HomeMy WebLinkAboutMinutes - City Council - Regular - 2/19/2004CITY OF LUBBOCK
REGULAR CITY COUNCIL MEETING
FEBRUARY 19, 2004
7:30 A. M.
The City Council of the City of Lubbock, Texas met in regular session on the 19th
day of February, 2004, in the City Council Chambers, first floor, City Hall, 1625
13th Street, Lubbock, Texas at 7:30 A. M.
7:35 A. M. CITY COUNCIL CONVENED
City Council Chambers, 1625 13th Street, Lubbock, Texas
Present: Mayor Marc McDougal, Mayor Pro Tern T. J. Patterson, Council
Member Gary O. Boren, Council Member Jim Gilbreath, Council
Member Tom Martin, Council Member Frank W. Morrison
Absent: Council Member Hernandez
7:39 A. M. Council Member Hernandez arrived.
CITIZEN COMMENTS
The following citizens expressed comments to the Council. They were:
• Ysabel Luna spoke concerning communications between the
citizens of Lubbock and the City Council.
• Jim Watters spoke regarding the unsafe conditions in the North
Overton neighborhood.
• Cindy Finley, Special Projects Director of South Plains
Transportation Alliance, spoke concerning Citibus and
transportation options in Lubbock.
• Hillary Hutcheson spoke concerning communications between the
citizens of Lubbock and the City Council.
EXECUTIVE SESSION
Mayor McDougal stated: "City Council will hold an Executive Session
today for the purpose of consulting with the City Staff with respect to
pending or contemplated litigation; personnel; the purchase, exchange,
lease or value of real property; competitive matters of the public power
utility; and to review certified agenda from the prior executive session as
provided by Subchapter D of Chapter 551 of the Government Code, the
Open Meetings Law."
7:51 A. M. CITY COUNCIL RECESSED TO EXECUTIVE SESSION
City Council/City Manager's Conference Room
All council members were present.
(1.) Hold an executive session in accordance with V.T.C.A. Government
Code, Section 551.071(1)(A), to discuss pending or contemplated
litigation (Civic Center; Electric Utilities; Haman Resources;
Information Technology; North Overton; Market Lubbock, Inc.;
Planning; Water Utilities).
( 2.) Hold an executive session in accordance with V.T.C.A. Government
Code, Section 551.072, to deliberate the purchase, exchange, lease, or
value of real property (North Overton; Planning; Street Engineering).
Regular City Council Meeting
February 19, 2004
(3.) Hold an executive session in accordance with V.T.C.A. Government
Code, Section 551.074(a)(1), to discuss personnel matters (City
Attorney; City Manager; Police Chief) and take appropriate action.
( 4.) Hold an executive session in accordance with V.T.C.A. Government
Code, Section 551.074(a)(1), to discuss personnel matters regarding
duties, responsibilities, and/or appointments to:
Appointments Advisory Board
Board of Health
Entertainment Lubbock Task Force
North Overton Tax Increment Financing District
Park and Recreation Board
Urban Design/Historic Preservation Commission
Youth Commission
Public Transportation Strategic Planning Task Force
Lubbock Water and Sewer Rates Review Committee
Electric Utility Board
( 5.) Hold an executive session in accordance with V.T.C.A. Government
Code, Section 551.086, on the following competitive matters (Electric
Utilities):
to deliberate, vote and take final action on a competitive matter
regarding executive service agreements for contract services
provided to Lubbock Power and Light and the City of
Lubbock;
to deliberate, vote and take final action on electric rates of
Lubbock Power and Light;
to deliberate, vote and take final action on a competitive matter
regarding the sale and/or exchange of natural gas pipelines and
natural gas service and transportation contracts by the City of
Lubbock;
to discuss, deliberate, and take final action on a competitive
matter regarding contracts related to the sale and/or
disposition of generation facilities (cooling towers); and
to deliberate, vote and take final action on a competitive matter
regarding wholesale energy sales/contracts and/or natural gas
supply, service, and transportation contracts by the City of
Lubbock.
(6.) Hold an executive session in accordance with V.T.C.A. Government
Code, Section 551.103, to review certified agenda from the prior
executive session (City Secretary).
9:49 A. M. CITY COUNCIL REGULAR MEETING RECONVENED
City Council Chambers
Present: Mayor Marc McDougal, Mayor Pro Tern T. J. Patterson, Council
Member Gary O. Boren, Council Member Jim Gilbreath, Council
Member Victor Hernandez, Council Member Tom Martin, Council
Member Frank W. Morrison; Quincy White, Acting City Manager;
Anita Burgess, City Attorney; Rebecca Garza, City Secretary; and
Richard Casner, First Assistant City Attorney.
Absent: No one.
Mayor McDougal called the meeting to order at 9:49 A. M.
114
Regular City Council Meeting
February 19, 2004
( 7.) Invocation by Reverend Clint Stephenson, Senior Minister of
Westmont Christian Church.
( 8.) Pledge of Allegiance was given in unison by those in the City Council
Chambers to both the United States flag and the Texas flag.
Mayor McDougal presented a nameplate to Mayor Pro Tern
Patterson. He stated that although Mayor Pro Tem Patterson had
held the position previously, he had never had a nameplate indicative
of his position.
At this time, Council Member Martin stated: "As a result of our
Executive Session this morning, I would like to make a motion on the
following minuted action. That minuted action is to approve the
hiring of Mr. Lou Fox as City Manager of the City of Lubbock,
effective February 16, 2004 at an annual salary of $185,000 and a total
compensation package of $258,745.47." Motion was seconded by
Council Member Morrison. Motion carried: 7 Yeas, 0 Nays.
Mayor McDougal asked City Manager Lou Fox to come to the podium.
He then presented Mr. Fox with two shirts. One shirt had a "Legendary
Lubbock" logo; the other, a "Music Crossroads of Texas" logo.
Mr. Fox gave comments.
BOARD APPOINTMENTS RECOGNITION
Animal Shelter Advisory Committee
Receiving: Mary Hatfield
Keep Lubbock Beautiful Advisory Committee
Receiving: Brenda Brown
Neighborhood Redevelopment Commission
Receiving: Michael Springer
North Overton Tax Increment Financing District
Receiving: Stephen Krier (unable to attend)
Park and Recreation Board
Receiving: Bruce Bunn
CITIZEN APPEARANCES
( 9.) Presentation of a Special Recognition to the Martin Luther King, Jr.
Commemorative Council for their efforts in making the Martin
Luther King, Jr. (MLK) Memorial a reality for the people of
Lubbock.
This item was deleted.
(10.) Presentation of a Special Recognition to the African American
Chamber of Commerce Staff and Board of Directors for their hard
work and dedication to the Lubbock Community.
The African American Chamber of Commerce has worked diligently on
behalf of Lubbock and the City's many businesses. The Chamber is an
organization that helps remove obstacles to Lubbock's commerce, as well
as identifies and creates opportunities for successful Lubbock business.
The Chamber also champions vital causes for the entire community.
Members of the African American Chamber of Commerce Staff and Board
of Directors recognized for their hard work and support of the Lubbock
115
Regular City Council Meeting
February 19, 2004
community, as well as their continued efforts to improve our City,
included Chair of the Board Ralph Ferguson and Executive Director Regji
Davis
The next item considered was Item 14.
(11.) Presentation of Special Recognition to the Optimist Club recognizing
March 2, 2004 as Optimist Awareness Day.
This item was considered following Item 14.
The Optimist Club is the civil club sponsor of the Optimist Branch of the
Boys & Girls Clubs of Lubbock. The Optimist Branch is one of three
Boys & Girls Clubs serving Lubbock. There are over 1,000 members of
the Optimist Branch that participate in activities such as basketball,
volleyball, drug and alcohol education, tutoring, internet safety education,
arts and crafts, photography, game room tournaments, weight training and
boxing. Four of their club members serve on the Boys and Girls Club
Board.
Council Member Martin gave the presentation to the Optimist Club
recognizing March 2, 2004 as Optimist Awareness Day. Members of the
Optimist Club were present to receive the recognition.
The next item considered was Item 13.
(12.) Presentation of Special Recognition to Up and Coming Scholars.
This item was deleted.
(13.) Presentation of a Special Recognition to Lt. Charles Davis, with the
Lubbock Fire Department, for an outstanding attitude while
performing job duties.
Fire Chief Steve Hailey received a letter, a copy of which was provided in
council backup, describing the actions and attitude of Lt. Charles Davis. It
is Chief Hailey's recommendation that Lt. Davis be recognized, not so
much for accomplishing his job duties, but the attitude that was
demonstrated during those actions.
Lt. Davis and his crew were worthy of this recognition, because this event
is consistent with the way that they handle all of the incidents they respond
to. Not only do they perform whatever duty is required at the incident
scene, but also they provide follow-up, assistance and assurance after the
emergency has passed. In this incident, they not only cared for the victims
at the scene, but also made sure they were taken care of until relatives
could arrive to help.
Quincy White, Acting City Manager, gave the presentation of a Special
Recognition to Lt. Charles Davis, with the Lubbock Fire Department, for
an outstanding attitude while performing job duties. Lt. Davis recognized
equipment operator Scott Odorizzi and fellow fire fighters Brad Jones and
Mark Culbert.
The next items considered were Consent Agenda Items 15-18, 20,
22-30, 34, 36, 38-48.
(14.) Presentation of a Special Recognition to the "Unsung Heroes" of the
City of Lubbock and Lubbock County.
This item was considered following Item 10.
For the past few years, the Lubbock Metropolitan Rotary Club has
presented the "Unsung Heroes" award to the outstanding Firefighter,
116
Regular City Council Meeting
February 19, 2004
Police Officer, Deputy Sheriff and EMS Paramedic. What makes the
award so unique is the fact that each of the individuals recognized are
selected by their own peers.
On February P of this year, a reception was sponsored by, and held at,
American State Bank at 1401 Avenue Q, recognizing the following
individuals as the "Unsung Heroes" for the year 2003: Chris Addington,
Lubbock Fire Department; Lubbock Police Officer Sarah Collins; Sheriff
Sergeant David Turner and canine sidekick `Riff'; and EMS senior field
training officer, Andrew Ochoa.
The above -named individuals were present for presentation of a Special
Recognition as the "Unsung Heroes" of the City of Lubbock and Lubbock
County.
The next item considered was Item 11.
CONSENT AGENDA (Items 15-18, 20, 22-30, 34, 36 and 38-48)
Motion was made by Council Member Morrison, seconded by Council
Member Gilbreath to approve Items 15-18, 20, 22-30, and 34, 36 and
38-48 on consent agenda. Council Member Martin requested that the
motion be amended to pull items 35 and 37. Council Members Morrison
and Gilbreath agreed. Motion carried: 7 Yeas, 0 Nays.
(15.) Approval of Minutes: February 5, 2004
Regular City Council Meeting
(16.) ORDINANCE NO. 2004-00018: Ordinance abandoning and closing a
20 foot garbage collection easement located in Section 8, Block E-2,
Lubbock, County, Texas (4311 501h Street) (second and final reading).
ORDINANCE NO.2004-00018
AN ORDINANCE ABANDONING AND CLOSING A PORTION OF A
20-FOOT GARBAGE COLLECTION EASEMENT LOCATED IN SECTION 8,
BLOCK E-2, LUBBOCK COUNTY, TEXAS, AND MORE PARTICULARLY
DESCRIBED IN THE BODY OF THIS ORDINANCE; DIRECTING THE CITY
ENGINEER TO MARK THE OFFICIAL MAPS OF THE CITY TO REFLECT SAID
ABANDONMENT AND CLOSING; PROVIDING A SAVINGS CLAUSE; AND
PROVIDING FOR PUBLICATION.
(17.) ORDINANCE NO. 2004-00019: Ordinance abandoning and closing a
Lubbock Power and Light Transformer Pad Easement located in
Tract "L", College Avenue Co-op Addition to the City of Lubbock
(8301 University Avenue) (second and final reading).
ORDINANCE NO. 2004-00019
AN ORDINANCE ABANDONING AND CLOSING A TRANSFORMER PAD
EASEMENT FOR LP&L LOCATED IN TRACT "L", COLLEGE AVENUE CO-0
ADDITION AND LOT E, HOBGOOD ADDITION TO THE CITY OF LUBBOCK,
LUBBOCK COUNTY, TEXAS, AND MORE PARTICULARLY DESCRIBED IN THE
BODY OF THIS ORDINANCE; DIRECTING THE CITY ENGINEER TO MARK THE
OFFICIAL MAPS OF THE CITY TO REFLECT SAID ABANDONMENT AND
CLOSING; PROVIDING A SAVINGS CLAUSE; AND PROVIDING FOR
PUBLICATION.
(18.) ORDINANCE NO. 2004-00020: Ordinance abandoning and closing a
Lubbock Power and Light 5 foot Underground Utility Easement
located in Lot 9C, Crow's Nest Addition to the City of Lubbock (5837
6th Street) (second and final reading).
117
Regular City Council Meeting
February 19, 2004
ORDINANCE NO. 2004-00020
AN ORDINANCE ABANDONING AND CLOSING A 5 FOOT
UNDERGROUND UTILITY EASEMENT FOR LP&L LOCATED IN LOT 9C, IN THE
CROW'S NEST ADDITION TO THE CITY OF LUBBOCK, LUBBOCK COUNTY,
TEXAS, WHICH IS MORE PARTICULARLY DESCRIBED IN THE BODY OF THIS
ORDINANCE; DIRECTING THE CITY ENGINEER TO MARK THE OFFICIAL
MAPS OF THE CITY TO REFLECT SAID ABANDONMENT AND CLOSING;
PROVIDING A SAVINGS CLAUSE; AND PROVIDING FOR PUBLICATION.
The next item considered was Item 20.
(19.) ORDINANCE NO. 2004-00021: Ordinance amending Article XVIII
of Chapter 2 of the Code of Ordinances with regard to the creation,
duties, terms and responsibilities of the Electric Utilities Board;
amending Article I of Chapter 9 to conform to changes made to the
duties and responsibilities of the Electric Utilities Board; providing
for the disbursement of revenues of the City's electric utility; defining
conflicts of interests and penalties associated therewith; reserving
specific powers to the City Council; providing a savings clause; and
providing for publication (second and final reading).
ORDINANCE NO.2004-00021
AN ORDINANCE AMENDING ARTICLE XVIII OF CHAPTER 2 OF THE
CODE OF ORDINANCES WITH REGARD TO THE CREATION, DUTIES, TERMS
AND RESPONSIBILITIES OF THE ELECTRIC UTILITIES BOARD; AMENDING
ARTICLES I AND II OF CHAPTER 9 OF THE CODE OF ORDINANCES TO
CONFORM TO CHANGES MADE TO THE DUTIES AND RESPONSIBILITIES OF
THE ELECTRIC UTILITIES BOARD; PROVIDING FOR THE DISBURSEMENT OF
REVENUES OF THE CITY'S ELECTRIC UTILITY; DEFINING CONFLICTS OF
INTERESTS AND PENALTIES ASSOCIATED THEREWITH; RESERVING
SPECIFIC POWERS TO THE CITY COUNCIL; PROVIDING A SAVINGS CLAUSE
AND PROVIDING FOR PUBLICATION.
This item was moved from consent agenda to regular agenda and was
considered following Item 49.
Motion was made by Council Member Boren, seconded by Council
Member Martin to pass on second and final reading Ordinance No.
2004-00021 with the amendments given to Council at the dais. Motion
carried: 7 Yeas, 0 Nays.
Assistant City Attorney Matt Wade read the changes as follows:
Sec. 2-480. Members, Qualifications.
a) A change from five board members to nine members appointed by
the City Council. The City Council may decrease the number of Board
members to no less than seven members upon the affirmative
recommendation of the Board.
The Mayor, or the Mayor's appointee, shall serve as a non -voting ex
officio member of the Board.
b) The number of Board members was changed to five instead of
three and four Board members instead of two to serve the one and two year
terms respectively.
Sec. 2-482. Authority, Duties, Responsibility of the Board.
Language was added to Section c) to where it reads: "To the extent
authorized by law and subject to the City's Charter and Code of
118
Regular City Council Meeting
February 19, 2004
Ordinances, the Board shall have all authority necessary to govern,
manage, administer and operate the City's electric utility including the
authority to contract for accounting, financial, human resource, legal and
other services separate and apart from those services currently being
provided by the City of Lubbock. Furthermore, this authority ...... If the
Board contracts for legal services separate and apart from the City
Attorney's office, the legal counsel for the Board shall also report to and
be responsible to the City Council of the City of Lubbock."
The next items considered were Items 50-53.
(20.) Ordinance No. 2004-0000022 ordering a bond election to be held in
the City of Lubbock, Texas, making provision for conduct of the
election and resolving other matters incidental and related to such
election (first reading).
ORDINANCE NO.2004-00022
AN ORDINANCE ordering a bond election to be held in the City of Lubbock,
Texas, making provision for the conduct of the election and resolving
other matters incidental and related to such election.
This item was considered following Item 18.
The Council created the Citizens Advisory Committee (CAC) to determine
the infrastructure needs/wants throughout the community. The 35-member
Committee held public meetings in each Council district and one meeting
for citywide neighborhood associations and other interested parties. The
members listened to citizens' comments, complaints, and concerns to
determine which projects Lubbock citizens think are most important.
After a five month review by the CAC, and several subcommittees made
up of Lubbock residents, voters will be asked to consider seven separate
propositions on streets, civic center/auditorium facilities, parks,
police/municipal court facilities, libraries, fire stations, and the animal
shelter facility. The total amount of projects included in the seven
propositions is $30,000,000.
This will be the first bond election since a $37,000,000 election in
September 1999. This bond election will be similar to the 1999 election in
that debt will be issued to fund these projects without the need for a tax
increase.
This ordinance calls for a bond election to be held on May 15, 2004 for the
purpose of submitting the following measures:
"THE ISSUANCE OF GENERAL OBLIGATION BONDS IN
THE AMOUNT OF $9,210,000 FOR STREET
IMPROVEMENTS"
The CAC has recommended the following project to be funded
with Proposition Number 1:
Proposed Bond
Project Descriptions Issuance
Slide @ N. Loop or partial funding for Erskine from 2,000,000
Frankford to Quaker
Subdivision Assessment
500,000
34th & University Intersection Reconstruction 1,395,000
119
Regular City Council Meeting
February 19, 2004
Milwaukee from 45th to Spur 327 Strip Paving 1,090,000
N/E Lubbock Infrastructure for New Residential 1,300,000
Subdivision
Regis Street Completion
365,000
Federally Mandated Curb Ramps
50,000
City -Wide Traffic Signal Communications Upgrade
510,000
Traffic Signals- New Locations
450,000
Sidewalk Construction Including Safe Routes to
400,000
Schools
Low/Moderate Income Area Street Paving
400,000
N. University "Gateway" Project
750,000
Streets
$ 9,210,000
"THE ISSUANCE OF GENERAL OBLIGATION BONDS IN THE
AMOUNT OF $6,450,000 FOR CIVIC CENTER/AUDITORIUM
RENOVATIONS AND IMPROVEMENTS"
The CAC has recommended the following project to be funded with
Proposition Number 2:
Proposed Bond
Project Descriptions Issuance
Auditorium Renovation (Partial Funding) 5,000,000
Civic Center Renovation Phase H (Partial Funding) 1,450,000
Civic Center/Auditorium
$ 6,450,000
"THE ISSUANCE OF GENERAL OBLIGATION BONDS IN THE
AMOUNT OF $6,395,000 FOR PARK IMPROVEMENTS"
The CAC has recommended the following project to be funded with
Proposition Number 3:
Proposed Bond
Project Descriptions Issuance
MLK Little League Complex (3 Fields) 1,664,000
Miller & Andrews Park Redevelopment 826,000
Burgess -Rushing Tennis Center Expansion 1,086,000
Indoor Recreation Center in West Lubbock with 25,000
partnership
Midwest Little League Complex (3 Fields) 1,664,000
Phase I New Park- Southwest Lubbock/Soccer 1,130,000
Parks
$ 6,395,000
120
Regular City Council Meeting
February 19, 2004
"THE ISSUANCE OF GENERAL OBLIGATION BONDS IN THE
AMOUNT OF $3,350,000 FOR POLICE/MUNICIPAL COURT
FACILITIES"
The CAC has recommended the following project to be funded with
Proposition Number 4:
Proposed Bond
Proiect Descriptions Issuance
Police/Municipal Court Renovation (Partial 2,500,000
Funding)
East Lubbock City Services Center/Pilot Program 850,000
Police
$ 3,350,000
"THE ISSUANCE OF GENERAL OBLIGATION BONDS IN THE
AMOUNT OF $2,145,000 FOR LIBRARY IMPROVEMENTS"
The CAC has recommended the following project to be funded with
Proposition Number 5:
Proposed Bond
Project Descriptions Issuance
Mahon Renovation (Partial Funding) 2,145,000
Libraries $ 2,145,000
"THE ISSUANCE OF GENERAL OBLIGATION BONDS IN THE
AMOUNT OF $1,405,000 FOR FIRE STATIONS"
The CAC has recommended the following project to be funded with
Pr^position Number 6:
Proposed Bond
Project Descriptions Issuance
Fire Station 12 Rehab/Fire Station 8 Replacement S 1,405,000
Fire $ 1,405,000
"THE ISSUANCE OF GENERAL OBLIGATION BONDS IN THE
AMOUNT OF $1,045,000 FOR ANIMAL SHELTER
RENOVATIONS AND IMPROVEMENTS"
The CAC has recommended the following projects to be funded with
Proposition Number 7:
Proposed Bond
Project Descriptions Issuance
Animal Shelter Renovation 1,045,000
Animal Shelter
FISCAL IMPACT:
$ 1,045,000
The total amount of projects included in the seven propositions is
$30,000,000.
Bonds will be issued to fund these projects over an estimated six -year
period. These bonds will be issued without a property tax rate increase,
utilizing the current property tax rate for debt service.
Staff recommended approval of this ordinance.
121
Regular City Council Meeting
February 19, 2004
The next items considered were Items 22-30.
(21.) Ordinance No. 2004-00023 calling for the closing of a Burlington
Northern and Santa Fe Railway Company railroad crossing on
Avenue M (at 3rd Street), DOT No. 014933U (first reading).
ORDINANCE NO. 2004-00023
AN ORDINANCE CALLING FOR THE CLOSING OF THE RAILROAD
CROSSING LOCATED IN AVENUE M AT 3RD STREET (DOT NO. 014933U),
RAILROAD MILEPOST 673.X IN THE CITY OF LUBBOCK, TEXAS.
This item was moved from consent agenda to regular agenda and was
considered following Item 48.
Neighborhood complaints about the condition of the railroad crossings
initiated contact with the Burlington Northern and Santa Fe Railway
Company (BNSF). This is in the Guadalupe Neighborhood area north of
4th Street, and west of Buddy Holly Avenue.
The railroad crossing generating the most complaints was the Avenue P
crossing, which is the primary access to the Guadalupe neighborhood from
4th Street.
In negotiations with the railroad, they indicated a strong desire to close the
Avenue M crossing of their main line track. In exchange for this closing,
they offered to reconstruct the Avenue P crossing at no cost to the City.
Initial discussions with the neighborhood also indicated concerns about the
Cornell Street crossing at North Avenue Q, and the 3rd Street crossing east
of Avenue M. There was a preliminary agreement with BNSF to rebuild
the Avenue P, Cornell Street, and 3rd Street crossings in exchange for the
closure of the Avenue M crossing and $75,000 in City participation.
On January 6, 2004, at a neighborhood meeting with Councilman
Hernandez, those in attendance prioritized their desired railroad crossing
improvements. They were:
Avenue P north of 3rd Street
Cornell Street at Avenue Q
I" Street west of Avenue K
Avenue K north of I" Street
3rd Street east of Avenue M
After the neighborhood meeting, staff contacted BNSF and requested the
3rd Street crossing reconstruction be replaced with rebuilding the lst Street
crossing. Staff also requested the railroad consider rebuilding the Avenue
K crossing.
The BNSF agreed to exchanging the 1 St Street crossing for the 3rd Street
crossing, and including the rebuilding of the Avenue K crossing for the
same $75,000 in City participation.
The cost breakdown is as follows:
RR Crossing
RR Cost
City Cost
Total Cost
lst Street
$ 25,236
$18,750
$43,986
Avenue K
$ 41,475
$18,750
$60,225
Cornell Street
$ 16,404
$37,500
$53,904
Avenue P
$265,504
$ 0
$265,504
Totals
$348,619
$75,000
$423,619
122
Regular City Council Meeting
February 19, 2004
Under the Agreements, the railroad agrees to:
• Rebuild the four crossings with concrete railroad crossing materials
• Leave the Avenue M crossing open until the Avenue P crossing is built
• Remove the crossing, signals, and roadway at the Avenue M crossing
Under the Agreements, the City agrees to:
• Pay the railroad $75,000 for rebuilding the four crossings
• Rebuild the asphalt paving approaches to the new crossings
• Provide traffic control and barricades during construction
• Provide road closure barriers at the closed Avenue M crossing
• Permanently abandon the Avenue M railroad crossing
With the closure of the Avenue M crossing, there is concern from some of
the businesses about all weather access with the upcoming construction of
the Marsha Sharp Freeway. The businesses will lose their secondary all
weather access when the Avenue M railroad crossing is closed. The staff
has determined the only viable alternative is providing an all weather
roadway on 3`d Street from Avenue M to Avenue P. Currently, 3`d Street
is dedicated as public right-of-way, but is unpaved.
To strip -pave 3`d Street from Avenue M to Avenue 0 could cost as little as
$15,000. However, the Street Department is concerned that any
significant volume of truck traffic will create rapid deterioration of this
type design strip paving. Because of an excellent bid on asphalt stabilized
base on an annual maintenance program, the Street Department
recommended this type of paving section, which should reduce future
maintenance needs significantly. This asphalt stabilized base strip paving
would cost approximately $38,000.
FISCAL IMPACT:
The $75,000 for the City's participation in the cost of rebuilding the
railroad crossings was approved by the City Council in the 2003-04
budget. These funds are set up in the Streets Capital Projects budget. If
approved by the Council, the additional $15,000 or $38,000 for the 3`d
Street strip paving will be taken from the State/Federal Match capital
project in the Street Capital Projects Fund. Approximately $114,000 is
currently in this capital project.
Staff recommended approval of the agreements with BNSF for the
reconstruction of the four railroad crossings, and the ordinance closing and
abandoning the Avenue M railroad crossing. Staff also recommended
Council authorization to construct the black base strip paving for 3`d Street
from Avenue M to Avenue P to provide secondary all weather paved
access from Avenue M to Avenue P to provide secondary all weather
paved access to the businesses no longer able to use the Avenue M
railroad crossing after its closure.
Staff recommended approval of this ordinance.
Motion was made by Council Member Gilbreath, seconded by Council
Member Hernandez to pass on first reading Ordinance No. 2004-00023 to
include $38,000 of strip paving. Motion carried: 6 Yeas, 0 Nays.
Council Member Boren was away from the dais.
The next items considered were Items 31-33.
Items 22-30 were considered following Item 20.
123
Regular City Council Meeting
February 19, 2004
(22.) Resolution No. 2004-R0059 authorizing the Mayor to sign an
agreement with the Burlington Northern and Santa Fe Railway
Company to improve the railroad crossing on 1st Street (west of
Avenue I), DOT No. 017 510E.
RESOLUTION NO. 2004-R0059
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an Agreement for the
improvement to railroad crossings on I" Street West of Avenue K, DOT. No. 017 510E,
by and between the City of Lubbock and The Burlington Northern and Santa Fe Railway
Company, and related documents. Said Agreement is attached hereto and incorporated in
this resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Craig Farmer
Craig Farmer, Managing Director of Planning & Transportation
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Agreement is filed with Resolution No. 2004-R0059.
Neighborhood complaints about the condition of the railroad crossings
initiated contact with the Burlington Northern and Santa Fe Railway
Company (BNSF). This is in the Guadalupe Neighborhood area north of
4`h Street, and west of Buddy Holly Avenue.
The railroad crossing generating the most complaints was the Avenue P
crossing, which is the primary access to the Guadalupe neighborhood from
4`h Street.
In negotiations with the railroad, they indicated a strong desire to close the
Avenue M crossing of their main -line track. In exchange for this closing,
they were offering to reconstruct the Avenue P crossing at no cost to the
City.
Initial discussions with the neighborhood also indicated concerns about the
Cornell Street crossing at North Avenue Q, and the 3rd Street crossing east
of Avenue M. There was preliminary agreement with BNSF to rebuild the
Avenue P, Cornell Street, and 3rd Street crossings in exchange for the
closure of the Avenue M crossing and $75,000 in City participation.
124
Regular City Council Meeting
February 19, 2004
On January 6, 2004, at a neighborhood meeting with Councilman
Hernandez, those in attendance prioritized their desired railroad crossing
improvements. They were:
Avenue P north of 3rd Street
Cornell Street at Avenue Q
1st Street west of Avenue K
Avenue K north of 1st Street
3rd Street east of Avenue M
After the neighborhood meeting, the staff contacted BNSF and requested
the 3rd Street crossing reconstruction be replaced with rebuilding the 1st
Street crossing. The staff also requested the railroad consider rebuilding
the Avenue K crossing.
The BNSF agreed to exchanging the 1st Street crossing for the 3rd Street
crossing, and including the rebuilding of the Avenue K crossing for the
same $75,000 in City participation.
The cost breakdown is as follows:
RR Crossing RR Cost City Cost Total Cost
1st Street $ 25,236 $18,750 $43,986
Avenue K $ 41,475 $18,750 $60,225
Cornell Street $ 16,404 $37,500 $53,904
Avenue P $265,504 $ 0 $265,504
Totals $348,619 $75,000 $423,619
Under the Agreements, the railroad agrees to:
• Rebuild the four crossings with concrete railroad crossing materials
• Leave the Avenue M crossing open until the Avenue P crossing is built
• Remove the crossing, signals, and roadway at the Avenue M crossing
Under the Agreements, the City agrees to:
• Pay the railroad $75,000 for rebuilding the four crossings
• Rebuild the asphalt paving approaches to the new crossings
• Provide traffic control and barricades during construction
• Provide road closure barriers at the closed Avenue M crossing
• Permanently abandon the Avenue M railroad crossing
With the closure of the Avenue M crossing, there is concern from some of
the businesses about all weather access with the upcoming construction of
the Marsha Sharp Freeway. The businesses will lose their secondary all
weather access when the Avenue M railroad crossing is closed. The staff
has determined the only viable alternative is providing an all weather
roadway on 3rd Street from Avenue M to Avenue P. Currently, 3rd Street
is dedicated as public right-of-way, but is unpaved.
To strip pave 3rd Street from Avenue M to Avenue O could cost as little as
$15,000. However, the Street Department is concerned that any
significant volume of truck traffic will create rapid deterioration of this
type design strip paving. Because of an excellent bid on asphalt stabilized
base on an annual maintenance program, Street Department recommended
this type of paving section which should reduce future maintenance needs
significantly. This asphalt stabilized base strip paving would cost
approximately $38,000.
FISCAL IMPACT:
The $75,000 for the City's participation in the cost of rebuilding the
railroad crossings was approved by the City Council in the 2003-04
budget. These funds are set up in the Streets Capital Projects budget. If
125
Regular City Council Meeting
February 19, 2004
approved by the Council, the additional $15,000 or $38,000 for the 3Td
Street strip paving will be taken from the State/Federal Match capital
project in the Street Capital Projects Fund. Approximately $114,000 is
currently in this capital project.
Staff recommended approval of the agreements with BNSF for the
reconstruction of the four railroad crossings, and the ordinance closing and
abandoning the Avenue M railroad crossing. The staff also recommended
Council authorization to construct the black base strip paving for 3Td Street
from Avenue M to Avenue P to provide secondary all weather paved
access from Avenue M to Avenue P to provide secondary all weather
paved access to the businesses no longer able to use the Avenue M
railroad crossing after its closure.
Staff recommended approval of this ordinance.
(23.) Resolution No. 2004-R0060 authorizing the Mayor to sign an
agreement with the Burlington Northern and Santa Fe Railway
Company to improve the railroad crossing on Avenue K (north of 1st
Street), DOT No. 017 511L.
RESOLUTION NO. 2004-R0060
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an Agreement for the
improvement to railroad crossings on Avenue K north of I" Street, DOT No. 017 511L,
by and between the City of Lubbock and The Burlington Northern and Santa Fe Railway
Company, and related documents. Said Agreement is attached hereto and incorporated in
this resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Craig Farmer
Craig Farmer, Managing Director of Planning & Transportation
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Agreement is filed with Resolution No. 2004-R0060.
Neighborhood complaints about the condition of the railroad crossings
initiated contact with the Burlington Northern and Santa Fe Railway
Company (BNSF). This is in the Guadalupe Neighborhood area north of
4`h Street, and west of Buddy Holly Avenue.
126
Regular City Council Meeting
February 19, 2004
The railroad crossing generating the most complaints was the Avenue P
crossing which is the primary access to the Guadalupe neighborhood from
4th Street.
I n negotiations with the railroad, they indicated a strong desire to close the
Avenue M crossing of their main line track. In exchange for this closing,
they were offering to reconstruct the Avenue P crossing at no cost to the
City.
Initial discussions with the neighborhood also indicated concerns about the
Cornell Street crossing at North Avenue Q, and the 3`d Street crossing east
of Avenue M. There was preliminary agreement with BNSF to rebuild the
Avenue P, Cornell Street, and 3`d Street crossings in exchange for the
closure of the Avenue M crossing and $75,000 in City participation.
On January 6, 2004, at a neighborhood meeting with Councilman
Hernandez, those in attendance prioritized their desired railroad crossing
improvements. They were:
Avenue P north of 3`d Street
Cornell Street at Avenue Q
1 sc Street west of Avenue K
Avenue K north of 1st Street
3`d Street east of Avenue M
After the neighborhood meeting, the staff contacted BNSF and requested
the 3`d Street crossing reconstruction be replaced with rebuilding the 1"
Street crossing. The staff also requested the railroad consider rebuilding
the Avenue K crossing.
The BNSF agreed to exchanging the 1st Street crossing for the 3`d Street
crossing, and including the rebuilding of the Avenue K crossing for the
same $75,000 in City participation.
The cost breakdown is as follows:
RR Crossing RR Cost City Cost Total Cost
1st Street $ 25,236 $18,750 $43,986
Avenue K $ 41,475 $18,750 $60,225
Cornell Street $ 16,404 $37,500 $53,904
Avenue P $265,504 $ 0 $265,504
Totals $348,619 $75,000 $423,619
Under the Agreements, the railroad agrees to:
• Rebuild the four crossings with concrete railroad crossing materials
• Leave the Avenue M crossing open until the Avenue P crossing is built
• Remove the crossing, signals, and roadway at the Avenue M crossing
Under the Agreements, the City agrees to:
• Pay the railroad $75,000 for rebuilding the four crossings
• Rebuild the asphalt paving approaches to the new crossings
• Provide traffic control and barricades during construction
• Provide road closure barriers at the closed Avenue M crossing
• Permanently abandon the Avenue M railroad crossing
With the closure of the Avenue M crossing, there is concern from some of
the businesses about all weather access with the upcoming construction of
the Marsha Sharp Freeway. The businesses will lose their secondary all
weather access when the Avenue M railroad crossing is closed. The staff
has determined the only viable alternative is providing an all weather
roadway on 3`d Street from Avenue M to Avenue P. Currently, P Street
is dedicated as public right-of-way, but is unpaved.
127
Regular City Council Meeting
February 19, 2004
To strip pave 3rd Street from Avenue M to Avenue O could cost as little as
$15,000. However, the Street Department is concerned that any
significant volume of truck traffic will create rapid deterioration of this
type design strip paving. Because of an excellent bid on asphalt stabilized
base on an annual maintenance program, Street Department recommended
this type of paving section which should reduce future maintenance needs
significantly. This asphalt stabilized base strip paving would cost
approximately $38,000.
FISCAL IMPACT:
The $75,000 for the City's participation in the cost of rebuilding the
railroad crossings was approved by the City Council in the 2003-04
budget. These funds are set up in the Streets Capital Projects budget. The
additional $15,000 or $38,000 for the 3rd Street strip paving, if approved
by the Council, will be taken from the State/Federal Match capital project
in the Street Capital Projects Fund. Approximately $114,000 is currently
in this capital project.
Staff recommended approval of the agreements with BNSF for the
reconstruction of the four railroad crossings, and the ordinance closing and
abandoning the Avenue M railroad crossing. The staff also recommended
Council authorization to construct the black base strip paving for 3rd Street
from Avenue M to Avenue P to provide secondary all weather paved
access from Avenue M to Avenue P to provide secondary all weather
paved access to the businesses no longer able to use the Avenue M
railroad crossing after its closure.
Staff recommended approval of first reading of this ordinance.
(24.) Resolution No. 2004-R0061 authorizing the Mayor to sign an
agreement with the Burlington Northern and Santa Fe Railway
Company to improve the railroad crossing on Cornell Street (at North
Avenue Q), DOT No. 017 370E.
RESOLUTION NO.2004-R0061
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an Agreement for the
improvement to railroad crossings on Cornell Street at North Avenue Q, DOT No. 017
370E, by and between the City of Lubbock and The Burlington Northern and Santa Fe
Railway Company, and related documents. Said Agreement is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
128
Regular City Council Meeting
February 19, 2004
APPROVED AS TO CONTENT:
/s/ Craig Farmer
Craig Farmer, Managing Director of Planning & Transportation
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Agreement is filed with Resolution No. 2004-R0061.
Neighborhood complaints about the condition of the railroad crossings
initiated contact with the Burlington Northern and Santa Fe Railway
Company (BNSF). This is in the Guadalupe Neighborhood area north of
4th Street, and west of Buddy Holly Avenue.
The railroad crossing generating the most complaints was the Avenue P
crossing which is the primary access to the Guadalupe neighborhood from
4th Street.
In negotiations with the railroad, they indicated a strong desire to close the
Avenue M crossing of their main line track. In exchange for this closing,
they were offering to reconstruct the Avenue P crossing at no cost to the
City.
Initial discussions with the neighborhood also indicated concerns about the
Cornell Street crossing at North Avenue Q, and the 3rd Street crossing east
of Avenue M. There was preliminary agreement with BNSF to rebuild the
Avenue P, Cornell Street, and 3rd Street crossings in exchange for the
closure of the Avenue M crossing and $75,000 in City participation.
On January 6, 2004, at a neighborhood meeting with Councilman
Hernandez, those in attendance prioritized their desired railroad crossing
improvements. They were:
Avenue P north of 3rd Street
Cornell Street at Avenue Q
1st Street west of Avenue K
Avenue K north of 1" Street
3rd Street east of Avenue M
After the neighborhood meeting, the staff contacted BNSF and requested
the 3rd Street crossing reconstruction be replaced with rebuilding the lst
Street crossing. The staff also requested the railroad consider rebuilding
the Avenue K crossing.
The BNSF agreed to exchanging the I" Street crossing for the 3rd Street
crossing, and including the rebuilding of the Avenue K crossing for the
same $75,000 in City participation.
The cost breakdown is as follows:
RR Crossing RR Cost City Cost Total Cost
1 St Street
$ 25,236
$18,750
$43,986
-- Avenue K
$ 41,475
$18,750
$60,225
Cornell Street
$ 16,404
$37,500
$53,904
Avenue P
$265,504
$ 0
$265,504
Totals
$348,619
$75,000
$423,619
129
Regular City Council Meeting
February 19, 2004
Under the Agreements, the railroad agrees to:
• Rebuild the four crossings with concrete railroad crossing materials
• Leave the Avenue M crossing open until the Avenue P crossing is built
• Remove the crossing, signals, and roadway at the Avenue M crossing
Under the Agreements, the City agrees to:
• Pay the railroad $75,000 for rebuilding the four crossings
• Rebuild the asphalt paving approaches to the new crossings
• Provide traffic control and barricades during construction
• Provide road closure barriers at the closed Avenue M crossing
• Permanently abandon the Avenue M railroad crossing
With the closure of the Avenue M crossing, there is concern from some of
the businesses about all weather access with the upcoming construction of
the Marsha Sharp Freeway. The businesses will lose their secondary all
weather access when the Avenue M railroad crossing is closed. The staff
has determined the only viable alternative is providing an all weather
roadway on P Street from Avenue M to Avenue P.
Currently, P Street is dedicated as public right-of-way, but is unpaved.
To strip -pave 3'd Street from Avenue M to Avenue O could cost as little as
$15,000. However, the Street Department is concerned that any significant
volume of truck traffic will create rapid deterioration of this type design
strip paving. Because of an excellent bid on asphalt stabilized base on an
annual maintenance program, Street Department recommended this type of
paving section which should reduce future maintenance needs
significantly. This asphalt stabilized base strip paving would cost
approximately $38,000.
FISCAL IMPACT:
The $75,000 for the City's participation in the cost of rebuilding the
railroad crossings was approved by the City Council in the 2003-04
budget. These funds are set up in the Streets Capital Projects budget. The
additional $15,000 or $38,000 for the 3`d Street strip paving, if approved
by the Council, will be taken from the State/Federal Match capital project
in the Street Capital Projects Fund. Approximately $114,000 is currently
in this capital project.
Staff recommended approval of the agreements with BNSF for the
reconstruction of the four railroad crossings, and the ordinance closing and
abandoning the Avenue M railroad crossing. The staff also recommended
Council authorization to construct the black base strip paving for 3'd Street
from Avenue M to Avenue P to provide secondary all weather paved
access from Avenue M to Avenue P to provide secondary all weather
paved access to the businesses no longer able to use the Avenue M
railroad crossing after its closure.
Staff recommended approval of this resolution.
(25.) Resolution No. 2004-R0062 authorizing the Mayor to sign an
agreement with the Burlington Northern and Santa Fe Railway
Company to close the railroad crossing on Avenue M (at 3rd Street),
DOT No. 014933U, and to improve the railroad crossing on Avenue P
(north of 3rd Street) DOT No. 014932M.
130
Regular City Council Meeting
February 19, 2004
RESOLUTION NO. 2004-R0062
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an Agreement for the
closure of Avenue M Public Crossing at 3Td Street, DOT No. 014933U, and the
improvement of the railroad crossing at Avenue P (north of 3Td Street), by and between
the City of Lubbock and The Burlington Northern and Santa Fe Railway Company, and
related documents. Said Agreement is attached hereto and incorporated in this resolution
as if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Craig Farmer
Craig Farmer, Managing Director of Planning & Transportation
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Agreement is filed with Resolution No. 2004-R0062.
Neighborhood complaints about the condition of the railroad crossings
initiated contact with the Burlington Northern and Santa Fe Railway
Company (BNSF). This is in the Guadalupe Neighborhood area north of
4th Street, and west of Buddy Holly Avenue.
The railroad crossing generating the most complaints was the Avenue P
crossing which is the primary access to the Guadalupe neighborhood from
41h Street.
In negotiations with the railroad, they indicated a strong desire to close the
Avenue M crossing of their main line track. In exchange for this closing,
they were offering to reconstruct the Avenue P crossing at no cost to the
City.
Initial discussions with the neighborhood also indicated concerns about the
Cornell Street crossing at North Avenue Q, and the 3rd Street crossing east
of Avenue M. There was preliminary agreement with BNSF to rebuild the
Avenue P, Cornell Street, and 3rd Street crossings in exchange for the
closure of the Avenue M crossing and $75,000 in City participation.
On January 6, 2004, at a neighborhood meeting with Councilman
Hernandez, those in attendance prioritized their desired railroad crossing
improvements. They were:
Avenue P north of 3 iTd Street
Cornell Street at Avenue Q
1" Street west of Avenue K
131
Regular City Council Meeting
February 19, 2004
Avenue K north of 1" Street
3rd Street east of Avenue M
After the neighborhood meeting, the staff contacted BNSF and requested
the 3rd Street crossing reconstruction be replaced with rebuilding the I"
Street crossing. The staff also requested the railroad consider rebuilding
the Avenue K crossing.
The BNSF agreed to exchanging the Vt Street crossing for the 3rd Street
crossing, and including the rebuilding of the Avenue K crossing for the
same $75,000 in City participation.
The cost breakdown is as follows:
RR Crossing RR Cost City Cost Total Cost
1" Street $ 25,236 $18,750 $43,986
Avenue K $ 41,475 $18,750 $60,225
Cornell Street $ 16,404 $37,500 $53,904
Avenue P $265,504 $ 0 $265,504
Totals $348,619 $75,000 $423,619
Under the Agreements, the railroad agrees to:
• Rebuild the four crossings with concrete railroad crossing materials
• Leave the Avenue M crossing open until the Avenue P crossing is built
• Remove the crossing, signals, and roadway at the Avenue M crossing
Under the Agreements, the City agrees to:
• Pay the railroad $75,000 for rebuilding the four crossings
• Rebuild the asphalt paving approaches to the new crossings
• Provide traffic control and barricades during construction
• Provide road closure barriers at the closed Avenue M crossing
• Permanently abandon the Avenue M railroad crossing
With the closure of the Avenue M crossing, there is concern from some of
the businesses about all weather access with the upcoming construction of
the Marsha Sharp Freeway. The businesses will lose their secondary all
weather access when the Avenue M railroad crossing is closed. The staff
has determined the only viable alternative is providing an all weather
roadway on 3rd Street from Avenue M to Avenue P.
Currently, 3rd Street is dedicated as public right-of-way, but is unpaved.
To strip pave 3rd Street from Avenue M to Avenue O could cost as little as
$15,000. However, the Street Department is concerned that any
significant volume of truck traffic will create rapid deterioration of this
type design strip paving. Because of an excellent bid on asphalt stabilized
base on an annual maintenance program, Street Department recommended
this type of paving section which should reduce future maintenance needs
significantly. This asphalt stabilized base strip paving would cost
approximately $38,000.
FISCAL IMPACT:
The $75,000 for the City's participation in the cost of rebuilding the
railroad crossings was approved by the City Council in the 2003-04
budget. These funds are set up in the Streets Capital Projects budget. The
additional $15,000 or $38,000 for the 3rd Street strip paving, if approved
by the Council, will be taken from the State/Federal Match capital project
in the Street Capital Projects Fund. Approximately $114,000 is currently
in this capital project.
The staff recommended approval of the agreements with BNSF for the
reconstruction of the four railroad crossings, and the ordinance closing and
abandoning the Avenue M railroad crossing. The staff also recommended
132
Regular City Council Meeting
February 19, 2004
Council authorization to construct the black base strip paving for 3ra Street
from Avenue M to Avenue P to provide secondary all weather paved
access from Avenue M to Avenue P to provide secondary all weather
paved access to the businesses no longer able to use the Avenue M
railroad crossing after its closure.
Staff recommended approval of first reading of this ordinance.
(26.) Resolution No. 2004-R0063 - a joint election between the City of
Lubbock and Lubbock Independent School District authorizing the
May 15, 2004 election to be a Joint Election. Lubbock Independent
School District has contracted with Lubbock County to administer
their election.
RESOLUTION NO.2004=R0063
WHEREAS, Chapter 271 of the Texas Election Code provides for joint elections
when an election is required upon the same day by two or more political subdivisions
occupying all or a part of the same territory; and
WHEREAS, the City of Lubbock and Lubbock Independent School District are
both required to conduct elections on May 15, 2004; and
WHEREAS, Lubbock Independent School District has contracted with Lubbock
County to administer the election on May 15, 2004, for Lubbock Independent School
District; and
WHEREAS, pursuant to Section 271.002 of the Election Code, the governing
bodies of both governmental subdivisions have determined that it is in the best
interest of each respective governmental subdivision to conduct a joint election on
May 15, 2004; NOW, THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock hereby authorizes and directs the
Mayor of the City of Lubbock to execute the attached Joint Election Agreement by and
between the City of Lubbock and Lubbock Independent School District authorizing the
May 15, 2004, election to be conducted as a joint election; and
THAT the City Secretary is hereby authorized and directed to make any necessary
changes to the Election Order exhibits necessary to carry out the purposes of this
Resolution.
Passed by the City Council this 19th day of February, 2004.
/S/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO FORM:
/s/ Donald G. Vandiver
Donald G. Vandiver, Attorney of Counsel
A copy of the Joint Election Agreement is filed with Resolution No. 2004-R0063.
133
Regular City Council Meeting
February 19, 2004
Both the City of Lubbock and Lubbock Independent School District will
be holding elections on May 15, 2004. Lubbock Independent School
District has contracted with Lubbock County to administer the LISD
election. Presented for Council consideration is a resolution between the
City of Lubbock and Lubbock County (for Lubbock Independent School
District) to hold a joint election in order to achieve convenience to the
voters as well as cost savings for both entities. The joint election to be held
on May 15, 2004, under provisions of the Texas Election Code and other
applicable law and in accordance with agreed terms, as detailed in the
Joint Election Resolution.
The City of Lubbock Election will be administered by the City Secretary,
and the LISD election by the Lubbock County Elections Administrator.
The joint areas are detailed in the Joint Election Resolution.
The LISD administrative offices will also be established as a branch early
voting location for the City (for this election). Exhibit B (early voting
locations) has been revised.
FISCAL IMPACT:
The actual cost savings is not known at this time. The City and LISD will
share the costs of election workers and of some of the services and
facilities provided by Lubbock County.
City Secretary recommended approval of this resolution.
(27.) Resolution No. 2004-R0064 authorizing acceptance of water and
sanitary sewer improvements for Tract B, Physician's Surgicenter of
Lubbock Addition to the City of Lubbock, Lubbock County, Texas,
northwest of North Loop 289, southwest of North Utica Avenue and
south of Erskine Street.
RE SOLUTION NO. 2004-R0064
A RESOLUTION ACCEPTING TRACT B, PHYSICIANS SURGICENTER OF
LUBBOCK ADDITION TO THE CITY OF LUBBOCK, LUBBOCK COUNTY,
TEXAS.
WHEREAS, the developer of Tract B, Physicians Surgicenter of Lubbock
Addition to the City of Lubbock, Lubbock County, Texas, has complied with the
provisions of Article IV, Chapter 28 of the Code of Ordinances of the City of Lubbock, in
providing the water and sewer improvements for said Addition; and
WHEREAS, the total utility cost to the developer is $147,277.71 with the
improvements constructed by Hutton Construction Corp. having a value of $115,000.00
as determined by the unit prices established by said Chapter 28, and $32,277.71 cash paid
to the City, which amount includes $29,977.71 cash for adjacent lines, with Heart
Hospitals of America, the developer, to receive a refund of $0.00 in accordance with
Chapter 28 of the Code of Ordinances of the City of Lubbock and a refund of deposit in
the amount of $0.00; and
WHEREAS, the construction of the said water and sewer improvements was
performed under the supervision of the Water Utilities Engineer and completed in
accordance with the City of Lubbock's plans and specifications; NOW THEREFORE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements be and the same are hereby accepted as an
integral part of the water and sewer system of the City of Lubbock.
134
Regular City Council Meeting
February 19, 2004
SECTION 2. THAT the refundable cost in the amount of $0.00 be made in
accordance with said Chapter 28.
SECTION 3. THAT a refund of deposit be made in the amount of $0.00.
SECTION 4. THAT this Resolution shall take effect and be in force from and
after the date of its passage.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Wood Franklin
Wood Franklin, Interim Chief Engineer, Public Works
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda Chamales, Supervising Attorney
This is a routine acceptance of water and sanitary sewer improvements
constructed in accordance with the subdivision regulations. The total cost
of the improvements is $147,277.71 and has a value of $115,000 as
determined by the unit prices established by said Chapter 28. Cash paid
to the City of Lubbock is $32,277.71, which includes $29,977.71 adjacent
mains. The developer, Heart Hospitals of America, will receive a refund
of $0.00 in accordance with Chapter 28 of the Code of Ordinances of the
City of Lubbock. There is no refund.
The subdivision is located northwest of North Loop 289, southwest of
North Utica Avenue and south of Erskine Street.
FISCAL IMPACT:
There will be negligible impact on Operational Maintenance.
Staff recommended approval of this resolution.
(28.) Resolution No. 2004-R0065 authorizing acceptance of water and
sanitary sewer improvements for Tract M, Westhaven Addition to the
City of Lubbock, Lubbock County, Texas, between 2"d Street and 2"d
Place and West of Gary Avenue.
RESOLUTION NO.2004-R0065
A RESOLUTION ACCEPTING TRACT M, WESTHAVEN ADDITION TO
THE CITY OF LUBBOCK, LUBBOCK COUNTY, TEXAS.
WHEREAS, the developer of Tract M, Westhaven Addition to the City of
Lubbock, Lubbock County, Texas, has complied with the provisions of Article IV,
Chapter 28 of the Code of Ordinances of the City of Lubbock, in providing the water and
sewer improvements for said Addition; and
135
Regular City Council Meeting
February 19, 2004
WHEREAS, the total utility cost to the developer is $5,478.95 with the
improvements constructed by Allen Doggett Construction Co. having a value of
$5,128.95 as determined by the unit prices established by said Chapter 28, and $350.00
cash paid to the City, which amount includes $0.00 cash for adjacent lines, with Royal
Texas -Tennessee Ltd. Partnership, the developer, to receive a refund of $0.00 in
accordance with Chapter 28 of the Code of Ordinances of the City of Lubbock and a
refund of deposit in the amount of $0.00; and
WHEREAS, the construction of the said water and sewer improvements was
performed under the supervision of the Water Utilities Engineer and completed in
accordance with the City of Lubbock's plans and specifications; NOW THEREFORE
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements be and the same are hereby accepted as an
integral part of the water and sewer system of the City of Lubbock.
SECTION 2. THAT the refundable cost in the amount of $0.00 be made in
accordance with said Chapter 28.
SECTION 3. THAT a refund of deposit be made in the amount of $0.00.
SECTION 4. THAT this Resolution shall take effect and be in force from and
after the date of its passage.
Passed by the City Council this 19th day of February, 2004.
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Wood Franklin
Wood Franklin, Interim Chief Engineer -Public Works
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda Chamales, Supervising Attorney
This is a routine acceptance of water and sanitary sewer improvements
constructed in accordance with the subdivision regulations. The total cost
of the improvements is $5,478.95 and has a value of $5,128.95 as
determined by the unit prices established by said Chapter 28. Cash paid
to the City of Lubbock is $350 that includes $0.00 adjacent mains. The
developer, Royal Texas -Tennessee Ltd. Partnership, will receive a refund
of $0.00 in accordance with Chapter 28 of the Code of Ordinances of the
City of Lubbock. There is no refund.
The subdivision is located between 2nd Street and 2"d Place and west of
Gary Avenue.
FISCAL IMPACT:
Negligible impact on Operational Maintenance.
Staff recommended approval of this resolution.
136
Regular City Council Meeting
February 19, 2004
(29.) Resolution No. 2004-R0066 reappointing five temporary, substitute
judges for the Municipal court (Jim Aldridge, Barbara Dickerson,
Michelle Hart, Jorge Hernandez, and Enrique Martinez).
RESOLUTION NO. 2004-R0066
WHEREAS, Subsection 30.00008(b) of the Government Code of the State of
Texas provides that the governing body of the City of Lubbock may appoint one or more
temporary substitute judges for the Lubbock Municipal Court of Record; and
WHEREAS, such temporary substitute judges shall meet the same qualifications
to serve as are required of a regular municipal judge; and
WHEREAS, the City Council of the City of Lubbock has determined that it is in
the best interest of the citizens of the City of Lubbock to appoint the following named
persons as temporary substitute judges for the Municipal Court of Record; NOW
THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the following named persons are hereby appointed temporary
substitute judges of the Lubbock Municipal Court of Record.
Barbara Dickerson Enrique Martinez
Michele Hart Jim Aldridge
Jorge Hernandez
SECTION 2. THAT said temporary substitute judges shall serve as needed and at
the pleasure of the Presiding Judge of the Lubbock Municipal Court and said temporary
substitute judges shall receive such pay as shall be provided for such positions by the City
Council in the annual City of Lubbock budget.
Passed by the City Council on this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Robert A. Doty
Robert Doty, Municipal Judge
APPROVED AS TO FORM:
/s/ Donald G. Vandiver
Donald G. Vandiver, Attorney of Counsel
Five existing temporary judges (who accomplish the night magistrate
duties at the City holding facility) need to be reappointed. All are willing
to continue serving. It is strongly recommended to reappoint all five
individuals.
FISCAL IMPACT:
Annual cost for judges' pay is already included in the annual budget. No
changes will be needed at the "revised" budget.
The appointment of the five temporary, substitute judges is requested.
137
Regular City Council Meeting
February 19, 2004
(30.) Resolution No. 2004-R0067 expressing appreciation for the service of
Ramon Gallegos as a temporary/substitute judge and appointing Jesse
Mendez as a new temporary/substitute judge.
RESOLUTION NO. 2004-R0067
WHEREAS, sections 30.00007 and 30.00008 of the Government Code provides
for the appointment and assignment of temporary and substitute judges for municipal
courts of record; and
WHEREAS, Judge Ramon Gallegos has resigned his position as a temporary and
substitute judge of the Municipal Court of Record; and
WHEREAS, the City Council and the Presiding Judge of the Lubbock Municipal
Court of Record desire to express their appreciation for his service and to appoint a new
temporary and substitute judge for the Lubbock Municipal Court of Record; NOW
THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the City Council of the City of Lubbock hereby expresses its
appreciation and gratitude to Ramon Gallegos for his service as a temporary and
substitute judge of the Lubbock Municipal Court of Record.
SECTION 2. THAT the City Council of the City of Lubbock hereby appoints
Jesse Mendez as temporary and substitute judge of the Lubbock Municipal Court of
Record. This appointment shall be effective upon final passage of this Resolution by the
City Council of the City of Lubbock. The term of office shall be for two years and the
salary shall be as provided by the City of Lubbock budget ordinance for such position.
Passed by the City Council this 19th day of February, 2004.
/S/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Robert A. Doty
Robert Doty, Presiding Municipal Judge
APPROVED AS TO FORM:
/s/ Donald G. Vandiver
Donald G. Vandiver, Attorney of Counsel
After serving as a magistrate (temporary/substitute judge) for the City of
Lubbock since 1997, Ramon Gallegos resigned, effective December 31,
2003. With deep regret and enormous appreciation, his resignation has
been accepted. As a result, the City needs to appoint a new
temporary/substitute judge. The nomination of Jesse Mendez is being
brought before the Council for approval.
FISCAL IMPACT:
Annual cost for the temporary/substitute judges' pay is already included in
the annual budget. This appointment will have no impact on the existing
budget. No changes will be needed at the "revised" budget.
138
Regular City Council Meeting
February 19, 2004
The appointment of Jesse Mendez as a new temporary/substitute judge is
requested.
The next item considered was Item 34.
Items 31-33 were moved from consent agenda to regular agenda and
considered following Item 21.
(31.) Resolution No. 2004-R0090 designating a portion of Dunbar
Historical Lake, otherwise known as Canyon Lake #6, as a designated
off -road bike trail.
RESOLUTION NO.2004-R0090
WHEREAS, the City of Lubbock owns and operates a park area known as Dunbar
Historical Lake, sometimes referred to as Canyon Lake No. 6;
WHEREAS, the Parks and Recreation Board of the City of Lubbock is an
advisory board to the City of Lubbock and is charged with making recommendations to
the City Council regarding operational policies of parks and recreation facilities;
WHEREAS, the Parks and Recreation Board of the City of Lubbock has carefully
considered the use of a portion of the Dunbar Historical Lake Park and has determined
that a non -motorized bike trail would be beneficial to the Park and to the citizens of the
City of Lubbock;
WHEREAS, the Parks and Recreation Board of the City of Lubbock has advised
and recommended to the City Council of the City of Lubbock that a non -motorized bike
trail, the route of same being roughly depicted in Exhibit "A" attached hereto, and made a
part hereof for all purposes, be officially designated by the City Council for the City of
Lubbock.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
1. THAT the City Council of the City of Lubbock hereby designates the route
depicted in Exhibit "A", attached hereto, as well as extensions and
improvements to such route, as a non -motorized bike trail in Dunbar
Historical Lake Park.
2. THAT the non -motorized bike trail may be utilized solely by
non -motorized bikes and pedestrians. No equestrian related activities may
be conducted within or upon the non -motorized bike trail.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Corbin Pemberton
Corbin Pemberton, Parks and Recreation Director
APPROVED AS TO FORM:
139
Regular City Council Meeting
February 19, 2004
/s/ Richard K. Casner
Richard K. Casner
First Assistant City Attorney
A copy of Exhibit "A" is filed with Resolution No. 2004-R0090.
The Parks and Recreation Department has received a joint proposal from
the Lubbock Bicycle and Chaparral Cycling Club. These two groups
would like to work in cooperation with the Lubbock Parks and Recreation
Department to develop and install a trail marking and classification system
for the off -road bike trail located at the Dunbar Historical Lake. An
accompanying item will designate a trail for official equestrian use and
prohibit off -road bicycles on that trail. The proposal will consist of three
phases:
Phase I: Trail mapping and classification
Phase I will include identifying and mapping the trails currently in
existence and identifying possible future trails at the site. After mapping
is complete, the trails, trail segments and/or trail loops will be classified
based on difficulty.
Parks and Recreation staff has indicated that recent aerial photos are
available for use in mapping the existing trail system.
Phase H: Initial trail and area signage
Phase H will include the installation of trail signs designated to direct
cyclists to trails appropriate for their skill level. These permanent signs
will be constructed from materials approved by the Parks and Recreation
staff and manufactured by a local professional sign contractor. The
members of the Lubbock Bicycle Club and the Chaparral Cycling Club
will install the signs.
The Parks and Recreation Department suggested the installation of a
traditional wooden park sign identifying the location as an off -road bicycle
area. This sign would be constructed and installed using existing Parks
and Recreation resources.
Phase III: Trail system map sign
At the suggestion of the Parks and Recreation staff, the Lubbock Bicycle
Club and the Chaparral Cycling Club agree that a laser cut sign showing
the off -road bike trail system, in map form and listing any rules adopted
for the use of the trails, should be installed. The Parks and Recreation
Department will have final say on the sign's content and installation.
FISCAL IMPACT:
The designation of this bike trail would have the following implications on
the Parks and Recreation Department:
Phase I: By using existing resources, there should be no cost to the City of
Lubbock or the cycling clubs to complete Phase I.
Phase 11: Both clubs have approved funding to cover the cost to
manufacture and install the signs.
Phase III: No funding has been identified to date. If the Parks and
Recreation Department uses operational funds for this portion of the
project, it will cost approximately $250. This will be paid out of
5221.8266, which was budgeted at $48,370.
140
Regular City Council Meeting
February 19, 2004
Staff will work with all local bicycling clubs to implement the
recommended phases. The Parks and Recreation Board approved this on
January 26, 1999.
The Parks and Recreation Department recommended approval of this
resolution.
Corbin Pemberton, Community Projects Manager, gave comments and
answered questions from Council Member Morrison.
Council Member Martin asked Council's consensus to instruct the Parks
Department and the City Attorney's office to prepare an amendment to
City Code Section 19.1 addressing the bike trail/equestrian issue in regard
to keeping bicycles off the equestrian trails and horses off the bike trails.
Motion was made by Council Member Morrison, seconded by Council
Member Martin to pass Resolution No. 2004-R0090 as recommended by
staff. Motion carried: 6 Yeas, 0 Nays.
Council Member Boren was away from the dais.
(32.) Resolution No. 2004-R0091 designating a portion of Mackenzie Park
as the official Equestrian Trail and signage area.
RESOLUTION NO.2004-R0091
WHEREAS, the City of Lubbock owns and operates Mackenzie Park; and
WHEREAS, the Parks and Recreation Board of the City of Lubbock is an
advisory board to the City of Lubbock and is charged with making recommendations to
the City Council regarding operational policies of parks and recreation facilities;
WHEREAS, the Parks and Recreation Board of the City of Lubbock has carefully
considered the use of the existing equestrian trail located in Mackenzie Park and has
determined that an official equestrian trail would be beneficial to the Park and to the
citizens of the City of Lubbock;
WHEREAS, the Parks and Recreation Board of the City of Lubbock has advised
and recommended to the City Council of the City of Lubbock that an equestrian trail, the
route of same being roughly depicted in Exhibit "A" attached hereto, and made a part
hereof for all purposes, be officially designated by the City Council for the City of
Lubbock.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
1. THAT the City Council of the City of Lubbock hereby designates the route
depicted in Exhibit "A", attached hereto, as well as extensions and
improvements to such route, as the official equestrian trail in Mackenzie
Park.
2. THAT no motorized or non -motorized vehicles may be utilized within or
upon the official equestrian trail.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
141
Regular City Council Meeting
February 19, 2004
APPROVED AS TO CONTENT:
/s/ Corbin Pemberton
Corbin Pemberton, Parks and Recreation Director
APPROVED AS TO FORM:
/s/ Richard K. Casner
Richard K. Casner
First Assistant City Attorney
A copy of Exhibit "A" is filed with Resolution No. 2004-RO091.
Parks and Recreation staff has just completed research into the existing
equestrian trail located in Mackenzie Park. In the mid-1990s an
Equestrian Committee identified land, standards/needs, user groups and
funding needed to designate an area. From the committee, the Parks
Department found that this area is extremely popular with several user
groups. An Eagle Scout installed signage and directional arrows along the
course.
The trail never received an official designation for equestrian use by the
City Council. It is now an appropriate time to designate this % mile course
as an official Equestrian Trail and post additional signage as necessary. A
copy of Exhibit A was provided in council backup.
An accompanying item will designate a trail for official off -road bicycles
and prohibit horses on that trail.
FISCAL IMPACT:
There is only a minimal fiscal impact to the Parks and Recreation
operating budget for signage along the trail, approximately $500. This
will be paid out of 5221.8266, which was budgeted at $48,370.
On January 27, 2004, the Parks and Recreation Board unanimously
approved this request. Once approved, staff will place the necessary
signage along the trail as needed.
The Parks and Recreation Department recommended approval of this
resolution.
Motion was made by Council Member Morrison, seconded by Council
Member Martin to pass Resolution No. 2004-R0091 as recommended by
staff. Motion carried: 6 Yeas, 0 Nays.
Council Member Boren was away from the dais.
(33.) Resolution No. 2004-R0092 authorizing the Mayor to execute an
Interlocal Agreement with the City of Wolfforth adding the Wolfforth
Police Department to the City's 800MHz Radio System.
RESOLUTION NO.2004-R0092
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT
the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for
and on behalf of the City of Lubbock an Interlocal Agreement by and between the City of
Lubbock and the City of Wolfforth for 800 MHz Trunked Radio System. Said
Agreement is attached hereto and incorporated in this Resolution as if fully set forth
herein and shall be included in the minutes of the Council.
142
Regular City Council Meeting
February 19, 2004
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Mark Yearwood
Mark Yearwood
Director of Information Technology
APPROVED AS TO FORM:
/s/ Amy L. Sims
Amy L. Sims, Assistant City Attorney
A copy of the Agreement is filed with Resolution No. 2004-R0092.
The City installed an 800MHz Radio System in 1995, which supplies
communications to the City's Public Works and Public Safety
Departments, as well as the County Sheriff's Department, EMS, Red
Cross, and Lubbock Independent School District.
The Wolfforth Police Department, needing to communicate with other
public safety agencies, requested subscribing to the City's radio system
and to purchase one radio to aid their communications with other public
safety agencies in the event of such an emergency.
FISCAL IMPACT:
This agreement will add one radio to the Radio Shop system, and will
increase revenue by approximately $434 per year.
Staff recommended approval of this resolution.
Mark Yearwood, Director of Information Technology, answered questions
from Council Member Morrison.
Motion was made by Council Member Morrison, seconded by Council
Member Martin to pass Resolution No. 2004-R0092 as recommended by
staff. Motion carried: 6 Yeas, 0 Nays.
Council Member Boren was away from the dais.
The next item considered was Item 35.
(34.) Resolution No. 2004-R0068 authorizing the Mayor to execute an alley
use license with John Mullins for a concrete ramp alley encroachment
(2662 34th Street).
RESOLUTION NO.2004-R0068
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, an Alley Use License for a
concrete ramp, by and between the City of Lubbock and John Mullins, and related
documents. Said License is attached hereto and incorporated in this resolution as if fully
set forth herein and shall be included in the minutes of the City Council.
143
Regular City Council Meeting
February 19, 2004
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Ed Bucy
Ed Bucy, Right -of -Way Agent
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda Chamales
Supervising Attorney/Office Practice
A copy of the License is filed with Resolution No. 2004-R0068.
This item was considered following Item 30.
Mullins TV is located at 2660 34th Street, just east of Boston Avenue.
They recently constructed a new building on the west side of their existing
building. Due to the size of the building, they were required to install a
rear exit door per Fire Department regulations. This construction also
required that a ramp be built for handicap access to exit this building.
Since this building was built nearly on the rear property line, this concrete
handicap ramp will have to be constructed in the north 4.5 feet of the
20-foot alley. This license allows them to construct this concrete ramp in
the south 4.5 feet of the alley at a height of 6 inches and a length of 13 feet
for a total square foot usage of 58.5 square feet. This concrete ramp will
have no rails or posts that could create a traffic or vehicle hazard. The cost
for this 20-year license will be the minimum of $50, payable every 5 years
in advance or $250. The Engineering Department and Building Inspection
Department have reviewed this request and find it acceptable.
FISCAL IMPACT:
The City will receive $50 per year income from this license.
Right -of -Way Department recommended approval of this resolution.
The next item considered was Item 36.
(35.) Resolution No. 2004-R0093 authorizing the Mayor to execute a
street -use license with High Impact Properties Texas for the use of a
City street for additional paved parking areas (3102 50th Street).
RESOLUTION NO.2004-R0093
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Street Use License for
additional paved parking area, by and between the City of Lubbock and High Impact
Properties Texas, L. L. C., and related documents. Said License is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
144
Regular City Council Meeting
February 19, 2004
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Ed Bucy
Ed Bucy, Right -of -Way Agent
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda Chamales
Supervising Attorney/Office Practice
A copy of the License is filed with Resolution No. 2004-R0093.
This item was moved from consent agenda to regular agenda and was
considered following Item 33.
High Impact Properties Texas, L.L.C. owns the property just west of Flint
Avenue on the north side of 50th Street. They are in the process of
remodeling their building and the parking lot. They desire to construct
two portions of their parking lot into the south right-of-way of 501h Street
by approximately 10 feet. These two portions are for head -in parking of
vehicles and are reached only from inside of their existing property. The
first portion of right-of-way parking area usage measures 97.9 feet by 10
feet or 979 square feet and the second portion of right-of-way parking area
usage measures 106.8 feet by 10 feet or 1,068 square feet for a street area
usage of 2,047 square feet. Using the street -use license formula to
determine the amount due the City for this license, a value is determined
of 2047 square feet X $4.30 per square foot = $8,802.10 X 10% _ $880.21
per year or $4,401.05 per each 5 year term of this 20 year license. The
Engineering Department, the Planning Department, and the Traffic
Engineering Department have all reviewed this request and find it
acceptable.
FISCAL IMPACT:
The City will receive $880.21 per year income from this license.
Right -of -Way Department recommended approval of this resolution.
Ed Bucy, Right -of -Way Agent, answered questions from Council Member
Martin.
Council Member Boren returned to the dais.
Motion was made by Council Member Patterson, seconded by Council
Member Gilbreath to pass Resolution No. 2004-R0093 as recommended
by staff. Motion carried: 7 Yeas, 0 Nays.
The next item considered was Item 37.
145
Regular City Council Meeting
February 19, 2004
(36.) Resolution No. 2004-R0069 authorizing the Right -of -Way Department
to make an offer to Tommy L. Townsend and wife, Elva L. Townsend
and Harvey Stotts, Jr., and Geraldine Stotts, as trustee for the Don
Carlton Stotts and Geraldine Stotts Revocable Living Trust, dated
November 13, 1996 for a 30 foot wide permanent storm water line
easement and a 100 foot wide working easement in Section 4, Block S,
Lubbock County for the South Lubbock Drainage Improvement
Project (3202 East Slaton Road, North -South on Guava Avenue
between East 82nd Street and US Highway 84).
RESOLUTION NO.2004-0069
WHEREAS, the City of Lubbock, Texas, a Home Rule Municipality located in
Lubbock County, Texas, has determined and does hereby determine that the public needs,
safety and welfare demand and create a public necessity for the acquisition of additional
easements for municipal public use and purposes, to -wit: for the South Lubbock Drainage
Improvement Project and the City Council of said City finds it in the public interest and
for public purposes and municipal purposes to proceed with the acquisition of easements
as needed for such purposes as aforesaid; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the permanent storm water line easement and working
easement to the tract of land further described in Exhibits "A" and `B", attached hereto,
be acquired for public purposes and municipal purposes as set forth in the preamble
hereof.
SECTION 2. THAT the owner of said tract, being Tommy L. Townsend and Elva
L. Townsend and Harvey Stotts, Jr., and Geraldine Stotts, as Trustee for the Don Carlon
Stotts and Geraldine Stotts Revocable Living Trust Dated November 13, 1996, BE
offered through the Right -of -Way Department of the City of Lubbock the amount of
$25,000.00 which is the amount appraised as the value and total damages for the
permanent storm water line easement and working easement and acquisition of said real
estate purposes herein stated, and unless accepted forthwith, the City Attorney of said
City of Lubbock is hereby authorized and instructed to institute condemnation (eminent
domain) proceedings to acquire the permanent storm water line easement and working
easement.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Ed Bucy
Ed Bucy, Right -of -Way Agent
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda Chamales
Supervising Attorney/Office Practice
A copy of Exhibits "A' and `B" are filed with Resolution No. 2004-R0069.
This item was considered following Item 34.
146
Regular City Council Meeting
February 19, 2004
At the November 17, 2003 City Council meeting, the Council approved a
resolution authorizing the Right -of -Way Department to make an offer to
Harvey Stotts, Jr. and Geraldine Stotts as Trustee for a permanent
easement and working easement for the 98th Street storm water pipeline
drainage project. This property is located between East 82°d Street and U.
S. Highway 84 (Slaton Road) along what would be Guava Avenue. This
property sold on February 6, 2004 from the Stotts family to Tommy L.
Townsend and Elva L. Townsend and this resolution authorizes the City to
make them the offer for these two easements. According to the Stotts'
attorney, the Stotts retained the right to negotiate and receive the money
for this easement and that is why they are named again in this resolution.
This permanent easement is approximately 1,552 feet in length and 30 feet
in width and contains 1.066 acres and the working easement is 100 feet in
width and contains 3.508 acres. Don Harris M.A.I. appraised these
easements for the City. His first appraisal valued the permanent and
working easement at $14,271, and irrigation repairs at $5,008, for a total
offer of $19,279. The Stotts' attorney hired a second appraiser, who
valued the easement areas at $32,300. I had our appraiser review the
Stotts' appraisal and he felt that their appraiser had over valued the land.
Our appraiser also felt that he could have added some money for crop
damages as their appraiser had done. After adding $3,027 for crop
damages, our appraiser submitted a revised easement offer of $22,306.
Ed Bucy, Right -of -Way Agent, then met with the Stotts' attorney to
discuss his appraiser's valuation and just what they would take. He held
firm with the $32,500 amount, and at one point, he stated that the appraisal
should be closer to $40,000, if his appraiser had made some adjustments
differently. On February 9, Mr. Bucy received a call from the Stotts'
attorney stating that they would accept $25,000 to settle.
That is $2,694 more than our appraiser's revised offer, but is certainly less
_— than just the expenses to condemn them. Staff left authorization for the
City to institute condemnation proceedings to acquire these easements if
our offer is refused in this resolution
Therefore, the offer to the Townsend family and Stotts family is $25,000.
FISCAL IMPACT:
A cost of $25,000 from the South Lubbock Storm Water Project account.
Right -of -Way Department recommended approval of this resolution.
The next items considered were Items 38-48.
(37.) Resolution No. 2004-R0094 authorizing the Mayor to execute a
Quitclaim Deed in favor of Lewis Garnett and Robert Corcorran for
Tract A, Winghaven Estates, a subdivision of Section 34, Block AK,
Lubbock County (6002 Upland Avenue).
RESOLUTION NO. 2004-R0094
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to
execute for and on behalf of the City of Lubbock a Quitclaim Deed in favor of Lewis
Garnett and Robert Corcorran, attached hereto. Said Quitclaim Deed is attached hereto
and incorporated in this Resolution as if fully set forth herein and shall be included in the
minutes of the Council.
147
Regular City Council Meeting
February 19, 2004
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Ed Bucy
Ed Bucy, Right -of -Way Agent
APPROVED AS TO FORM:
/s/ Richard Casner
Richard Casner
First Assistant City Attorney
A copy of the Quitclaim Deed is filed with Resolution No. 2004-R0094.
This item was moved from consent agenda to regular agenda and was
considered following Item 35.
In 1996, the plat named Winghaven Addition, Lots 1-38 and Tract A was
filed for record in the courthouse. This subdivision is located at
approximately 60th Street on the west side of Upland Avenue and was in
the county when platted, but under the City's Extra Territorial Jurisdiction
(ETJ). Now about half of this subdivision is in the City limits.
Tract A was dedicated in the plat as a private access, drainage, utility and
garbage collection easement rather than a street. This easement area
resembles a street, but was not built to City street standards and has lay
down curbs instead of the typical curb and gutter construction the City
permits. A couple of years ago, Mr. Garnett approached the City about
accepting this dedication and the City reviewed it. The City informed Mr.
Garnett know what our estimates were for paving reconstruction and that
there were some extensive drainage problems that would have to be taken
care of. Mr. Garnett let us know that they would take care of the drainage
problems themselves instead of getting into all of the requirements the
City required.
Recently, a title company notified the Engineering Department that a
dedication deed of record had been filed dedicating this Tract A,
Winghaven Addition to the public as a street and right-of-way. The filing
date of this dedication deed was July 17, 2002.
According to our engineers, this street was not constructed to our accepted
standards and the City did not approve the acceptance of this paving plan
nor did the City Council approve the acceptance of this dedication deed.
Therefore, this deed quitclaims Tract A, Winghaven Addition to the
original dedicators, Lewis Garnett and Robert Corcorran.
FISCAL IMPACT:
The property will go back on the tax roll and the City will not be
responsible for its maintenance or liability.
Right -of -Way Department recommended approval of this resolution.
Regular City Council Meeting
February 19, 2004
Ed Bucy, Right -of -Way Agent, answered questions from Council Member
Martin.
Motion was made by Council Member Martin, seconded by Council
Member Patterson to pass Resolution No. 2004-R0094 as recommended
by staff. Motion carried: 7 Yeas, 0 Nays.
The next item considered was Item 49.
Items 38-48 were considered following Item 36.
(38.) Resolution No. 2004-R0070; Resolution No. 2004-R0071; Resolution
No. 2004-110072; RFP #240-03/DC - for Temporary Employment
Services (Human Resources).
RESOLUTION NO.2004-R0070
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a contract to provide
temporary employee services, by and between the City of Lubbock and Labor Ready
Central III, LLP of Lubbock, Texas, and related documents. Said contract is attached
hereto and incorporated in this resolution as if fully set forth herein and shall be included
in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s,' Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Scott Snider
Director of Human Resources
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
A copy of the contract is filed with Resolution No. 2004-R0070.
RESOLUTION NO.2004-R0071
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a contract to provide
temporary employee services, by and between the City of Lubbock and SOS Staffing
Services of Lubbock, Texas, and related documents. Said contract is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
149
Regular City Council Meeting
February 19, 2004
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Anthony Jones for Scott Snider
Scott Snider
Director of Human Resources
APPROVED AS TO FORM:
/s/ Linda L. Chamales
for Amy Sims, Assistant City Attorney
A copy of the Contract is filed with Resolution No. 2004-R0071.
RESOLUTION NO. 2004-R0072
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a contract to provide
temporary employee services, by and between the City of Lubbock and Spherion Staffing
of Lubbock, Texas, and related documents. Said contract is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Scott Snider
Scott Snider
Director of Human Resources
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
A copy of the contract is filed with Resolution No. 2004-R0072.
The City utilizes approximately 25 to 35 technical/clerical temporaries per
year. Each technical/clerical temporary works from a few days to several
weeks. The majority of temporary assignments range from two to six
150
Regular City Council Meeting
February 19, 2004
weeks in duration. The City also utilizes approximately 90 to 150
trades/labor temporaries per year. The majority of temporaries are utilized
during the summer months as seasonal workers and work from about the
middle of May through the middle of September.
Two temporary employment agencies will service this contract for each of
the following categories:
Clerical
Trades I (general laborers)
Trades H (skilled workers)
Proposals
Proposals were received from the following temporary agencies:
1. Snelling Personnel Services
2222 Indiana Ave.
Lubbock, Texas 79410
3. Labor Ready Central III, LP
1704 Broadway
Lubbock, Texas 79401
5. Express Personnel Services
2701 81St Street
Lubbock, Texas 79423
7. Manpower
3223 S. Loop 289, Suite 115
Lubbock, Texas 79414
9. Office Team
1500 Broadway Suite 1124
Lubbock, Texas 79401
Selection Committee Process
2. Kelly Services, Inc.
8200 C Nashville, Suite 204
Lubbock, Texas 79423
4. Spherion Staffing
4505 82°a Street, Suite 9
Lubbock, Texas 79424
6. SOS Staffing
2811 South Loop 289, Ste. 3
Lubbock, Texas 79423
8. Lubbock Temp. Help Services
2124 50`h Street
Lubbock, Texas 79412
10. Adecco
6816 Slide Road Suite I IA
Lubbock, Texas 79424
Five employees comprised the Committee that evaluated and ranked the
temporary employment services proposal. They included: Anthony Jones,
Human Resources Staffing Coordinator; Jesse Herrera, Civic Services
Operations Foreman; Mary Gonzales, Administrative Assistant in Public
Information; Penny Morin, Customer Service Coordinator at Solid Waste;
and Benito Ortiz -Park Maintenance Supervisor.
A pass/fail was assigned to each proposal for 1) meeting the minimum
requirement of providing workers' compensation, 2) including no
placement fee for employees hired for full-time and/or part-time positions,
3) ensuring employees were bonded, 4) providing 8-hour turn around, and
5) providing satisfactory billing procedures. Each member of the
Committee read the proposals and ranked the agencies on a scale of 1 to
10 with "10" being the best.
The following evaluation criteria was used:
CLERICAL
Hourly Rate (45%)
Testing Procedures (Skill Level, Physical Ability, Etc.) (25%)
Employee Replacement Assistance (15%)
Supply Methods and Emergency Responses (10%)
Reference Checks on Vendor (5%)
151
Regular City Council Meeting
February 19, 2004
TRADES I AND II
Hourly Rate (35%)
Testing Procedures (Skill Level, Physical Ability, Etc.) (15%)
Employee Replacement Assistance (15%)
Drivers License Checks (10%)
Provide CDL Drivers and CDL Random Drug Testing Procedures (10%)
Supply Methods and Emergency Responses (10%)
Reference Checks on Vendor (5%)
After the initial ranking process, it was determined that site visits were
necessary to further evaluate the top three agencies in each of the three job
categories:
CLERICAL
SOS Staffing
Snelling Personnel
Spherion
TRADES I
SOS Staffing
Labor Ready Central III
Lubbock Temp. Service
TRADES II
SOS Staffing
Labor Ready Central III
Lubbock Temp. Service
Site Visits
(38.50 cumulative points)
(33.55 cumulative points)
(33.15 cumulative points)
(42.30 cumulative points)
(41.45 cumulative points)
(39.55 cumulative points)
(41.95 cumulative points)
(41.80 cumulative points)
(38.50 cumulative points)
Site visits were conducted on the abovementioned vendors. Each of the
five Committee members rated the above agencies on a weighted scale of
1 to 10 with "10" being best. The site visit evaluation categories were;
ADA Compliance, testing procedures, employee replacement, drivers'
license checks, CDL driver/CDL drug testing procedures, supply and
emergency responses, and employee background checks.
Each of the agencies' site visit cumulative totals was added to the initial
evaluation cumulative totals for a final score.
The following are the cumulative results of the initial RFP ranking and site
visit evaluations, by job category:
CLERICAL
Vendor
RFP
Site Visit
Total
SOS Staffing
38.50
43.40
81.90
Spherion
33.15
40.45
73.60
Snelling Personnel
33.55
38.10
71.65
TRADES I
Vendor
RFP
Site Visit
Total
SOS Staffing
42.30
42.45
84.75
Labor Ready Central
41.45
39.65
81.10
Lubbock Temp. Service
39.55
40.40
79.95
152
Regular City Council Meeting
February 19, 2004
TRADES II
Vendor RFP Site Visit Total
SOS Staffing 41.95 42.45 84.40
Labor Ready Central 41.80 39.65 81.45
Lubbock Temp. Service 38.50 40.40 78.90
FISCAL IMPACT:
The contracts will result in an estimated expenditure of $745,981 from
February 26, 2004 through September 30, 2004. The City anticipated
appropriating an approximate $1,000,000 for fiscal years 2004/2005 and
2005/2006 for temporary employment services for an estimated three-year
allocation of $2,745,981.
Clerical
Staff recommended contract award to SOS Staffing of Lubbock, Texas and
Spherion Staffing of Lubbock, Texas to provide Clerical Temporary
Employment Services. The contract is for one year with an option to renew
for up to two additional one-year terms.
Trades I and Trades II
Staff recommended contract award to Labor Ready Central III of Lubbock,
Texas and SOS Staffing of Lubbock, Texas to provide Trades I and Trades
II Temporary Employment Services. The contract is for one year with an
option to renew for up to two additional one-year terms.
(39.) Resolution No. 2004-R0073/RFP #221-03/BM - authorizing the Mayor
to reject all proposals for the Automobile Parking Concession at
Lubbock International Airport (Airport).
RESOLUTION NO.2004-R0073
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to reject on behalf of the City Council, all proposals for the Automobile Parking
Concession at Lubbock International Airport, per RFP #221-03/BM.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ John McGinley
John McGinley, Interim Airport Director
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda Chamales, Supervising Attorney
Office Practice Section
153
Regular City Council Meeting
February 19, 2004
In mid -November, the City of Lubbock issued a Request for Proposals
(RFP) for the Automobile Parking Concession at Lubbock International
Airport. On January 21, 2004, staff received four proposals. On January
27, 2004, the selection committee consisting of Department of Aviation
staff, Budget & Research staff and an Airport Board representative met to
evaluate the proposals. After reviewing the proposals, the selection
committee recommended to reject all proposals and reissue the RFP.
Three of the four proposers did not offer to meet the $900,000 Minimum
Annual Guarantee (MAG) as stated in the RFP. Additionally, the
committee had concerns with the fourth proposer's ability to meet the
requirements of the RFP/contract.
On February 4, 2004, the Airport Board reviewed and accepted the
selection committee's recommendation to reject all proposals.
When the RFP is reissued, the MAG will be adjusted to allow proposers
some additional flexibility to consider profit and risk while competing for
this contract. Additionally, the RFP will be modified to add an alternate
section, where offerors will be asked to submit proposals for a
management agreement (in addition to the concessionaire agreement) to
determine which is more advantageous to the City.
FISCAL IMPACT:
The current management contract with APCOA will remain in place until
a contract is awarded.
Staff and Airport Board recommended rejecting all proposals and reissuing
the RFP.
(40.) Resolution No. 2004-R0074/BID #026-04/RW —for Opticom
Emergency Pre-empt Equipment (Traffic Engineering).
RESOLUTION NO. 2004-R0074
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Purchase Order for
opticom emergency preempt equipment, by and between the City of Lubbock and
Houston -Galveston Area Council of Houston, Texas, and related documents. Said
Purchase Order is attached hereto and incorporated in this resolution as if fully set forth
herein and shall be included in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
154
Regular City Council Meeting
February 19, 2004
/s/ John M. Knight
John M. Knight
Assistant City Attorney
A copy of the Purchase Order is filed with Resolution No. 2004-R0074.
This bid is for the purchase of 3M Opticom emergency pre-empt
equipment for the Traffic Engineering Department. This acquisition is for
optical detectors, discriminators, mounting brackets, and optical detector
cables. The equipment will be used at five signalized intersections along
the east -west freeway, four signalized intersections along Texas Tech
Parkway, and two new signalized intersections to allow for pre-emption of
the signal of emergency Fire Department, EMS, and Police Department
vehicles. 3M equipment and protocols are proprietary. There are
approximately 140 intersections in Lubbock with existing 3M pre-emption
equipment.
Purchase of this equipment is through an inter -local cooperative
purchasing agreement between the City of Lubbock and
Houston -Galveston Area Council (H-GAC). There are no local suppliers
for this emergency equipment.
FISCAL IMPACT:
A total of $69,042.89 was appropriated with $69,042.89 available in
project numbers 90330, 90331 and 9296 for the Quaker and 98`h Street
new signal, Indiana and Erskine Street new signal, and Computer System
Design. A total of $38,072.39 will be reimbursed by TxDOT.
Award contract to Houston -Galveston Area Council of Houston, Texas for
$69,042.89.
(41.) Resolution No. 2004-R00075 Resolution No. 2004-R0076; Resolution
No. 2004-R0077; Resolution No. 2004-R0078; Resolution No.
2004-R0079; Resolution No. 2004-110080; Resolution No.
2004-110081/11I1) #226-03/RS — for Distribution Transformers -Annual
Pricing (Electric Distribution).
RESOLUTION NO.2004-R0075
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Letter of Award for
Distribution Transformers, by and between the City of Lubbock and Central Moloney,
Inc. of Pine Bluff, AR, and related documents. Said Letter of Award is attached hereto
and incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
155
Regular City Council Meeting
February 19, 2004
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John M. Knight
John Knight, Assistant City Attorney
A copy of the Letter of Award is filed with Resolution No. 2004-R0075.
RESOLUTION NO.2004-R0076
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Letter of Award for
Distribution Transformers, by and between the City of Lubbock and Hughes Supply, Inc.
of Lubbock, TX, and related documents. Said Letter of Award is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knijzht
John Knight, Assistant City Attorney
A copy of the Letter of Award is filed with Resolution No. 2004-R0076.
RESOLUTION NO.2004-R0077
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Letter of Award for
Distribution Transformers, by and between the City of Lubbock and Kuhlman Electric
Corporation of Versailles, KY, and related documents. Said Letter of Award is attached
hereto and incorporated in this resolution as if fully set forth herein and shall be included
in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
156
Regular City Council Meeting
February 19, 2004
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Letter of Award is filed with Resolution No. 2004-R0077.
RESOLUTION NO. 2004-R0078
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Letter of Award for
distribution transformers, by and between the City of Lubbock and Pauwels
Transformers, Inc. of Washington, MO, and related documents. Said Letter of Award is
attached hereto and incorporated in this resolution as if fully set forth herein and shall be
included in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Letter of Award is filed with Resolution No. 2004-R0078.
RESOLUTION NO.2004-R0079
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Letter of Award for
distribution transformers, by and between the City of Lubbock and Priester Supply
Company, Inc. of Amarillo, Texas, and related documents. Said Letter of Award is
attached hereto and incorporated in this resolution as if fully set forth herein and shall be
included in the minutes of the City Council.
157
Regular City Council Meeting
February 19, 2004
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Letter of Award is filed with Resolution No. 2004-R0079.
RESOLUTION NO.2004-R0080
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Letter of Award for
distribution transformers, by and between the City of Lubbock and TEC Utility Supply &
Service of Lubbock, Texas, and related documents. Said Letter of Award is attached
hereto and incorporated in this resolution as if fully set forth herein and shall be included
in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Letter of Award is filed with Resolution No. 2004-R0080.
158
Regular City Council Meeting
February 19, 2004
RESOLUTION NO.2004-R0081
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Letter of Award for
distribution transformers, by and between the City of Lubbock and Techline, Inc. of
Amarillo, Texas, and related documents. Said Letter of Award is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC T'ICDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Letter of Award is filed with Resolution No. 2004-R0081.
This bid establishes annual pricing for the purchase of pole type and pad
mounted distribution transformers used to serve residential, commercial,
and industrial customers. These transformers are electrical devices that
convert electrical energy from one voltage level down to another (i.e. from
12,700 Volts to 120 Volts). The transformers are of different capacities
ranging from lOkVA to 1500kVA and different types and secondary
voltages to suit customer requirements. These units will be installed in
Lubbock Power and Light's (LP&L) overhead and underground
distribution systems to maintain existing electrical service and to serve
new and additional customers.
The tab sheet lists the bidders for each bid item in order of increasing
evaluated life -cycle cost of buying and operating the transformer over a
twenty-year period.
Transformer losses were translated to dollar values (industry standard
consists of adding $5.60 per watt of core loss and $1.70 per watt of
winding loss) and added to the bid price to arrive at the evaluated cost. For
bids that are within 3% of the lowest life -cycle cost, the bids are
considered equal and the bidders are listed in order of unit price.
The low bids are from the following companies:
Hughes Supply, Inc. (Temple) of Lubbock, TX $234,770.62
Priester Supply Company, Inc. of Amarillo, TX $219,214.71
Kuhlman Electric Corporation of Versailles, KY $ 98,230.00
TEC Utility Supply & Service of Lubbock, TX $ 73,859.00
Central Moloney, Inc. of Pine Bluff, AR $ 57,277.00
159
Regular City Council Meeting
February 19, 2004
Techline, Inc. of Amarillo, TX $ 46,494.00
Pauwels Transformers, Inc. of Washington, MO $ 23,060.00
FISCAL IMPACT:
A total of $800,000 was appropriated with $800,000 available in project
number 90317 (Distribution Transformers 2003-2004) for this purpose.
Award contracts to Hughes Supply Inc. (Temple) of Lubbock, Texas for
$234,770.62; Priester Supply Company, Inc. of Amarillo, Texas for
$219,214.71; Pauwels Transformers, Inc. of Washington, Missouri for
$23,060; Central Moloney, Inc. of Pine Bluff, Arkansas for $57,277;
Techline, Inc. of Amarillo, Texas for $46,494; TEC Utility Supply &
Service of Lubbock, Texas for $73,859; and Kuhlman Electric
Corporation of Versailles, Kentucky for $98,230.
(42.) Resolution No. 2004-110082/11I1) #232-03/RS — for Roll Off Container
Frame Assembly and Truck (Fleet Services).
RESOLUTION NO.2004-R0082
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Purchase Order for a roll
off container frame assembly and truck, by and between the City of Lubbock and
Lubbock Truck Sales of Lubbock, Texas, and related documents. Said Purchase Order is
attached hereto and incorporated in this resolution as if fully set forth herein and shall be
included in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Purchase Order is filed with Resolution No. 2004-R0082.
This bid is for the purchase of two roll off container trucks for Landfill
Operations and one roll -off container truck for Recycling. The equipment
for recycling includes five year extended warranty and on -board scale
system options.
Existing equipment has been evaluated and has met the replacement
criteria established by Fleet Services. Based on maintenance costs of the
existing equipment, replacement is more cost effective than repair.
Twenty local bidders were notified of this Invitation to Bid.
160
Regular City Council Meeting
February 19, 2004
FISCAL IMPACT:
A total of $1,363,000 (Solid Waste) was appropriated with $331,000
available in project numbers 90340 (Solid Waste Major Equipment
Replacement 03-04) and 90337 (Water Major Equipment Replacement)
for this purpose.
Award contract to Lubbock Truck Sales of Lubbock, Texas for $326,182.
(43.) Resolution No. 2004-R0083BID #233-03/RS — for Tractor Backhoe
with Front End Loader (Fleet Services).
RESOLUTION NO. 2004-R0083
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Purchase Order per ITB#
233-03/RS for tractor backhoe with front end loader, by and between the City of Lubbock
and Scott Tractor & Equipment Company, Inc. of Lubbock, Texas, and related
documents. Said Purchase Order is attached hereto and incorporated in this resolution as
if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Purchase Order is filed with Resolution No. 2004-R0083.
This bid is for the purchase of one Case Model 580SM tractor/backhoe
with front-end loader for the Cemetery.
Existing equipment has been evaluated and has met the replacement
criteria established by Fleet Services. Based on maintenance costs of the
existing equipment, replacement is more cost effective than repair.
Fourteen local bidders were notified of this Invitation to Bid.
FISCAL IMPACT:
A total of $608,581 was appropriated with $63,800 available in project
number 90335 (Fleet Replacement 03-04) for this purpose.
Award contract to Scott Tractor and Equipment Company, Inc. of
Lubbock, Texas for $60,225.
161
Regular City Council Meeting
February 19, 2004
(44.) Resolution No. 2004-R0084; Resolution No. 2004-R0085 / BID
#238-03/RS —for Heavy Equipment Trailer and Trailer Mounted
Water Tank (Fleet Services).
RESOLUTION NO.2004-R0084
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Purchase Order per Bid
ITB #238-03/RS for heavy equipment trailer and trailer mounted water tank, by and
between the City of Lubbock and American Equipment & Trailer, Inc. of Lubbock,
Texas, and related documents. Said Purchase Order is attached hereto and incorporated
in this resolution as if fully set forth herein and shall be included in the minutes of the
City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Purchase Order is filed with Resolution No. 2004-R0084.
RESOLUTION NO. 2004-R0085
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Purchase Order per Bid
ITB #238-03/RS for heavy equipment trailer and trailer mounted water tank, by and
between the City of Lubbock and J & B Trailers & Equipment, Inc. of Lubbock, Texas,
and related documents. Said Purchase Order is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City
Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
162
Regular City Council Meeting
February 19, 2004
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Purchase Order is filed with Resolution No. 2004-R0085.
This bid is for the purchase of one Eager Beaver Model 50GSL-3 lowboy
utility trailer for Pipeline Maintenance and one Acro 5,000 gallon stainless
steel trailer mounted water tank for Landfill Operations.
Existing equipment has been evaluated and has met the replacement
criteria established by Fleet Services. Based on maintenance costs of the
existing equipment, replacement is more cost effective than repair.
Twenty-five local bidders were notified of this Invitation to Bid.
FISCAL IMPACT:
A total of $1,363,000 was appropriated with $82,000 available in project
numbers 90340 and 90337 (Solid Waste Major Equipment Replacement
03-04 and Water Major Equipment Replacement) for this purpose.
Award contracts to American Equipment & Trailer, Inc. of Lubbock,
Texas for $37,543 and J&B Trailers & Equipment, Inc. of Lubbock, Texas
for $41,985.
(45.) Resolution No. 2004-R0086/BID #239-03/RS —for Skid Steer Loader
and Three Wheel Rough Terrain Forklift (Fleet Services).
RESOLUTION NO. 2004-R0086
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LU 3BOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Purchase Order for a skid
steer loader & three wheel rough terrain forklift, by and between the City of Lubbock and
Sunbelt Industrial Trucks of Dallas, Texas, and related documents. Said Purchase Order
is attached hereto and incorporated in this resolution as if fully set forth herein and shall
be included in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
163
Regular City Council Meeting
February 19, 2004
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Purchase Order is filed with Resolution No. 2004-R0086.
This bid is for the purchase of one forklift for Solid Waste Residential
Collections and one skid steer loader for Solid Waste Recycling.
Existing equipment has been evaluated and has met the replacement
criteria established by Fleet Services. Based on maintenance costs of the
existing equipment, replacement is more cost effective than repair.
Twenty-two local bidders were notified of this Invitation to Bid.
FISCAL IMPACT:
A total of $1,363,000 was appropriated with $54,000 available in project
number 90340 and account number 5519.9226 (Solid Waste Major
Equipment Replacement 03-04 and Equipment Capital Recycling
Collection) for this purpose.
Award contract to Yellowhouse Machinery Company of Lubbock, Texas
for $18,450 and Sunbelt Industrial Trucks of Dallas, Texas for $32,350.
(46.) Resolution No. 2004-R0087BID #245-03/RS —for Liquid Aluminum
Sulfate Polymer Blend — Annual Pricing (Water Production and
Treatment).
RESOLUTION NO.2004-R0087
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Letter of Award for liquid
aluminum sulfate polymer blend — annual pricing, by and between the City of Lubbock
and Chameleon Industries, Inc. of Mesquite, Texas and related documents. Said Letter of
Award is attached hereto and incorporated in this resolution as if fully set forth herein and
shall be included in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL,
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Letter of Award is filed with Resolution No. 2004-R0087.
164
Regular City Council Meeting
February 19, 2004
The purpose of this bid is to establish annual pricing for the purchase of
liquid aluminum sulfate -polymer blend and copper sulfate seasonal
additive for use in the treatment process for potable drinking water.
Aluminum sulfate polymer blend is the primary coagulant at the Water
Treatment Plant. The coagulation process in potable water treatment is
essential and is required by the Texas Commission on Environmental
Quality. The seasonal copper sulfate additive is necessary during warmer
weather to prevent algae build-up.
Bidders were required to have their product evaluated by a trial run
through the City's pilot -scale water treatment plant. Plant operations
personnel administered and oversaw each trial run. Bidders were welcome
to observe the evaluation of their product, but were not required to do so.
Criteria used in the product evaluation included water quality as a primary
factor along with cost effectiveness and reference checks.
Five local bidders were notified of this Invitation to Bid.
After examination of the bids submitted and results of the pilot -scale plant
evaluations, it was determined that Chameleon Industries, Inc. best met all
water quality parameters used in the evaluation process (settled and final
water turbidities). Chameleon Industries' bid of $108 per ton is also the
most cost effective and meets all specifications required in the bid.
FISCAL IMPACT:
A total of $456,024 was appropriated with $300,153 available in account
number 6345.8111 (Water Treatment -Chemical Supplies) for this purpose.
Award contract to Chameleon Industries of Mesquite, Texas for
$77,839.20.
(47.) Resolution No. 2004-R0088/BID #255-03/RS — for Municipal Lease -
Purchase Financing (Finance).
RESOLUTION NO. 2004-R0088
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Contract for municipal
lease -purchase financing, by and between the City of Lubbock and Suntrust Leasing
Corporation of Towson, Md., and related documents. Said Contract is attached hereto
and incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rcbccca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
165
Regular City Council Meeting
February 19, 2004
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
A copy of the Contract is filed with Resolution No. 2004-R0088.
This bid is for financing a three-year municipal lease purchase of 44 police
cars, police car equipment, police car striping, three '/2 ton pickups,
three- 3/4 ton cab and chassis, and one tractor backhoe. This bid is also for
financing a five- year municipal lease purchase of a round bale hay baler,
and metal building construction. The financed amount for the five-year
lease purchase is $106,070.
Forty-four local firms were notified of this Invitation to Bid.
FISCAL IMPACT:
The financed amount for the three-year lease purchase is $1,535,075.02.
The low bids for three-year and five-year financing is 1.96% and 2.33%
respectively from SunTrust Leasing Corporation of Towson, Maryland
with total interest payments of $34,832.46. The annual payment in
advance amount is $521,655.31 for three years and $22,202.31 for five
years. A total of $608,581 was appropriated and $606,511 is available in
project number 90335 (Fleet Replacement FY 2003-2004 General Fund
for this purpose. The interest rates provided by SunTrust are very
favorable for the three and five year payments. Currently, U. S. Treasuries
are paying 2.19% for three-year maturities and 3.12% for five-year
maturities. Therefore, the borrowing costs are less than potential
investment earnings.
Staff recommended approval of this resolution.
(48.) Resolution No. 2004-110089/11I1) #257-03/RS — for Land Application
Site Shop/Office at Wilson, Texas (Facilities Management).
RESOLUTION NO.2004-R0089
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock, a Contract for the Land
Application Site Shop/Office at Wilson, Texas, by and between the City of Lubbock and
Minnix Commercial, Inc. of Lubbock, Texas, and related documents. Said Contract is
attached hereto and incorporated in this resolution as if fully set forth herein and shall be
included in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Victor Kilman
Victor Kilman, Purchasing Manager
166
Regular City Council Meeting
February 19, 2004
APPROVED AS TO FORM:
/s/ John Knight
John Knight, Assistant City Attorney
CONTRACT
STATE OF TEXAS §
COUNTY OF LUBBOCK §
THIS AGREEMENT, made and entered into this 19th day of February, 2004, by
and between the City of Lubbock, County of Lubbock, State of Texas, acting by and
through Marc McDougal, Mayor, thereunto authorized to do so, hereinafter referred to as
OWNER, and Minnix Commercial, Inc., of the City of Lubbock, County of Lubbock,
and the State of Texas, herein termed CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements
hereinafter mentioned, to be made and performed by the OWNER and under the
conditions expressed in the bond bearing even date herewith (if any) the CONTRACTOR
hereby agrees with OWNER to commence and complete the construction of certain
improvements described as follows:
BID #257-03/RS - Land Application Site Shop/Office at Wilson, Texas - $118,748.00
and all extra work in connection therewith, under the terms as stated in the contract
documents, and at his (or their) own proper cost and expense to furnish all materials,
supplies, machinery, equipment, tools, superintendence, labor, insurance, and other
accessories and services necessary to complete said construction in accordance with the
contract documents as defined in the General Condition of Agreement.
THE CONTRACTOR hereby agrees to commence work within ten days after the
date written notice to do so shall have been given to him and to substantially complete
same within the time specified in the contract documents.
The OWNER agrees to pay the CONTRACTOR in current funds for the
performance of the contract in accordance with the bid submitted therefore, subject to
additions and deductions, as provided in the contract documents and to make payment on
account thereof as provided therein.
IN WITNESS WHEREOF, the parties to these presents have executed this
agreement in Lubbock, Lubbock County, Texas in the year and day first above written.
ATTEST:
/s/ Rebecca Garza
Secretary
APPROVED AS TO CONTENT:
/s/ Harlan D. Stauffer
Owner's Representative
APPROVED AS TO FORM:
/s/ Don Vandiver
City Attorney
CITY OF LUBBOCK, TEXAS (OWNER)
/s/ Marc McDougal
MAYOR
CONTRACTOR:
Minnix Commercial, Inc.
By: /s/ Jerry Smith
PRINTED NAME: Jerry Smith
TITLE: Vice -President
167
Regular City Council Meeting
February 19, 2004
ATTEST:
Corporate Secretary
/s/ Jo Sisk
COMPLETE ADDRESS:
Minnix Commercial, Inc.
14302 S. Slide Rd
Lubbock, Texas 79424
This project involves the construction of a 2,500 square foot
pre-engineered steel shop building for the Land Application Site at
Wilson, Texas. The building will be used for equipment repairs and other
work activity as designated by the Land Application staff. The building
will also have a 225 square foot office located within the shop area.
Time for completion of this project is 90 consecutive calendar days and
liquidated damages is $250 per day.
Thirty local contractors were notified of this Invitation to Bid.
FISCAL IMPACT:
A total of $120,000 was appropriated with $120,000 available in account
number 6415.8704 (Land Application Site Rent/Lease Account) for this
purpose.
Award contract to Minnix Commercial, Inc. of Lubbock, Texas for
$118,748.
The next item considered was Item 21.
ORDINANCES FOR PASSAGE
Second Reading
(49.) ORDINANCE NO. 2004-00001: Ordinance amendment of Chapters
6, 12, and 28 of the City of Lubbock's Code of Ordinances with
regard to landscaping irrigation systems and operation of irrigation
systems, providing penalties, and providing savings clause (second
and final reading).
This item was considered following Item 37.
This item was continued.
The Conservation Subcommittee of the Lubbock Water Advisory
Commission (LWAC) reviewed and approved these amendments. They
were also reviewed and approved by the LWAC.
These amendments establish the following:
• Runoff water as a nuisance.
• Requirements on the design and operation of landscape irrigation
systems that prevent over spray onto impervious areas, excessive
watering for extended periods, and operation of systems during rainfall
and freezing weather.
• The installation of a separate irrigation water meter (residential
installations are excluded from this requirement).
• Restriction of landscape irrigation to set times of the day.
FISCAL IMPACT:
Reduced water consumption through water conservation efforts could have
a negative impact on water revenues. This reduction in revenue will be
offset to a minimal degree with a reduction in treatment and electric costs.
The Lubbock Water Advisory Commission recommended approval of this
168
Regular City Council Meeting
February 19, 2004
ordinance.
Motion was made by Council Member Patterson, seconded by Council
Member Martin to pass on second and final reading Ordinance No.
2004-00001 as recommended by staff.
Council Member Gilbreath asked about the appeals board and the
appropriateness of using the Building Board of Appeals as the appeals
board, rather than setting up a new board with people who are more in
tune with landscape architecture, horticulture, agronomy, etc. He
suggested that the ordinance be amended, to not put the responsibility on
the Building Board of Appeals, but to create a board to include a licensed
irrigator, a member of the Keep Lubbock Beautiful Committee, two
citizens, a realtor, a licensed landscape architect and a horticulturalist or
agronomist.
Council Member Boren stated he felt the City should take care of their
water issues.
Mayor McDougal suggested that an amendment should be added that no
fines would be issued to citizens until the City of Lubbock has its house in
order. He also stated that the second reading of this ordinance should be
delayed to allow the new City Manager, Lou Fox, to look at it.
At this time, Council Members Patterson and Martin withdrew the motion
to approve this ordinance. Motion was then made by Council Member
Patterson, seconded by Council Member Martin, to continue this item.
Motion carried: 7 Yeas, 0 Nays.
Council Member Boren stated that during the last quarter of 2003, the City
went into a voluntary conservation mode. In response to an email from
Council Member Boren, Chester Carthel, Chief Engineer for Water
Utilities responded that 10% more water was being used today than before.
Council Member Boren requested that as Mr. Fox reviews this, statistics
should be checked to see where the City is on the conservation plan in
relationship to this ordinance.
Council Member Gilbreath also requested that before the ordinance is
brought back for second reading, the Water Commission should consider a
dedicated board, which he had previously described.
City Attorney Anita Burgess asked if the procedures generally adhered to
by the Building Board of Appeals should be applied in general terms to
this particular board. Council Member Gilbreath stated his statements
were only suggestions.
The next item considered was Item 19.
Items 50-53 were considered following Item 19.
PUBLIC HEARING
10:50 A. M.
(50.) Resolution No. 2004-R0095 - Hold a public hearing to consider a rate
change request by Atmos Energy Corporation and take appropriate
action.
RESOLUTION NO. 2004-R0095 AND ORDER
WHEREAS, a Statement of Intent to increase gas rates within the City of Lubbock
was filed by Atmos Energy October 21, 2003; and
169
Regular City Council Meeting
February 19, 2004
WHEREAS, the City Council of the City of Lubbock, sitting as a regulatory
authority under provisions of law, heretofore suspended the implementation of such
proposed major change in order that such proposed change in rates might be studied and
staff comment received; and
WHEREAS, such study has been completed and a public hearing has been
conducted as required by law; NOW THEREFORE:
BE IT RESOLVED AND ORDERED BY THE CITY COUNCIL OF THE CITY OF
LUBBOCK:
THAT pursuant to the provisions of the Gas Utility Regulatory Act, Chapter 104,
Utilities Code, Resolution No. 2003-RO519 of the City of Lubbock, dated November 17,
2003, which suspended operation of the proposed rate increase of Atmos Energy, as filed
October 21, 2003, is hereby withdrawn; and
THAT by this action Atmos Company shall be entitled to place into effect such
rate tariffs as are attached hereto as Exhibit A at such time after final passage of this
Resolution and Order as shall be deemed appropriate by Atmos Energy; and
THAT selected revised schedules are attached hereto as Exhibit B and made a part
hereof for all purposes.
Passed by the City Council of the City of Lubbock this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Quincy White
Quincy White, Acting City Manager
APPROVED AS TO CONTENT:
/s/ Donald G. Vandiver
Donald G. Vandiver, Attorney of Counsel
A copy of Exhibits A and B is filed with Resolution No. 2004-R0095.
Mayor McDougal opened the public hearing at 10:50 a. in. No one
appeared on behalf of Atmos Energy Corporation. No one appeared in
opposition. Mayor McDougal closed the hearing at 10:50 a. m.
A citizen, Cliff Karr, appeared to speak on this issue. Mayor McDougal
reopened the public hearing at 10:51 a. in. Mr. Karr appeared in
opposition. Mayor McDougal closed the hearing at 10:53 a. in.
Atmos Energy Corporation filed a Statement of Intent to increase gas rates
within the City of Lubbock on October 21, 2003. The City Council, sitting
as a regulatory body, suspended the implementation of the rate increase on
November 17, 2003, in order to study the proposed change and to receive
staff comment. On that date, the council set the date for public hearing on
the requested rate increase for February 12, 2003 at 11:00 a. in. On
February 5, 2003, the City Council changed the date of the public hearing
from February 121h to February 19`h at 10:00 a. in.
170
Regular City Council Meeting
February 19, 2004
The City Council is mandated by law to conduct a public hearing on the
rate increase proposed by Atmos Energy Corporation. The proposed
change is a "major change" as defined by Section 104.101 of the Texas
Utility Code as increasing the aggregate revenues of the utility by more
than the greater of $100,000 or two and one-half percent. Upon
conclusion of the public hearing, and after due consideration of any public
and staff comments, the council will need to enter a Resolution and Order,
upon terms the council deems appropriate.
FISCAL IMPACT:
None.
Staff recommended holding the public hearing and entering an appropriate
Resolution and Order.
Motion was made by Council Member Patterson, seconded by Council
Member Morrison to pass Resolution No. 2004-R0095 and Order as
recommended by staff. Motion carried: 7 Yeas, 0 Nays.
(51.) Ordinance No. 2004-00024 granting a franchise to Atmos Energy
Corporation to conduct a gas utility business and to occupy the public
streets and right-of-way.
OR INANCE NO. 2004-00024
AN ORDINANCE OF THE CITY OF LUBBOCK, TEXAS, GRANTING TO
ATMOS ENERGY CORPORATION, A TEXAS AND VIRGINIA CORPORATION
WITH ITS PRINCIPAL OFFICE IN THE CITY OF DALLAS, DALLAS COUNTY,
TEXAS) THE FRANCHISE AND RIGHTS TO CONDUCT IN SUCH CITY THE
BUSINESS OF ACQUIRING, MAINTAINING, CONSTRUCTING, LAYING,
REPAIRING, REMOVING, REPLACING, INSTALLING, OPERATING, AND
DISPOSING OF A GAS SYSTEM FOR THE SALE, TRANSPORTATION, AND
DISTRIBUTION OF NATURAL GAS WITHIN THE MUNICIPAL BOUNDARIES OF
THE CITY AND TO THE RESIDENTS AND BUSINESSES LOCATED THEREIN
FOR LIGHT, HEAT, POWER, AND ANY OTHER PURPOSES AND THE RIGHT TO
USE THE PRESENT AND FUTURE STREETS, ROADS, HIGHWAYS, ALLEYS,
PUBLIC WAYS, AND REAL PROPERTY IN SUCH CITY AND OWNED OR
CONTROLLED BY SUCH CITY FOR SUCH PURPOSES; PRESCRIBING THE
TERMS AND CONDITIONS TO WHICH SUCH FRANCHISE AND RIGHTS ARE
SUBJECT; AND PRESCRIBING THE TERM OF SUCH FRANCHISE AND RIGHTS.
Atmos Energy Corporation's fifteen -year franchise ordinance with the City
of Lubbock expired on May 12, 2003. This ordinance allowed Atmos to
use the City's right-of-ways for purposes of operating a gas utility
company. Atmos was paying a franchise fee of 3% of its total yearly gross
receipts from its sale of natural gas within the City of Lubbock. Since the
expiration of the franchise ordinance, Atmos has been paying a franchise
fee each month based upon the terms of the old ordinance.
The new franchise ordinance is again for fifteen years, and includes a 5%
franchise fee. Other important aspects of the new franchise ordinance are
the following:
The definition of gross receipts clarifies the intent of the parties that
the franchise will not include revenues for transport of gas wheeled for
another entity for sale to customers outside the City of Lubbock.
The ordinance outlines the rights, duties and obligations associated
with using the City's right-of-way, to include provisions requiring
Atmos to notify the City prior to installing new facilities in the streets.
171
Regular City Council Meeting
February 19, 2004
Under the ordinance, Atmos is required to extend its gas facilities up to
75 feet to service a customer. Atmos may extend its facilities at a
distance greater than 75 feet in the event of an agreement between
Atmos and the customer.
The ordinance provides for an interest provision on all past due
franchise payments.
Atmos is required to provide a policy of insurance or proof of ability to
self -insure.
FISCAL IMPACT:
Staff estimated $1,000,000 in increased revenue per year.
Staff recommended approval of this ordinance.
Council Member Boren stated he wanted the citizens to realize this fee
was not paid by the company, but collected by the company from the
citizens.
Vicki Key, Civic Center Services Director, answered questions asked by
Council Member Martin.
Council Member Martin explained franchise fees.
Motion was made by Council Member Morrison, seconded by Council
Member Patterson to pass on first reading Ordinance No. 2004-00024 as
recommended by staff. Motion carried: 7 Yeas, 0 Nays.
PUBLIC ZONING HEARINGS
11:06 A. M. Zoning
(52.) Ordinance No. 2004-00025/ZONE CASE NO. 1794-H (3410 981h
Street): Hold a public hearing to consider request of Lubbock
Commercial Buildings (for Above and Beyond Pet Care Hospital) for
a zoning change from C-2 to C-2 Specific Use for a veterinary clinic
on a portion of Tract R, Raintree Addition.
ORDINANCE NO. 2004-00025
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 1794-H; A ZONING CHANGE FROM C-2 TO C-2
SPECIFIC USE FOR A VETERINARY CLINIC ON A PORTION OF TRACT R,
RAINTREE ADDITION, LUBBOCK, TEXAS; PROVIDING A PENALTY,
PROVIDING A SAVINGS CLAUSE AND PROVIDING FOR PUBLICATION.
Mayor McDougal opened the public hearing at 11:06 a. in. No one
appeared on behalf of Lubbock Commercial Buildings. No one appeared
in opposition. Mayor McDougal closed the hearing at 11:07 a. in.
Neither the doctor leasing the space nor the building owner were aware
that a vet clinic requires a Specific Use permit in the C-2 District. The
construction permit was issued for a finish out within an existing shell
building. The error was caught during a request for a sign permit from the
Planning Department. The series of events leading to the error do not
happen very often, and the staff has offered an apology to both the doctor
and the building owner.
172
Regular City Council Meeting
February 19, 2004
Since 1975, when vet clinics were placed in the Zoning Code within the
Specific Use Section to ensure verification of noise and operational related
requirements, the staff is not aware of one ever being a problem.
Adjacent land uses:
North — residential
South — commercial
East — commercial
West — commercial
_ The proposal is consistent with the Comprehensive Land Use Plan and
zoning policy. As noted, staff has received no complaints about vet clinics
in strip shopping centers.
The proposal will have no effect on the thoroughfare system.
The Planning Commission recommended approval of this ordinance.
FISCAL IMPACT:
Not Applicable.
Staff supported the recommendation of the Planning Commission.
Motion was made by Council Member Martin, seconded by Council
Member Morrison to pass on first reading Ordinance No. 2004-00025 as
recommended by staff. Motion carried: 7 Yeas, 0 Nays.
(53.) Ordinance No. 2004-00026/ZONE CASE NO. 2998 (South of 98th St.
and east of University Avenue): Hold a public hearing to consider
request of Hugo Reed and Associates, Inc. (for McQueen Company
Realtors) for a zoning change from R-1 and T to C-3 and IHC of 27.1
acres of unplatted land out of Section 10, Block E.
ORDINANCE NO.2004-00026
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 2998; A ZONING CHANGE FROM R-1 and T TO C-3
AND IHC ZONING ON 27.1 ACRES OF UNPLATTED LAND OUT OF SECTION 10,
BLOCK E, LUBBOCK, TEXAS; SUBJECT TO CONDITIONS; PROVIDING A
PENALTY; PROVIDING A SAVINGS CLAUSE; AND PROVIDING FOR
PUBLICATION.
Mayor McDougal opened the public hearing at 11:06 a. m. No one
appeared on behalf of Hugo Reed and Associates, Inc. No one appeared in
opposition. Mayor McDougal closed the hearing at 11:07 a. m.
The request would accommodate a half -mile of commercial development
south of 98`h Street and on the east side of University. The east boundary
of the proposed C-3 tract is the City limit.
Adjacent Land Uses:
North
th
— 98 Street and a church
South
— mixed uses
East —
vacant farm property
West
— commercial and vacant
The ten -acre parcel at 98`h Street and University proposed for C-3 meets
policy for both the Comprehensive Land Use Plan and zoning. The strip
south of the ten -acre tract on the corner is not consistent with the current
Comprehensive Land Use Plan. As strip commercial, the motion by the
173
Regular City Council Meeting
February 19, 2004
Planning Commission contained language related to a minor amendment
of the Comprehensive Plan.
Background on commercial policy and the Comprehensive Plan:
During several recent zone cases, the topic of allowing commercial away
from the areas normally designated for retail development (at the corner of
two major intersections — 98th Street and University in this case) has been
discussed at length. What the staff attempts to defend is how and why the
policies of the Comprehensive Land Use Plan exist. Then, with the Plan
policies as a basis, the decision making process by the Planning
Commission and City Council for each zone case is affected by the
existing or proposed conditions in the area.
A major objective during the development of any Comprehensive Plan is
creation of a method to divide land in areas being developed into an
equitable share of the various land uses (residential, commercial or
industrial) from an overall perspective. The ten acres of commercial at
each major intersection does just that, and getting away from that plan
should only be based on circumstances that merit the decision.
The support that staff offered in this request was based on two primary
circumstances:
The first is market based. As the City of Lubbock moved south and west,
after the adoption of the current zoning ordinance in 1975, the community
was hesitant to zone any portions of the growth area as C-4. C-4 as heavy
commercial contains many uses considered detrimental to residential and
even to some retail. All of the heavy automotive uses (brakes,
transmission, body work, glass), bars and office warehousing are contained
in C-4. As a result, large portions of the south and west commercial areas
in Lubbock have not provided sites for these heavier uses. Exceptions
include the Fiesta Autoland area south of the Loop and east of Slide
(which was C-4 prior to the current ordinance) and the vicinity of
Frankford both north and south of Spur 327, where a concentration of
automotive related uses is located.
Several years ago, a strip commercial zone case for C-4 with a number of
strikes (of permitted uses) was proposed on the east side of Slide Road
between 98th and 110 Streets. Since a portion of that area had developed
as commercial while outside the City, the trend was made official by the
C-4 zone case. The staff considers that somewhat of a bracket of C-4 on
the west end, or at least the middle, of the rapid development between 82nd
Street and 114th Street. Zoning this strip as IHC (which is comparable to
the C-4 case on Slide) will provide an east bracket of land that can provide
the heavier uses to the public.
The second rationale is a physical constraint caused by the location of a
playa on the west side of University Avenue, south of 98th Street. Much of
the property across University Avenue from the proposed IHC will be
either not developable, because of the lake or not residential, because of
the lack of depth that can be recovered through a cut and fill. This
condition on the west side extends nearly the full half -mile across from the
parcel. This same physical condition exists on the Slide Road strip south
of 82nd Street and was part of the discussion in that zone case.
Planning staff support is based primarily on the fact that the property
across University Avenue will be undeveloped or will be requested as
commercial if a cut and fill is possible. As noted, the lack of heavy
commercial zoning in southwest Lubbock has also been a growing issue
for the last ten years. The staff hopes that the two strips will satisfy the
need on the east and middle portions of the rapid growth area.
174
Regular City Council Meeting
February 19, 2004
Several zone cases in the last year have pressed the issue regarding strip
zoning. From the public perspective, efficiency of the thoroughfare
system (the node policy concentrates commercial at major intersections
versus miles of strip centers clashing with traffic with too many curb cuts)
and providing equity between adjacent landowners is the basis for current
Comprehensive Land Use Plan policy. In Lubbock, market forces or
demand have not been at the forefront of zoning discussions. The forty
acres per intersection seems to have provided more than enough
commercial development area. The increased requests for strip
commercial will necessitate reinforcement of the fact that there is not
enough commercial demand to support strip commercial on all of the
developing thoroughfares. Finding a formula that balances the public
interest, market interests and equity between adjacent property owners will
become critical.
Reduction of side traffic onto thoroughfares is one of the primary
principles involved in the node commercial policy. With commercial at
the corners and residential in between mile corners, the efficiency of
thoroughfare streets is increased because of a reduced number of conflict
points. Based on this concept, the Planning Commission agrees with a
condition related to curb cut management on both of the tracts requesting
zoning. With a common developer, access easements can provide access
across the front of individual lots to common curb returns, reducing the
total number.
The Planning Commission recommended approval of a minor amendment
to the Comprehensive Land Use Plan and of the request with the following
condition:
Prior to development of any parcel, the Planning Commission shall review
and approve a curb cut access or management plan:
For the Interstate Commercial parcel the review shall be prior to
construction permits on a minimum of either the north half or the south
half of the tract.
For the C-3 parcel the review shall be prior to issuance of any permit on
the entire tract.
FISCAL IMPACT:
Not Applicable.
Staff supported recommendation of the Planning Commission.
Motion was made by Council Member Martin, seconded by Council
Member Morrison to pass on first reading Ordinance No. 2004-00026 as
recommended by staff. Motion carried: 7 Yeas, 0 Nays.
The next items considered were Items 55-57.
(54.) Ordinance No. 2004-R0030/ZONE CASE NO. 2305-H (301 Utica
Avenue): Hold a public hearing to consider request of Tara Land
Company (for State National Bank) for a zoning from AM Specific
Use limited to professional offices to AM Specific Use for a bank
building on Lots 1, 2, 3 and a portion of Lots 4 and 6A, Whisperwood
Office Park.
ORDINANCE NO. 2004-00030
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 2305-H; A ZONING CHANGE FROM AM SPECIFIC
175
Regular City Council Meeting
February 19, 2004
USE TO AM SPECIFIC USE FOR A BANK BUILDING ON LOTS 1, 2, 3 AND A
PORTION OF LOTS 4 AND 6A, WHISPERWOOD OFFICE PARK, LUBBOCK,
TEXAS; PROVIDING A PENALTY, PROVIDING A SAVINGS CLAUSE AND
PROVIDING FOR PUBLICATION.
This item was considered following Item 57.
Mayor McDougal opened the public hearing at 11:08 a. m. Mark Griffin
appeared on behalf of Tara Land Company. Jo White, 4806 Whisperwood
Boulevard and Ellen Hein, 4804 Whisperwood Boulevard appeared in
opposition. Mayor McDougal closed the hearing at 11:16 a. m.
The request will allow an area zoned for professional offices to be
developed as a bank site.
Adjacent land uses:
North — zoned for offices
South — 4th Street, and residential south of 4th Street
East — an existing office building
West — Whisperwood Boulevard with residential to the west.
The request is consistent with the Comprehensive Land Use Plan, which
illustrates this area as commercial. In the 1980 zone case, a condition
required that the parcel be developed with access from Whisperwood
Boulevard and no access from 4th Street. It required a screening fence be
installed on the 4th Street and part of the Whisperwood Boulevard property
lines. The lack of access and exposure to 4th Street has hampered the
development of the property since that initial zone case.
This zone change would replace the current zoning limited to offices and
allow a bank to be built according to the proposed site plan. The screening
fence on 4th Street (that is in disrepair) would be removed. The primary
interest of the Planning Department in the site plan is the limitation of one
curb return on 4`h Street from the bank parcel. The curb cut on
Whisperwood will remain. It serves the proposed bank parcel as well as
the balance of the area to the north. Otherwise, the site plan is adequate.
Several residents were at the meeting to express concern for increased
traffic. They made no indication if the neighborhood is aware of the
current zoning that would allow the entire area to be developed as offices.
With the bank, at least a portion of the traffic to and from the site will be
able to directly access 4th Street. The Planning Department is of the
opinion that very little increased traffic should affect the areas to the north.
There will be an increase in traffic at the current curb cut on Whisperwood
Boulevard caused by whatever develops in the office park. The neighbors
at the hearing did more clearly understand the proposal but did not indicate
if their opposition would be withdrawn.
The site plan may undergo minor change for the building location but
access to adjacent streets will remain limited to the current curb cut on
Whisperwood Boulevard and one on 4th Street. The bank is requesting a
1/200 parking ratio that is satisfied by the parking illustrated on the site
plan for both the initial and future phase of construction.
The Planning Commission recommended approval of the request.
FISCAL IMPACT:
Not applicable.
Staff supported the recommendation of the Planning Commission.
176
Regular City Council Meeting
February 19, 2004
Council Member Morrison stated he would like the Traffic Department to
answer questions regarding the traffic -count in the area and the problem
with the light there.
Randy Henson, Senior Planner, gave staff comments.
Council Member Martin asked that staff study and look at traffic at the
intersection.
Motion was made by Council Member Martin, seconded by Council
_ Member Boren to pass on first reading Ordinance No. 2004-00030 as
recommended by staff. Motion carried: 5 Yeas, 1 Nay. Council Member
Hernandez voted Nay.
Council Member Gilbreath recused himself.
The next items considered were Items 58-62.
Items 55-57 were considered following Item 53.
(55.) Ordinance No. 2004-00027/ZONE CASE NO. 2999 (1301, 1303, 1305,
1307, 1309, 1311, 1313 and 1315 82"d Street): Hold a public hearing to
consider request of Douglas General Construction, Inc. for a zoning
change from R-1 to IHC for offices and/or retail on Lots 1-8, Block 3,
Rhoades Heights Addition.
O;R.DINANCE NO.2004-00027
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 2999; A ZONING CHANGE FROM R-1 TO IHC
ZONING ON LOTS 1-8, BLOCK 3, RHOADES HEIGHTS ADDITION, LUBBOCK,
TEXAS; SUBJECT TO CONDITIONS; PROVIDING A PENALTY; PROVIDING A
SAVINGS CLAUSE; AND PROVIDING FOR PUBLICATION.
Mayor McDougal opened the public hearing at 11:06 a. in. No one
appeared on behalf of Douglas General Construction. No one appeared in
opposition. Mayor McDougal closed the hearing at 11:07 a. m.
The request will accommodate commercial development on 82"d Street
between Avenue L and Avenue N.
Adjacent land uses:
North — 82"d Street and duplex units
South — residential, out side the city limits
East — residential
West — commercial, zoned Interstate Commercial
Staff has long had a concern about the future land use of the lots facing
82"d Street, east of Avenue P to the Tahoka Highway. Until the recent
upgrade of the street to a seven -lane road, no requests for zone changes
had been submitted.
To avoid strip commercial along the north side of this four -block area, the
City of Lubbock zoned the lots for duplex construction after the lots were
acquired for expansion of 82"d Street. This case has a condition that the
lots would have only one drive cut for each two duplex lots.
The ability to aggregate all the lots on the south side will probably not
occur, because of the large number of owners and there is little incentive
for a single developer to acquire all of the property. In addition to the
multi -ownership, approximately twenty feet of the south portion of all the
lots is not within the City of Lubbock. Annexation in this area included a
177
Regular City Council Meeting
February 19, 2004
150-foot dimension south from the section line (the center line of 82nd
Street).
Staff suspected that commercial requests would be made at some point,
and the block to the west was zoned IHC several years ago based on the
proximity to Avenue P (a designated thoroughfare south of 82nd Street).
Although the block to the west on only one lot deep, it is within the
660- foot commercial policy area established by the Comprehensive Land
Use Plan.
Mr. Douglas contacted the owners on this block prior to filing a common
zone case. With the block under one zone case, a condition can be
attached to address the number of curb cuts, which is a greater concern
than the use of the property.
The Planning Commission recommended approval of a minor change to
the Comprehensive Land Use Plan and the request with the following
condition:
Prior to development of any parcel on the block, the Planning Commission
shall review and approve a curb cut access or management plan for an
appropriate amount of the block face.
FISCAL IMPACT:
Not Applicable.
Staff supported the recommendation of the Planning Commission.
Motion was made by Council Member Martin, seconded by Council
Member Morrison to pass on first reading Ordinance No. 2004-00027 as
recommended by staff. Motion carried: 7 Yeas, 0 Nays.
(56.) Ordinance No. 2004-00028/ZONE CASE NO. 2939-B (South of 8`h
Street and west of Inler Avenue): Hold a public hearing to consider
request of Hugo Reed and Associates, Inc. (for Craft Development
Corporation) for a zoning change from T to C-2 and GO on 2.5 acres
of unplatted land out of Section 3, Block D-6.
ORDINANCE NO. 2004-00028
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 2939-B; A ZONING CHANGE FROM T TO C-2 AND
GO ZONING ON 2.5 ACRES OF UNPLATTED LAND OUT OF SECTION 3, BLOCK
D-6, LUBBOCK, TEXAS; PROVIDING A PENALTY; PROVIDING A SAVINGS
CLAUSE; AND PROVIDING FOR PUBLICATION.
Mayor McDougal opened the public hearing at 11:06 a. in. No one
appeared on behalf of Hugo Reed and Associates, Inc. No one appeared in
opposition. Mayor McDougal closed the hearing at 11:07 a. m.
The request is an adjustment for zoning in the area of 8`h Street and Inler
Avenue within the Reese Estates proposed subdivision. The change is a
response to a minor redesign of the plat. The location of the railroad and
Inler Avenue would make the use of the property as residential difficult, or
at least undesirable.
178
Regular City Council Meeting
February 19, 2004
Adjacent land uses:
North — vacant
South — vacant
East — mixed uses
West — vacant
The request is reasonably consistent with the policies of the
Comprehensive Land Use Plan and zoning policies. As noted, the
convergence of the railroad toward Infer Avenue creates several awkward
parcels, and a non-residential use is a practical proposal.
The proposal should have no adverse affect on the thoroughfare system.
The Planning Commission recommended approval of this ordinance.
FISCAL IMPACT:
Not Applicable.
Staff supported the recommendation of the Planning Commission.
Motion was made by Council Member Martin, seconded by Council
Member Morrison to pass on first reading Ordinance No. 2004-00028 as
recommended by staff. Motion carried: 7 Yeas, 0 Nays.
(57.) Ordinance No. 2004-00029/ZONE CASE NO.3001 (7112 82"d Street):
Hold a public hearing to consider request of Greenstreet, Inc. (for
Dick Sisson) for a zoning change from T to C-3 on 0.744 acres of
unplatted land out of Section 30, Block AK.
ORDINANCE NO. 2004-00029
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 3001; A ZONING CHANGE FROM T TO C-3 ZONING
ON 0.744 ACRES OF UNPLATTED LAND OUT OF SECTION 30, BLOCK AK,
LUBBOCK, TEXAS; PROVIDING A PENALTY; PROVIDING A SAVINGS
CLAUSE; AND PROVIDING FOR PUBLICATION.
Mayor McDougal opened the public hearing at 11:06 a. m. No one
appeared on behalf of Greenstreet, Inc. No one appeared in opposition.
Mayor McDougal closed the hearing at 11:07 a. in.
The request is just inside the west City limits on 82"d Street.
Adjacent land use:
North — commercial
South — commercial
East — commercial
West — commercial
The parcel is designated as commercial on the Comprehensive Land Use
Plan and meets zoning policy. Most of the existing construction in the
area is legal nonconforming, having been in place before the annexation in
1999. The proposal should have little adverse impact on the thoroughfare
system.
The Planning Commission recommended approval of this ordinance.
FISCAL IMPACT:
Not Applicable.
179
Regular City Council Meeting
February 19, 2004
Staff supported the recommendation of the Planning Commission.
Motion was made by Council Member Martin, seconded by Council
Member Morrison to pass on first reading Ordinance No. 2004-00029 as
recommended by staff. Motion carried: 7 Yeas, 0 Nays.
The next item considered was Item 54.
Items 58-62 were considered following Item 54.
ADMINISTRATIVE SERVICES
(58.) Resolution No. 2004-R0096 authorizing the Mayor to sign an
agreement with the Lubbock Arts Alliance to administer the art grant
program.
RESOLUTION NO. 2004-R0096
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT
the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for
and on behalf of the City of Lubbock an Agreement between the City of Lubbock and the
Lubbock Arts Alliance, Inc., to administer the Cultural Grants Program, and related
documents. Said Agreement is attached hereto and incorporated in this Resolution as if
fully set forth herein and shall be included in the minutes of the Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Catherine Prose
Catherine Prose,
Buddy Holly Center Director
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda L. Chamales, Supervising Attorney
Office Practice Section
A copy of the Agreement is filed with Resolution No. 2004-R0096.
For the past 21 years, the Lubbock City Council has partnered with the
Lubbock Arts Alliance, Inc., whereby the Arts Alliance manages a grant
program designed to encourage and promote all forms of art in the
Lubbock community. Funding for the grant program is allocated from
5.71429% of the total hotel/motel tax collected during the previous fiscal
year.
The 2004/2005 agreement provides for a total of $157,120, which is
5.71429% of the total hotel/motel tax collected during the fiscal year
ended September 30, 2003. The agreement provides that a Joint Review
Committee, represented by the Lubbock Arts Alliance, Inc., and
appointments by the Lubbock City Council, evaluate applications from
community arts organizations for the art grants. The Grants Review
Committee then makes recommendations to the City Council for awarding
of the grant funds. Upon approval by the Lubbock City Council, the
Lubbock Arts Alliance, Inc., using funds received from the City, then
allocates funds for the approved programs. The Lubbock Arts Alliance is
responsible for monitoring and administering all aspects of the grant
program.
Regular City Council Meeting
February 19, 2004
FISCAL IMPACT:
Not Applicable.
Lubbock Arts Alliance, Inc., recommended approval of this resolution.
Motion was made by Council Member Hernandez, seconded by Council
Member Patterson to pass Resolution No. 2004-R0096 as recommended
by staff. Motion carried: 7 Yeas, 0 Nays.
Community Services
(58A.) Ordinance No. 2004-00031 amending Ordinance No. 2003-0122 to
change the designation of $175,000 from the 2004 Buddy Holly
Festival to a 2004 Fall Music Festival first reading).
ORDINANCE NO. 2004-00031
AN ORDINANCE AMENDING ORDINANCE NO. 2003-00122 WHICH
MADE CHANGES IN THE FY 2003-04 BUDGET OF THE CITY OF LUBBOCK FOR
MUNICIPAL PURPOSES.
In November 2003, the City Council passed Ordinance No. 2003-00122
that allocated $175,000 to assist with the 2004 Buddy Holly Festival. The
Entertainment Lubbock Task Force recommended that the funds be used
for a fall music festival that will celebrate popular music from the past
sixty plus years.
While the Buddy Holly legacy will be celebrated at the annual Buddy
Holly Symposium, a separate festival will be held to promote and
celebrate other music influences and genres.
FISCAL IMPACT:
None.
Staff recommended approval of the first reading of this Ordinance.
Council Member Morrison stated he needed reassurance that this was good
use of this money.
Mayor McDougal stated that Entertainment Lubbock Task Force was
essentially asked that the designation of funds be changed from
specifically for a Buddy Holly Festival to a Fall Music Festival, which
would most likely be called the "Lubbock Texas Music Festival".
Motion was made by Council Member Patterson, seconded by Council
Member Boren to pass on first reading Ordinance No. 2004-00031 as
recommended by staff. Motion carried: 6 Yeas, 1 Nay. Council Member
Hernandez voted Nay.
(58B.) Resolution No. 2004-R0097 authorizing the Entertainment Lubbock
Task Force to provide oversight and recommendations on the
utilization of funds designated for a fall music festival.
RESOLUTION NO. 2004-R0097
WHEREAS, the City Council of the City of Lubbock, by Resolution No.
2003-R0143, created the Entertainment Lubbock Task Force; and
WHEREAS, the primary objective for the Entertainment Lubbock Task Force is
to develop recommendations for the City Council with regard to the development,
organization, coordination and funding of events that would take advantage of the various
talent and venues associated with the City of Lubbock's entertainment industry; and
181
Regular City Council Meeting
February 19, 2004
WHEREAS, the Entertainment Lubbock Task Force recommended that $175,000
of Hotel/Motel tax funds be designated for a fall music festival and that an oversight
committee be assigned to coordinate the festival events and make recommendations as to
how the funds would best be spent; and
WHEREAS, the City of Lubbock, by Ordinance No. 2003-0122, has designated
$175,000 as funding to assist with the 2004 festival; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
I. THAT the Entertainment Lubbock Task Force shall provide oversight and
recommendations on how the designated funds should be utilized for a fall
music festival; and
2. THAT a proposed budget for the 2004 fall music festival shall be
presented for City Council approval prior to April 1, 2004; and
3. THAT the Entertainment Lubbock Task Force shall be responsible for
oversight and recommendations for future music festivals.
Passed by the City Council this 19th day of February, 2004.
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Quincy White
Quincy White,
Acting City Manager
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda Chamales,
Supervising Attorney
At the October 9, 2003 Work Session, the Entertainment Lubbock Task
Force recommended that funds be designated from the Hotel Motel Tax to
assist with a fall music festival. The Task Force further recommended that
the City Council designate an oversight committee that would coordinate
the festival events and make recommendations as to how the funds would
be spent. The Task Force also offered to take on the responsibility of the
oversight committee.
City Council has designated the amount of $175,000 for a fall music
festival under separate action. This resolution officially designates the
Entertainment Lubbock Task Force as the oversight committee for a fall
music festival. Their responsibilities will include providing oversight and
recommendations on how the designated funds shall be utilized for the
2004 music festival and any future fall music festivals and presenting a
budget to the City Council for the 2004 music festival prior to April 1,
2004.
FISCAL IMPACT:
None.
Staff recommended approval of this resolution.
182
Regular City Council Meeting
February 19, 2004
Motion was made by Council Member Martin, seconded by Council
Member Patterson to pass Resolution No. 2004-R0097 as recommended
by staff. Motion carried: 6 Yeas, 1 Nay. Council Member Hernandez
voted Nay.
Facilities Management
(59.) Resolution No. 2004-R0098 authorizing the Mayor to execute a Deed
without Warranty with Lubbock Regional Mental Health and Mental
Retardation Center, an agency of the State of Texas, with regard to
-- the property located at 1602 Avenue O (corner of 161h Street and
Avenue O).
RESOLUTION NO.2004-R0098
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT
the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for
and on behalf of the City of Lubbock a Deed Without Warranty by and between the City
of Lubbock and the Lubbock Regional Mental Health and Mental Retardation Center, an
agency of the State of Texas. Said Deed Without Warranty is attached hereto and
incorporated in this Resolution as if fully set forth herein and shall be included in the
minutes of the Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Harlan D. Stauffer
Harlan Stauffer, Facilities Manager
APPROVED AS TO FORM:
/s/ AM L. Sims
Amy L. Sims, Assistant City Attorney
A copy of the Deed Without Warranty is filed with Resolution No. 2004-R0098.
This action is being taken to deed the land located at 16th Street and
Avenue O, a/k/a Lonnie Gary House, owned by the City of Lubbock, to
Lubbock Regional Mental Health and Mental Retardation Center. The 's
Council previously directed to either lease this property at fair market
value or to transfer ownership. The property at 16th Street and Avenue O
was originally vacant but leased to MHMR (LESSEE) on December 8,
1988. The lease states "LESSEE is or is to become the owner of a
residential structure in consideration for the removal thereof by LESSEE
from a location owned by the residential structure's present owner.
LESSEE has requested of LESSOR the right and permission to relocate
said residential structure upon vacant land owned by LESSOR". The
lease indicates the residential structure is the personal property of the
LESSEE, and shall not be considered attached to the real estate, and shall
remain the property of the LESSEE unless and until said residential
structure becomes the property of the LESSOR under the following
conditions.
"If the residential structure is not removed by LESSEE as LESSEE'S
personal property from the leased premises within six months after the
date of termination of the lease, such residential structure shall become the
183
Regular City Council Meeting
February 19, 2004
property of the LESSOR without any further action by the parties hereto,
or any further instrument in writing being required."
The Deed Without Warranty conveys the Property by Grantor () to the
Grantee (Lubbock Regional Mental Health and Mental Retardation
Center) as long as the Grantee utilizes the Property solely in a manner that
promotes a public purpose of the Grantor.
For the purpose hereof, "public purpose" of the Grantor shall mean:
Lubbock Regional Mental Health and Mental Retardation Center provides
public health and human services, to include but not limited to, mental
health, mental retardation, substance abuse, and HIV services. If the
Property ceases to be so used, all rights, title, and interest conveyed by this
instrument shall automatically revert to and vest in Grantor.
Property located at 1602 Avenue O, Lubbock, Texas 79427. Legal
description is Lot 1 — 7 (inclusive) and the North One -Half of Lot 8, all in
Block 191 of the Original Town of Lubbock, Lubbock County, Texas.
FISCAL IMPACT:
The 1988 lease of this property was for a five-year term for an annual
rental of $4,242.50. Annual rental during the initial five year term was to
be satisfied by the payment by LESSEE of the maintenance costs of the
landscaping and grounds and payment by LESSEE of the costs of
construction of an asphalt parking lot, landscaping, fencing, concrete
sidewalk and arches and curbing and concrete approach. The total value
of maintenance and improvements paid by LESSEE satisfied annual
rentals for the five years.
"After expiration of the first five (5) years of the lease, the annual rental
under this lease shall be at the rate of $2,444.20. Against this annual rate
there is hereby allowed a credit to LESSEE the greater of the sum of
$1,500 per year for LESSEE's maintenance of the landscaping and
grounds or the actual maintenance, improvements, or repair costs done to
the grounds, landscaping or building resulting in an amount of net annual
rental payable in cash or credit as defined above by LESSEE to LESSOR
each year after expiration of the five year term of the difference between
the annual rental rate of $2,444.20 and the credit as defined above payable
on or before December 8, 1993 and annually on each 8th day of December
of each year subsequent to December 8, 1993 during the life of this lease".
The execution of the lease has generated no cash payments so this action
will result in no dollar impact to Facilities Management Revenues.
Staff recommended approval of this resolution.
Motion was made by Council Member Morrison, seconded by Council
Member Martin to pass Resolution No. 2004-R0098 as recommended by
staff. Motion carried: 7 Yeas, 0 Nays.
FINANCE
Budget and Research
(60.) Ordinance No. 2004-00032 amending the FY 03-04 Budget by adding
$10,900,000 to various water and sewer projects first reading).
ORDINANCE NO. Mu"t-00032
AN ORDINANCE MAKING CHANGES IN THE FY 2003-04 BUDGET OF THE CITY
OF LUBBOCK FOR MUNICIPAL PURPOSES.
184
Regular City Council Meeting
February 19, 2004
Marsha Sharp Freeway
The Marsha Sharp Freeway budget was established in 1995. Since that
time many changes have been made to the project that have both impacted
and, at times, challenged the ability to proceed within the time frame set
forth by the Texas Department of Transportation (TxDOT) and within
approved budgetary limits. Some of the changes include designing storm
sewer retaining walls and sound walls; changes in locations of structure
that in return require that more utilities be moved than originally planned;
some of the original plans are now being moved into City streets because
there is no room left in the right of way; and the phases have changed.
The most significant impact in terms of financing the project has been the
situations where TxDOT has moved the project forward.
The pressing issue now is Phase 2. Phase 2 now includes all utilities from
Salem to Avenue L. This was once considered about two phases of work.
Additional funding is required, and the need for the funding has been
accelerated. According to TxDOT, Phase 2 must be completed by
September 2004 or TxDOT will lose their federal funding.
Pump Station #10 Well Supply
The Pump Station #10 Well Supply Project involves the drilling of 10
wells with a treatment system to provide approximately 5 million per day
(mgd) of potable water to PS 10 (82nd and Memphis). This project is in
response to the 2004 allocation reduction by the CRMWA and anticipated
further reductions in allocation for 2005. The Lubbock Water Advisory
Commission has endorsed this project.
Project Budgets
Work is scheduled to begin on these projects March 2004. Funding will
come from the Water and Sewer Working Capital Reserve, as applicable.
Water
Marsha Sharp Freeway Utility Relocation 3,800,000
PS#10 Well Supply Project 5,500,000
Sewer
Marsha Sharp Freeway Utility Relocation 1,600.000
Total $10,900,000
FISCAL IMPACT:
Funding will initially come from the Water and Sewer Working Capital
Reserve, as applicable. However, the intent is to have bond funds
reimburse these reserves when bond proceeds are sold and received in FY
04-05. The utility ratepayer will pay the bonds back over the next 20
years. These expenses are now included in the respective rate models.
The impact of these projects on the rates will be included in the rate study
currently being conducted by an outside consultant.
Staff recommended approval of this ordinance.
-- Motion was made by Council Member Hernandez, seconded by Council
Member Patterson to pass on first reading Ordinance No. 2004-00032 as
recommended by staff. Motion carried: 7 Yeas, 0 Nays.
(61.) Resolution No. 2004-R0099 directing the City Manager to establish
the Gateway Street Projects Fund for the Fiscal Year 2004 — 2005 City
budget.
185
Regular City Council Meeting
February 19, 2004
RESOLUTION NO. 2004-R0099
WHEREAS, it is the intent of the City Council of the City of Lubbock to establish
the "GATEWAY STREET PROJECTS FUND" to provide a source of construction
funding for street projects designed to spur development, growth, and redevelopment in
Lubbock; and
WHEREAS, the City of Lubbock collects franchise fees and line -access fees from
public utilities using and renting the public rights -of -way within the city; and
WHEREAS, the City Council desires to use a portion of said franchise fees and
access line fees to fund the "GATEWAY STREET PROJECTS FUND" beginning with
the FY 2004-2005 city budget, now therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:THAT
the City Manager of the City of Lubbock is hereby instructed to establish the
"GATEWAY STREET PROJECTS FUND" in the FY 2004-2005 city budget; and
1. THAT beginning with the FY 2004-2005 budget, the revenue of forty per cent
(40%) of franchise fees or access line fees collected for each public utility that
pays said fees shall be deposited into the "GATEWAY STREET PROJECTS
FUND"; and
2. THAT it is the intent of this City Council to appropriate said funds in the FY
2004-2005 budget for construction of street projects compatible with the
purposes expressed in this resolution.
Passed by the City Council this 19th day of February, 2004.
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Quincy White
Quincy White, Acting City Manager
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda Chamales, Supervising Attorney
Office Practice
The Gateway Street Projects Fund is intended to provide a source of
construction funding for street projects designed to spur development,
growth and redevelopment in Lubbock. This fund would consist of forty
percent of the franchise fees and line access fees collected from public
utilities using and renting the public right-of-ways within the City.
FISCAL IMPACT:
An allocation of 40% would equate to $3.68M based on a FY 04/05
Franchise Fee and Access Line revenue estimate of $9.2M.
The remaining Franchise and Access Line Fee revenue of $5.52M would
be recorded in the General Fund. This compares to actual General Fund
revenue of $6.77M in FY 02/03.
This item was requested by the City Council.
Council Member Martin stated his proposal in the resolution accomplished
two purposes. First of all, it is direction for the City Manager in the
preparation of the fiscal year budget that will start October 1. It sets
policy, which is what the Council is for. It's a policy setting group to
direct the City Manager in the preparation of the budget next year.
Regular City Council Meeting
February 19, 2004
Number two, the purpose of this is to take care of a lot of street
infrastructure, which the City has not been able to do for many years.
Council Member Boren asked if it's more than $3.68M, will it still go to
the Gateway Project? Mayor McDougal stated it would.
Motion was made by Council Member Martin, seconded by Council
Member Patterson to pass Resolution No. 2004-R0099 as recommended
by staff. Motion carried: 6 Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
PLANNING AND TRANSPORTATION
Citibus Liaison
(62.) Resolution No. 2004-RO100 authorizing the Mayor to establish a
Public Transportation Strategic Planning Task Force.
RESOLUTION NO. 2004-RO100
WHEREAS, the City Council of the City of Lubbock desires to establish a Public
Transportation Strategic Planning Task Force for the City of Lubbock to work with the existing
Transit Advisory Board; and
WHEREAS, the Public Transportation Strategic Planning Task Force shall be composed
of citizensof the City of Lubbock and City employees; and
WHEREAS, the purpose of the task force shall be to look as transportation issues such as
long term goals, funding, strategic planning and solutions for transporting disabled individuals;
NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT a
Public Transporation Strategic Planning Task Force is hereby created by the City Council of the
City of Lubbock, which shall perform its duties in accordance with the following criteria:
1. The Task Force shall consist of seven members that shall be citizens of the City
of Lubbock and shall be appointed by the City Council upon recommendation of
the City Manager. The City Council shall designate the Chairperson from the
appointed members of the Task Force. Two or more city employees shall be
appointed by the City Manager to act as staff liaisons to the Task Force.
2. The primary objective of the Task Force shall be to look at public transportation
in relation to strategic planning, long-term goals, funding, and transportation of
disabled individuals, and then to make recommendations to the City Council.
3. Regular meetings will be held at times and locations established by a majority of
the Task Force members. A simple majority shall constitute a quorum, and a
majority vote of the quorum shall be required for any action to be taken by the
Task Force.
4. The Public Transportation Strategic Planning Task Force members shall serve for
a term of one year or until such time as their successors are appointed.
5. Reports shall be presented by the Chairperson of the Task Force to the City
Council as requested by the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
187
Regular City Council Meeting
February 19, 2004
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Quincy White _
Quincy White, Acting City Manager
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda L. Chamales, Supervising Attorney/
Office Practice Section
The purpose of the Public Transportation Strategic Planning Task Force
shall be to review transportation issues such as long-term goals, funding,
strategic planning, and solutions for transporting disabled individuals. The
Public Transportation Strategic Planning Task Force will work with the
existing Transit Advisory Board.
FISCAL IMPACT:
Not Applicable.
This item was requested by the City Council.
Mayor McDougal stated that after Council Member Gilbreath met with
Cindy Finley and other members of South Plains Transportation Alliance,
Council discussed what could be done with the Citibus services. This task
force will strive to find solutions in the transportation area.
Motion was made by Council Member Patterson, seconded by Council
Member Gilbreath to pass Resolution No. 2004-ROIOO as recommended
by staff. Motion carried: 6 Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
The next item considered was Item 67.
(63.) Moved to Item 58A.
(64.) Moved to Item 5813.
Items 65-66 were considered following Item 76.
PUBLIC WORKS
(65.) Resolution No. 2004-R0102 authorizing the Mayor to enter into a
contract with Rick Giardina & Associates, Inc, for the purpose of
conducting a Water and Sewer Rates Structure and Model Study.
RESOLUTION NO. 2004-R0102
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Consulting Agreement for
water and sewer financial planning and rate analysis between the City of Lubbock and
Rick Giardina & Associates, Inc., a Colorado corporation, and any other related
documents. Said Agreement is attached hereto and incorporated in this Resolution as if
fully set forth herein and shall be included in the minutes of the Council.
Regular City Council Meeting
February 19, 2004
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Sherry Stohens
Sherry Stephens
Acting Director of Public Works
APPROVED AS TO FORM:
/s/ Richard K. Casner
Richard K. Casner
First Assistant City Attorney
A copy of the Agreement is filed with Resolution No. 2004-R0102.
Prior to 1991, the City of Lubbock had a rate structure known as a
descending block rate. Under this rate structure, users were charged less
per thousand gallons, the more water they used. In the late 1980s, the City
applied for a State Revolving Fund loan for the renovation and
rehabilitation of the Southeast Water Reclamation Plant. Two of the
conditions of receiving this funding were to conduct a rate study and to
implement a conservation -oriented rate structure. In 1991, the City hired a
consultant to conduct the study. As a result of that study, the current rate
structure, the uniform rate, was implemented.
Many changes have occurred during the last ten years that necessitate the
need for another rate study. For one, there have been changes in
expenditures, two large debt issuances in water, southwest growth, and
development affecting both water and sewer, and implementing stream
discharge as a method of effluent disposal affecting sewer. Most recently,
and ultimately the most costly, is the need to secure a 100-year water
supply.
The Lubbock Water Advisory Commission was asked to assist in securing
a 100-year water supply. In order to do this, Water Texas emphasized the
importance of implementing a rate structure that will generate sufficient
revenue for current and future expenditures while effectively promoting
wise use of water.
As recommended by Water Texas and supported by the Lubbock Water
Advisory Commission, staff negotiated a contract with Rick Giardina &
Associates, Inc., to conduct a water and sewer rate structure and model
study. Components of this study include developing a 10-year financial
plan, conducting a cost of service study, evaluating alternate conservation
rate structure, and conducting a public involvement process.
FISCAL IMPACT:
If a new rate structure is implemented, both revenues and expenditures are
ultimately affected. The extent to which either is affected will not be fully
realized until after Summer 2005, when projections are evaluated to
NZ
Regular City Council Meeting
February 19, 2004
determine if they are in line with actual performance under the new rate
structure.
The cost under this contract is $129,000. The funding will be added to the
Water Administration operating budget from Rate Stabilization during the
revised budget process.
Staff recommended approval of this item.
Mayor McDougal stated this was about getting a recommendation from
the Lubbock Water Advisory Commission on who to get to do the study.
He asked if they had looked at it.
City Attorney Anita Burgess stated they had. She was present at the
meeting where they had the presentation. The Commission has discussed
the need for a rate study and recommended this company for the study.
Motion was made by Council Member Martin, seconded by Council
Member Patterson to pass Resolution No. 2004-RO102 as recommended
by staff. Motion carried: 6 Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
(66.) Resolution No. 2004-RO103 establishing the Lubbock Water and
Sewer Rates Review Committee.
RESOLUTION NO. 2004-RO103
WHEREAS, the City Council of the City of Lubbock desires to establish the
Lubbock Water and Sewer Rate Review Committee to provide input and advice reganaitlg
the development and implementation of water and sewer rate and fee structures and other
various water and wastewater related issues;
WHEREAS, the Lubbock Water and Sewer Rate Review Committee shall be
appointed and serve as set forth below;
WHEREAS, the mission of the Lubbock Water and Sewer Rate Review
Committee is to advise the City Council, and to assist in the development and
implementation of water and sewer rate and fee structures and other various water and
wastewater related issues;
WHEREAS, the creation of the Lubbock Water and Sewer Rate Review
Committee to advise and assist the City Council of the City of Lubbock as described
below is important to ensure that future revenue requirements may be met while
encouraging the efficient and effective use of water; NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
1. THAT the Lubbock Water and Sewer Rate Review Committee is hereby
created by the City Council of the City of Lubbock. The primary objective of the
Lubbock Water and Sewer Rate Review Committee is to assist the City of Lubbock with
the development and implementation of water and sewer rate and fee structures and other
various water and wastewater related issues. In particular, the Committee will be asked
to:
a. Acquaint itself with the City's water and sewer system and its
customer base, costs incurred to provide service and past rate
design practices;
b. Identify and evaluate water and sewer pricing objectives;
C. Consider rate design alternatives based on the selected pricing
objectives;
190
Regular City Council Meeting
February 19, 2004
d. Review and evaluate rate design alternatives;
e. Recommend water and sewer rates and fees, based on pricing
objectives, customer impacts and community values;
f. Other water and sewer rate and fee structure related matters and
other water or wastewater matters, as designated by the City
Council of the City of Lubbock.
2. THAT the Committee shall consist of. five (5) voting members, who shall
_ be citizens of the City of Lubbock and be comprised of the following groups, entities
and/or industries: the Lubbock Water Advisory Commission; Market Lubbock, Inc.;
Texas Tech University; Lubbock Independent School District; Lubbock commercial
customers; Lubbock Multi -family customers; Lubbock restaurants; or Lubbock residential
customers. Further, two (2) non -voting members, who shall be comprised of one (1)
member representing the City Council of the City of Lubbock and one (1) member
representing the Water Utilities Department of the City of Lubbock should be appointed.
The City Council of the City of Lubbock shall designate the Chairperson from the
appointed voting members of the Committee.
3. THAT regular meetings will be held approximately every four (4) weeks,
or at such other intervals as deemed necessary by the Committee, until a final report
regarding the matters set forth herein have been issued by Rick Giardina and Associates,
Inc., and recommendations are presented to the Lubbock City Council.
4. THAT a simple majority will constitute a quorum, and a majority vote of
the quorum shall be required for any action to be taken by the Committee. All meetings
and procedures shall be consistent with the policies of the City of Lubbock concerning
advisory commissions, committees, and boards.
5. THAT all Committee members shall serve at the pleasure of, and may be
removed by, the City Council of the City of Lubbock.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s Anita Burgess
Anita Burgess, Acting Assistant City Manager
APPROVED AS TO FORM:
/s/ Richard Casner
Richard Casner, First Assistant City Attorney
Lubbock will be conducting a Water and Sewer Rate Structure and Model
Study. In order to effectively receive input from ratepayers for
consideration in developing and implementing a rate structure, staff
recommended that the Lubbock City Council establish a Water and Sewer
Rate Review Committee.
The mission of this committee is to become knowledgeable about the
City's water and sewer system in terms of customer base, costs incurred to
provide service and past rate design practices. The committee will identify
and evaluate water and sewer pricing objectives, and based on selected
191
Regular City Council Meeting
February 19, 2004
pricing objectives, consider rate design alternatives. It will review and
evaluate these alternatives and, while considering customer impacts and
community values, recommended water and sewer rate structures to the
Lubbock City Council.
Meetings will be held approximately every four weeks until a final report
regarding the matters set before them have been issued by Rick Giardina
and Associates, Inc. The meetings may last up to three hours each and will
be interactive in nature and will be facilitated by the consultant.
This committee shall consist of five voting members and two non -voting
members, appointed by the Lubbock City Council to represent the City's
major customer classes. Based on our current customer base, top 100
users, long-term water supply goals, and political climate, the rate
consultant recommended the voting members appointments from the
following groups, entities, or industries: Lubbock Water Advisory
Commission, Market Lubbock, Inc., Texas Tech University, Lubbock
Independent School District, Lubbock commercial customers, Lubbock
multi -family customers, Lubbock restaurants, or Lubbock residential
customers. Additionally, staff recommended the appointment of non-
voting members as follows: Lubbock City Council and City of Lubbock
Water Utilities Department.
FISCAL IMPACT:
Except for staff time, there is no expected fiscal impact.
Staff recommended approval of this resolution.
Motion was made by Council Member Patterson, seconded by Council
Member Gilbreath to pass Resolution No. 2004-R0103 as recommended
by staff. Motion carved: 6 Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
The next items considered were Items 68-74.
MISCELLANEOUS
Business Development
(67.) Resolution No. 2004-11O101 authorizing the Mayor to execute an
assignment of the Wilkerson Commercial Tax Abatement Contract to
G. Barney Adams.
RESOLUTION NO. 2nn4-Rn101
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT
the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for
and on behalf of the City of Lubbock an Assignment to transfer and assign to G. Barney
Adams that certain tax abatement Agreement dated November 26, 2002, between the City
of Lubbock and Wilkerson Investment Company. Said Assignment is attached hereto and
incorporated in this Resolution as if fully set forth herein and shall be included in the
minutes of the Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC McDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
192
Regular City Council Meeting
February 19, 2004
APPROVED AS TO CONTENT:
/s/ Nancy Haney
Nancy Haney, Community Development Director
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda L. Chamales, Supervising Attorney/
Office Practice Section
This item was considered following Item 62.
The City of Lubbock received a request from Wilkerson Investments to
assign the tax abatement dated November 26, 2002 to a new owner. The
commercial abatement was for the new freight terminal facility for
Watkins Motor Lines in the Lubbock 2000 South Enterprise Zone.
Wilkerson Investments has sold the building to G. Barney Adams and in
order for the tax abatement to remain in place on the facility, and Watkins
Motor Lines to receive the benefit; it will need to be assigned to the new
owner.
There will be no changes in the requirements in the contract. The only
change will be in the ownership of the building.
FISCAL IMPACT:
None.
The Market Lubbock, Inc. Board of Directors reviewed the request at their
January 14, 2004 meeting and recommended that the assignment be
approved. Staff concurred with the recommendation.
Motion was made by Council Member Morrison, seconded by Council
_ Member Patterson to pass Resolution No. 2004-RO101 as recommended
by staff. Motion carried: 6 Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
At this time, Council Member Boren stated: "I want to lecture you all.
Because I — I want you guys to be — I have never done this, but I think it is
a cheap chicken -shot way of doing business, when you call a question on
discussion. I know it's a tool you can use to end a debate. And I realize
we don't want to be down here all day. But I want to encourage you to
hesitate before you get too quick on discussion, whether you agree or
disagree, to pull that maneuver. Let's give a chance for everybody to say
what they want to say, get it out there and then vote. So, you know, I
haven't called the question on anybody and I just want to put that on the
table for consideration for you all to think about and in the days ahead as
we debate and argue, let's don't be so quick to do that, call the question
crap kind of stuff."
Motion was made by Council Member Martin to recess to Executive
Session.
11:53 A. M. CITY COUNCIL RECESSED TO EXECUTIVE SESSION
City Council/City Manager's Conference Room
All council members were present, except Hernandez.
1:27 P. M. CITY COUNCIL WORK SESSION CONVENED
Committee Room 103
All council members were present, except Council Member
Hernandez.
193
Regular City Council Meeting
February 19, 2004
The first item considered was Item 75, followed by Items 76, 65 and
66.
Items 68-74 were considered following Item 66.
Communications/Lel4islation,
(68.) Resolution No. 2004-RO104 adopting the Legislative Priorities for the
109th United States Congressional Session.
RESOLUTION NO. 2004-RO104
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK
THAT the City Council of the City of Lubbock hereby adopts legislative priorities
for the 1081h United States Congress for the purpose of defining the position of the City of
Lubbock. Said legislative priorities are attached hereto and incorporated in this resolution
as if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 19th day of February, 2004.
/s/ MARC MCDOUGAL
MARC MCDOUGAL, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza
City Secretary
APPROVED AS TO CONTENT:
/s/ Bob Goodwin
Bob Goodwin
Corporate Communications Manager
APPROVED AS TO FORM:
/s/ John Gioodwin
John Knight
Assistant City Attorney
Federal Legislative priorities for the 109th Congress are attached. Once
approved, these Federal Legislative Priorities will be sent to Senator John
Cornyn, Senator Kay Bailey Hutchison, and Congressman Randy
Neugebauer for their review and consideration. A separate spiral booklet
contains the material for Council's consideration.
Mayor McDougal, Meyers & Associates, and City staff have reviewed this
material and approved it for City Council's consideration. The Federal
Legislative Priorities provide an overview of the 's areas of federal interest
and provides the City's City Council Omnibus Legislative Policy, Federal
Legislative Policy, Contact Information, Appropriation Requests,
Monitoring Requests, and Policy Positions.
Once approved, copies will be sent to our elected officials as well as
Meyers & Associates as a reference during the I09`h Congressional
Session.
FISCAL IMPACT:
Not Applicable.
194
Regular City Council Meeting
February 19, 2004
Staff recommended approval of this resolution.
Bob Goodwin, Corporate Communications Manager, gave staff comments.
Mayor McDougal asked Mr. Goodwin to make sure Meyers knows about
the Gateway Project in case there are dollars out there in legislation.
Motion was made by Council Member Gilbreath, seconded by Council
Member Morrison to pass Resolution No. 2004-R0104 as recommended
by staff. Motion carried: 6 Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
Other
(69.) Consider one appointment to the Lubbock Housing Finance
Corporation Board of Directors.
The Lubbock Housing Finance Corporation (LHFC) is a legal entity,
which accomplishes public purposes on behalf of the City of Lubbock,
pursuant to the Texas Housing Finance Corporation Act. Terms on this
Board are six years. Don Graham has served one term in the At -Large
position.
This Board vacancy did not go before the Appointments Advisory Board
Motion was made by Council Member Morrison, seconded by Council
Member Martin to appoint Debra Lopez to the Lubbock Housing Finance
Corporation Board of Directors. Motion carried: 6 Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
Board Appointments
(70.) Consider one appointment to the Community Development & Services
Board.
Motion was made by Council Member Morrison, seconded by Council
Member Martin to reappoint Karen Worley to the Lubbock Housing
Finance Corporation Board of Directors. Motion carried: 6 Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
(71.) Consider five appointments to the Zoning Board of Adjustment.
Motion was made by Council Member Morrison, seconded by Council
Member Martin to appoint Jay House, Larry Lowe, Maggie Trejo, Darrell
Hill and Mike Moss to the Zoning Board of Adjustment. Motion carried: 6
Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
(72.) Consider seven appointments to the Public Transportation Strategic
Planning Task Force.
Motion was made by Council Member Morrison, seconded by Council
Member Martin to appoint Brian Baker, Rich Baker, Cindy Finley, Jay
Jacobus, Carolyn Thompson Conwright, John Wilson and Steve Warren to
the Public Transportation Strategic Planning Task Force. Motion carried:
6 Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
195
Regular City Council Meeting
February 19, 2004
(73.) Consider nine voting and two non -voting appointments to the
Lubbock Water and Sewer Rates Review Committee.
This item was deleted.
(74.) Consider appointments to the newly created Electric Utility Board.
Motion was made by Council Member Morrison, seconded by Council
Member Martin to appoint W. R. Collier as Chair, John Owens, Chris
Snead, Craig Wells, Marciano Morales, Lloyd Rinehart, Connie Wharton,
Randy Andrews and John Zwiacher to the Electric Utility Board. Motion
carried: 6 Yeas, 0 Nays.
Council Member Hernandez was away from the dais.
2:15 P. M. COUNCIL ADJOURNED
Items 75-76 were considered following Item 67.
(75.) Presentation by the Lubbock Chamber of Commerce regarding the
amount of funding received from the Hotel Occupancy Tax for the
purpose of funding the Visitor Information Center Administration.
This item was the first item considered when Council convened in
Work Session at 1:27 P. M.
Kevin McMahon, a Partner with the Chamber of Commerce, gave a brief
introduction of the presentation to be given by Eddie McBride, President
of Lubbock Chamber of Commerce.
Mr. McBride then gave a presentation on the "Visitor Information Center
Administration, Request for Proposal", which was provided in council
backup
Mayor McDougal asked that this be brought back as an action item on the
March 4, 2004 agenda.
(76.) Discuss the False Alarm Ordinance.
Claude Jones, Chief of Police gave a presentation on the False Alarm
Ordinance.
Chief Jones stated that since the Ordinance dated in the latter part of 2001,
false alarms had been decreased by 8,420 (33.5%). This ordinance has
been very successful. It has allowed officers to break free to do other
police activities. In soft dollars, this is approximately two officers' salary,
which doesn't include the time spent for 911 call takers, etc. to dispatch
calls.
Mayor McDougal asked that Chief Jones come back each year with an
update. He stated that even though he voted for this ordinance, he was
opposed to it in the beginning. However, once the numbers started to
drop, he couldn't see how anyone could argue with what was happening,
especially with officers' safety.
2:05 P. M. CITY COUNCIL REGULAR MEETING RECONVENED
Committee Room 103
All council members were present, except Council Member Hernandez.
The next items considered were Items 65-66.
2:15 P. M. COUNCIL ADJOURNED
lul
Regular City Council Meeting
February 19, 2004
There being no further business to come before Council, Council Member
Patterson made a motion to adjourn the meeting.
Read and approved this // Z day of �2005.
i
/MARC MCDOUGAL, MAYOR
ATTEST:
becca Garza, City Secr a
197