RESOLUTION
RESOLUTION APPROVING AND ADOPTING ESTIMATE OF THE COST OF IMPROVEMENTS,
OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS IN THE NATURE OF GRADING, LAYING
CURB AND GUTTER AND PAVING PORTIONS OF CERTAIN STREETS, HIGHWAYS, AVENUES AND/OR
ALLEYS IN THE CITY OF LUBBOCK, TEXAS AND CERTAIN STREETS AND HIGHWAYS, AVENUES
AND/OR ALLEYS ALONG 'THE BOUNDARY OF SAID CITY, SAID IMPROVEMENTS BEING DESIGNATED
AS GWO NO. 3008, FIXING THE TIME AND PLACE FOR A HEARING TO THE OWNERS OF ABUTTING
PROPERTY1 RAILWAYS, OR RAILWAY COMPANIES USING, OCCUPYING OR CROSSING ANY PORTION
OF STREETS AND/OR ALLEYS AND OTHER PERSONS INTERESTED IN SAID PROPERTY AND DI-
RECTING THE CITY SECRETARY TO PUBLISH NOTICE ON BEHALF OF THE GOVERNING BODY OF
THE CITY OF LUBBOCK, TEXAS.
WHEREAS, the Governing Body of the City of Lubbock has heretofore ordered
that portions of streets, highways, avenues and/or alleys be improved by grading,
installing concrete curb and gutter, reinforced concrete five (5) inch thick alley
pavement, reinforced concrete railroad crossings and street pavement with caliche
base and five (5) course asphalt surface together with incidentals and appurte-
nances.
WHEREAS, the Governing Body of the City of Lubbock has caused the City
Engineer to prepare and file estimates of the cost of such improvements and
estimates of the amounts per front foot to be assessed against abutting property
and the owners thereof, and Railways or Railway Companies using, occupying or
crossing any portion of streets and/or alleys, and such estimates have been
prepared and examined;
THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK,
I.
Such estimates be and they are hereby adopted and approved.
II.
NOTICE
TO THE OWNERS OF PROPERTY ABUTTING UPON THE HEREINBELOW MENTIONED PORTIONS
OF STREETS, HIGHWAYS, AVENUES AND/OR ALLEYS, RAILWAYS AND/OR RAILWAY COMPANIES
USING, OCCUPYING OR CROSSING ANY PORTION OF STREETS AND/OR ALLEYS AND TO ALL OTHERS
AFFECTED:
The Governing Body of the City of Lubbock has heretofore ordered that the
following portions of streets, highways, avenues and/or alleys in and along the
boundary of the said City of Lubbock, Texas, be improved by raising, grading
and filling and installing concrete 'curbs and gutters, reinforced concrete five (5)
inch thick alley pavement, reinforced concrete railroad crossings and street pave-
ment with caliche base, five (5) course asphalt surface, storm sewers and drains
where necessary on streets, highways, avenues and/or alleys, designated below:
It is hereby found and determined that the cost of the improvements on
such portions of said streets, avenues, highways and/or alleys with the amount or
amounts per front foot proposed to be assessed for such improvements against the
abutting property, the owners thereof, on the portions of said streets, avenues,
highways and/or alleys and railways and/or railway companies, using, occupying or
crossing any portion of said streets, avenues, highways and/or alleys as follows,
to -wit:
The following thirty-six (36) foot width streets are known and designated
as Unit Number 2215, Sub -Unit l through 7 (inclusive), the total estimated cost of
the improvements is $54,608.96; the estimated amount per front foot to be assessed
against the abutting property and the owners thereof for curb and gutter is
$2.5725;• the estimated amount per front foot to be assessed against the abutting
property and the owners thereof for improvements exclusive of property owner curb
and gutter is $5.9907808 for front abutting and $3.9938539 for side abutting
property.
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, 55th Street from Wayne Avenue to Vicksburg Avenue, the
estimated cost of Sub -Unit 1 of Unit 2215 is $10,745.82.
Sub -Unit 2, 55th Street from Vicksburg Avenue to Utica Avenue,
the estimated cost of Sub -Unit 2 of Unit 2215 is $8,208.58.
Sub -Unit 3, 56th Street from Wayne Avenue to Vicksburg Avenue, the
estimated cost of Sub -Unit 3 of Unit 2215 is $10,218.55.
Sub -Unit 4, 57th Street from Wayne Avenue to Vicksburg Avenue, the
estimated cost of Sub -Unit 4 of Unit 2215 is $8,851.16.
Sub -Unit 5, Wayne Avenue from 57th Street to 58th Street, the estimated
cost of Sub -Unit 5 of Unit 2215 is $6,544.28.
Sub -Unit 6, Wayne Avenue from 56th Street to 57th Street, the estimated
cost of Sub -Unit 6 of Unit 2215 is $6,396.48.
Sub -Unit 7, Vicksburg Avenue from 55th Street to 56th Street, the
estimated cost of Sub -Unit 7 of Unit 2215 is $3,644.09.
The following forty-two (42) foot width streets are known and designated
as Unit Number 2216, Sub -Unit 1 through 5 (inclusive), the total estimated 'cost of
the improvements is $42,765.81; the estimated amount per front foot to be assessed
against the abutting property and the owners thereof for curb and gutter is
$2.5725; the estimated amount per front foot to be assessed against the abutting
property and the owners thereof for improvements exclusive of property owner curb
and gutter is $5.5382044 for front abutting property in residential zones and
$3.6921362 for side abutting property in residential zones and $6.5318255 for
business zones and $7.2332044 for school rate.
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, Vicksburg Avenue from 56th Street to 58th Street, the
estimated cost of Sub -Unit 1 of Unit 2216 is $9,276.34.
Sub -Unit 2, Utica Avenue from 56th Street to 58th Street, the estimated
cost of Sub -Unit 2 of Unit 2216 is $11,503.28.
Sub -Unit 3, 56th Street from Vicksburg Avenue to Utica Avenue, the
estimated cost of Sub -Unit 3 of Unit 2216 is $9,242.54.
Sub -Unit 4, Utica Avenue from 55th Street to 56th Street, the estimated
cost of Sub -Unit 4 of Unit 2216 is $8,457.87.
Sub -Unit 5, Utica Avenue from 54th Street to 55th Street, the estimated
cost of Sub -Unit 5 of Unit 2216 is $4,285.78.
The following forty-four (44) foot width streets are known and designated
as Unit Number 2217, Sub -Unit 1 through 2 (inclusive), the total estimated cost of
the improvements is $21,239.19; the estimated amount per front foot to be assessed
against the abutting property and the owners thereof for curb and gutter is
$2.5725; the estimated amount per front foot to be assessed against the abutting
property and the owners thereof for improvements exclusive of property owner curb
and gutter is $5.2477426 for front abutting property in residential zones and
$3.4984950 for side abutting property in residential zones and $7.2014122 for
business zones.
The estimated cost of each Sub -Unit is as follows:
Sub -Unit 1, 58th Street from Wayne Avenue to Vicksburg Avenue, the
estimated cost of Sub -Unit 1 of Unit 2217 is $11,682.09.
Sub -Unit 2, 58th Street from Vicksburg Avenue to Utica Avenue, the
estimated cost of Sub -Unit 2 of Unit 2217 is $9,557.10.
And arrangement for the making and construction of such improvements with
pavement of five course asphalt surface treatment (Inverted Penetration Type) and
a six (6) inch compacted caliche base in streets, highways and avenues, alleys to
be constructed with pavement of five (5) inch reinforced concrete slab has been
made and entered into by the City of Lubbock, Texas, and rolls or statements
showing the proposed amounts to be assessed against the abutting property, the
owners thereof and the Railways and/or Railway Companies, using occupying or
crossing any portion of said streets or alleys, their rails, tracks, double tracks,
turnouts and switches and two (2) feet on each side thereof for reinforced concrete
street crossings and reinforced concrete alley slabs in said streets or alleys
have been filed with the City, such rolls or statements showing other matters and
things, and have been approved and the City Council of said City has fixed a time
and place for hearing to the owners of property abutting upon said portions of
streets, highways, avenues and/or alley and Railways or Railway Companies using,
occupying or crossing any portion of said streets or alleys, and to all others
affected, at which hearing the amounts to be assessed against the respective
parcels of abutting land and the owners thereof for improvements in the units
upon which the particular parcels of property abut, the amounts of benefits to the
respective parcels of property by means of the improvements in the unit upon
which the particular property abuts, the regularity of the proceedings with
reference to such improvements, the apportionment of the cost of such improvements,
and 'other matters and things will be determined, and after such hearings
assessments will by ordinance be made and levied, and such hearing will be had and
held by and before the City Council of the City of Lubbock, Texas, in regular
Council Meeting Room in the City Hall, in the City of Lubbock, Texas on the 13th
day of August 1970, at 1:30 p.m. o'clock. The rolls or statements showing the
proposed amounts of such assessments are on file in the office of the City
Secretary and copies thereof are in the office of the City Engineer of the City
of Lubbock and open to inspection of any interested parties at any time, and of
all said matters and things all such owners of property, as well as any and
others in anywise affected or interested, will take due notice.
By order of the City Council of the City of Lubbock, this the 9th day
of July, 1970.
No notice other than that herein provided for shall be necessary and such
notice shall be due and sufficient notice to any and all persons, firms,
corporations and other parties.
That a hearing be given and held by and before the Governing Body of the
City of Lubbock, Texas, to all persons owning or claiming any property abutting
any part or portion of said streets, highways, avenues and/or alleys or any
Railway or Railway Company using, occupying or crossing any street, avenue or
alley described in Section II, of this Resolution, as well as all owning or claim-
ing any interest in any such property. Such hearing shall be given and held on th
13th day of August, 1970, at 1:30 p.m. o'clock on the second floor in the City
Hall, City of Lubbock, Texas and the City Secretary is hereby directed to give
notice of the time and place of such hearing, and of other matters and facts in
accordance with the terms and provisions of an Act passed at the first called
session of the 40th Legislature of the State of Texas and known as Chapter 106 of
the Acts of said Legislature which has been adopted as an amendment to and made a
part of the Charter of the City of Lubbock, Texas, and as amended by Chapter 176
Acts of the 60th Regular Session of said Legislature. Such notice shall be by
advertisement inserted at least three times in a newspaper published in the City
of Lubbock, Texas; the first publication shall be made at least twenty-one days
before the said hearing; and, additional written notice of the hearing shall be
given by depositing in the United States mail, at least fourteen (14) days before
the date of the hearing, written notice of such hearing, postage prepaid, in an
envelope addressed to the owners of the respective properties abutting such
highway, highways or portion or portions hereof and any railway or street railway
using, occupying or crossing any highway, portion or portions thereof to be
improved, as the names of such owners are shown on the then current rendered tax
rolls of the City of Lubbock and at the addresses so shown, or if the names of
such respective owners do not appear on such rendered tax rolls, then addressed
to such owners as their names are shown on the current unrendered rolls of the
city at the addresses shown thereon. Said notice shall comply with and be in
accordance with the terms and provisions of this resolution and said Act as
amended.
PASSED AND APPROVED BY UNANINDUS VOTE OF THE GOVERNING oAroj� OF THE CITY OF LUBBOCK
TEXAS, THIS, THE 9TH DAY OF JULY, 1970. �/
. UranUrry,
ATTEST
1�1t
Lave 'a Lowe, 'City"S eretary
IAPPRa D
o
Wil d D Watson; City Engineer
AP OVED:
red 0. Senter, Jr., City Att rn
WESTERN HILLS ADDITION
12 blocks of assessment paving between
54th Street and 58th Street and :Wayne Avenue
to Utica Avenue.
TOTAL COST
$124,559.93
LESS CITY'S. COST
- 13,585.10
LESS SCHOOL'S COST
- 22,042.78
P. 0. COST BASED ON
$ 88,932.05
ESTIMATED COSTS.
1970 RATES APPROVED FOR USE:
(Proposed to be reduced after contract)
--For 36' Street Front Rate $
8.5625.
(including C & G $2.5725) Side Rate
6.5625;
42' Street Front Rate -
8.5625
Side Rate
6.5625
School Rate
9.8051
44' Street Front Rate
8.5625
Side Rate
6.5625