface water from entering excavations by grading, dikes, and other means approved by the Engineer. D. Remove dewater system if no longer needed. 1.4 QUALITY ASSURANCE A. Comply with water disposal requirements of authorities having jurisdiction. 1.5 PROJECT CONDITIONS A. Existing Utilities: (1) Do not interrupt utilities serving facilities occupied by Owner or others unless permitted in writing by the Engineer and then only after arranging to provide temporary utility services according to requirements indicated. B. Project Site Information: (1) A geotechnical report has not been prepared for the Project area. (2) The Contractor, at own expense, may make test borings and conduct other exploratory operations necessary for dewatering. (3) Survey adjacent structures and improvements, employing a qualified professional engineer or land surveyor, establishing exact elevations at fixed points to act as benchmarks. (4) Clearly identify benchmarks and record existing elevations. (5) During dewatering, regularly resurvey benchmarks, maintaining an accurate log of surveyed elevations for comparison with original elevations. (6) Promptly notify the Engineer if changes in elevations occur or if cracks, sags, or other damage is evident in adjacent construction. PART 2 PRODUCTS Not used PART 3 EXECUTION 3.1 PREPARATION A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by dewatering operations. B. Prevent surface water and subsurface or ground water from entering excavations, ponding on prepared subgrades, and from flooding site and surrounding area. C. Protect subgrades and foundation soils from softening and damage by rain or water accumulation. D. Install dewatering system to ensure minimum interference with roads, streets, walks, and other adjacent occupied and used facilities. E. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. (1) Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction. 3.2 INSTALLATION Kent Street Water Line Extension 02240-2 May 2017 A. Install dewatering system utilizing wells, well points, or similar methods complete with pump equipment, standby power and pumps, filter material gradation, valves, appurtenances, water disposal, and surface -water controls. B. Before excavating below ground water level, place system into operation to lower water to specified levels. C. Operate system continuously until drains, sewers, and structures have been constructed and fill materials have been placed, or until dewatering is no longer required. D. Provide an adequate system to lower and control ground water to permit excavation, construction of structures, and placement of fill materials on dry subgrades. E. Install sufficient dewatering equipment to drain water -bearing strata above and below bottom of foundations, drains, sewers, and other excavations. F. Do not permit open -sump pumping that leads to loss of fines, soil piping, subgrade softening, and slope stability. G. Reduce hydrostatic head in water -bearing strata below subgrade elevations of foundations, drains, sewers, and other excavations. H. Maintain piezometric water level a minimum of sixty (60) inches below surface of excavation. I. Dispose of water removed by dewatering in a manner that avoids endangering public health, property, and portions of work under construction or completed. J. Dispose of water in a manner that avoids inconvenience to others. K. Provide sumps, sedimentation tanks, and other flow -control devices as required by authorities having jurisdiction. L. Provide standby equipment on -site, installed and available for immediate operation, to maintain dewatering on continuous basis if any part of system becomes inadequate or fails. M. If dewatering requirements are not satisfied due to inadequacy or failure of dewatering system, restore damaged structures and foundation soils at no additional expense to Owner. N. Remove dewatering system from Project Site on completion of dewatering. O. Plug or fill well holes with sand or cut off and cap wells a minimum of thirty-six (36) inches below overlying construction. P. Promptly repair damages to adjacent facilities caused by dewatering operations. 3.3 OBSERVATION WELLS A. Provide, take measurements, and maintain at least the minimum number of observation wells or piezometers indicated and additional observation wells as may be required by authorities having jurisdiction. B. Observe and record daily elevation of ground water and piezometric water levels in observation wells. C. Repair or replace, within twenty-four (24) hours, observation wells that become inactive, damaged, or destroyed. D. Suspend construction activities in areas where observation wells are not functioning properly until reliable observations can be made. E. Add or remove water from observation well risers to demonstrate that observation wells are functioning properly. F. Fill observation wells, remove piezometers, and fill holes when dewatering is completed. END OF SECTION Kent Street Water Line Extension 02240-3 May 2017 SECTION 02257 CONTROLLED LOW STRENGTH MATERIAL — FLOWABLE FILL 1.1 WORK INCLUDED A. Furnish labor, materials, equipment, and incidentals necessary to mix and place a flowable mortar fill, consisting ofPortland Cement, fine aggregate, fly ash, and water in the proper proportions as specified herein. Flowable fill shall be used to bed and backfill around piping and utilities where indicated. 1.2 QUALITY ASSURANCE A. Design Criteria; Concrete Proportions and Consistency: 1. Concrete shall be proportioned to give the necessary workability and strength and shall conform to the following governing requirements. 28 Day Min. Cement Fine Max. Water Max. FlyAsh Compressive pounds Per Aggregate Pounds Per Pounds Per Strength -psi CuYd. Pounds Per Cu. Yd. Cu. Yd. (Min -Max) . Cu. Yd. 70-150 50 2720 290 150 2. Fluidity of the flowable mortar shall be measured by the Corps of Engineers flow cone method, according to their specification CRD-C611-80. Prior to filling the flow cone with flowable mortar, the mixture shall be passed through a 1/4-inch screen. Time of efflux shall be approximately 12seconds. B. Factory Testing: The Contractor shall be responsible for the design of the material. A trial mix shall be designed by an independent testing laboratory, retained by the Contractor. The testing laboratory shall submit verification that the materials and proportions of the trial mix design meets the requirement of the specifications. Concrete mix additive such as "Darafill" manufactured by Grace Construction Products or equal products maybe required to achieve the low strength and the flowability requirements. In lieu of trial mix design, Contractor may submit a mix design used successfully in previous similar work, for similar materials for approval by Engineer. The Contractor shall not make changes in materials (gradation, source, brand, or proportions) of the mixture after having been approved, except by specific approval of the Engineer. C. Pre -Job Testing: Pre job testing with actual equipment and intended configuration of concrete sample maybe required to determine whether the material can be excavated. The testing equipment and configuration of concrete sample shall be determined by the Owner's representative. D. Testing: It is the responsibility ofthe Contractor to achieve and maintain the quality ofmaterial required by this specification. However, the Owner may secure the services of an independent testing laboratory to verify the qualityofthe material. The Owner shall have the right to require additional testing, strengthening, or replacement ofconcrete thathas failedto meetthe minimum requirements ofthis section. Kent Street Water Line Extension 02257-1 May 2017 _._ t 1.3 SUBMITTALS A. Submittals shall be in accordance with Section 01300, and shall include a trial mix design on material 1.4 STANDARDS AND REFERENCES A. Materials shall meet recommendation for mix design and placement, as published by National Ready Mixed Concrete Association. B. The applicable provisions of the following references and standards shall applyto this section as ifwritten herein in their entirety. 1. American Societyfor Testing and Materials (ASTM) Standards: ASTM C33 Specifications for Concrete Aggregates ASTM C40 Test Method for Organic Impurities In Fine Aggregates For Concrete ASTM C 150 Specification for Portland Cement ASTM C 618 Specification for F1yAsh and Raw or Calcined Natural Pozzolan for Use as Mineral Admixture in Portland Cement Concrete 2. Federal Specifications: a. COE — (CRD-C611-80). PART 2 —PRODUCTS 2.1 MATERIALS A. Cement: Portland Cement conforming to the specifications and test for Type I Portland Cement per ASTM C4 50 B. Fine Aggregate: Fine aggregate consisting ofnatural, washed and screened sand having clean, hard, strong, durable, uncoated grains complying with the requirements for ASTM C33. The sand shall generally be of such size that all will pass a 3/8-inch sieve, at least 95 percent pass at 1/4-inch screen and at least 80 percent pass a No. 8 sieve. Aggregate shall not contain strong alkali, or organic material that gives a color darkerthan the standard colorwhen tested in accordance with ASTM C40. C. Fly Ash/Pozzolans: Fly ash shall be an ASTM C618, Class "C" fly ash. The fly ash may be used in controlled low -strength material. D. Water: Water for concrete shall be clean and free from oil, acid, alkali, organic matter or other harmful impurities. Water which is suitable for drinking or for ordinary household use will be acceptable for concrete. Where available, water shall be obtained from main of a waterworks system. E. Additive: "Darafill" or approved alternate additive may be required to meet these specifications. Kent Street Water Line Extension 02257-2 May 2017 2.2 MIXES A. In the determination of the amount of water required for mix, consideration shall be given to the moisture content ofthe aggregate. The net amount of water in the mix will be the amount added at the mixer; plus the free water in the aggregate; and minus the absorption of the aggregate, based on a 30 minute absorption period. No water allowance shall be made for evaporation after batching. B. The methods of measurement of materials shall be such that the proportions of water to cement can be closely controlled during the progress of the work and easily checked at any time by the Owner's Representative. To avoid unnecessary or haphazard changes in consistency, the aggregate shall be obtained from sources which will insure a uniform quality and grading during any single day's operation and they shall be delivered to the work and handled in such a manner that the variation in moisture content will not interfere with the steady production of concrete ofreasonable degree ofuniformity. Sources of supply shall be approved by the Owner's Representative. C. All material shall be separately and accurately measured. Measurement may be made by weight or by volume, as determined by the Contractor; however; all equipment for measurement of materials shall be subject to approval by the Owner's Representative. D. The proportions ofthe mix shall be such as to produce material that can be placed readily into the void area without spading orvibrating, and without segregation or undue accumulation of water orlaitance ofthe surface. E. When additive is contained in the concrete mix, the additive ingredients, proportions and placement of the additive shall be per manufacturer's recommendations. PART 3 —EXECUTION 3.1 INSTALLATION A. Contractor shall give the Owner's Representative sufficient advance notice before starting to place material in any area to permit inspection ofthe area and to prepare forpouring. B. Conduct the operation of depositing and compacting the material so as to form a compact, dense, impervious mass. C. Flowable fill shall be placed the full depth into the trenches. The fill shall be brought up uniformly to the elevation shown in the Plans. Flowable fill shall be protected from traffic for a periodof72hours. D. The material shall be placed against undisturbed trench walls, and shall not be placed on or against frozen ground. E. Material shall be placed in lifts or other measures shall be taken to prevent pipe flotation. Material shall be allowed to harden before placing next lift. END OF SECTION Kent Street Water Line Extension 02257-3 May 2017 ; j f �_ i MOAMLIKI ► BSI] EXCAVATION SUPPORT AND PROTECTION PARTI GENERAL 1.1 SUMMARY A. This Section includes temporary excavation support and protection systems. B. Section Includes: (1) Submittals (2) Performance Requirements (3) Project Conditions (4) Materials (5) Preparation (6) Sheet Piling (7) Trench Boxes (8) Trenching Procedures 1.2 SUBMITTALS A. Shop Drawings for Information: (1) Prepared by or under the supervision of a qualified Professional Engineer for excavation support and protection systems. (2) Include Shop Drawings signed and sealed by a Texas Licensed Professional Engineer responsible for their preparation. B. Qualification data for installer and Professional Engineer. C. Photographs or videotape, sufficiently detailed, of existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by the absence of, the installation of, or the performance of excavation support and protection systems. 1.3 PERFORMANCE REQUIREMENTS A. Design, furnish, install, monitor, and maintain excavation support and protection system capable of supporting excavation sidewalls and of resisting soil and hydrostatic pressure and superimposed and construction loads. B. Provide professional engineering services needed to assume engineering responsibility, including preparation of Shop Drawings and a comprehensive engineering analysis by a qualified Professional Engineer. C. Prevent surface water from entering excavations by grading, dikes, or other means approved by the Engineer. D. Install excavation support and protection systems without damaging existing buildings, pavements, and other improvements adjacent to excavation. 1.4 PROJECT CONDITIONS A. Existing Utilities: (1) Do not interrupt utilities serving facilities occupied by Owner or others unless permitted in writing by the Engineer and then only after arranging to provide temporary utility services according to requirements indicated. Kent Street Water Line Extension 02260-1 May 2017 B. Project Site Information: (1) Survey adjacent structures and improvements, employing a qualified professional engineer or land surveyor, establishing exact elevations at fixed points to act as benchmarks. (2) Clearly identify benchmarks and record existing elevations. (3) During installation of excavation support and protection systems, regularly resurvey benchmarks, maintaining an accurate log of surveyed elevations and positions for comparison with original elevations and positions. (4) Promptly notify the Engineer if changes in elevations or positions occur, or if cracks, sags, or other damage is evident in adjacent construction. PART PRODUCTS 2.1 MATERIALS A. Provide materials that are either new or in serviceable condition. B. Structural Steel: ASTM A36/A 36M, ASTM A690/A 690 M, ASTM A 992/ A 992M. C. Steel Sheet Piling: ASTM A 328/A 328M, ASTM A 572/ A 572M, or ASTM A690/ A 690M; with continuous interlocks. PART 3 EXECUTION 3.1 PREPARATION A. Project structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards that could develop during excavation support and protection systems operations. B. Shore, support, and protect utilities encountered. C. Install excavation support and protection systems to ensure minimum interference with roads, streets, walks, and other adjacent occupied and used facilities. D. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. (1) Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction. E. Locate excavation support and protection systems clear of permanent construction so that forming and finishing of concrete surfaces is not impeded. F. Monitor excavation support and protection systems daily during excavation progress and for as long as excavation remains open. G. Promptly correct bulges, breakage, or other evidence of movement to ensure that excavation support and protection systems remain stable. H. Promptly repair damages to adjacent facilities caused by installing excavation support and protection systems. 3.2 SHEET PILING A. Before starting excavation, install one-piece sheet piling lengths and tightly interlock to form a continuous barrier. B. Limit vertical offset of adjacent sheet piling to sixty (60) inches. C. Accurately align exposed faces of sheet piling to vary not more than two (2) inches from a horizontal line and not more than 1:120 out of vertical alignment. Kent Street Water Line Extension 02260-2 May 2017 D. Cut tops of sheet piling to uniform elevation at top of excavation. 3.3 TRENCH BOXES A. Provide Engineer approved trench boxes sufficient for depth and width of open -cut trench. B. All exposed trench shall be protected. 3.4 TRENCHING PROCEDURES A. Provide shoring systems in accordance with the Contractor's submitted design to adequately resist earth pressures. B. Proceed with work in an orderly fashion. C. Install trench bracing systems as soon as possible after opening trenches. D. Do not allow workers in trench prior to installing trench bracing systems. E. Backfill trenches as soon as possible after completion of work. F. Stockpile excavated materials at three (3) feet away from edge of trench. G. Maintain barricades and signage as required by State and Local codes to protect open excavations. H. Do not allow surface water to enter excavations. I. Properly grade areas adjacent to trench excavations to control surface drainage away from excavations. J. If cut back method is allowed by Owner and is employed, maintain a clear distance of three (3) feet from edge of cut to avoid allowing loose material to enter trench. K. Cut back method may not be used where there is insufficient work area to employ it. L. Do not operate heavy equipment except for trench digging or pipe laying equipment within twenty (20) feet of edge of excavation. M. Haul trucks, if needed, may operate closer than twenty (20) feet to trench edge provided the Contractor deems it safe to do so. 3.5 REMOVAL AND REPAIRS A. Remove excavation support and protection systems when construction has progressed sufficiently to support excavation and bear soil and hydrostatic pressures. B. Remove in stages to avoid disturbing underlying soils or damaging structures, pavements, facilities, and utilities. END OF SECTION Kent Street Water Line Extension 02260-3 May 2017 SECTION 02317 EXCAVATION AND BACKFILL FOR UTILITIES PART 1 GENERAL 1.1 SUMMARY A. This section of the specifications includes information on excavation, trenching, foundation, embedment, and backfill for installation of utilities, including manholes and pipeline structures. B. Section Includes: (1) Definitions (2) References (3) Scheduling (4) Submittals (5) Tests (6) Equipment (7) Material Classifications (8) Accessories (9) Installation (10) Preparation (11) Protection (12) Excavation (13) Handling Excavation Materials (14) Trench Foundation (15) Ground Water Control (16) Pipe Embedment, Placement and Compaction (17) Trench Zone Backfill, Placement and Compaction (18) Field Quality Control (19) Disposal of Excess Material 1.2 DEFINITIONS A. Pipe Foundation — Suitable and stable native soils that are exposed at the trench subgrade after excavation to depth of bottom of the bedding as shown on the Drawings, or foundation backfill material placed and compacted in over -excavations. B. Pipe Bedding — The portion of trench backfill that extends vertically from top of foundation up to a level line at bottom of pipe, and horizontally under one-third of the pipe O.D. C. Haunching — The material placed on either side of the pipe from the foundation to the springline of the pipe for rigid wall pipe, and horizontally from one trench sidewall to opposite sidewall, excluding the bedding section as shown on the plans. D. Initial Backfill — The portion of trench backfill that extends vertically from the top of haunching or cement stabilized backfill up to a level line immediately below pavement subgrade, and horizontally from on trench sidewall to opposite sidewall. E. Pipe Embedment — The portion of trench backfill that consists of bedding, haunching, and initial backfill. Kent Street Water Line Extension 02317-1 May 2017 F. Trench Zone — The portion of trench backfill that extends vertically from top of pipe embedment up to a line immediately below pavement subgrade or up to final grade when not beneath paving. G. Backfill — Suitable material meeting specified quality requirements, placed and compacted under controlled conditions. H. Ground Water Control Systems — Installations external to trench, such as well points, eductors, or deep wells. Ground water control includes dewatering to lower ground water, intercepting seepage which would otherwise emerge from side or bottom of trench excavation, and depressurization to prevent failure or heaving of excavation bottom. Refer to Section 02240 — Dewatering. I. Surface Water Control — Diversion and drainage of surface water runoff and rain water away from trench excavation. Rain water and surface water accidentally entering trench shall be controlled and removed as a part of excavation drainage. J. Excavation Drainage — Removal of surface and seepage water in trench by sump pumping or other approved means. K. Trench Conditions are defined with regard to the stability of trench bottom and trench walls of pipe embedment zone. Maintain trench conditions that provide for effective placement and compaction of embedment material directly on or against undisturbed soils or foundation backfill, except where structural trench support is necessary. L. Dry Stable Trench — Stable and substantially dry trench conditions exist in pipe embedment zone as a result of typically dry soils or achieved by ground water control (dewatering or depressurization) for trenches extending below ground water level. M. Stable Trench with Seepage — Stable trench in which ground water seepage is controlled by excavation drainage. N. Stable Trench with Seepage in Clayey Soils — Excavation drainage is provided in lieu of or to supplement ground water control systems to control seepage and provide stable trench subgrade in predominately clayey soils prior to bedding placement. O. Stable Wet Trench in Sandy Soils — Excavation drainage is provided in the embedment zone in combination with ground water control in predominately sandy or silty soils. P. Unstable Trench — Unstable trench conditions exist in the pipe embedment zone if ground water inflow or high water content causes soil disturbances, such as sloughing, sliding, boiling, heaving, or loss of density. Q. Subtrench — Subtrench is a special case of benched excavation. Subtrench excavation below trench shields or shoring installations may be used to allow placement and compaction of foundation or embedment materials directly against undisturbed soils. Depth of a subtrench depends upon trench stability and safety as determined by the Contractor. R. Over -Excavation and Backfill — Excavation of subgrade soils with unsatisfactory bearing capacity or composed of otherwise unsuitable materials below top of foundation as shown on Drawings, and backfilled with foundation backfill material. S. Foundation Backfill Materials — Natural soil or manufactured aggregate of controlled gradation, to control drainage and material separation. Foundation backfill material is placed and compacted as backfill to provide stable support for bedding. T. Trench Safety Systems include both protective systems and shoring systems as defined in Section 02260 — Excavation Support and Protection U. Trench Shield (Trench Box) — A portable worker safety structure moved along the trench as work proceeds, used as a protective system and designed to withstand forces imposed on it by Kent Street Water Line Extension 02317-2 May 2017 cave-in, thereby protecting persons within the trench. Trench shields may be stacked if so designed or placed in a series depending on depth and length of excavation to be protected. V. Shoring System — A structure that supports sides of an excavation to maintain stable soil conditions and prevent cave-ins, or to prevent movement of the ground affecting adjacent installations or improvements. 1.3 REFENCES A. ASTM D 558 — Test Methods for Moisture -Density Relations of Soil Cement Mixtures. - B. ASTM D 698 — Test Methods for Moisture -Density Relations of Soils and Soil -Aggregate Mixtures Using 5.5-lb. Rammer and 12 inch Drop. C. ASTM D 1556 — Test Method for Density in Place by the Sand -Cone Method. D. ASTM D 2487 — Classification and Soils for Engineering Purposes. E. ASTM D 2922 — Test Method for Density of Soil and Soil -Aggregate in Place by Nuclear -_ Methods (Shallow Depth). F. ASTM D 3017 — Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth). -f G. ASTM D 4318 — Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils. H. TxDOT Tex- 101-E — Preparation of Soil and Flexible Base Materials for Testing. I. TxDOT Tex- 110-E — Determination of Particle Size Analysis of Soils. J. Federal Regulations, 29 CFR Part 1926, Standards -Excavation, Occupational Safety and Health Administration (OSHA). 1.4 SCHEDULING A. Schedule work so that pipe embedment can be completed on the same day that acceptable foundation has been achieved for each section of pipe installation, manhole, or other 1.5 SUBMITTALS structures. A. Conform to Section 01300 — Submittal Procedures B. Submit a written description for information only of the planned typical method of Ll excavation, backfill placement, and compaction, including: (1) Sequence of work and coordination of activities. (2) Selected trench widths and dimensions of excavations. (3) Procedures for foundation and embedment placement, and compaction. (4) Procedure for use of trench boxes and other pre -manufactured systems while assuring j specified compaction against undisturbed soils.] C. Submit backfill material sources and product quality information in accordance with requirements of Section 02320 — Utility Backfill Materials. D. Submit record of location of pipe as installed, referenced to the TxDOT coordinate system._ (1) Include locations of utilities encountered that are not shown on drawings or rerouted for the convenience of the Contractor. (2) Give stations, coordinates, elevations, inverts, and gradients of installed pipe, casing, etc.-' E. Submit field density tests of trench backfill F. Submit laboratory density compaction curves for each material. J 1.6 TESTS C_ Kent Street Water Line Extension 02317-3 May 2017 t _ A. The Contractor is to perform backfill material source qualification testing in accordance with requirements of Section 02320 — Utility Backfill Materials. B. The Contractor shall have a competent, separate agency perform field density tests of trench backfill representative of each 200 linear feet of trench and each compacted layer. PART 2 PRODUCTS 2.1 EQUIPMENT A. Perform excavation with hydraulic excavator or other equipment suitable for achieving the requirements of this Section. B. Use only hand -operated tamping equipment until a minimum cover of twelve (12) inches is obtained over pipes, conduits, and ducts. C. Do not use heavy compacting equipment until adequate cover is attained to prevent damage to pipes, conduits, or ducts. D. Do not use vibratory equipment until five (5) feet of cover over pipes, conduits, or ducts is obtained. E. Do not use vibratory equipment if adjacent structures could be affected. F. Use trench shields or other protective systems or shoring systems which are designed and operated to achieve placement and compaction of backfill directly against undisturbed native soil. 2.2 MATERIAL CLASSIFICATIONS A. Embedment and Trench Zone Backfill Materials: Conform to classifications and product descriptions of Section 02320 — Utility Backfill Materials. 1 2.3 ACCESSORIES A. Warning Tape: Install twelve (12) inches below finished grade acid and alkali resistant polyethylene film warning tape manufactured for marking and identifying underground utilities, six (6) inches wide and four (4) mils thick, continuously inscribed with a description of the utility; colored as follows: (1) Red —Electric (2) Yellow — Gas, oil, steam, and dangerous materials. (3) Orange — Telephone and other communications. (4) Blue — Water systems. (5) Green — Sewer systems. B. Locator Wire: Install continuously coated ten (10) gauge locating wire as indicated on Plans. PART 3 EXECUTION 3.1 INSTALLATION A. Install flexible pipe to conform to the trench details shown in the drawings. B. Install rigid pipe to conform to the trench details shown in the drawings. 3.2 PREPARATION Kent Street Water Line Extension 023174 May 2017 v A. Establish traffic control to conform to requirements of Section 01555 — Barricades, Signs, and Traffic Handling and the drawings. B. Perform work to conform to applicable safety standards and regulations. C. Employ a trench safety system as specified in Section 02260 — Excavation Support and Protection. D. Immediately notify the agency or company owning any existing utility line which is damaged, broken, or disturbed. E. Obtain approval from the Engineer and agency for any repairs or relocations, either temporary or permanent. F. Remove existing pavements and structures, including sidewalks and driveways, to conform to requirements of Section 02220 — Demolition, Removal, and Salvaging of Existing Material. G. Maintain permanent benchmarks, monumentation and other reference points, and unless otherwise directed in writing, replace those which are damaged or destroyed. 3.3 PROTECTION A. Protect trees, shrubs, lawns, existing structures, and other permanent objects outside of the construction limits. B. Protect and support above grade and below grade utilities, which are to remain. C. Restore damaged permanent facilities to pre -construction conditions unless replacement or abandonment of facilities are indicated on the Drawings. D. Take measures to minimize erosion of trenches and excavations. E. Do not allow water to pond in trenches or excavations. F. Where slides, washouts, settlements, or areas with loss of density or pavement failures or potholes occur, repair, recompact, and pave those areas at no additional cost to the Owner. G. The Contractor shall locate all existing underground lines, whether or not they are shown on the Drawings, sufficiently in advance of trenching operations to prevent any damage thereto. H. Verification of location, size, and burial depth of existing utilities shall be the complete responsibility of the Contractor. I. The Contractor is responsible for notifying pipeline and cable utility owners of the intention to cross said utility no less than seven (7) days prior to crossing the utility. J. Coordinate vertical separation requirements with utility owners and any other special construction considerations. K. Notify the Engineer if required changes in the vertical profile shown on the Drawings prior to constructing these changes. L. Trench digging machinery may be used to make the trench excavations except in places where operation of same would cause damages to pipelines, fences, or other existing structures either above or below ground; in such instances hand methods shall be employed. 3.4 EXCAVATION A. Perform excavation work so that pipe, conduit, or ducts can be installed to depths and alignments shown on the Drawings. B. Avoid disturbing surrounding ground and existing facilities and improvements. C. Determine trench excavation widths based on the requirements shown on the plans. D. Use sufficient trench width or benches above the embedment zone for installation of well point headers or manifolds and pumps where depth of trenches makes it uneconomical or impractical to pump from the surface elevation. Kent Street Water Line Extension 02317-5 May 2017 E. Provide sufficient space between shoring cross braces to permit equipment operations and handling of forms, pipe, embedment and backfill, and other materials. F. Upon discovery of unknown utilities, badly deteriorated utilities not designated for removal, or concealed conditions, discontinue work at that location. Notify the Engineer and obtain instructions before proceeding. G. Shoring of Trench Walls: (1) Install special shoring in advance of trench excavation or simultaneously with the trench excavation, so that the soils within the full height of the trench excavation walls will remain laterally supported at all times. (2) For all types of shoring, support trench walls in the pipe embedment zone throughout the installation. (3) Provide trench wall supports sufficiently tight to prevent washing the trench wall soil out behind the trench wall support. (4) Unless otherwise directed by the Engineer, leave sheeting driven into or below the pipe embedment zone in place to preclude loss of support of foundation and embedment materials. (5) Leave rangers, wafers, and braces in place as long as required to support the sheeting, which has been cut off, and the trench wall in the vicinity of the pipe zone. (6) Employ special methods for maintaining the integrity of embedment or foundation material. (7) Before moving supports, place and compact embedment to sufficient depths to provide protection of pipe and stability of trench walls. (8) As supports are moved, finish placing and compacting embedment. (9) If sheeting or other shoring is used below top of the pipe embedment zone, do not disturb pipe foundation and embedment materials by subsequent removal. (10) Maximum thickness of removable sheeting extending into the embedment zone shall be the equivalent of a one (1) inch thick steel plate. (11) Fill voids left on removal of supports with compacted backfill material. H. Wherever necessary to prevent caving, the trench shall be adequately supported as required by the Drawings and Specifications. I. The Contractor is entirely responsible for assuring that trenches are adequately supported to protect both the workers and the public. J. Use of Trench Shields/Trench Boxes: (1) Make trench excavations of sufficient width to allow shield to be lifted or pulled feely, without damage to the trench sidewalls. (2) Move trench shields so that pipe, and backfill materials, after placement and compaction, are not damaged or disturbed, or the degree of compaction reduced. (3) When required, place, spread, and compact pipe foundation and bedding materials beneath the shield. (4) For backfill above bedding, lift the shield as each layer of backfill is placed and spread. (5) Place and compact backfill materials against undisturbed walls and foundation. (6) Maintain trench shield in position to allow sampling and testing to be performed in a safe manner. (7) Contractor shall provide trench shield for Owner's tests within the trench as required in paragraph 3.11.13 Kent Street Water Line Extension 02317-6 May 2017 3.5 HANDLING EXCAVATION MATERIALS A. Use only excavated materials which are suitable as defined in this Section and conforming to Section 02320 — Utility Backfill Materials. B. Place material suitable for backfilling in stockpiles at a distance from the trench to prevent slides or cave-ins. C. Do not place stockpiles of excess excavated materials on streets and adjacent properties. D. Protect excess stockpiles for use on site. E. Maintain site conditions in accordance with Section 01500 — Temporary Facilities and Controls. 3.6 TRENCH FOUNDATION A. The trench shall be excavated to an even grade so that the bottom of the pipe will rest on the bottom of the trench over the entire length of the pipe. B. Any part of the trench excavated below grade shall be corrected by filling with approved material and compacting thoroughly. C. If ledge rock, rock fragments, or other unyielding material is encountered in the bottom of the trench, it shall be removed to a depth of six (6) inches below grade, refilled with selected material, and thoroughly compacted. D. Bell holes of ample dimensions shall be dug at each joint to permit the jointing of pipe to be made properly, and of sufficient depth to prevent the bell of the pipe from resting on undisturbed materials. 3.7 GROUND WATER CONTROL A. Should ground water become an issue, refer to Section 02240 — Dewatering. B. Provide a stable trench to allow installation in accordance with the Specifications. 3.8 PIPE EMBEDMENT, PLACEMENT AND COMPACTION A. Immediately prior to placement of embedment materials, the bottoms and sidewalls of trenches shall be free of loose, sloughing, caving, or otherwise unsuitable soil. B. Place embedment including bedding, haunching, and initial backfill as shown on the Drawings. C. For pipe installation, manually spread embedment materials around the pipe to provide uniform bearing and side support when compacted. D. Do not allow materials to free -fall from heights greater than twenty-four (24) inches above top of pipe. E. Perform placement and compaction directly against the undisturbed soils in the trench sidewalls, or against sheeting which is to remain in place. F. Do not place trench shields or shoring within height of the embedment zone unless means to maintain the density of compacted embedment material are used. G. If moveable supports are used in embedment zone, lift the supports incrementally to allow placement and compaction of the material against undisturbed soil. H. Do not damage coatings or wrappings of pipes during backfilling and compacting operations. L When embedding coated or wrapped pipes, do not use crushed stone or other sharp, angular aggregates. J. Place haunching material manually around the pipe and compact it to provide uniform bearing and side support. Kent Street Water Line Extension 02317-7 May 2017 K. If necessary, hold small -diameter or lightweight pipe in place with sand bags or other suitable means during compaction of haunch areas and placement beside the pipe. L. Shovel in -place and compact embedment material using pneumatic tampers in restricted areas, and vibratory -plate compactors or engine -powered jumping jacks in unrestricted areas. M. Compact each lift before proceeding with placement of the next lift. N. Water tamping and water jetting are not allowed. O. For flowable fill, such as cement stabilized backfill, vibrate flowable backfill with concrete vibrator to consolidate material under haunches. P. Install specified location tape and wire as shown on the drawings and per paragraphs 2.3.A and 2.3.B. 3.9 TRENCH ZONE BACKFILL, PLACEMENT AND COMPACTION A. Place backfill for pipe or conduits and restore as soon as practicable. B. Leave only the minimum length of trench open as necessary for construction. C. Maximum allowed open trench is limited to 200 feet unless otherwise approved by the Owner. D. Where damage to completed pipe installation work is likely to result from withdrawal of sheeting, leave the sheeting in place. (1) Cut off sheeting two (2) feet or move above the crown of the pipe. (2) Remove trench supports within five (5) feet from the ground surface. E. Place trench zone backfill in lifts and compact by methods selected by the Contractor. F. Fully compact each lift before placement of the next lift. G. Cement Stabilized Backfill/Lean Concrete Backfill: (1) Place in depths as shown on plans. (2) Use vibratory equipment to ensure placement under the haunches of the pipe. (3) Backfilling of the remaining trench depth after cement stabilized backfill has been placed shall not commence until the in -place cement stabilized backfill has attained a penetration resistance reading of at least thirty (30) when measured with a soil penetrometer according to ASTM D 1558 and using a one -tenth square inch needle. (4) This equates to a penetration resistance of approximately 300 pounds per square inch. (5) This is not a strength requirement of the cement -stabilized backfill, but a measure of the degree of curing of the cement stabilized backfill. (6) After a penetrometer reading of 30 is obtained on the cement stabilized backfill, then compacted backfill operations may commence. (7) The Contractor shall furnish and have on site a calibrated ASTM D 1558 soil penetrometer with one -tenth square inch needle. (8) The Contractor shall take no less than four (4) penetrometer readings, equally spaced on both sides of the pipe (8 readings total) in accordance with ASTM D 1558, for each day's trench length that is planned for controlled density backfill operations. (9) Such readings shall be taken prior to commencing backfill operations. H. Bedding Material: (1) Sand bedding shall be loosely placed in trench as shown on the Drawings. I. Gravel Embedment: (1) Place in depths as shown on plans Kent Street Water Line Extension 02317-8 May 2017 t (2) Use vibratory equipment or shovel slicing to ensure placement under the haunches of the pipe. J. Native Material/Borrow Material (Pipe Installation): (1) Maximum lift thickness determined by Contractor to achieve uniform placement and required compaction, but not exceeding eight (8) inches. (2) Compaction by trench sheep's foot or by vibratory equipment to provide backfill densities at least equivalent to the surrounding undisturbed material or ninety-five (95) percent of the maximum dry density determined according to ASTM D 698. (3) Use of vibratory equipment limited as specified in paragraph 2.1. (4) Moisture content within two (2) percent of optimum determined according to ASTM D 698. K. Topsoil: ` (1) Maximum lift thickness determined by Contractor to achieve uniform placement and required compaction, but not exceeding eight (8) inches. (2) Compaction by trench sheep's foot or by vibratory equipment to provide backfill _f densities at least equivalent to the surrounding undisturbed material or ninety-five (95) percent of the maximum dry density determined according to ASTM D 698. (3) Use of vibratory equipment limited as specified in paragraph 2.1. (4) Moisture content within two (2) percent of optimum determined according to ASTM D 698. 3.10 MANHOLES, JUNCTION BOXES, AND OTHER PIPELINE STRUCTURES A. Meet the requirements of adjoining utility installations for backfill of pipeline structures, as shown on the Drawings. 3.11 FIELD QUALITY CONTROL A. Test for material source qualifications as defined in Section 02320 — Utility Backfill Materials. B. Provide excavation and trench safety systems at locations and to depths required for testing and retesting during construction at no additional cost to the Owner. C. Tests will be performed by the Contractor on a minimum of three (3) different samples of each material type for plasticity characteristics, in accordance with ASTM D 4318, and for gradation characteristics, in accordance with Tex- 101-E and Tex- 110-E. Additional classification tests will be performed whenever there is a noticeable change in material gradation or plasticity. D. At least three (3) tests for moisture -density relationships will be performed initially for backfill materials in accordance with ASTM D 698. Additional moisture -density relationship tests will be performed whenever there is a noticeable change in material gradation or plasticity. E. The Contractor shall perform in -place density tests of compacted pipe foundation, i '' embedment, and trench zone backfill soil materials will be performed according to ASTM D 1556, or ASTM D 2922 and ASTM D 3017, and at the following frequencies and conditions. i 4 F. A minimum of one test for every 200 linear feet of compacted trench zone backfill material for each compacted layer._ G. Density tests will be distributed around the placement areas. Placement areas are foundation, bedding, haunching, initial backfill, and trench zone. 1 L_ Kent Street Water Line Extension 02317-9 May 2017 i [i H. The number of tests will be increased if compacting effort is variable and not considered sufficient to attain uniform density, as specified. I. Density tests may be performed at various depths below the fill surface by pit excavation. Material in previously placed lifts may therefore be subject to acceptance/rejection. J. Two (2) verification tests will be performed adjacent to in -place tests showing density less than the acceptance criteria. Placement will be rejected unless both verification tests show acceptable results. K. Recompacted placement will be retested at the same frequency as the first test series, including verification tests. L. Recondition, recompact, and retest at Contractor's expense if tests indicate Work does not meet specified compaction requirements. For hardened cement stabilized backfill with nonconforming density, core and test for compressive strength at Contractor's expense. - M. Acceptability of crushed rock compaction will be determined by inspection. -- 3.12 DISPOSAL OF EXCESS MATERIAL A. Dispose of excess materials in accordance with requirements of Section 01576 —Waste Material Disposal. END OF SECTION Kent Street Water Line Extension 02317-10 May 2017 SECTION 02320 UTILITY BACKFILL MATERIALS PART1 GENERAL 1.1 SUMMARY A. This Section of the specification covers materials related to the backfill of utilities. B. Section Includes: (1) "Concrete" sand (for use as pipe bedding). (2) Native soil materials. (3) Topsoil. (4) Crushed stone. (5) Cement stabilized backfill. C. Related Sections: (1) Drawings and General Provisions of the Contract, including General and Supplementary Conditions and other Division 1 specification sections apply to this section. (2) Section 01300 — Submittal Procedures (3) Section 01400 — Quality Requirements (4) Section 02317 — Excavation and Backfill for Utilities. 1.2 DEFINITIONS A. Refer to Section 02317 — Excavation and Backfill for Utilities. 1.3 REFENCES A. ASTM C 33 — Specification for Concrete Aggregate. B. ASTM C 40 — Test Method for Organic Impurities in Fine Aggregates for Concrete. C. ASTM C 123 — Test Method for Lightweight Pieces in Aggregate. D. ASTM C 131 — Test Method for Resistance to Degradation of Small -Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine. E. ASTM C 136 — Test Method for Sieve Analysis of Fine and Coarse Aggregates. F. ASTM C 142 — Test Method for Clay Lumps and Friable Particles in Aggregates. G. ASTM D 698 — Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lb/ft3). H. ASTM D 1140 — Test Method for Amount of Materials in Soils Finer Than Number 200 Sieve. 1. ASTM D 2487 — Classification of Soils for Engineering Purposes (Unified Soil Classification System). J. ASTM D 2488 — Standard Practice for Description and Identification of Soils (Visual -Manual Procedure). K. ASTM D 4318 — Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils. L. ASTM D 4643 — Method for Determination of Water (Moisture) Content of Soil by the Microwave Oven Method. M. TxDOT Tex- 101-E — Preparation of Soil and Flexible Base Materials for Testing. N. TxDOT Tex-104-E — Test Method for Determination of Liquid Limit of Soils (Part 1). O. TxDOT Tex-106-E — Test Method — Methods of Calculating Plasticity Index of Soils. Kent Street Water Line Extension 02320-1 May 2017 1 C, P. TxDOT Tex- 110-E —Determination of Particle Size Analysis of Soils. 1.4 SUBMITTALS A. Conform to Section 01300 — Submittal Procedures. B. Submit a description of source, material classification and product description, production method, and application of backfill materials. C. Submit test results for samples of off -site backfill materials. D. For each delivery of material, provide a delivery ticket which includes source location. 1.5 TESTS A. Perform tests of sources for off -site backfill material. B. Verification tests of backfill materials may be performed by the Owner, at the Owner's expense; however, failing tests will be charged to the Contractor. PART 2 PRODUCTS 2.1 MATERIAL DESCIRPTIONS A. "Concrete" Sand (1) Coarse -grained, well -graded, sand (natural, manufactured, or a combination of both) conforming to requirements of ASTM C 33. (2) Gradation shall conform to ASTM C 136 and the following limits. Sieve Percent Passing 3/8" 100 No. 4 95 to 100 No. 8 80 to 100 No. 16 50 to 85 No. 30 25 to 60 No. 50 10 to 30 No. 100 2 to 10 B. Native Soil Material for Backfill (1) Provide backfill material that is free of stones greater than six (6) inches, free of roots, waste, debris, trash, organic material, unstable material, non -soil matter, hydrocarbons, or other contamination. C. Topsoil (1) Provide topsoil material that is free of stones greater than three (3) inches, free of roots, waste, debris, trash, organic matter, unstable material, non -soil matter, hydrocarbons, or other contamination. (2) Surface should be made clear of rock and other debris before planting. (3) Use top two (2) feet of excavated material for topsoil backfill. This material shall be set aside to prevent mixing with other excavated material. Topsoil is only required in non - paved areas. D. Gravel Embedment _ (1) Gravel embedment shall be free of waste, trash, debris, organic material, unstable material, and other non -gravel matter. (2) Provide gravel embedment that meets the following gradation requirements: �3 Kent Street Water Line Extension 02320-2 May 2017 Sieve Percent Retained 3/8" 0 No. 4 5 to 15 No. 10 50 to 90 No. 40 90 to 100 (3) A minimum of four inches of gravel embedment will be placed under the pipe. This material will be used for backfill to the top of the pipe. This material MUST be shovel sliced to the haunch of the pipe and mechanically tamped to midpoint of the pipe. E. Cement Stabilized Backfill (1) Cement Content — 2 sack mix per cubic yard. (2) Water/Cement Ratio — 0.60. (3) Maximum aggregate size shall not exceed one and one half (1.5) inch diameter for backfilling pipe sizes forty-eight (48) inches and greater in diameter. (4) Maximum aggregate size shall not exceed one (1) inch diameter for backfilling sizes less than forty-eight (48) inches in diameter. 2.2 MATERIAL TESTING A. Ensure that material selected, produced, and delivered to the project meets applicable specifications and is of sufficiently uniform properties to allow practical construction and quality control. B. Source or Supplier Qualification: Perform testing, or obtain representative tests by suppliers, for selection of material sources and products. Provide test results for a minimum of three (3) samples for each source and material type. Tests samples of processed materials from current production representing material to be delivered. Tests shall verify that the materials meet specification requirements. Repeat qualification test procedures each time the source characteristic changes or there is a planned change in source location or supplier. Qualification tests shall include, as applicable: (1) Gradation: Complete sieve analyses shall be reported regardless of the specified control sieves. The range of sieves shall be from the largest particle through the No. 200 sieve. (2) Plasticity of material passing the No. 40 sieve. (3) Clay lumps. (4) Lightweight pieces. (5) Organic impurities. C. Production Testing: Provide reports to the Engineer from an independent testing laboratory that backfill materials to be placed in the Work meet applicable specification requirements. D. Native material requires testing only when questionable material is encountered. PART 3 3.1 SOURCES EXECUTION A. Use of material encountered in the trench excavations is acceptable, provided applicable specification requirements are satisfied. If excavation material is not acceptable, provide from other approved source. Top two (2) feet of excavated material shall be used as topsoil. B. Identify off -site sources for backfill material at least fourteen (14) days ahead of intended use so that the Engineer may obtain samples from verification testing. t f; Kent Street Water Line Extension 02320-3 May 2017 { i C. Obtain approval for each material source by the Engineer before delivery is started. If sources previously approved do not produce uniform and satisfactory products, furnish materials from other approved sources. Materials may be subjected to inspection or additional verification testing after delivery. Materials which do not meet the requirements of the specifications will be rejected. Do not use material which, after approval, has become unsuitable for use due to segregation, mixing with other materials, or by contamination. Once a material is approved by the Engineer, expense for sampling and testing required to change to a different material will be at the Contractor's expense with no additional cost to the Owner. 3.2 MATERIAL HANDLING A. Establish temporary stockpile locations as practical for material handling and control. B. Cement stabilized backfill shall be consolidated upon placement by using concrete vibrators to ensure filling of voids, filling around and under haunches of pipe and filling of spaces between corrugations. Vibration shall not be applied to the utility pipe itself. 3.3 FIELD QUALITY CONTROL A. Quality Control (1) The Engineer may sample and test backfill at: i. Sources including borrow pits, production plants, and Contractor's designated off -site stockpiles. ii. On -site stockpiles. iii. Materials placed in the Work. (2) The Engineer may resample material at any stage of work or location if changes in characteristics are apparent. B. Production Verification Testing: The Owner's testing laboratory will provide verification testing on backfill materials, as directed by the Engineer. Samples may be taken at the source or at the production plant, as applicable. Contractor shall cooperate with the Owner and Engineer in allowing access to materials. END OF SECTION Kent Street Water Line Extension 02320-4 May 2017 SECTION 02445 BORING AND ENCASING PART1 GENERAL 1.1 WORK COVERED BY CONTRACT DOCUMENTS A. The section covers utility bores and placing steel encasement in open cut trenches. B. The encasement will be installed at the locations indicated on the attached plans. C. The contractor will be responsible for providing all labor, materials, equipment and incidentals necessary to accomplish the following: (1) Construction of the bore and bore pits or trench cut. (2) Installing the appropriate steel casing. (3) Installing the water supply pipe in the steel casing using the pipe manufactures recommended practices. (4) Backfill all excavations. (5) All traffic barricading and control. (6) All trench safety requirements. (7) Implementing a best management plan for the control of storm water runoff 1.2 CONTRACTOR USE OF SITE A. Limit use of site to allow: (1) Owner occupancy. (2) Contractor. B. Coordinate use of site under direction of Owner's Representative. C. Execute Work in a coordinated manner to avoid conflicts with Owner's operations or other Contractors. D. Move any stored products under Contractor's control, which interfere with operations of (1) Owner. E. Assume full responsibility for the protection and safekeeping of products furnished under this contract, stored on or off the site. A. Construct Work to accommodate Owner's occupancy requirements during the construction period. B. Sequence and schedule shall balance Owner's occupancy and the requirements of adjacent utility work and construction schedules of other government agencies, however, Contractor's coordination for construction schedule and operations shall be with the Engineer or the Owner's Representative only. 1.4 SUBMITTALS A. Provide written plan with methods and materials to be used in bore and casing process. B. Provide shop drawings or manufacturer literature for casing spacers; include drawings of proposed locations within pipe casing. Lift Station 46 Force Main Relocation 02445 — 1 August 2016 1.5 STANDARDS A. All work shall be accomplished in accordance with the following standards: (1) AWWA C-206 "Field Welding of Steel Water Pipe" (2) AWWA C-210 "Liquid Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines" (3) AASHTO M-190 "Bituminous Coated Corrugated Metal Culvert Pipe and Pipe Arches" (4) AASHTO Standard Specifications for Highway Bridges, 1993. (5) ASTM A-36 "Carbon Structural Steel" (6) ASTM A-123 "Zinc (Hot Dipped Galvanized) Coatings on Iron and Steel Products" (7) ASTM A-135 "Electric — Resistance — Welded Steel Pipe" (8) ASTM A-139 `Electric — Fusion (Arc) — Welded Steel Pipe" (NPS4 and over) (9) ASTM A-153 "Zinc (Hot Dipped Galvanized) on Iron and Steel Hardware" (10) ASTM A-307 "Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength" (11) ASTM A-449 "Quenched and Tempered Steel Bolts and Studs" (12) ASTM A-568/M "Steel, Carbon, and High Strength, Low Alloy, Hot -Rolled and Cold - Rolled for Commercial Quality" (13) ASTM C-76 "Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe" (14) ASTM D-4254 "Test Methods for minimum Index Density of Soils and Calculations of Relative Density" B. Additional standards contained in the City of Lubbock Public Works Engineering Design Standards and Specifications handbook also apply. 1.6 QUALITY ASSURANCE A. Installer's Qualifications (1) Installers shall be competent and experienced in boring work of equal scope. (2) Installers shall provide proof of successful, related work experience with references. B. Job Conditions (1) Where work is in the right-of-way of any government or corporate jurisdiction, the i Owner will secure the appropriate permits or easements. The Contractor shall observe regulations, instructions and limitations of each right-of-way owner. Coordination shall be through Owner's representative. (2) Excavated material shall be kept off of roads and railroad tracks at all times. (3) No blasting is allowed at any time. (4) The Contractor shall protect existing pipelines and utilities. The Contractor shall verify location and elevation of all pipelines, power lines and communication cable in the construction area prior to execution. Verification of existing pipe and cable utilities shall be the sole responsibility of the Contractor. 1.7 OWNER OCCUPANCY A. Cooperate with Owner to minimize conflict, and to facilitate Owner's and other Contractor's operation. B. Schedule the Work to accommodate this requirement. Kent Street Water Line Extension 02445 — 2 May 2017 PART 2 PRODUCTS 2.1 STEEL CASING A. Steel casing pipe shall have a minimum yield strength of 36 ksi. Casing shall meet ASTM A-36, ASTM A-568, ASTM A-135, ASTM A-139 or approved equal. B. The steel casing shall be new, free of any structural defects such as cracks, dents, bends or heavy rust. Used Casing may be used with the Owners Representative approval and inspection. Casing joints shall be fillet welded according to ASTM C-206. 2.2 CASING SPACERS A. Casings spacers shall be sized according to the plans with steel casing to clear the bell and not center the line vertically within the casing. B. Approved casing spacers include: (1) Advance Products (2) BMW (3) Cascade (4) CCI Pipeline (5) Culpico (6) PSI C. Other casing spacers may be used with approval from the Owner Representative or the Engineer. 2.3 JOINT RESTRAINT A. Uncased pipe bores are permitted with Engineer's approval. B. Approved joint restraint devices which prevent over -insertion: (1) EBAA Mega -Stop (for push direction only) (2) CertainTeed Certa-Lok (3) Other over -insertion protection devices must be submitted prior to approval. C. Contractor shall provide joint restraint materials and methods which do not conflict with pipe spacers. D. All uncased bore methods require Contractor to submit joint restraint manufacturer's literature for Engineer's approval. PART 3 EXECUTION 3.1 BORES A. Boring shall proceed from the low or downstream end of crossing unless otherwise specified or instructed. B. Water used for lubrication of cuttings in conjunction with boring operations shall be permitted. Jetting shall be prohibited. C. All bores under existing paving will be subject to the following precautions: (1) Auger Boring — Auger boring shall use a pilot hole to set precise, clear auger path. (2) Wet (Slick) Boring — Under highway and arterial street pavement, the use of wet boring techniques shall be subject to the approval of the Engineer on a case -by -case basis. Lift Station 46 Force Main Relocation 02445 — 3 August 2016 (3) Impact Moling — Impact moling shall be used only for bore sizes 3" in diam. and smaller. Impact moling may be used for drilling pilot holes. (4) Pipe Jacking or Ramming — Continue jacking process to completion once it has begun to prevent the pipe from becoming firmly set in the embankment. (5) Microtunneling — Remote tunneling trenchers are allowed within the constraints and operational limitations set by manufacturer. D. Contractor shall be fully responsible to insure the boring methods used are safe and adequate for workers, installed pipe, property, the public, adjacent utilities and other site conditions. E. The bore must be at or near level. A tolerance of 1/2 % grade either positive or negative will be allowed. F. Contractor is responsible for removing all excavated material. G. Contractor shall be responsible for trench safety and all traffic control requirements. H. After installing the water pipe in the encasement the ends of the encasement must be sealed to prevent soil creep into the pipe. 3.2 PIPE INSTALLATION A. Contractor shall use approved joint restraint devices for pipe within casing. B. Contractor shall use approved spacers as specified to install pipe in casing. 3.3 OPEN TRENCH ENCASEMENT A. The water distribution pipe shall be installed in the same manner as the encased bores. The cost of installing the carrier pipe will include any appurtenances needed to protect the pipe as per manufacture recommendation. B. The ends of the encasement shall be sealed after the carrier pipe is installed. END OF SECTION I._` Kent Street Water Line Extension 02445 — 4 May 2017 SECTION 02449 JACK & BORE UNDER RAILROADS & STREETS PART 1 GENERAL 1.1 WORK COVERED BY CONTRACT DOCUMENTS A. The section covers utility bores and placing steel encasement in open cut trenches. B. The encasement will be installed at the locations indicated on the attached plans. C. The contractor will be responsible for providing all labor, materials, equipment and incidentals necessary to accomplish the following: (1) Training and insurance required by Railroad or local jurisdiction. (2) Verifying existing utilities (3) Construction of the bore and bore pits or trench cut. (4) Installing the appropriate steel casing. (5) Installing the water supply pipe in the steel casing using the pipe manufacturer's recommended practices. (6) Backfill all excavations. (7) All traffic barricading and control. (8) All trench safety requirements. (9) Implementing a best management plan for the control of storm water runoff 1.2 CONTRACTOR USE OF SITE A. Limit use of site to allow: (1) Owner operational capacity. (2) Railroad, local jurisdiction, or other occupants use to remain unhindered. B. Coordinate use of site under direction of Owner's Representative, Railroad, Texas Department of Transportation (TxDOT), and/or other occupants. C. Execute Work in a coordinated manner to avoid conflicts with Owner's operations or other Contractors. D. Move any stored products under Contractor's control, which interfere with operations of (1) Owner. (2) Railroad. (3) TxDOT right-of-way. E. Assume full responsibility for the protection and safekeeping of products furnished under this contract, stored on or off the site. 1.3 WORK SEQUENCE A. Construct Work to accommodate Owner's occupancy requirements during the construction period. B. Sequence and schedule shall balance Owner's and Occupant's operational requirements of adjacent utility work and construction schedules of other government agencies, however, Contractor's coordination for construction schedule and operations shall be with the Engineer or the Owner's Representative only. Kent Street Water Line Extension 02449 — 1 May 2017 1.4 SUBMITTALS A. Provide written plan with methods and materials to be used in bore and casing process, including depths for pits and shoring plans. This will be reviewed by Engineer and Owner's Rep. to determine the need B. Provide shop drawings or manufacturer literature for casing spacers; include drawings of proposed locations within pipe casing. 1.5 STANDARDS A. All work shall be accomplished in accordance with the following standards: (1) AWWA C-206 "Field Welding of Steel Water Pipe" (2) AWWA C-210 "Liquid Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines" (3) AASHTO M-190 "Bituminous Coated Corrugated Metal Culvert Pipe and Pipe Arches" (4) AASHTO Standard Specifications for Highway Bridges, 1993. (5) ASTM A-36 "Carbon Structural Steel" (6) ASTM A-123 "Zinc (Hot Dipped Galvanized) Coatings on Iron and Steel Products" (7) ASTM A-135 `Electric — Resistance — Welded Steel Pipe" (8) ASTM A-139 "Electric — Fusion (Arc) — Welded Steel Pipe" (NPS4 and over) (9) ASTM A-153 "Zinc (Hot Dipped Galvanized) on Iron and Steel Hardware" (10) ASTM A-307 "Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength" (11) ASTM A-449 "Quenched and Tempered Steel Bolts and Studs" (12) ASTM A-568/M "Steel, Carbon, and High Strength, Low Alloy, Hot -Rolled and Cold - Rolled for Commercial Quality" (13) ASTM C-76 "Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe" (14) ASTM D-4254 "Test Methods for minimum Index Density of Soils and Calculations of Relative Density" (15) OSHA PL 91-596 (16) OSHA Pub 2226, SHR Part 1926, Subpart P "Excavation, Trenching & Shoring" (17) 49 CFR Part 195 "Transportation of Liquids by Pipelines and Amendments." B. Additional standards contained in the City of Lubbock Public Works Engineering Design Standards and Specifications handbook also apply. C. Additional standards may be required by railroads within project site. (1) This project will require adherence to Burlington Northern Santa Fe (BNSF) "Utility Accommodation Policy" (2) In addition, all requirements outlined in BNSF permit number _ shall be adhered to. D. Where standards overlap or conflict the more stringent standard shall prevail unless approved by the Engineer. 1.6 QUALITY ASSURANCE A. Installer's Qualifications (1) Installers shall be competent and experienced in boring work of equal scope. Original Lubbock Water Line Replacement 02314 — 2 November 2013 (2) Installers shall provide proof of successful, related work experience with references. This will also apply to sub -contractors. (3) Installers shall have the necessary qualifications required for working on or near active railroads. These qualifications shall be specific to the Railroad company present on project site. B. Job Conditions (1) Where work is in the right-of-way of any government or corporate jurisdiction, the Owner will secure the appropriate permits or easements. The Contractor shall observe regulations, instructions and limitations of each right-of-way owner. Coordination shall be through Owner's representative. (1) Comply with the requirements of the permit and/or easement, a copy of which is included in the Appendix. The work within the Texas Department of Transportation (TXDOT) shall comply with TXDOT specifications. The work within the Lubbock County shall comply with Lubbock County Standards. The work within the railroad shall comply with the railroad specifications. If required by the Right -of -Way Owner, obtain Protective Liability Insurance in the amount required by the particular company or other insurance as is specified in the permit at no additional cost to the Owner. Acquire a permit, agreement, or work order from the rightof-way Owner as is required. (2) Excavated material shall be kept off of roads and railroad tracks (or right of way) at all times. (3) No blasting is allowed at any time. (4) The Contractor shall protect existing pipelines, utilities and railways. The Contractor shall verify location and elevation of all pipelines, power lines and communication cable in the construction area prior to execution. Verification of existing pipe and cable utilities shall be the sole responsibility of the Contractor. (5) The Contractor shall restrict work to the jack and bore operations as described in the plans and technical specifications for the project. (1) Verification of location of existing utilities shall be the complete responsibility of the Contractor. 1.2 OWNER & OCCUPANT A. Cooperate with Owner to minimize conflict, and to facilitate Owner's and other Contractor's operation. B. Schedule the Work to accommodate this requirement. PART PRODUCTS 2.1 STEEL CASING A. Steel casing pipe shall have a minimum yield strength of 36 ksi. Casting shall meet ASTM A-36, ASTM A-568, ASTM A-135, ASTM A-139 or approved equal. B. The minimum size and wall thickness of jacked steel pipe casings shall be as follows, unless otherwise required by the agency having jurisdiction over the road, utilities, or improvements. Kent Street Water Line Extension 02449 — 3 May 2017 Carrier Min. Casing Min. Steel Casing Pipe Size Size (O.D.) Wall Thickness 4" 12" 3/8" 6" 14" 3/8" 8" 16" 1/2" 10" 18" 1/2" 12" 20" 1/2" 16" 30" 1/2" 20" 36" 1/2" 24" 42" 1/2" C. The steel casing shall be new, free of any structural defects such as cracks, dents, bends or heavy rust. Used Casing may be used with the Owners Representative approval and inspection. Casing joints shall be fillet welded according to ASTM C-206. D. For casing pipe crossings under roadways/railroads (1) , the Contractor shall comply with the regulations of said authority in regard to design, specifications, and construction. (2) State highway casing installations shall be as specified in the FDOT, "Utility Accommodation Manual," and (3) for railroads, the American Railway Engineering Association manual for Railway Engineering, Chapters 1, Part 5, Section 5.2, "Specifications for Pipelines Conveying Nonflammable Substances," shall be applicable. (4) In no case shall the minimum casing pipe diameter and wall thickness, for a specific carrier pipe size, be less than that specified under Paragraph 2.1 A. E. The boring and jacking operations shall be done simultaneously, with continuous installation, until the casing pipe is in final position. (1) Correct line and grade shall be carefully maintained. (2) Add on sections of casing pipe shall be full -ring welded to the preceding length, developing watertight total pipe strength joints. (3) The casing installation shall produce no upheaval, settlement, cracking, movement, or distortion of the existing roadbed or other facilities. Following placement of the carrier pipe within the steel casing, brick and mortar shall be used to seal each open end. (4) Unless approved otherwise by the Utilities Engineer, a two-inch vent pipe shall be installed on the casing. F. Casing pipe holes shall be mechanically bored through the soil by a cutting head on a continuous auger mounted inside the pipe. G. The auger shall extend a minimum distance beyond the end of the casing pipe to preclude formation of voids outside of the pipe shell. H. The casing pipe shall be adequately protected to prevent crushing or other damage under jacking pressures. Backstops shall be provided for adequately distributing the jack thrust without causing deformation of the soil or other damage. Should the casing Original Lubbock Water Line Replacement 02314 — 4 November 2013 pipe be damaged, such damaged portion, if not in the hole, shall be replaced; however, if inserted, the encasement pipe shall be abandoned in place, grouted full, and suitably plugged, and an alternate installation made. I. Required boring and jacking pits or shafts shall be excavated and maintained to the minimum dimension necessary to perform the operation. Said excavations shall be _ adequately barricaded, sheeted, braced and dewatered, as required, in accordance with the applicable portions of Section 02200, "Utility "Utili Excavation, Trenching, and Pp P Backfilling," and OSHA requirements. Boring and jacking pits will normally be no closer than five feet from the edge of pavement, with the permitting agency having final determination of the required setback distance. 1 2.2 CASING SPACERS A. Casings spacers shall be sized to allow the bell of carrier pipe to clear the casing, not necessarily to center the line vertically within the casing. B. Casing spacers are required shall be determined by manufacturer, with one spacer located within 24" of the ends of each pipe C. Approved casing spacers include: (1) Advance Products (2) BMW (3) Cascade (4) CCI Pipeline (5) Culpico (6) PSI D. Other casing spacers may be used with approval from the Owner Representative or the Engineer. 2.3 JOINT RETRAINT A. For line lengths in excess of 100 feet, approved joint restraint devices which prevent over - insertion shall be required: (1) EBAA Mega -Stop (for push direction only) (2) CertainTeed Certa-Lok (3) Other over -insertion protection devices must be submitted prior to approval. B. Contractor shall provide joint restraint materials and methods which do not conflict with pipe spacers. 2.4 MORTAR MIXES A. CEMENT MORTAR: Consisting of one (1) part cement to two (2) parts clean sand with sufficient water to make a thick workable mix. B. CELLULAR GROUT MIX: The cellular grout shall be a low -density, non -shrink grout composed of Type II Portland cement, water, and a preformed foam. (1) The cellular grout shall have the following characteristics: (a) Minimum 28-day Compressive Strength = 150 psi (b) Slurry (Wet) Density = 50 to 60 pcf (c) Cement = Type II, per ASTM C150 Kent Street Water Line Extension 02449 — 5 May 2017 (d) Water = Potable (e) Foam = Per ASTM C869 (f) Water/Cement Ratio = 0.56 to 0.60 (2) Grout shall meet the following requirements, as verified by independent laboratory tests: (3) No shrinkage from the time of placement, or expansion after set, under ASTM C-827 and CRD-C621-83. When non -shrink grouts are tested under CRD-C621-83, the grout shall be tested in a fluid state. A fluid state shall be defined as flowing through a flow cone at a rate of 20 seconds, plus or minus 5 seconds. C. PRESSURE GROUT MIX: Comprised of 1 cubic foot of cement and 3.5 cubic feet of clean fine sand with sufficient water added to provide a free -flowing thick slurry. If desired to maintain solids in the mixture in suspension, one cubic foot of commercial grade bentonite may be added to each 12 to 15 cubic feet of the slurry. PART 3 EXECUTION 3.1 GENERAL A. Boring shall proceed from the low or downstream end of crossing unless otherwise specified or instructed. B. Water used for lubrication of cuttings in conjunction with boring operations shall be permitted. Jetting shall be prohibited. C. Contractor shall be fully responsible to insure the boring methods used are safe and adequate for workers, installed pipe, property, the public, adjacent utilities and other site conditions. D. The bore must be at or near level. A tolerance of 1/2 % grade either positive or negative will be allowed. E. Contractor is responsible for removing all excavated material. F. Contractor shall be responsible for trench safety and all traffic control requirements. 3.2 RAILROAD REQUIREMENTS A. A safety orientation course will be completed by all workers prior to entering Railroad property. B. It is the Contractor's responsibility to conduct the safety training and implementation of a safety program for its employees. C. Training materials are available on the web site: www. contraororientation.com. D. The Contractor must comply with all federal, state and local safety regulations. E. For Railroad cable locates call (for BNSF 1-800-533-2891) prior to beginning jack and bore work. BNSF form "Underground Cable Location & Acknowledge" will be completed by a BNSF representative and copy provided to the Contractor. The Contractor must have this completed form in possession at the job site at all times. F. Rail elevations over the work must be monitored at intervals prescribed by Railroad to detect any track movement. Movements of over one -quarter (1/4) inch vertically shall be immediately reported to the Railroad Roadmaster. Due to the danger to rail traffic that is caused by only small amounts of track movement, Railroad forces may have to be called to surface the track several times. G. The following shall be limits to jack and bore construction methods: Original Lubbock Water Line Replacement 02314 — 6 November 2013 1) The use of water under pressure jetting or puddling will not be permitted to 3 facilitate boring, pushing or jacking operations. Some boring may require water to lubricate cutter and pipe, and under such conditions, is considered dry boring. 2) Where unstable soil conditions exist, boring or tunneling operations shall be conducted in such a manner as not to be detrimental to the railroad being crossed. 3) If excessive voids or too large a bored hole is produced during casing or pipeline installations, or if it is necessary to abandon a bored or tunneled hole, prompt remedial action should be taken by the Contractor. � 4) All voids or abandoned holes caused by boring or jacking are to be filled by pressure grouting. The grout material should be sand cement slurry with a minimum of two (2) sacks of cement per cubic yard and a minimum of water to ' assure satisfactory placement. ._ 5) The hole diameter resulting from bored or tunneled installations shall not exceed the outside diameter of the utility pipe, cable or casing (including coating) by more than one and one-half (1-1/2) inches for pipes with an inside diameter of twelve (12) inches or less, or two (2) inches on pipes with an inside diameter greater than twelve (12) inches. 6) Pits for boring, tunneling or jacking will not be permitted within thirty (30) feet of the centerline of track; or closer to the track than the toe of fill slopes in fill sections, or toe of shoulder slopes in ditch sections when pipes are allowed on the railroad property. 1.1 JACKING A. Casing pipe holes shall be mechanically bored through the soil by a cutting head on a continuous auger mounted inside the pipe. B. The boring and jacking operations shall be done simultaneously, with continuous installation, until the casing pipe is in final position. C. Correct line and grade shall be carefully maintained. D. Casing Protection (1) The casing pipe shall be adequately protected to prevent crushing or other damage underjacking pressures. i (2) Should the casing pipe be damaged, such damaged portion, if not in the hole, shall be replaced; however, if inserted, the encasement pipe shall be abandoned in place, t grouted full, and suitably plugged, and an alternate installation made. E. The auger shall extend a minimum distance beyond the end of the casing pipe to preclude formation of voids outside of the pipe shell. F. Add on sections of casing pipe shall be full -ring welded to the preceding length, developing watertight total pipe strength joints. G. The casing installation shall produce no upheaval, settlement, cracking, movement, or distortion of the existing roadbed or other facilities. H. Following placement of the carrier pipe within the pipe casing. Only approved casing seal methods shall be used. I. Backstops shall be provided for adequately distributing the jack thrust without causing deformation of the soil or other damage. �f Kent Street Water Line Extension 02449 — 7 May 2017 t t_ J. Unless approved otherwise by the Utilities Engineer a two-inch vent pipe shall be installed onto the casing. 1.2 JACK & BORE PITS A. Required boring and jacking pits or shafts shall be excavated and maintained to the minimum dimension necessary to perform the operation. B. Placement of equipment in the approach trench of the jacking pit shall be firmly bedded on the required line and grade using heavy timbers, structural steel, or concrete cradles of sufficient length to provide accurate control of jacking alignment. Provide space to insert the casing lengths to be jacked. Anchor the timbers and structural steel sections to ensure action of the jacks in line with the Jacked Pipe Casing axis of the casing. Place a timber or structural steel bearing block between the jacks and the end of the casing to provide uniform bearing upon the casing end evenly distribute the jacking pressure. C. Shoring & Bracing (1) Said excavations shall be adequately barricaded, sheeted, braced and dewatered, as required, in accordance with the applicable portions of Section 02200, "Utility Excavation, Trenching, and Backfilling," and OSHA requirements. (2) The approach trench for jacking or boring operations shall be adequately shored to safeguard existing substructures and surface improvements and to ensure against ground movement in the vicinity of the casing portal. (3) Bracing and shoring in and around existing utilities shall be the responsibility of the Contractor. The Engineer or Owner's Representative may determine that the conditions warrant shoring or bracing plans sealed by a Texas Professional Engineer at the Contractor's expense. D. Boring and jacking pits will normally be no closer than five (5) feet from the edge of pavement, with the Owner or Occupant having final determination of the required setback distance. E. After jacking equipment and debris from the tunnel have been removed from the approach trench of jacking pit, prepare the bottom of the jacking pit to support pipe according to standard trench details. Remove all loose and disturbed materials below pipe grade to undisturbed earth and re -compact the material in accordance with Sections 02317 and 02320. 1.3 PIPE INSTALLATION A. Contractor shall use approved joint restraint devices for pipe within casing for lengths over 100 feet. B. Contractor shall use approved spacers as specified to install pipe in casing. C. The ends of the encasement shall be sealed after the carrier pipe is installed to prevent soil creep into the pipe. 1.4 SITE RESTORATION A. Areas of railroad property, disturbed by the installation, maintenance, removal and relocation of utilities shall be kept to a minimum. t B. Disturbed areas shall be returned to normal grade and elevation, with compaction of backfill material, and all excess or undesirable material removed by the Contractor. Original Lubbock Water Line Replacement 02314 — 8 November 2013 C. The Contractor shall replace destroyed vegetation by sodding, or seeding, fertilizing and mulching, or a combination thereof. D. Unused material or debris shall be removed from the work site area. At the end of every construction day, construction equipment and materials shall be removed as far from the operating railroad tracks as possible (minimum 25 feet from centerline). All machines will be disabled when not in use to prevent unauthorized operation. END OF SECTION Kent Street Water Line Extension 02449 — 9 May 2017 i' r- SECTION 02665 WATER PIPING, VALVES, AND FITTINGS PART1 GENERAL 1.1 SUMMARY A. This section of the specifications covers all water piping, valves, and fittings required for the project. B. Section Includes: (1) Material Schedule (2) Submittals (3) References (4) Materials (5) Polyvinyl Chloride (PVC) Pipe (6) Ductile Iron Pipe (7) Concrete Cylinder Pipe (8) Pipe Fittings (9) Flexible Couplings and Flanged Coupling Adapters (10) Pipe Joints (11) Steel Casing (12) Valves (13) Fire Hydrants (14) Polyethylene Wrap (15) Joint Restraints (16) Concrete (17) General (18) Inspection (19) Responsibility for Materials (20) Handling Pipe and Accessories (21) Alignment and Grade (22) Manner of Handling Pipe and Accessories in Trench (23) Cleaning and Inspecting (24) Laying and Jointing PVC Pipe (25) Plugging Dead Ends (26) Fittings (27) Setting Valves, Valve Boxes, Fire Hydrants and Fittings (28) Thrust Restraint (29) Excavation, Trenching and Backfilling (30) Line Testing (31) Disinfection of Pipelines (32) Installation of Steel Pipe Casing and Pipe in Casing Kent Street Water Line Extension 02665-1 May 2017 (33) Pipe Identifiers (34) Cleanup 1.2 MATERIAL SCHEDULE A. 6", 8", 10" and 12" lines shall be AWWA C 900, DR 18 PVC pipe. B. Ductile Iron Fittings (AWWA C 153) C. Tapping Sleeve (ductile iron or stainless steel) D. Gate Valves E. Valve Boxes F. Fire Hydrants (AWWA C 502) G. Mechanical Joint Restraints 1.3 SUBMITTALS A. Submit all manufacturers' data for all pipe and fittings including all pipe thickness class calculations, steel casing, and casing spacers. B. Submit affidavits of compliance with appropriate standards. C. Submit product warranties. D. Submit manufacturer's installation instructions. E. Submit manufacturer's loading, unloading, and storage requirements. F. Submit product information for pipe identification tape. ; G. Submit concrete In design for concrete thrust blocking. 1.4 REFERENCES A. AWWA C 104 — Cement Mortar Lining for Ductile Iron Pipe and Fittings for Water. B. AWWA C 110 — Ductile Iron and Gray Iron Fittings, 3 inch through 48 inch, for Water. C. AWWA C 111 — Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings. Pill D. AWWA C 104 — Rubber Seated Butterfly Valves. E. AWWA 509 — Resilient Seated Gate Valves for Water Supply. F. AWWA C 900 — Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 inch through 12 inch, for water distribution. G. AWWA C 905 — Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 14 inch through 48 inch, for water transmission and distribution. H. AWWA C 301 — Prestressed Concrete Pressure Pipe, Steel Cylinder Type, for Water and other Liquids. I. AWWA C 303 — Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Type J. ANSI/AWWA C-200 Standard for Steel Water Pipe 6 Inches and Larger K. ANSI/AWWA C-205 Standard for Cement -Mortar Protective Lining and Coating for Steel �j Water Pipe - 4 in. and Larger -Shop Applied L. ANSI/AWWA C-206 Standard for Field Welding of Steel Water Pipe M. ANSI/AWWA C-207 Standard for Steel Pipe Flanges for Water Works Service, 4" - 144" N. ANSI/AWWA C-208 Standard for Dimensions for Fabricated Steel Water Pipe Fittings O. ANSI/AWWA C-209 Standard for Cold -Applied Tape Coatings for the Exterior of Special Sections, Connections, and Fittings for Steel Water Pipelines_ r� 1_ Kent Street Water Line Extension 02665-2 May 2017 I �_t P. ANSI/AWWA C-210 Standard for Liquid -Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines Q. ANSI/AWWA C-214 Standard for Tape Coating Systems for the Exterior of Steel Water Pipelines R. ANSI/AWWA C-216 Standard for Heat -Shrinkable Cross -Linked Polyolefin Coatings for the Exterior of Special Sections, Connections, and Fittings for Steel Water Pipelines S. ANSI/AWWA C-218 Standard for Coating the Exterior of Aboveground Steel Water Pipelines and Fittings T. ANSI/AWWA C-219 Standard for Bolted Sleeve -Type Couplings for Plain -End Pipe U. ANSI/AWWA C-222 Standard for Polyurethane Coatings for the Interior and Exterior of Steel Water Pipelines and Fittings V. AWWA M-I I Steel Pipe - A guide for Design and Installation W. ASTM A 106 Standard Specification for Seamless Carbon Steel Pipe for High -Temperature Service. X. ASTM A 53 Standard Specification for Pipe, Steel, Black and Hot -Dipped, Zinc Coated Welded and Seamless Y. ASTM E 165 Method for Liquid Penetrant Examination Z. ASTM E 709 Guide for Magnetic Particle Examination AA. ASME Section V Nondestructive Testing Examination BB.ASME Section IX Welding and Brazing Qualification. CC.AWS B2.1 Standard for Welding Procedure and Welding Qualifications. PART 2 PRODUCTS 2.1 MATERIALS A. All pipe, fittings, and valves shall be new and of the best quality in material and workmanship. B. All pipe, fittings, and valves shall conform to American National Standards Institute/National Sanitation Foundation (ANSI/NSF) Standard 61. C. In areas where natural gas lines exist, and are cathodically protected by means of impressed .. current, only electrically non-conductive pipe shall be allowed. -, 2.2 POLYVINYL CHLORIDE (PVC) PIPE A. PVC pipe 12 inches and smaller shall be AWWA C-900, DR-18. B. PVC pipe 14 inches and larger shall be AWWA C-905, DR-21. The outside diameter of the PVC pipe shall be cast iron equivalent. C. PVC pipe shall be formed with an integral bell and shall be joined using a gasketed bell and spigot joint. Spigot ends shall be beveled and reference marked to facilitate joining and insure proper seating depth. Gaskets shall conform to ASTM F 477. The nominal joint length shall be twenty (20) feet. D. AWWA C-900 and C-905 pipe shall be marked as prescribed by AWWA standards including nominal size, dimension, ratio, AWWA pressure class, manufacturer's name and code, and seal of testing agency that verified the suitability of the pipe material for potable water. Kent Street Water Line Extension 02665-3 May 2017 E. Pipe shall meet all additional test requirements as described in AWWA C-900 or C-905, as applicable. F. All PVC pipe shall be approved by the National Sanitation Foundation (NSF) for use in the transportation of potable water and shall bear the NSF seal of approval. 2.3 DUCTILE IRON PIPE A. Ductile Iron pipe 12" shall be Class 200. B. Ductile iron pipe to be furnished shall conform to the following standard specifications or latest revisions: (1) ANSI/AWWA C150/A21.50-81 (2) ANSI/AWWA C104/A21.4-80 (3) ANSI/AWWA C151/A21.4-80 C. All ductile iron pipe shall be cement lined in accordance with AWWA C104-80 (ANSI A21.4) specifications. The external surface shall be coated with an asphalt base paint. D. All joint for ductile iron pipe shall be of the rubber gasket bell and spigot type, except where connecting flanged fittings, and shall otherwise conform to the base specifications to which the pipe is manufactured. E. The joint shall be latest approved type of rubber gasket joint for ductile iron pipe. F. All joints of ductile iron pipe and fittings shall be sealed with a continuous ring rubber gasket meeting standards specified by AWWA C11-72 (ANSI A21.11) or its latest revision. 2.4 CONCRETE CYLINDER PIPE A. Prestressed Concrete Embedded Cylinder pipe shall be manufactured in accordance with the latest revision of AWWA C-301. B. Pretensioned Concrete Cylinder Pipe (PCCP) shall be manufactured in accordance with the latest revision of AWWAS C303-78 C. Concrete Cylinder Pipe shall withstand a minimum pressure of 150 p.s.i. longitudinally and helically. D. The joints of the pretensioned concrete cylinder pipe and fittings shall be sealed with a continuous ring rubber gasket meeting standards specified in AWWA C303-78. E. A Portland cement mortar shall be used to fill the annular space both inside and outside of joints in the pretensioned concrete cylinder pipe. (1) Portland cement used in the mortar shall conform to "Standard Specifications and Test for Portland Cement" A.S.T.M. serial designations C150 and C77. (2) Sand for the mortar shall conform to A.S.T.M. designation C-33-52T for fine aggregate. (3) The exterior joints on pretensioned concrete cylinder pipe shall be poured with a heavy duty diaper. (a) The width of the diaper shall be nine inches. (b) The band shall be provided with 3/8 inch x 0.20 steel straps on each side. 2.5 PIPE FITTINGS A. General: Pipe fittings shall be of a type and design especially suitable for use with the type of piping with which they are installed. Pressure rating of fittings shall not be less than that of the pipe. B. All ductile iron fittings shall have an external bituminous coating and shall be cement lined in accordance with AWWA C 104. Kent Street Water Line Extension 02665-4 May 2017 i- C. Fittings shall be ductile iron and shall be mechanical joint or push -on joint unless otherwise specified or shown on the Drawings. D. Ductile Iron Fittings — Ductile iron fittings shall conform to AWWA C153 110. Fittings shall be mechanical joint or push -on joint unless otherwise specified or shown on the Drawings. E. All fittings shall have a pressure rating equal to that of the pipe with which they are used but in no case less than 150 psi. F. Unless otherwise indicated, all ductile iron fittings shall have an external bituminous coating and shall be cement -lined in accordance with the specifications for coating and lining the pipe. G. All ductile iron fittings shall be cast from the same quality of metal used in casting ductile iron pipe and shall be subjected to the same test requirements. Marking and weighing shall be as required for ductile iron pipe. H. Where flanged fittings are used, the flanges shall be of the same material as the fitting. Where bell or mechanical joint fittings are used, the bells shall be cast integrally with the fitting. Screwed -on bells will not be acceptable. 2.6 FLEXIBLE COUPLINGS AND FLANGED COUPLING ADAPTERS A. Flanged coupling adapters and flexible couplings shall be provided at the locations shown on the Drawings and at other locations required for installation of the piping system. B. Flanged coupling adapters will be provided with anchoring studs to provide thrust restraint. Epoxy coated sheet construction shall be used for all couplings. All bolts, nuts, and washers shall be stainless steel. 2.7 PIPE JOINTS A. Push -on Joints — Push -on joints shall be as specified in AWWA Standard C111. B. Mechanical Joints —Mechanical joints shall be as specified in AWWA Standard C111. 2.8 STEEL CASING A. Steel casing shall be new welded steel pipe with minimum yield strength of 35,000 psi meeting ASTM A36. The exterior of the casing pipe shall have a bituminous coating. B. Casing wall thickness for installation shall be in accordance with the City of Lubbock Design Standards and Specifications. C. Casing spacers shall be used to install carrier pipe inside the encasement pipe and to provide support around the periphery of the pipe should the pipe twist as it is pushed through the casing. D. The spacers shall be of a projection type that has a minimum number of projections around the circumference totaling the number of diameter inches. For example, eight (8) inch pipe shall have a minimum of eight (8) projections and eighteen (18) inch pipe shall have a minimum of eighteen (18) projections. E. Casing spacers shall use double backed tape, provided with the spacers, to fasten tightly onto the carrier pipe so that the spacers do not move during installation. Installation instructions shall be provided with each shipment. F. Casing spacers shall have a span of ten (10) feet to six (6) feet dependent on the total load anticipated with the pipe full of liquid. The maximum load shall not exceed the load limits per spacer listed in the brochure. G. These values in the brochure include conservative safety factors for class spacer used. Spacers shall have minimum height that clears the pipe bell or as otherwise indicated on plans. _N Kent Street Water Line Extension 02665-5 May 2017 H. Casing spacers shall be projection type totally non-metallic spacers constructed of preformed { sections of high -density polyethylene. Spacers shall be ISO 9002 certified for strength and quality. I. Manufacturer: Projection type spacers shall be Raci type spacers, or equal approved by the Engineer, along with wrap around end seal made of 1/8" think rubber with stainless steel bands. r 2.9 VALVES A. Valves that are twelve (12) inches and smaller shall be gate valves unless otherwise noted on the plans or specified herein. All valves shall be designed for a working pressure of at least 150 psi unless otherwise noted. B. Gate Valves: (1) All gate valves shall be resilient seat or double disk parallel seat, iron body; bronze mounted throughout and shall meet all requirements of AWWA C 509. (2) The valves shall be of the type of joint used in the piping. (3) All valves shall open by turning to the left, and unless otherwise specified, shall have non -rising stem when buried and outside screw and yoke when exposed, and be furnished with a two (2) inch operating nut when valves are buried and shall be furnished with hand wheels when exposed. (4) Gate valves shall be furnished with O-ring stem packing. (5) All gate valves shall be designed to withstand a working pressure of 200 psi unless otherwise noted. (6) Gate valves shall be meet the City of Lubbock Design Standards and Specifications. (7) All ductile iron shall conform to A536 Grade 65-45-12. Castings shall be clean and sound without defects that will impair their service. No plugging or welding of such defects will be allowed. (8) Bolts shall be electro-zinc plated steel with hex heads and hex nuts in accordance with ASTM 307 and A563, respectively. (9) All parts for valves furnished must be standard and completely interchangeable with valves of the same brand. Successful bidder to furnish to the Owner, upon request, a letter stating the type of valves to be installed and a letter from the manufacturer stating that the parts are standard and interchangeable. C. Valve Boxes and Extension Stems: (1) Extension stems shall be furnished on buried valves where the top of the operating nut is more than ninety (60) inches below fmished grade. Top of the extension stem shall not be more than thirty-six (36) inches below the top of the valve box. (2) Buried valves shall be provided with cast iron valve boxes. (3) The boxes shall be designed to fit over a section of six (6) inch C 900 PVC riser pipe, which will be used, as an extension from the top of the valve to within six (6) inches of the ground surface. (4) The box shall have a heavy cast iron cover marked "Water"._ (5) The box shall have a flange type base, with the base being approximately four (4) inches larger in diameter than the outside diameter of the barrel of the box. (6) The necessary length of the six (6) inch C 900 PVC riser pipe required for the extension shall be considered as a part of the box. (7) Valve boxes shall be East Jordan Iron Works No. 8453, or approved equal. 4 Kent Street Water Line Extension 02665-6 May 2017 f D. FIRE HYDRANTS (1) Hydrants shall meet the City of Lubbock Design Standards and Specifications (2) Hydrants shall meet AWWA C-502 (3) Hydrants shall have an iron body, bronze mounted throughout and be designed for working pressure of 150 psi. (4) Hydrants shall be traffic model type with a 5-1/4-inch valve opening, two (2) 2-1/2-inch hose nozzles, and one (1) 4-inch steamer nozzle. (5) The hydrant shall be for a 6-inch main. 2.10 POLYETHYLENE WRAP A. All buried valves and fittings shall be thoroughly wrapped prior to installation with a polyethylene material meeting the requirements of ASTM D 1248. B. The polyethylene material shall have a minimum thickness of eight (8) mils. C. �+ The wrap shall be secured by two (2) inch duct tape. 2.11 JOINT RESTRAINTS A. Uniflange series 1500 joint restraint for PVC pipelines or approved equal. B. Must meet all pressure testing requirements of ASTM F-1674. C. Materials must meet requirements of ASTM A-536. D. Install per manufacturer's recommendations. 2.12 CONCRETE A. Concrete may be used for blocking the pipe and fittings and shall conform to the concrete t specifications, as set forth in the Section 03300 Cast -in -Place Concrete, except a minimum compressive strength of 2,800 psi will be acceptable. PART 3 EXECUTION 3.1 GENERAL A. All pipe and accessories shall be unloaded, handled, laid, jointed, tested for defects and for leakage, and disinfected in the manner herein specified. 3.2 INSPECTION A. The pipe, fittings, and accessories shall be inspected upon delivery and during the progress of the Work and any material found to be defective will be rejected by the Engineer, and the Contractor shall remove such defective material from the site of the Work. 3.3 RESPONSIBILITY FOR MATERIALS A. The Contractor shall be responsible for all material furnished and shall replace, at the Contractor's expense, all such material that is found to be defective in manufacture or has become damaged in handling after delivery. 3.4 HANDLING PIPE AND ACCESSORIES A. All pipe, fittings, and other accessories shall, unless otherwise directed, be unloaded at the point of delivery, hauled to and distributed at the site of the Work by the Contractor. 7 Kent Street Water Line Extension 02665-7 May 2017 — B. In loading and unloading, they shall be lifted by hoists or slid, or roiled on skidways in such a manner as to avoid shock or damage to the materials. Under no circumstances shall they be dropped. Pipe handled on skyways must not be skidded or rolled against pipe already on the ground. C. The pipe, fittings, and accessories shall be placed along the site in such a manner as to be kept as free as possible from dirt, sand, mud, and other foreign matter. 3.5 ALIGNMENT AND GRADE A. All pipe shall be laid and maintained to the lines and grades shown on the plans or as established on the ground by the Engineer. B. The Contractor shall verify horizontal and vertical locations of items critical to the alignment and grade of the proposed water line. C. Confirm compliance with the Drawings and Specifications. D. Wherever it is necessary to deflect pipe from a straight line either in a vertical or horizontal plane to avoid obstructions, to plumb valves, or where vertical or horizontal curves are shown or permitted, the degree of deflection at each joint shall not exceed the maximum deflection noted on the Drawings. 3.6 MANNER OF HANDLING PIPE AND ACCESSORIES IN TRENCH A. After the trench grade has been completed, all bell holes dug and the grade inspected, the pipes and accessories may be placed in the trench. B. All pipe and fittings shall be carefully lowered into the trench piece by piece by means of derricks, ropes, or other suitable tools or equipment, in such a manner so as to prevent damage to the material in any way. Under no circumstances shall pipe or accessories be dropped or dumped into the trench. 3.7 CLEANING AND INSPECTING A. Before lowering into the trench, the pipe shall be again inspected for defects and the pipe, while suspended, shall be lightly hammered to detect cracks. Any defective, damaged, or unsound pipe and materials shall be rejected. B. All foreign matter or dirt shall be removed from the inside of the pipe and from all bells, spigots, or parts of the pipe used in forming the joint, before the pipe is lowered into the trench, and it shall be kept clean by approved means during and after laying. C. At a time when pipe laying is not in progress, the open ends of the pipe shall be closed by approved means, and no trench water shall be allowed to enter the pipe. 3.8 LAYING AND JOINTING PVC PIPE A. General: Unless otherwise directed, pipe shall be laid with bells facing in direction of laying; and for lines on appreciable slopes, bells shall, at the discretion of the Engineer, face up grade. B. Cutting of pipe for inserting fittings or closure pieces shall be done in a neat and workmanlike manner without damage to the pipe or the cement lining. C. The jointing shall be completed for all pipe laid each day, in order not to leave open joints in the trench overnight. At times when pipe laying is not in progress, the open ends of the pipe shall be closed by approved means, and not trench water shall be permitted to enter the pipe. D. No pipe shall be laid in water, or when the trench conditions or weather are unsuitable for such work, except by permission of the Engineer. Kent Street Water Line Extension 02665-8 May 2017 F E l E. Before lapipes, all lumps, blisters, and excess coating shall be removed from the bell � laying the � p�p P , g and spigot ends of each pipe; the outside of the spigot and the inside of the bell shall be wire brushed and wiped clean and dry. Pipe ends shall be kept clean until joints are made. y F. Defective joints shall be repaired as directed by the Engineer. G. Mechanical Joint Piping: (1) The last eight (8) inches outside of the spigot and inside of the bell of mechanical joint pipe shall be thoroughly cleaned to remove oil, grit, excess coating, and other foreign matter from the joint, and then painted with lubricant recommended by the pipe manufacturer. - (2) The cast iron gland shall then be slipped on the spigot end of the pipe with the lip extension of the gland toward the socket or bell end. (3) The rubber gasket shall be painted with lubricant recommended by the pipe manufacturer and placed on the spigot end with the thick edge toward the gland. (4) The entire section of the pipe shall be pushed forward to seat the spigot end in the bell. t, (5) The gasket shall then be pressed into place within the bell; care shall be taken to locate the gasket evenly around the entire joint. (6) The gland shall be moved along the pipe into position for bolting, all of the bolts inserted, and the nuts screwed up tightly with the fingers. (7) All nuts shall be tightened with a suitable torque limiting wrench. (8) Nuts spaced 180 degrees apart shall be tightened alternately in order to produce an equal pressure on all parts of the gland. H. If water gets in the trench before the joint is completed, or if the pipe is disturbed from line and grade after being laid, the pipe shall be taken up, the joints cleaned and the pipe re-laid. 1. Immediately after completion of the jointing, sufficient bedding and backfill material shall be placed around and over the pipe to hold the pipe to line and grade. J. Pre -molded joints shall be made in accordance with the recommendations of the manufacturer of the pipe. K. The surfaces of the jointing material on both the bell and spigot at each joint shall be wiped with the solvent recommended by the pipe manufacturer. L. The spigot shall then be firmly forced into the bell using a bar or other similar lever and a block of wood to prevent damage to the pipe. 3.9 PLUGGING DEAD ENDS A. Standard plugs shall be inserted into the bells of all dead ends and pipes, tees, or crosses and spigot ends shall be capped. B. Plugs or caps shall be jointed to the pipe or fittings in the same manner used in jointing the pipe. C. All plugs and caps shall have horizontal thrust blocks. 3.10 FITTINGS A. Fittings shall be set at the locations shown on the plans or at locations as established by the Engineer, and shall be set and jointed to the pipe in the manner heretofore specified for pipe installations. Concrete blocking shall be provided for all buried fittings. 3.11 SETTING VALVES, VALVE BOXES, FIRE HYDRANTS AND FITTINGS A. Valves and fittings shall be set at the locations shown on the Drawings and shall be set and jointed to the pipe in the manner heretofore specified for pipe installations. 44 - Kent Street Water Line Extension 02665-9 May 2017 4 B. All valves shall be hub end as required and all valves buried in the ground shall have a cast iron or precast concrete valve box set over the valve. C. All valves shall be set vertical, unless otherwise specified, and shall be thoroughly checked for operation prior to installation. D. After pressure has been applied to the line, stuffing boxes shall be checked for operation prior to installation. E. After pressure has been applied to the line, stuffing boxes shall be checked and tightened if necessary. F. Valve Boxes: (1) Valve boxes shall be firmly supported and maintained centered and plumb over the wrench nut of the valve, with the box cover flush with the surface of the ground or at such a level as directed by the Engineer. (2) All valve boxes under pavement shall be adjusted to finished pavement grades. G. Fire Hydrants: (1) Fire hydrants shall be located at the points shown on the Drawings. (2) All fire hydrants shall be set plumb, to the grade established on the Drawing, and with the steamer nozzle at right angles to the street. (3) Hydrants shall be supported in such a manner as not to cause a strain on the fire hydrant lead or branch. (4) The bowl of the hydrant shall be well braced against unexcavated earth at the end of the trench with concrete blocking. (5) The concrete blocking shall be placed so as not to interfere with the hydrant drains and so that the joints of the flanges are accessible. (6) Blocking of gate valves on fire hydrants leads shall be with concrete as shown on the Drawings. (7) The hydrants shall be thoroughly cleaned of dirt or foreign matter and checked for operation prior to installation. Drain holes shall not be blocked or sealed. (8) Fire hydrants shall be installed and maintained so that the center of the lowest water outlet shall be eighteen (18) inches from the ground. (9) Fire hydrants shall be installed with the four (4) inch nozzle facing the required access way. 3.12 THRUST RESTRAINT A. All fittings, valves and fire hydrants, unless otherwise specified, shall be provided with suitably restrained joints per the manufacturer's recommendation. B. Restrained push -on or mechanical joints, mechanical joint anchoring fittings, and mechanical joints utilizing setscrew ductile iron retainer glands shall be used in lieu of concrete thrust blocking. Thrust blocking will be allowed only under special circumstances as approved by the Engineer. 3.13 EXCAVATION, TRENCHING AND BACKFILLING. A. Backfill and compaction shall be performed in accordance of COL Ordinance 2007-00122. B. Backfill around pipe with specified granular bedding material that is free of large rocks, topsoil, debris or other unacceptable material. C. The backfill around the pipe shall be shovel sliced around the haunch of the pipe and mechanically compacted or hand tamped to a point 12 inches above the top of the pipe. Kent Street Water Line Extension 02665-10 May 2017 D. Backfill from 12 inches above the pipe to the finished grade will be as follows: (1) For unpaved areas: (a) Use excavated material that is free of large rocks, debris or other material determined unsuitable by the Owner's Representative. Backfill shall be placed in maximum six (6) inch lifts and compacted to 95% Standard Proctor Density at +/- 2% optimum moisture content. (b) Each lift shall be tested at a maximum of 500 feet intervals according to ASTM designation D-698. (c) These tests shall be performed by a reputable contractor specializing in geotechnical work and will be at the successful bidder's expense. (d) Copies of these tests shall be provided to the Owners Representative. (2) For paved areas: (a) Place Cement Stabilized Backfill (CSB) meeting City of Lubbock Standards under the bottom of the pavement in a minimum thickness of 12". (b) The backfill from 12-inches above the top of pipe to the CSB shall be in placed in maximum 6 inch lifts and compacted to 95% Standard Proctor Density. (c) Each lift shall be tested at a maximum of 500 feet intervals according to ASTM designation D-698. (d) These tests shall be performed by a reputable contractor specializing in geotechnical work and will be at the successful bidder's expense. (e) Copies of these tests shall be provided to the Owners Representative. (3) The City of Lubbock will perform random spot testing at no expense to the contractor. 3.14 LINE TESTING A. After the pipe is laid and the joints completed, each section or run of piping, shall be tested as specified herein. The Contractor shall bear all costs of providing all equipment, materials, labor, and other incidentals required to test pipe lines as specified herein. B. The Contractor shall provide suitable means for filling the lines and developing the¢required pressure in the lines. C. Testing procedure shall be as follows: (1) Duration — The duration of the hydrostatic test shall be a minimum of four (4) hours. (2) Pressure — The pipeline shall be tested so that the pressure at the lowest point in the test section is at least 100 percent, but not greater than 120 percent of the pressure class of the pipe, and the minimum pressure at the highest point in the test section is not less than 85 percent of the pressure class of the pipe. D. Allowable Leakage —The maximum allowable leakage for push -on joints is the number of gallons per hour as determined by the following formula(s): E. PVC: Ductile Iron: (1) L = ND(P) '/2 L = SD(P) '/z (2) 7,400 133,200 (3) where: (a) L = allowable leakage in gallons per hour (b) N = number of joints in length of pipe tested (c) S = length of pipe (d) D = nominal diameter of the pipe in inches (e) P = average of the maximum and minimum pressures within the test section in psi Kent Street Water Line Extension 02665-11 May 2017 �z. 1 F. Any leakage which becomes evident prior to final acceptance of the project shall be found and repaired to the satisfaction of the Engineer even though the particular line has been previously accepted and tested. 3.15 DISINFECTION OF PIPE LINES A. The Contractor shall furnish all labor, equipment, and materials necessary for the disinfection of all pipe lines, which shall be disinfected before being placed in service. B. The lines shall be disinfected by the application of a chlorinating agent in accordance with the requirements of AWWA C 651, include the placement of hypochlorite granules in the pipe during construction. C. The Contractor shall notify the Engineer 48 hours in advance of disinfection so that the Engineer or Owner's Representative may witness the disinfection activities. D. Quality Assurance: (1) Bacteriological sampling and test will be performed in accordance with the latest requirements of Standard Methods for the Examination of Water and Wastewater. (2) The City of Lubbock laboratory will be used for bacteriological testing. E. Chemicals: (1) Acceptable disinfectants are liquid and solid forms of hypochlorites. Chlorine gas is not acceptable. (2) Acceptable chemicals for neutralizing chlorinated water are liquid and solid forms of sodium bisulfate, sodium sulfite, and sodium thiosulfate. i (3) The water being used to fill the line shall be controlled to flow into the section to be sterilized very slowly, and the rate of application of the chlorinating agent shall be proportioned at least fifty (50) parts per million in the water entering the pipe. F. Temporary Facilities: (1) Provide temporary taps or blowoffs as required. As a minimum, use a two (2) inch diameter steel pipe and fittings with isolation valves and sampling taps. (2) Water used for the initial flushing as well as the final chlorination shall be introduced into the pipeline through a corporation stop or other approved connection inserted in the horizontal axis of the newly laid pipe. (3) No connection to the existing distribution system is allowed until the pipeline has passed all bacteriological testing. G. Final Flushing: i (1) Flush the water system of the highly chlorinated water within twenty-four (24) hours of initial chlorination. (2) Flush water in a location and manner approved by the Engineer. (3) Neutralize the highly chlorinated water to a maximum free chlorine residual of 1.0 mg/L. H. Sampling and Analysis: , (1) Collect bacteriological samples at intervals no more than 1000 feet and one (1) sample from each end of the pipeline in the presence of the Engineer or Owner's representative. t (2) The Owner's representative or the Engineer shall deliver the samples to the City of Lubbock Health Department or the City of Lubbock Water Treatment Laboratory for analysis. (3) Collect samples after the initial disinfection and after the facilities have been filled with chlorinated water and a free chlorine residual of at least 0.5 mg/L has been detected. I. Acceptance: is i Kent Street Water Line Extension 02665-12 May 2017 (1) Facilities will be considered properly disinfected when two (2) consecutive sets of acceptable bacteriological samples, taken at least twenty-four (24) hours apart, have indicated the absence of coliform organisms. J. After acceptance by the Engineer, remove all temporary facilities and properly plug test taps. The pipeline may then be connected to the City of Lubbock water distribution system. 3.16 INSTALLATION OF STEEL PIPE CASING AND PIPE IN CASING A. Installation of the casing pipe sleeves shall be accomplished by boring as specified herein. B. Equipment used shall be such size and capacity as to allow the placement of the casing to proceed in a safe and expeditious manner. Installation of the casing and the excavation and removal of the materials within the casing shall proceed simultaneously. C. The boring shall proceed from a pit provided for the boring equipment and workers. D. Excavation and location of the pit shall be approved by the Engineer and County as appropriate. E. Boring without the concurrent installation of the casing pipe will not be permitted. F. The use of water or other fluids in connection with the boring operation will be permitted only to the extent of lubricating cuttings. G. Jetting will not be permitted. H. Overcutting in excess of one (1) inch shall be remedied by concrete pressure grouting the entire length of the installation. I. All casing pipe joints shall be welded. J. Care shall be taken to keep the pipe sleeve on the proper line and grade. K. After the casing pipe has been jacked and bored and is accepted by the Engineer, the pipe shall be shoved through the casing. L. The pipe shall be pushed or pulled through the casing by exerting pressure on the barrel of the pipe and not on the bell, and shall be done in such a manner that the joint is always in compression during the shoving operation. 3.17 PIPE IDENTIFIERS A. Marking Tape: (1) All pipes installed in an open trench will be identified with the appropriate color and description of three (3) inch wide pipe identification tape. (2) Install the tape parallel to the pipe it identifies at a distance above the pipe of twelve (12) to eighteen (18) inches. (3) Above non-metallic (PVC) pipe material, install a tape detectable with a metal detector from the top of finished grade. (4) Install detectable tape as deep as it can be detected but no closer to the non-metallic pipe than twelve (12) inches. B. Locator Wire: (1) On non-metallic (PVC) pipe material, install twelve (12) gauge minimum solid copper with 30 mil HDPE thermoplastic insulation directly above piping. 3.18 CLEANUP A. The backfill shall be rounded up over the trench sufficiently to allow for future settlement and any excess dirt shall be removed from the site. Kent Street Water Line Extension 02665-13 May 2017 B. Design Mixes: For each concrete mix, include alternate mix designs when characteristics of materials, project conditions, weather, test results, or other circumstances warrant adjustments. C. Indicate amounts of mix water withheld for later addition at Project site. Water added at project site will not be permissible without paperwork showing how much water has been withheld. 1.4 QUALITY ASSURANCE A. Installer Qualifications: An experienced installer who has completed concrete work similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance. B. Manufacturer Qualifications: A firm experienced in manufacturing ready -mixed concrete products complying with ASTM C 94 requirements for production facilities and equipment. C. Manufacturer must be certified according to the National Ready Mixed Concrete Association's Certification of Ready Mixed Concrete Production Facilities. D. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, each aggregate from one source, and each admixture from the same manufacturer. E. ACI Publications: Comply with the following, unless more stringent provisions are indicated: (1) ACI 301 — Specification for Structural Concrete (2) ACI 117 — Specifications for Tolerances for Concrete Construction and Materials. 1.5 DELIVERY, STORAGE AND HANDLING A. Deliver, store, and handle steel reinforcement to prevent bending and damage. B. Avoid damaging coatings on steel reinforcement. PART PRODUCTS 2.1 FORM -FACING MATERIALS A. Smooth -Formed Finished Concrete: Form -facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable size to minimize number of joints. B. Plywood, metal, or other approved panel material. C. Rough -Formed Finished Concrete: Plywood, lumber, metal, earth, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit. D. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.\ E. Form -Release Agent: Commercially formulated form -release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces. F. Formulate form -release agent with rust inhibitor for steel form -facing materials. G. Form -Ties: Factory -fabricated, removable or snap -off metal or glass -fiber -reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal. H. Furnish units that will leave no corrodible metal closer than one (1) inch to the place of the exposed concrete surface. 1, Kent Street Water Line Extension 03300-2 May 2017 , I. Furnish ties that, when removed, will leave holes less than one (1) inch in diameter in concrete surface. J. Furnish ties with integral water -barrier plates to walls indicated to receive damp proofing or waterproofing. 2.2 STEEL REINFORCEMENT A. Reinforcing Bars: ASTM A 615, Grade 60, deformed 2.3 REINFORCEMENT ACCESSORIES A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire fabric in place. B. Manufacture bar supports according to CRSI's Manual of Standard Practice from steel wire, plastic, and as follows: (1) For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic -protected or CRSI Class 2 stainless -steel bar supports. (2) For slabs -on -grade, use supports with sand plates or horizontal runners where base material will not support chair legs. (3) Wood, concrete, or clay blocks are not permissible. C. Joint Dowel Bars: Plain -steel bars, ASTM A 615, Grade 60. Cut bars true to length with ends square and free of burrs. 2.4 CONCRETE MATERIALS A. Portland Cement: ASTM C 150, Type I. B. Fly Ash: ASTM C 618, Class C. C. Normal -Weight Aggregate: ASTM C 33, uniformly graded, and as follows: D. Class: Moderate weathering region, but not less than 3M. E. Water: Potable and complying with ASTM C 94. 2.5 ADMIXTURES A. General: Admixtures certified by manufacturer to contain not more than 0.1 percent water- soluble chloride ions by mass of cementitious material and to be compatible with other admixtures and cementitious materials. Do not use admixtures containing calcium chloride. B. Air -Entraining Admixture: ASTM C 260. C. Water -Reducing Admixture: ASTM C 494, Type A. D. High -Range, Water -Reducing Admixture: ASTM C 494, Type F. E. Water -Reducing and Accelerating Admixture: ASTM C 494, Type E. F. Water -Reducing and Retarding Admixture: ASTM C 494, Type D. G. Moisture Retaining Film: Dayton Superior — Sure Film J-74. 2.6 CURING MATERIALS A. Clear, Waterborne, Membrane -Forming Curing Compound: ASTM C 309, Type 1, Class B. B. Curing blankets approved by the Engineer. 2.7 REPAIR MATERIALS A. Repair Underlayment: Cement -based, polymer -modified, self -leveling product that can be applied in thicknesses from 1/8 inch and that can be feathered at the edges to match adjacent elevations. Kent Street Water Line Extension 03300-3 May 2017 B. Cement Binder: ASTM C 150, Portland Cement or hydraulic or blended hydraulic cement as defined in ASTM C 219. C. Primer: Product of underlayment manufacturer recommended for substrate, conditions, and application. D. Aggregate: Well -graded, washed gravel, 1/8 to 1/4 inch, or coarse sand as recommended by underlayment manufacturer. E. Compressive Strength: Not less than 4100 psi at 28 days when tested according to ASTM C 109. 2.8 CONCRETE MIXES A. Prepare design mixes for each type and strength of concrete determined by either laboratory trial mix or field data bases, as follows: (1) Proportion normal -weight concrete according to ACI 211.1 and ACI 301. (2) Standard design mix to be used unless noted otherwise, provide normal weight concrete with the following properties: (3) Compressive Strength (28 days): 3000 psi (4) Type I cement (5) Fly Ash: Allow up to 25% of cementitious material (6) Minimum Slump: 4 inches (7) Maximum Slump: 6 inches (8) Maximum Slump for Concrete Containing High -Range Water -Reducing Admixture: 8 inches after admixture is added to concrete with 2 to 4 inch slump. (9) Maximum Water/Cementitious Materials Ratio: 0.55 (10) Add air -entraining admixture at manufacturer's prescribed rate to result in concrete at point of placement having an air content of five (5) to seven (7) percent, unless otherwise indicated. B. Cementitious Materials: (1) For concrete exposed to deicers, limit percentage, by weight, of cementitious materials other than Portland cement according to ACI 301 requirements. (2) Limit percentage, by weight, of cementitious materials other than Portland cement in concrete as follows: (a) Fly Ash: 20 percent (b) Do not air entrain concrete to trowel -finished interior floors and suspended slabs. Do not allow entrapped air content to exceed 3 percent. (c) Admixtures with chloride ions are prohibited. C. Admixtures: (1) Use admixtures according to manufacturer's written instructions. (2) Use water -reducing admixture or high -range water -reducing admixture (superplasticizer) in concrete, as required, for placement and workability. (3) Use water -reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions. (4) Use water -reducing admixture in pumped concrete, concrete for heavy -use industrial slabs and parking structure slabs, concrete required to be watertight, and concrete with a water/cementitious materials ratio below 0.50. Kent Street Water Line Extension 03300-4 May 2017 c , kj 2.9 FABRICATING REINFORCEMENT A. Fabricate steel reinforcement according to CRSI's Manual of Standard Practice. 2.10 CONCRETE MIXING A. Ready -Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94, and as specified. B. When air temperature is between 85 degrees Fahrenheit and 90 degrees Fahrenheit, reduce mixing and delivery time from ninety (90) minutes to seventy-five (75) minutes, and when air temperature is above 90 degree Fahrenheit, reduce mixing and delivery time to sixty (60) minutes. PART 3 EXECUTION 3.1 FORMWORK A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until concrete structure can support such loads. B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117. C. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as follows: (1) Class B, 1/4 inch (2) Construct forms tight enough to prevent loss of concrete mortar. (3) Fabricate forms for easy removal without hammering or prying against concrete surfaces. (4) Provide crush or wrecking plates where stripping may damage cast concrete surfaces. (5) Provide top forms for included surfaces steeper than 1.5 horizontal to 1 vertical. Kerf wood inserts form forming keyways, reglets, recesses, and the like, for easy removal. (6) Do not use rust -stained steel form -facing material. (7) Set edge of forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. (8) Provide and secure units to support screed strips, use strike -off templates, or compacting type screeds. (9) Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous locations. (10) Chamfer exterior corners and edges of permanently exposed concrete. (11) Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work. Determine sizes and locations from trades providing such items. (12) Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete. (13) Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment. (14) Coat contact surfaces of forms with form -release agent, according to manufacturer's written instructions, before placing reinforcement. Kent Street Water Line Extension 03300-5 May 2017 a_ A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast -in -place concrete. B. Use Setting Drawings, templates, diagrams, instructions, and directions furnished with items to be embedded. C. Install anchor bolts, accurately located, to elevations required. 3.3 REMOVING AND REUSING FORMS A. Formwork, for sides of beams, walls, columns and similar parts of the Work, that does not support weight of concrete may be removed after cumulatively curing at not less than 50 degree Fahrenheit for 52 hours after placing concrete provided concrete is hard enough to not be damaged by form -removal operations and provided curing and protection operations are maintained. B. Leave formwork, for beam soffits, joist, slabs, and other structural elements, that supports weight of concrete in place until concrete has achieved the following: (1) At least 70 percent of 28-day design compressive strength. C. Determine compressive strength of in -place concrete by testing representative field or laboratory cured test specimens according to ACI 301. D. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form -facing material will not be acceptable for exposed surfaces. Apply new form -release agent. E. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints. Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by Architect. 3.4 SHORES AND RESHORES A. Comply with ACI 318, ACI 301, and recommendations in ACI 347R for design, installation, and removal of shoring and reshoring. B. Plan sequence of removal of shores and reshore to avoid damage to concrete. Locate and provide adequate reshoring to support construction without excessive stress or deflection. 3.5 STEEL REINFORCEMENT A. Comply with CRSI's Manual of Standard Practice for placing reinforcement. B. Do not cut or puncture vapor retarder. Repaid damage and reseal vapor retarder before placing concrete. C. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials. D. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars. E. All reinforcement to be in place prior to placing of concrete. Equipment will not be allowed to drive over reinforcement. 3.6 JOINTS A. Construction joints true to line with faces perpendicular to surface plane of concrete. B. Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect. Kent Street Water Line Extension 03300-6 May 2017 C. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints, unless otherwise indicated. Do not continue reinforcement through sides of strip placements of floors and slabs. D. Form from preformed galvanized steel, plastic keyway -section forms, or bulkhead forms with keys, unless otherwise indicated. Embed keys at least 1-1/2 inches into concrete. E. Locate joints for beams, slabs, joists, and girders in the middle third of spans. Offset joints in girders a minimum distance of twice the beam width from a beam -girder intersection. F. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs. G. Space vertical joints in walls as indicated. Locate joints beside piers integral with walls, near corners, and in concealed locations where possible. H. Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces. I. Contraction Joints in Slabs -on -Grade: Form weakened -plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one- fourth of concrete thickness, as follows: (1) Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond -rimmed blades. Cut 1/8 inch wide joints into concrete when cutting action will not tear, abrade, or otherwise damage,surface and before concrete develops random contraction cracks. (2) Curb and Gutter Joints: Curbs and gutter shall be constructed with an expansion joint at the tangent point on each return at intersections and at the end of each day's concrete pour. (a) A construction or contraction joint shall be located at intervals corresponding to the joint interval of the adjacent concrete pavement or as directed by the Owner's Representative. (b) Joints in the new concrete pavement shall extend through the new curb and gutter unless otherwise directed by the Owner's Representative. (c) All joints shall be perpendicular to the surface of the concrete and to the axis of the section. (d) The contraction joints shall be made by cutting into the curb and gutter sections with a trowel a depth of 22 inches; these joints shall be finished as specified under finishing. (e) Expansion joint material shall be an approved preformed bituminous impregnated non -extruding type jointing material, meeting the requirements of AASHTO M 213. The joint material shall be 1/2 inch thick, and shaped to the section of the curb and gutter or other work. (3) Sidewalk Joints: Space contraction joints at 4 feet and expansion joints every 20 feet. Expansion joints shall be placed between existing and new setting of concrete. (4) Dowel Joints: Install dowel sleeves and dowels or dowel bar and support assemblies at joints where indicated. (a) Use dowel sleeves or lubricate or asphalt -coat one-half of dowel length to prevent concrete bonding to one side of joint. 3.7 CONCRETE PLACEMENT A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections have been performed. �.j Kent Street Water Line Extension 03300-7 May 2017 B. Do not add water to concrete during delivery, at Project site, or during placement, unless approved by the Engineer. C. Before placing concrete, water may be added at Project site, subject to limitations of ACI 301. D. Do not add water to concrete after adding high -range water -reducing admixtures to the mix. E. Water may not be added beyond the limit of water withheld from the plant. F. Deposit concrete continuously or in layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. G. If a section cannot be placed continuously, provide construction joints as specified. H. Deposit concrete to avoid segregation. I. Deposit concrete in forms in horizontal layers no deeper than 24 inches and in a manner to avoid inclined construction joints. Place each layer while preceding layer is still plastic, to avoid cold joints. J. Consolidate placed concrete with mechanical vibrating equipment. Use equipment and procedures for consolidating concrete recommended by ACI 309R. (1) Do not use vibrators to transport concrete inside forms. Inset and withdraw vibrators vertically at uniformly spaced locations no farther than the visible effectiveness of the vibrator. (2) Place vibrators to rapidly penetrate placed layer and at least 6 inches into preceding layer. (3) Do not insert vibrators into lower layers of concrete that have begun to lose plasticity. (4) At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mix constituents to segregate. K. Deposit and consolidate concrete for floors and slabs in a continuous operation, within limits of construction joints, until placement of a panel or section is complete. L. Consolidate concrete during placement operations so concrete is thoroughly worked around reinforcement and other embedded items and into corners. M. Maintain reinforcement in position on chairs during concrete placement. N. Screed slab surfaces with a straightedge and strike off to correct elevations. O. Slope surfaces uniformly to drains where required. P. Begin initial floating using bull floats or darbies to form a uniform and open -textured surface plane, free of humps or hollows, before excess moisture or bleedwater appears on the surface. Do not further disturb slab surfaces before starting finishing operations. Q. Cold Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures. (1) When air temperature has fallen to or is expected to fall below 40 degree Fahrenheit, uniformly heat water and aggregates before mixing to obtain a concrete mix temperature of not less than 50 degrees Fahrenheit and not more than 80 degrees Fahrenheit at point of placement. (2) Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials. (3) Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators, unless otherwise specified and approved in mix designs. Kent Street Water Line Extension 03300-8 May 2017 R. Hot Weather Placement: Place concrete according to recommendations in ACI 350R and as follows, when hot weather conditions exist: S. Cool ingredients before mixing to maintain concrete temperature below 90 degrees Fahrenheit at time of placement. T. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. U. Using liquid nitrogen to cool concrete is Contractor's option. V. Cover steel reinforcement with water -soaked burlap so steel temperature will not exceed ambient air temperature immediately before embedding in concrete. W. Fog -spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas. 3.8 MISCELLANEOUS CONCRETE ITEMS A. Filling In: Fill in holes and openings left in concrete structures, unless otherwise indicated, after work of other trades is in place. B. Mix, place, and cure concrete, as specified, to blend with in -place construction. Provide other miscellaneous concrete filling indicated or required to complete Work. 3.9 CONCRETE PROTECTION AND CURING A. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold -weather protection and with recommendations in ACI 305R for hot -weather protection during curing. B. Formed Surfaces: Cured formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. (1) Leave forms in place for a minim of 3 days. (2) Upon removal of forms, apply approved curing compound. C. Unformed Surfaces: Begin curing immediately after finishing concrete. (1) Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces, by the following method: D. Concrete shall be wet cured for 3 days after concrete placement. Wet curing shall begin immediately after final finishing of slab surface and shall consist of continuous misting by sprinkler or wet burlap. (1) No work will be permitted on the slab during wet curing. E. Immediately after removal of sprinkler or burlap, Contractor shall apply approved curing compound. F. During cold weather concrete placement, in lieu of wet curing, the Contractor shall place plastic sheets over the concrete surface with blankets over the plastic. Plastic shall remain in place for 3 days. G. Sealing Coat: Uniformly apply a continuous sealing coat of curing and sealing compound to hardened concrete by power spry or roller according to manufacturer's written instructions. 3.10 FIELD QUALITY CONTROL A. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device will be permitted by the Engineer. END OF SECTION Kent Street Water Line Extension 03300-9 May 2017 PUBLIC WORKS ENGINEERING MAYOR DANIEL M. POPE CITY COUNCIL JUAN CHADIS, SHELIA PATTERSON-HARRIS, JEFF GRIFFTTH, STEVE MASSENGALE, KAREN GIBSON, LATRELLE JOY CITY MANAGER W. JARRETT ATKINSON KENT STREET WATER LINE VICINITY MAP Y� a � gil City of Lubbock MAY 2017 DIRECTOR OF PUBLIC WORKS L WOOD FRANKLIN, P.E. CITY ENGINEER MI0iAEL G. KEENUM, P.E., CFM CHIEF WATER UTILITIES ENGINEER JOHN TURPIN, P.E. P_2! z p�Sz e ' ' 8p '���QQ� �'.a^ 56 Ir9 I '� g m W CO 1IyyI K a1 18H1H8aa ;uoo� o b KENT STREET WATER LINE N 300 50 1 0 SCALE 1:100 12' PVC WATER LINE SUMMARY: p+00 TIE TO ENLSTTNG I2'Cf £ -45°BEND 0+39 n AS- WHO . w 0+ •12'N6"TEE ... LOYgAST SOUTH. -6"GATE VALVE G -7LP OF 6'PVC - FIRE HYDRANT WITH BOLLARDS (LOCATION TO BE VERIFIED IN FIELD) (LOCATION :i 12'PVC WATER 3+07 ' Smut tkk N. -yy p ' % l u'Ct.stiU1 Tau Mtih. . IN 2O'GSING BY OPEN CUT CENTERED OVER -BEGIN ENCASEMENT 3+27 > .. ! .•�, , ,. / O+pO EXISTING PETROLEUM LINE PROPOSED 12' PVC WATE0. 11+00 15+W — - END ENCASEMENT 1DO -PI 3220.83FL 0� 3+07 1 �W 3+27 �M� 15+5+002"GATE VALVE �v,s' N P sewn Lbw � ap I 1 PROFILEC 12" -900 PVC WgjE0. fROM 0+00 TO 18+11 ...._..__. .._.._ ..._._.,..�. „_,_.,_.__ .........._.. ... .......:........:......_W...�.__._....,_ _.� ...__,._..._�_.....__•_ __,m_._......._.. _..._.:..._.... .....�..... G�iA"T:. R. 1 n125 NOTES: - CONTRACTOR SHALL COORDINATE WITH ELECTRIC COMPANY AS NEEDED. LEGEND wr..SGST. WATERLINE EXIST. SEWER LINE P. WATER LINE .... EXIST. PETROLEUM LIN p PROP. TAP SLEEVE DST. TV SLEEVE I PROP, PLUG EGST. PLUG 0 PROP. GATE VALVE DaST. GATE VALVE DOST. MANHOLE a PROP. REDUCER EXIST. REDUCER O PROP. HYDRANT DUST. HYDRANT PI POINT OF INFLECTION DIG-TESS NOTE: CONTRACTOR SHALL CONTACT DIG-TESS (1.800-DIG-TESS) FOR UTILITY LOCATES NO LATER THAN TWO FULL WORKING DAYS PRIOR TO COMMENCING GRADING/ PAVING/CONSTRUCTION, %''$yJ�OBN N� INEN'y� 'FgS�;.fN GENEPN. NOTES:'' City of I.PRIOIRTOANY CONSTRUCTION Lubbock DIFFERENT FROM THIS PLAN, Gil JOSH I=05A84JS2. ,.... 2. TRACER WIRE SMALL BE INSTALLED TO INDICATE LOCATION OF WATER PIPES. -'.`....___...._® 3. CONSTRUCTION TAPE SHALL BE INSTALLED 2' ABOVE WATERISEWEe PIPES, 3.0.117028 C.I.P.#92454.9241.30000 DESIGNED BY: AN, 3K A. 2" BLOW -OFF VALVES SMALL BE INSTALLED ON WATER PIPES WHEN REQUIRED FOR DRAWN BY: AP TESTING AND DISINFECTANT. CHECKED BY: IT S. MANDATORY: CALL FOR LINE LOCATES SCALE: 1"=100' 48 HOURS PRIOR TO BEGINNING DATE: MAY 2017 ANY CONSTRUCTION ALTIVM. 6. FOLLOW BEST MANAGEMENT PRACTICES .•,MIN• TO COMPLY WITH EPA5 STORM WATER POLLUTION PREVENTION PLAN REQUIREMENTS. KENT STREET WATER LINE 7. A CITY OF LUBBOCK AND/OR TOM STA 0+00 TO 18+00 DEPARTMENT OF TRANSPORTATION PERMIT WILL BE REQUIRED TO BE ON SITE DUIUNG CONSTRUCTION...,.,, 8. CONTRACTOR IS RESPONSIBLE FOR FIELD DRAWING # ERI STANDALL NEELOCATTIIOISPRIORRTOCO 3-D-1513 BEGINNING CONSTRUCTION. THE CITY OF LUBB= WILL NOT BE MELD RESPONSIBLE FOR ANY MINOR CHANGES NEEDED TO ADJUST THE PROPOSED LINES. W-1 7 KENT STREET WATER LINE 41 uwr Pmw WATER w 2v CASING, By OPEN CUT CENIVIEDOVER BOSTING PETROLEUM LINE PROPOSED I' PVC WA T M tU^Mr.JM 25+OD 26+38.-...", 26+S8 REM PLAN SHEET C-1 PROFILE 12'C-900 PVC WATER FROM ft0qjp �1:10D_ tCALI� I .. ........ I ?o 5 1 0 SCALE 1:100 12' PVC WATER LINE SUMMARY 25+07 _ PT 3219.35 FL 26+38 • BEGIN ENCASEMENT 16,11 _END ENCA SEMENT IB+17 12"x 6"TEE GATE VALVE SOUTH; V GATE VALVE 7 UP OF 6- PVC • FIRE HYDRANT WITH DOLLARDS (LOCATION TO BE VERIFIED IN FWD) GENERAL NOTES: __ .......... 11.1-- ---- ... ...... . . ...... ___ 1. PRIOR TO ANY CONSTRUCTION 6. FOLLOW BEST MANAGEMENT PRACnCES DIFFERENT FROM THIS PLAN, CALL TO COMPLY WITH EPAS STORM WATER JOSH FULD 0 S48Al52. POLLUTION PREVENnDN PLAN REQUIREMENTS. 2. TRACER WIRE SHALLBE INSTALLED TO INDICATE LOCATION OF WAWA PIPES. 7, A CITY OF LUB800C AND/OR TEXTS 3. CONSTRUCTION TAPE SHALL BE DEPARTMENT OF TRANSPORTATION PERMIT WILL BE "EQUIRED TO BE INSTALLED 2'AWVE WATERISEWER PIPES. ON SITE DURING CONSTRUCTION. ................................................. --------------- CONTRACTOR SMALL COORDINATE WITH ELECTRIC COMPANY AS NEEDED. 4. 2- SLOW -OFF VALVES SHALL BE INSTALLED E AND 'ITZMANQUIRED FOR T 8, CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL LOCATIONS AND DEPTHS OF TIE-INS AND LINE LOCATIONS PRIOR TO CONTRACTOR SHALL COORDINATE AND S. MANDATORY: CALL FOR LINE LOCATES BEGINNING CONSTRUCTION. THE CITY OF LUBBOCK WILL NOT BE HELD RESPONSIBLE NOTIFY B.N.S.F. RAILWAYS PRIOR TO CONSTRUCrION OF PROPOSED BORE. 48 HOURS PAID RTOBEGINNING ANY OMWR UCTION ACTIVITY. FOR ANY MINOR CHANGESNEEDED TO A03M THE PROPOSED LINES. 3235 3230 3225 322D 3215 3210 ---- ---------- - ------- ------- REVISIONS KENT STREET WATER LINE LEGEND 110 $o I SCALE 1: 100 EXIST. SEINER LINE ---.PROP. WATER LINE EXIST, PETROLEUM LINE 12" PVC WATER LINE SUMMARY: D PROP. TAP SLEEVE 44.21 DUST. TO SLEEVE - BEGIN ENCASEMENT PROF. PLUG -END ENCASEMENT EXIST, PLUG 44+65 - 22.S' SEND 0 PROP, GATE VALVE WEST,. EXIST. GATE VALVE Pd 12"PVCWATERSO.2-W IN By woal& 4i - 12'GATE VALVE 45+02 EAST. MANHOLE 2LS' SEND PROP. REDUCER pm'�wm �mv 45,0 - BEGIN BORE EXIST. REDUC LAT: 33.63S858 LONG: 101,855572 PROP HYDIANTER 46+1 EXIST. HYDRANT ... 4S+07tYN PRoposm ir 22 61�00 62+00 -ENO BORE LAT: 33.63958 LONG: 10I.M206 1 PI POINT OF INFLECTION D 1 6 T E SS NOTE - 46+60 XENTST 46+22 - 22.5- SEW -49+59 S4+8S KENT $T 11, 65+05 WEST, 12* GATE VALVE 46. - BEGINENCASEMENT CONTRACTOR SHALL CONTACT DIG-TESS (1 -800-DIG-TESS) FOR UTILITY LOCATES NO rl Ant RELEASE VALVE IN TRAmc RATED VAULT LATER THAN TWO FULL 12 IM11. IN 2r CASING 110W-11. WITH GOOSENECK LOCATED V NORTH OF POLE 46+50 WORKING DAYS PRIOR TO • END ENCASEMENT COMMENCING GRADING/ =WUNDER E PEIIWUBUM LINES 47+08 - 22.5- SEND PAVING/CONSTRUCTION. 49+59 -PI 3217.10 FL sq+S PI 3220.83 R lr'PVC WATER -.,,-om—cvr; TAP AND VALVE r AIR RELEASE VALVE COMBED UNDER , LINES EnMNGftlRmm 61+00 - 12* GATE VALVE 62+ 00 P1 3217.00 Ft. GRWND -------------- -- -,"F%rWAPER 'a -01 -------- N61f2W CASIki( 7 .. ... ... . . ........ 7'77 .... 12PvcW,TER - - --------- - - ,- i � rPvcwATER P, -- ------------ . ........ 7 .... ......... ... ---------------- -------------- ------ LubbocklO IN 2TNw ' -.-BY OPEN 4i+bD W; 43 4 44+011 49�66 56�01) fi;w ------ - 5-2,+,Do 53-00 511.66 - -------------- ;66 **"*U ---- a -04F - - - ........ Mwed ---------- - .. ..... ....... 04 •1.0.117028 67 ------ ie+66 ... ... . ... FURD'A lw- C.I.P. *92454 9241.30000 QW&MMY N, DI K VALVE PI 3220.83 FL DESIGNED BY:. AN, X DRAWN BY: AP 94Al;ZsrmeNT CHECKED BY: 3T SCALE: V'-IOV PROFILE I2" 7C WATER FROtj;�%(R:%"tW ....... . . . . . ..... ...... .. ....... . ...... . . ... ..... . ... .. .... .. ... .. . . .. ..... .. .............. ..... DATE: MAY 2017 I!N�t KEW STREET WATER LINE NOTES: STA 41+00 TO 64+00 1. PRIOR TO ANY CONSTRUCTION CONTRACTOR SHALL COORDINATE DIFFERENT FROM THIS PLAN. CALL 4. 2- BLOM)FF VALVES SHALL BE INSTALLED ON WATER PIPES MEN REQUIRED FOR 7. A CITY OF LUBBOCK AND/OR TEXAS DEPARTMENT OF TRANSPORTATION WITH ELECTRIC COMPANY AS NEEDED. JOSH FLUD 0 540-41S2. TESTING AND DISINFECTANT. PERMIT WILL BE REQUIRED TO BE ON SITE DURING CONSTRUCTION. CONTRACTOR SHALL COORDINATE AND 2. TRACER WINE SHALL BE INSTALLED NOTIFY N.S.F.RAILWAYS PRIOR TO TO INDICATE LOCATION OF WATER PIPES, 5. MANDATORY: CALL FOR LINE LOCATES 48H RSPRIORTOSEGINNING S. CONTRACTOR IS RESPONSIBLE FOR FIELD ....... DRAWING CONSTRUCTION OF PROPOSED SORE. 3. CONSTRUCTION TAPE SHALL BE ANY CONSTRUCTION ACTIVITY. VERIFYING ALL LOCATIONS AND DEPTHS OF TIE4NS AND LINE LOCATIONS PRIOR TO 3-D-1 13 INSTALLED 2' ABOVE WATERSEWER PIPES 6. FOLLOW BEST MANAGEMENT PRACTICES TO COMPLY WITH EPN STORM WATER BEGINNING CONSTRUCTION, THE CITY OF LUBBOCK WILL NOT BE HUD RESPONSIBLE POLLUTION PREVENTION PLAN FOR ANY MINOR CHANGES NEEDED TO ADJUST W-3 ........ .. .... ...... .. . ... ......... REQUIREMENTS. THE PROPOSED LINES. KENT STREET WATER LINE AC SCiLB:F�1'� V.-I�d H�O ToM6 TER FROM +.e1....—___...__...__. N 1 _ 50 1 _ SCALE 1:100 it P,C WATERLBE SUfR4ARY: • BEGIN DETECTION - PI 3215.42 FL 65+56 - BEGO EIUS@B1T 65 6 • ElO BIGSElBNT 66N00 - P 3214d10. n+n -1rxe,TEE SCUM -5 LF OF 6-PVC - W GTE VALVE - FIRE HYDRANT (LOCATION TO BE VMFTED IN FIELD) 75+25 -PI 319 FL R 36 - Ir GTE VALVE "H4 -4S• BED EAST: -1r GTE VALVE 76+99 - 4S` BEND w+DD -P 31"FL 91+28 • 2" aeD 81+M - lr x 10' REDUCER - TEE TO E%LSTINf IV AC LEGEND „�.. DMST. "TER LINE s SaST. SEWER LINE —w-.PROP. WATER LINE ew. PETROLEUM Up p PROP. TAP AEEVE EXIST, TAP SLEEVE 1 PROP. FM EOSN. PLUG 0 PROP. GTE VALVE EXLST. GTE VALVE COST. MANHOLE 4 PROP, REDUCER EOST. REDUCER U PRDR, HYDRANT DOM. HYDPANf P PODPT OF MifCTM0 D1GTE55 NOTE: CONTRACTOR SHALL CONTACT DIG-TESS (1-800-DIGTESS) FOR UTILITY LOCATES NO LATER THAN TWO FULL WORIO:NG DAYS PRIOR T( COMMENCING GRADING) PAVING/CONS CT/ON. J06X xA16TIHPx MOTES: /�c^l _ -MNNTRACIOI SNNLL COORDRAITE .. WIM HECfRIC COPiANTf AS Rom. - CONTRACTOR SHALL DOMINATE AND NOTIFY BNS.F. RAJLWAYS POOR TO OOMPRUCTION OF PROPOSED DOPE. `I. - ` CONSTRUCTION .y. Lubbock W ERE NT FROM THIS PML CALL 305H FLUID O 54b4152. 2. TRACER WIRE SMALL M INSTALLED TO INDICATE LOCATION Or WATER P14Ew 3.0. 117028 3. C.I.P. 392454.9241.3000 WAwsnoAAM MA- DISTALLID 7 ABOVE WATEVSeWEI P1PES DESIGNED BY: AN, M 4. r ED WALLED VALVESSHALLREQUIRED DRAWN BY: AP I ON WATER PIPES WHEN RE0002ED FOR WATERKOW-PI TPSTIMG AND OBNIECTNfT, CHECIOEDBY: Jr S. MANDATORY: CALL FOR LINE LOCATES 48 HOURS PRIOR TO BEGNNDIG SCALE: V-100' DATE: MAY 2017 ANY CONSTRUCTION ACTIVITY. 6. FOLLOW BEST WNme4ENT PRACTICES TO COMPLY WITH EMS STOW WATER POLLUTION PREAENno" REQUIPENEMP.vL 1 STREET WATER LIN 7. A CRY OF WBBOO( ANDX R TDCAS STA 64+00 TO 81+46 DEPARTMENT OF TRANSPORTATION PERMIT WILL SE REQUIRED ro BE ON SITE DLNBIG CONSTRUCRON. 8. CONTRACTOR 6 R$PONG9BtE FOR F7EID DRAWING # VERIFYING ALL LOCA7I016 AND DEPns OF TIETNSAND LISM 1OCA71016 PRIORro 3•D-1513 I=n7ILL� CITYFOAYMINORHDTDE tBDRDTON5101E taaANTMuaaouHGESIEED®roAD)UST W-4 2017 WATER IMPROVEMENTS PHASE 1 ^ SAPD. N 20 .. SCALE 1:20 TatES COMPACTOR 9Yu. COOVnvulE WITH BECTAC COWANY AS NNE®® • CONTRACTOR 6 RESPOAS®LE FOR P ACMG DMEWAYS BAG( TO • COMPACTOR S RESPONSIBLE FOR PROVIDING ACCESS TO NOW OWNERS DURDIG WATER MALN OON STRUCTM • ONCE THE WATER MCNN CONSTRUCTION CROSSES THE BILSTRNG DR1YEWAYS THE CONTRACTOR HAS 10 WOBOMG DAYS TO REPLACE THE DRR£WAYS. GBEI+AL IOTES: L PR10R TO ANY CONSTRUCTION DNFBENT FROM THIS PLAN. CALL JOSH N.UD Q 5NB11S2. 1 TRACER WIRE SHALL BE RSTALLED TO DOIEATE LOCATION OF WATER PWM 3. CONSTRUCTION TAPE SHALL BE INSTALLED 7 ABOVE WATT PIPES. 4. T BIOW-oPP VALVES SHALL BE BSTAUEO ON WATER PEES WHEN REQU RED FOR TEBTIIIG AND DISDAWTANT. A MANDATORY: CALL FOR U E LOCATES /B INAIRS PRIOR TO BEGDMNG ANY OCISITBJCTION ACTIVRY. 6. FOLLOW BEST MA -G9ENT PRACTICES TO COMPLY WITH EPAS STORM WATER POLLUTION PREVENTION PLAN FSOOA&ENTS. T. A CITY OF LUBBOCK ROAR TEYAS DEPARTMENT OF TRANSPORTATION PERKT WILL BE REQUIRED TO BE ON SITE OURN10 CONSTRUCTION. B. CON TRACTOR LS PESPORSIM FOR FR D VBUFYAIG ALL LDCATHJNS AND DEMS OF TIERS AND LWE LOCATIONS PRIOR TO BWIMHNG CDNSTRUCTM THE Cry OF LUBBOCK WILL NOT BE LED RSSPOLCBLE FOR ANY MUM ORANGES NEEDED TO ADW THE PROPOSED LDES. w ti