Loading...
HomeMy WebLinkAboutMinutes - City Council - Regular - 7/14/1988443 REGULAR CITY COUNCIL MEETING JULY 14, 1988 9:00 A.M. The City Council of the City of Lubbock, Texas met in regular session an the 14th day of July in the City Council Chambers, first floor, City Hall, 1625 13th Street, Lubbock, Texas at 9:00 a.m. Present: Mayor B. C. McMinn, Mayor Pro Tem Joan Baker, Councilman T. J. Patterson, Councilman George Carpenter, Councilman Gary Phillips, Councilman Bill Maloy, City Manager Larry J. Cunningham, City Attorney John C. Ross, Jr., and City Secretary Ranette Boyd. Absent: Councilwoman Maggie Trejo. Mayor McMinn called the meeting to order at 9:00 a.m. ( 1.} The Invocation was given by Robert Massengale, Assistant City Manager. 2.) The Pledge of Allegiance was given in unison by those in the Council Chambers. ( 3.) Motion was made by Councilman Patterson, seconded by Councilman Phillips to approve the Minutes of the June 23, 1988 City Council meeting as written. Motion carried: 6 Yeas; 0 Nays. Citizen Appearances ( 4.) Board Appointments ( 5.) Representatives of the Lubbock Conventions and Tourism Bureau and members of the Board appeared to present the City Council with a Hero Award in recognition of the City Council being instrumental in getting the Texas Mayors and Councilmembers Association meeting booked in Lubbock for 1990. [ 6.) Cindy Ethridge will appear an behalf of Oakrid e A artments to request a Loudspeaker Permit for July 22, 1988. Cindy Ethridge appeared an behalf of Oakridge Apartments to request a Loudspeaker Permit for a resident's party an Friday, July 22, 1988 from 8:00 p.m. until 1:00 a.m. Saturday, July 23, 1988 at 5321 South Loop 289. Staff was informed that entertainment will be provided by playing of records and tapes and that no alcoholic beverages will be sold at this event. Ms. Ethridge has obtained the necessary signatures required from 444 July 14, 1988 residents and businesses in the area and no neg- ative responses were received. The Oakridge Apartments have met the requirements of the ordinance regarding Loudspeaker Permits. City Council approval was requested because this event will be conducted in the late evening hours and in a residential area. Motion was made by Councilman Patterson, seconded by Mayor Pro Tem Baker to approve issuance of a Loudspeaker Permit to Oakridge Apartments for July 22, 1988. Motion carried: 6 Yeas; 0 Nays. ORDINANCE 9210 AN ORDINANCE AMENDING TEIF STATE OF TEXAS R..'i+`6 SECTION 20-147 Of: THE Gu8- BOCK CITY CODE TO CLARIFY COUNTY OF LUBBOCK PRE DATA FOOT RAres: AMENDING SECTION 28-148 OF Before me r r z�. i L I, S •li�� �=" `� L a Not.ary Public In and for Lubbock County THE LUBBOCK CITY CODE TOCLAR4 T r �� ,7 - } I f r of the Sol appeared �, -mod ;; �P,a«���— RATA IRATES ON PROPERTFY FRONT FOOT Y personally ��, �...-�, . pers Corporation. publishers of the Lubbock Avalanche -Journal — Morning. Evenin€ ALREADY PLATTED; AMEND- ING SECTION 28.150OF THE TO being by me duly sworn did depose and say that said newspaper has been published cor LUBBOCK CITY CODE CHANGE DETERMINING PER- than fifty-two weeks prior to the first insertion of this _ ;� i�r � SON TO BE THE DIRECTOR OF WATER UTILI7IESFORSIIEOF at Lubbock County. Texas and SEWER INES; NG secTIONL20-53OFhTHEDLIUB- ed copy of the — ' ' jAL.1jirp is a true copy of the original and was prig BOCK CITY CODE TO ADD AN ILLUSTRATION THERETO TO following dates: ° • Avalanche-,lournal on.� li I Y 1.1a t ._� � .��[ CLARIFY WHEN THE COST OF CLARIFY LARGE MAINS IS PARTIALLY •�•r . 'j = PAID BY THE CITYt AMENDING SECTION 20- 54 OF HE LUB- BOCK CITY CODE TO ADD IL- LUSTRAT;ONSTO CLARIFY COST OF EXTENSION PROVI- �— SIONS; AMENDING SECTION TO REVISE DEVELOPER INSTALLATION PROVISIONS AS REGARDS UTI REGARDS UtILITIES; AMEND- ING SECTION 28.157 OF THE rim C'-stI i il'KrILA r UBBOCK CITY CODE TO CLAR- LFY SURVEYING REQUIRE- LUBBOCK AVALANCHE —,JOURNAL MENTS; AMENDING SECTION 29.158 OF THE LUBBOCK CITY Southwestern Newspapers Corporation CODE TO REVISE CONTRACTS FOR REFUNDS PROCEDURE. - AMENDING SECTION 20.140 OF THE LUBBOCK CITY CODE TO n-rw Ii 1 Y 19 ADD A UNIT PRICE FOR TRENCH SHORING REQUIRED Subscribed and sworn to before me this '' day of .J~ BY A SEPARATE STATE STAT- UTE; AMENDING SECTION 28-164 OF LUBBOCK CITY CODE TO CLARIFY THE DEFINITION OF PROPERTY OWNER; PRO- VIDING A SAVINGS CLAUSE AND PROVIDING FOR PUBLICA- TION, FORM as -in `,.. 8847B-444-431 (7) ORDINANCE #9210 ORDINANCE #9210 AN ORDINANCE AMENDING SECTION 28-147 OF THE LUBBOCK CITY CODE TO CLARIFY PRO RATA FRONT FOOT RATES; AMENDING SECTION 28-148 OF THE LUBBOCK CITY CODE TO CLARIFY FRONT FOOT PRO RATA RATES ON PROPERTY ALREADY PLATTED; AMENDING SECTION 28-150 OF THE LUBBOCK CITY CODE TO CHANGE DETERMINING PERSON TO BE THE DIRECTOR OF WATER UTILITIES FOR SITE: OF SEWER LINES; AMENDING SECTION 28-153 OF THE LUBBOCK CITY CODE TO ADD AN ILLUSTRATION THERETO TO CLARIFY WHEN THE COST OF LARGE MAINS IS PARTIALLY PAID BY THE CITY; AMENDING SECTION 28-154 OF THE LUBBOCK CITY CODE TO ADD ILLUSTRATIONS TO CLARIFY COST OF EXTENSION PROVISIONS; AMENDING SECTION 28-155 TO REVISE DEVELOPER INSTALLATION PROVISIONS AS REGARDS UTILITIES; AMENDING SECTION 28-157 OF THE July 14, 1988 445 LUBBOCK CITY CODE TO CLARIFY SURVEYING REQUIREMENTS; AMENDING SECTION 28-158 OF THE LUBBOCK CITY CODE TO REVISE CONTRACTS FOR REFUNDS PROCEDURE; AMENDING SECTION 28-160 OF THE LUBBOCK CITY CODE TO ADD A UNIT PRICE FOR TRENCH SHORING REQUIRED BY A SEPARATE STATE STATUTE; AMENDING SECTION 28-164 OF LUBBOCK CITY CODE TO CLARIFY THE DEFINITION OF A PROPERTY OWNER; PROVIDING A SAVINGS CLAUSE AND PROVIDING FOR PUBLICATION. Motion was made by Councilman Phillips, seconded by Councilman Patterson to pass on second and final reading Ordinance #9210. Motion carried: 6 Yeas; 0 Nays. 88-478-4d5-432 { 8.) Consider Resolution #2875 accepting paving RESOLUTION #2875 RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Wheelocks 2nd Addition, Lot I -A, Block 88, and Lot 1-A-1, Block 93, made arrangements with Gordon Carey Construction for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above -mentioned addition including the following streets: Elm Avenue Street stub removal on north side of 34th Street known and designated as New Subdivision Sub -Unit Number 46 of Unit Number 2033. Cedar Avenue Street stub removal on north side of 34th Street known and designated as New Subdivision Sub -Unit Number 47 of Unit Number 2033; and WHEREAS, the construction of the above improvements on the above -mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331; NOW THEREFORE: BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the improvements on said portions of the above -mentioned streets BE and the same are hereby accepted and the City Engineer BE and he is hereby authorized to notify the developer of acceptance by the Lubbock City Council. SECTION 2. THAT this resolution shall take effect and be in force from and after its passage. 446 July 14, 1988 Passed by the City Council this 14th day of August, 1988. /s/ B. C. McMinn R. C. McMINN, MAYOR ATTEST: /s/ Ranette Boyd Ranette Boyd, City Secretary APPROVED AS TO CONTENT: APPROVED AS TO FORM: IsZ Larry Hertel /s/ J. Worth Fullingim Larry Hertel, Acting City Engineer J. Worth Fullingim, Assistant City Attorney 88-47B=445-433 ( 9.) This is a routine acceptance of improvements required at the time of platting. This new subdivision is situated on the north side of 34th Street between Elm and Cedar Avenues. The improvements consist of removal of the paving stubs at Elm and Cedar Avenues, which were closed in the replat, and the construction of curb and gutter to meet code requirements. There is no City cost due the Contractor. Staff recommended approval. Motion was made by Councilman Patterson, seconded by Councilman Carpenter to authorize Resolution #2875 as recommended by Staff. Motion carried: 5 Yeas; a Nays. RESOLUTION #2875 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of said City the cover (title) Sheet for the State of Texas Department of Highways and Public Transportation plans and specifications for U. S. 87 Riprap Repairs at 82nd Street, 98th Street, 114th Street and F.M. 1585. July 14, 1988 447 SECTION 2. THAT the execution of the Cover (title) Sheet by the Mayor was requested by said State Department by letter dated June 28, 1988, addressed to Mr. Larry Cunningham, City Manager of the City of Lubbock. Passed by the City Council this 14th day of July, 1988. ATTEST: Isl Ranette Boyd Ranette Boyd, City Secretary APPROVED AS TO CONTENT: /s/ Larry Hertel Larry Hertel, Acting City Engineer Assistant /s B. C. McMinn B. C. McMINN, MAYOR APPROVED AS TO FORM: /s1 J. Worth Fulling!m J. Worth Fullingim, City Attorney This State project includes repair and replacement of riprap at the overpasses at four locations (82nd Street, 98th Street, 114th Street and F.M. 1585) on U.S. 87 (Tahoka Highway). Staff recommended approval. Motion was made by Mayor Pro Tem 8aker, seconded by Councilman Maloy to authorize Resolution #2876 as recommended by Staff. Motion carried: 5 Yeas; 0 Nays. 88-47B-447-434 (10.) Consider request of Chevron U.S.A., Inc. to reduce the $25,000 bond on H. Newton Oil Well No. 2 to $10,000. This is a routine request, as authorized in the Oil Well Drilling Ordinance. All work has been completed in conjunction with drilling of this well, and the Ordinance allows a reduction of the amount of the band. Staff recommended approval of this request. Motion was made by Councilman Phillips, seconded by Councilman Patterson to approve request of Chevron U.S.A., Inc. to reduce the $25,000 band on H. Newton Oil Well No. 2 to $10,000. Motion carried: 5 Yeas; 0 Nays. B8-47B-447-435 (ll.j Consider Ordinance #9211 abandoning and closing portions of a Storm Water Storage and Drainage Easement located in Section 15, Block E-2. ORDINANCE #9211 AN ORDINANCE ABANDONING AND CLOSING PORTIONS OF A STORM WATER STORAGE AND DRAINAGE EASEMENT LOCATED IN SECTION 15, BLOCK E-2, LUBBOCK COUNTY, TEXAS, AND MORE PARTICULARLY DESCRIBED IN THE BODY OF THIS ORDINANCE; DIRECTING THE CITY ENGINEER TO MARK THE OFFICIAL MAPS OF THE CITY OF LUBBOCK TO REFLECT SAID ABANDONMENT AND CLOSING; PROVIDING A SAVINGS CLAUSE; AND PROVIDING FOR PUBLICATION. 448 July 14, 1988 These three portions of a Storm Water Storage and Drainage Easement are located between 82nd Street and 84th Street, west ❑f Vicksburg Avenue in an unplatted commercial area of the Lakeridge Country Club Estates Addition. The proponent of this closure is Larry Teaver for Lakeridge, the original dedicators of this Easement. The reason for this closure is for platting and commercial building purposes. The three areas t❑ be closed contain 29,285.3 sq.ft., 1,955.6 sq.ft., and 22,866.4 sq.ft., for a total closure area of 54,107.3 sq.ft. They are dedicating a 12,057.5 sq.ft. Underground Utility Easement and a 3,658.3 sq.ft. Storm Water Storage and Drainage Easement. Also, a Cut -and -Fill Plan has been filed to offset the Easement area being closed. The plat has been filed and all utilities are in agreement. Staff recommended approval. Motion was made by Councilman Carpenter, seconded by Councilman Patterson to pass on first reading Ordinance #9211 as recommended by Staff. Motion carried: 6 Yeas; 0 Nays. 88-47B-448-436 (12.) Consider Resolution #2877 approving the Lubbock Hous i na Authority's apgl i cation for "Front End Annual Contribution Contract" ACC funding for Low Rent Public Housing tannin . RESOLUTION #2877 RESOLUTION APPROVING APPLICATION FOR FRONT-END ACC FOR LOW -RENT PUBLIC HOUSING WHEREAS, it is the policy of this locality t❑ eliminate substandard and ❑ther inadequate housing, to prevent the spread of slums and blight, and to realize as soon as feasible the goal of a decent home in a suitable living environment for all of its citizens; and WHEREAS, under the provisions of the United States Housing Act of 1937, as amended, the United States ❑f America, acting through the Secretary ❑f Housing and Urban Development (herein called the "Government"), is authorized to provide financial assistance t❑ local public housing agencies for undertaking and carrying out preliminary planning of low -rent housing projects that will assist in meeting this goal; and WHEREAS, the Act provides that there shall be local determination of need for low -rent housing to meet needs not being adequately met by private enterprise and that the Government shall not make any contract with a public housing agency for a fron-end ACC for surveys and planning in respect to any low -rent housing projects unless the governing body of the locality involved has by resolution approved the application ❑f the public housing agency for such front- end ACC; and WHEREAS, the Housing Authority of the City ❑f Lubbock [herein called the "Local Authority"] is a public housing agency and is applying to the Government for a front-end ACC t❑ cover the costs ❑f surveys and planning in connection with the development of low -rent housing; NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: SECTION 1. That there exists in the City of Lubbock a need for such low -rent housing which is not being met by private enterprise. July 14, 1988 449 SECTION 2. That the application of the local Authority to the Government for a front-end ACC for surveys and planning in connection with low -rent housing projects of not to exceed approximately 130 dwelling units is hereby approved. Passed by the City Council of the City of Lubbock this 14th day of July, 1988, on the motion of Councilman Carpenter, seconded by Councilman Patterson, by the following vote: 6 yeas, O nays. s B. C. McMinn B. C. McMinn, Mayor ATTEST: /sZ Ranette Boyd Ranette Boyd, City Secretary APPROVED AS TO CONTENT: s Sandy Ogletree Sandy Ogletree, Community Development Administrator APPROVED AS TO FORM: Is1 James Brewster James Brewster, Civil Trial Attorney The Lubbock Housing Authority requested support for the submission of an application to the Department of Housing and Urban Development for "Front End Annual Contribution Contract" (ACC) funding to prepare detailed design and reha- bilitation specifications for replacement housing. This is a preliminary application, which, if approved by HUD, will allow the LHA to develop and submit a more detailed application for funding for acquisition, rehabilitation and other expenses for the replace-ment of the 130 units at Hub Homes. As background to this application, the LHA is currently negotiating the sale and disposition of Hub Homes to the State Department of Highways and Public Transportation since a portion of Hub Homes is included in the right-of-way of Interstate 27. Currently, the State has a pending application with HUD to demolish the Hub Homes project which will provide relocation benefits to the current residents of the complex. Hub Homes has a total of 130 units which includes 28 1-bedrooms, 53 2-bedrooms, 37 3-bedrooms, and 12 4-bedrooms. The LHA and the City of Lubbock have a need for additional housing for low and moderate income elderly persons. The LHA has also begun the investigation of possible sites for an elderly complex, two of which are the Pioneer Hotel and the Civic Center Inn, both located in the downtown area. No estimate has been made by the LHA as to the number of renovated LHA units there would be in the Pioneer Hotel; the Civic Center Inn has the potential for approximately 50 renovated units. In light of the current development of a Central Business 450 July 14, 1988 District Revitalization Plan, the LHA staff met with the representatives of the consulting firm, RTKL, and discussed the projects. LHA also presented the proposals to Downtown Lubbock, Inc. and the Central Business District Steering Committee. The LHA will also seek additional 2-bedroom units as replacements for the 3 and 4 bedroom units at Hub Homes. It is the objective of the LHA to replace all 130 units with housing for the elderly and small families, since these are cur- rently the areas of primary need for low and moderate income housing. If HUD approves this application for funding, the LHA will prepare detailed proposals for the replacement housing which will be presented to the City Council for review and support prior to submission to HUD. It is anticipated that the HUD decision on this application will be made by mid -September. The LHA application will receive a priority rating due to the pending demolition request and disposition to the SDHPT. Staff recommended approval and minuted action reflecting the concerns of the Central Business District Steering Committee as follow: 1) that the projects be limited to elderly housing units, and 2) that any restoration or renovation be tied to the historical character or other design considerations as recom-mended by the Central Business District Plan. Councilman Maloy stated that he believes there is a definite need for additional housing, and questioned why two facilities in downtown Lubbock are being considered, since these are not close to shopping, and also since there are many other locations available in Lubbock which would be more accessible. D. C. Fair, from the Lubbock Housing Authority, stated that these are suggested because they could be maintained in a way to afford protection for the elderly. He went on to say that hospitals are nearby, and that there is the possibility of having Citibus service and bus service by the Housing Authority to provide transportation for the tenants to shop. He stated it would be more economical to locate an existing facility, than to build one, and that use of an existing facility would be given a higher priority by HUD than building a new project. Councilman Maloy asked what the cost would be, and Mr. Fair stated that the cost is unknown at this time. He said that a HUD formula would have to be applied to determine the allowable replacement cost per unit. Councilman Carpenter stated he has personal knowledge of the maintenance problems with the mechanical system at the Civic Center Inn, and that the facility has gone through its life span and then asked if the structure would be completely redone. Mr. Fair replied that the facility would be renovated into 1-bedroom and efficiency apartments, and that a large July 14, 1988 451 percentage would have to be redone. He said their intent is to take advantage of the load baring walls. Mr. Carpenter asked what would be done about the heating/air conditioning system, and Mr. Fair replied that it probably would have to be replaced. Councilman Malay asked why other existing housing is not being considered in light of the high cost factor of this proposed acquisition and renovation. Mr. Fair stated that several facilities had been considered, but because of the July 15, 1988 deadline for submission of the application, availability of the facility is a prime issue. He said that because of the vacancies in Lubbock, new construction was, in their opinion, not acceptable. Efforts had been made to locate projects in receivership, and it was determined that there are none in Lubbock. Because this facility has been vacant for four years, and because other cities renovate these types of facilities for housing for elderly, this facility was suggested. Mayor Pro Tem Baker asked if the application is made on one of these pieces of property --Civic Center Inn or Pioneer hotel-- could it be amended at a later date to change the location. Mr. Fair stated that the application would be tied to that piece of property and that renovation of that facility would be less costly than building a new high-rise facility. Councilman Patterson stated that he favors this request. Councilman Malay asked how the assumption could be made that renovation will cost less than building a new facility. He then stated that based on an estimated $700,000 purchase price, it would cost approximately $12,000 per unit to purchase the facility and another $10,000 per unit for renovation, and that almost any well- built, new apartment property which is near shopping and hospitals, would be much less than $22,000 per unit. Mr. Fair pointed out that Public housing program in Lubbock has been progressive and aggressive in every way, but that Public housing is not accepted in many areas of town. Also, he said that federal regulations do not allow location of new public housing in a predominantly minority area. Mayor Pro Tem Baker asked if the process was to send in the application to HUD, then they make an allotment of a specific amount, and if that was why Mr. Fair did not know what the cost of this project would be. Mr. Fair said that only so much is allowed per unit, and that if HUD would authorize the funds, the price of the buildings could be negotiated to much less than the asking price, but that because of the structure of the programs, the cost is much greater. Mr. Fair pointed out the high cost of labor, due to the regulations of the Davis -Bacon Act, and Councilman Carpenter responded that if new property were purchased, the Davis -Bacon rates would not apply. Mr. Fair said that HUD has sent an announcement that existing facilities have priority over new facilities, because of the problem of property vacancies in cities. 452 July 14, 1988 Councilman Carpenter stated that he does not oppose having a downtown location or renovating a building, but rather is concerned with maintenance costs of the Civic Center structure. Mr. Carpenter concurred with Councilman Maloy that the government will be wasting taxpayers' money and sometimes Council has to say no. Mr. Carpenter said that other cities do not have the land to spread out for these type facilities and that the City of Lubbock has relatively inexpensive land and can spread out further or use other buildings. Councilman Patterson pointed out that this was meant to enhance the downtown area and that is what he is concerned with; to bring people downtown with security. Councilman Maloy stated that he understood about the enhancement of the downtown area, but said he does not feel that the long-term goal was to make it a housing area, but a business and commerce area. Mr. Maloy stated that housing is the most critical thing and if federal funds are available, then it should be used to help create a better environment and further stated that he would not want senior citizen housing downtown where they may not want to live. Mr. Fair said that any new construction based on the notice that was sent out, would have to be large family units and that they are requesting a waiver to use this application for replacement. Councilman Carpenter asked Mr. Fair if he thought that the proposed operating budget for these proposed buildings would be sufficient to maintain and operate the facility. Mr. Fair replied that he feels that they will. He further stated that it has been several years since they have received any subsidy for management, and he feels they will be able to operate it to the City's satisfaction. Mayor Pro Tem Baker stated that she feels the Council is in a precarious situation because they understand that there has to be a place for the people who are going to be displaced from their homes and have stated their support for public housing. She went on to say that she has an additional problem with this in that she is not sure the City is spending the money wisely but then the Central Business district Steering Committee has recommended Council approval of this request. Ms. Baker said she personally wished that there had been a member of that Committee present so that they could discuss it with them and find out what their thinking was. Ms. Baker further stated Council is also concerned about the downtown district they are trying to revitalize and how to make best use of the property downtown. She said she would like to know what the Steering Committee's recommendations are because of the questions raised that need their reasoning. July 14, 1988 453 Mayor McMinn said Council received the letter of June 29 and that the subject is economics and also questioned the locations. He stated that as far as the question about being close to shopping, even though Council may raise questions about government spending, they are running against a time frame. Mayor McMinn noted the work which has already been done on this and apprised Council that the Steering Committee has looked at this in detail and stated that Council needs to consider approval of the application. Mr. Carpenter asked, of the people that are being displaced by the highway, how many would be eligible to move into this project. D. C. Fair noted that those that aren't elderly will not go into that project. Mary Myers, Assistant Director of Lubbock Housing Authority, replied that there are 47 elderly, with 5 of these being couples. Mr. Maloy asked that if the July 15 deadline is missed, would there be another process to make these applications since Council heard the case just one day before the deadline and he was not comfortable with it. Mr. Fair said he had checked on the possibilities of an extension before he began the process and that there was no other process. Mr. Fair said that the notice came out in May and that they followed all the preliminary procedures before coming before Council. Mayor Pro Tem Baker said that the Council's dilemma was that they were trying to support what he (Mr. Fair) was trying to do, what the Business District Committee was trying to do and that yet Council is trying to also be true to their own cause and make the best use of the money available. Mr. Fair said that if the Business District had not supported it, he would not have come before Council. Mayor Pro Tem Baker replied that she wanted the Central Business District Committee to tell Council why they think it would help downtown as well as helping the elderly. Mr. Carpenter asked if, for some reason the application is not approved, what would be the next step and Mr. Fair replied that he did not know and stated that the application is presently in Washington to demolish the Hub Homes. Mr. Carpenter asked what would happen to these people if it is approved. Mr. Fair replied that some would have to be overhoused in existing units, that some would have to be given Section 8 certificates to go out and try to find a place, but that none of them will be put on the streets and all will be housed. He reported that they had $1,800,000 to spend on Hub homes and were told not to spend it because of the situation. Councilman Maloy asked if the application was for the Civic Center Inn or the Pioneer Hotel. Assistant City Manager Jim Bertram replied that the application is for 130 units of replacement housing and mentions the two downtown locations that the Housing Authority are going to look at, but that those are not the only two that Council is limited to, and Mr. Fair concurred. Mr. Bertram went on to say that the application is 454 July 14, 1988 88--47B-454-437 (13.) for planning funds to look at those locations and others, if those two prove not to be feasible, but that no matter what the final proposals are, those applications have to come back to Council before they are submitted to HUD. Mr. Maloy asked if Council could approve the resolution with a limitation that it not specifically be tied to these two downtown facilities. Mayor McMinn said he did not mind it being downtown, but he did not feel that those two facilities were the best built structures. Mr. Bertram further said that this plan would fit well into plans for downtown revitalization. Motion was made by Councilman Carpenter, seconded by Councilman Patterson to approve Resolution #2877. Mayor Pro Tem Baker stated that the application was applying for replacement. Mr. Bertram informed Council that these are planning funds only, and that before they can submit an actual plan to HUD for the actual funding, they have to come back to Council for approval. Councilman Carpenter said he thought Council should approve it on the basis of the feasibility study and that they are not approving any one project. After it goes back for study and funds are available, they will find that those two pieces of property are too expensive and they can find good locations in the downtown area for the senior citizens. He stated he is in favor of doing that and that his only objections to this item were to those two pieces of property. Motion carried: 5 Yeas; 0 Nays. Consider Resolution #2878 authorizing the .Mayor to execute an Amendment to a_Funding Agreement with Guadalupe Economic Services Corporation._ RESOLUTION #2878 BE 'IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Amendment to an Emergency Shelter Grant Funding Agreement by and between the City of Lubbock and Guadalupe Economic Services Corporation, attached herewith, which shall be spread upon the July 14, 1988 455 minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. LS1 B. C. McMinn B. C. McMinn, Mayor ATTEST: Zsl Ranette Boyd Ranette Boyd, City Secretary APPROVED AS TO CONTENT: lam' -Sandy O letree Sandy Ogletree, Community Development Administrator APPROVED AS TO FORM: Z—sz' James Brewster James Brewster, Civil Trial Attorney On June 25, 1987, the City Council passed a resolution authorizing the Mayor to execute a Funding Agreement with Guadalupe Economic Services Corporation which provided them with $30,000 from a Grant which the City received from the Texas Department of Community Affairs' (TDCA) Emergency Shelter Grant Program. The Grant funded the renovation of a homeless shelter at 2701 Clovis Road which began operating in December, 1987. Guadalupe Economic Services Corporation has asked that the termination date of the Agreement be extended from the original date of June 24, 19B8, to August 28, 1988. In addition, they have requested that the Performance Statement be amended to allow more expenditure of funds in the Renovation/Major Rehabilitation Conversion category. These two changes will allow Guadalupe Economic Services to make needed repairs to the parking area which services its homeless shelter. Both of the changes would be in compliance with the City of Lubbock's Emergency Shelter Grant Program Contract with TDCA and is subject to approval by TDCA. The total amount of the Grant will not change. Guadalupe Economic Services Corporation is matching these Grant funds with the value of the lease on the building, donated labor, the value of time and services of volunteers, donated materials and food, and private donations. Staff recommended approval. Motion was made by Mayor by Councilman Patterson #2878 as recommended by 5 Yeas; 0 Nays. 88-478-455-438 (14.) Consider Resolo to sign a Contr 25th Street and Pro Tem Baker, seconded to authorize Resolution Staff. Motion carried: 456 July 14, 1988 RESOLUTION #2879 8E IT RESOLVED 8Y THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock an Architectural Services Agreement by and between the City of Lubbock and Atcheson & Associates to provide professional services for the construction of Fire Station No. 3, 25th & Milwaukee Avenue, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. /S/ B. C. McMinn B. C. McMinn, Mayor ATTEST: /s/ Ranette Boyd Ranette Boyd, City Secretary APPROVED AS TO CONTENT: Lsj' Rita Harmon Rita Harmon, Assistant City Manager for, Public Safety & Services APPROVED AS TO FORM: ZsZ Donald G. Vandiver First Assistant City Attorney This Project will be funded by 1981 General Obligation Bonds. The location is the northeast corner of 25th Street and Milwaukee Avenue, Lots 1, 8, Block 18, West End Place. The City of Lubbock has a set of drawings from a previously constructed fire station which will be used as a guide for the basic design for the Project. The architect hired for the job will adapt the building to the lots available, plan the parking lot and traffic pattern, work with representatives of the Fire Department in regard to design modifications and supervision of the project during construction, inspect the work during construction to assure that the builder is following the plans, and make sure that proper tests are conducted during construction. Following the presentation of the recommendation of the Architectural Selection Committee at the June 23 Council work session, the Council authorized Staff to negotiate a Contract with Atcheson and Associates. The Committee recommended that Staff enter into a Contract with the firm of Atcheson and Associates based on a fixed fee of $16,500 and a rating of number one on the Committee's evaluation. Mr. Michael E. Atcheson designed Fire Station No. 13 in 1981, the prototype of the proposed facility, July 14, 1988 457 and is thoroughly familiar with the product desired. Steven P. Daughtry, P.E., A.I.A., Engineer and Architect, represents the firm of Allied Associates, Lubbock, Texas and will provide structural, plumbing, mechanical and electrical engineering expertise for the Project. Atcheson and Associates will approach this Project as a new facility and document accordingly, not assuming anything from the past as correct and using the most up-to-date con- struction methods, materials and economy of design. This fire station will also be designed to accommodate a District Chief's living quarters and office space which will add approximately 700 square feet to the facility. Mr. Atcheson estimated the projected cost of construction would run between $260,000 and $297,000. Mr. Atcheson's initial fee for all the required basic service was reduced from $17,820 to $16,500 after negotiating with Staff on July 1, 1988. The construction phase is projected to begin January 2, 1989, with acceptance scheduled for June 2, 1989. Staff recommended that the Council approve the proposed Contract with Atcheson and Associates. Motion was made by Councilman Carpenter, seconded by Councilman Phillips to authorize Resolution #2879 as recommended by Staff. Motion carried: 6 Yeas; 0 Nays. 88-478-457-439 (15.} Consider Ordinance #9212 setting the sewer rate. ORDINANCE #9212 A.00L,f:LWN11 : AN ORDINANCE AMENDING SECTION 28-92 OF THE CODE OF ORDINANCES OF THE CITY OF LUBBOCK, TEXAS, IN ITS ENTIRETY SO AS TO CHANGE THE RATES FOR SEWER SERVICE WITHIN THE CITY OF LUBBOCK EFFECTIVE AUGUST 1, 1988; PROVIDING A SAVINGS CLAUSE AND PROVIDING FOR PUBLICATION. Consistent with directions by the City Council on the improvements for the land application site, Staff recommended this Ordinance for setting of the sewer rates to pay the debt service on the proposed financing. The Ordinance provides for an increase of 75¢ on August 1, 1988 and another 75¢ increase on January 1, 1989. This rate adjustment is according to the plans as presented in the Budget Work Sessions and as recommended by Staff. Mayor McMinn announced that this item was briefly discussed and that basically they decided 75t would be imposed August 1, another 75¢ would be imposed in January for a total of $1.50. Councilman Carpenter asked what indebtedness this would cover. Robert Massengale, Assistant City Manager for Financial Services, replied that the 458 July 14, 1948 rate is designed to cover the proposed indebtedness that they would be issuing on the $5 million CO's for the projects to be done in 1988- 89 plus the operating expenses. Councilman Carpenter asked if this was only for the $5 million and Mr. Massengale said that it was only for the $5 million and did not include any future debt service. Councilman Carpenter then asked what percentage of that is operating and what percentage is construction. Mr. Massengale replied that he did not have the percentages, but that the majority of it is for operating expenses. Councilman Carpenter asked what it would take to pay the $5 million indebtedness back and Mr. Massengale said that the debt service schedule on the $5 million was included in the backup and explained that the way the schedule has been designed, it includes future issues and past issues. The third set of figures is the debt service for the $5 million. Mr. Massengale went on to say that the total for 1989 would be $365,000 and will graduate up based on the maturity schedule, to 1996, which would be the peak. Councilman Carpenter stated he would still like to know how much of that rate, the 75t and the 75t, is going to be allocated to the bonds. Mr. Massengale gave an approximate figure of 33% of the $1.50 and said that it would be 75t for six months and $1.50 for the next six months. Councilman Carpenter asked if the other 75t would not change so it would be $1.50 after six months, and Mr. Massengale said that was correct and went on to say it would produce more the next full year and would cover some of increase in the debt service. Mayor Pro Tem Baker asked if 50t of the $1.50 is going towards debt service, and Mr. Massengale said that was an approximate figure and that it would be more the next year --that it would flow with the debt service. Ms. 8aker asked if most of the $5 million would go for operating expenses and Mr. Massengale replied that the $5 million is all capital and that some of the rate increase is for operating. Councilman Carpenter asked if 50t of it retires the $5 million debt as an average, and if the other $1.00 is for operating expenses, and Mr. Massengale said that in 1988-89 this is correct, but then more of it will go to debt service the next year, then the next year. Councilman Carpenter asked how much more and Mr. Massengale stated that it will be based on the way that the debt service increases up to 1996. Councilman Carpenter asked if at that time Staff would have to come back to Council and report the debt service has gone up, and that the rate will have to be increased to pick up the service from the previous operation. Mr. Massengale replied that it would not be from this $5 million and that there are some of the older bonds that will be maturing every year allowing money to be available to assist in this --they will not have to raise the rate anymore, for that $5 million or service to it. July 14, 1988 459 For the benefit of those in the audience, Mayor McMinn stated that the bulk of this $5 million would be to build the 500 million gallon storage facility, but that it will cost somewhat less than $5 million. Councilman Malay stated that when they discussed this in a previous work session he understood that the $1.50 was to go for 100% bond retirement, and that now Staff is saying 57% of it will go to operating expenses. Mayor McMinn said he did not recall anyone saying 100% of this $1.50 would go toward bond retirement. Councilman Malay recalls the question being asked about how the City would pay for this $5 million, and when they agreed to raise the sewer rates (750 and then 75t again), he did not hear anyone say they had a shortfall in the operating revenues, and that the sewer rates would have to be raised. Mr. Massengale replied that they have not had a shortfall on the operating revenues, but a major increase in operating expense. City Manager Larry Cunningham reported that they have added several acres of land that are having to be farmed and also changing the cropping pattern. Councilman Maloy said he was aware of all that, but that he thought the $1.50 was going to the entire debt, not 57% of it to increase operating expenses. Mayor McMinn stated they did not discuss percentages at that briefing, and that he did not hear anybody say all of it would go to debt service. Councilman Carpenter stated he did not hear anyone say any of it was going to service --that all he heard was what Councilman Maloy said, and that he just wanted to be sure that Council didn't approve this and then come back and get an answer that the debt service has peaked and that Council would have to come back and modify the service portion again. Councilman Carpenter said that during the same briefing, they were told they were going to have to come back and do some additional work and sell additional bonds next year, but that he was not aware that Staff was going to refinance the short-term bonds. Mr. Cunningham stated that in the Council work session on June 23, there was written information as well as the discussion. Staff indicated they would be recommending an increase of 75t in August, 750 in January, and also the refinancing of the debt already issued for the Grey site, and if that was the way Council wanted to go, it would be brought to them on July 14. 1n the overall discussion, Mr. Cunningham said the primary purpose was for capital improvements on the reservoir, financing the operations, and the debt service. Mr. Cunningham expanded on Mr. Massengale comments and said that on this first year of the debt quite a bit of the money will be allocated to take care of the increased cost with the additional acreage, etc. and also the losses in revenue simply because they're going from the cash crop to the more water user type crops. He stated that in the following years as more debt is paid for and debt service increases, the percentage will go up, but that in looking at the 460 July 14, 1988 composite of all of the expenses, operating and debt, the $1.50 plus the refinancing will take care of the indebtedness being proposed --the $5 million plus the operations. When talking about the stream quality plan (a different situation), this will necessitate more funding. Councilman Maloy said if currently 67% of this $1.50 increase is going to operating expenses, then in 1996, rather than pay $365,000 in debt service, it leaves $613,000 in debt service. At that time probably 60% of the money is going to debt service as opposed to 33%. Are they going to be able to effectively lower operating expenses substantially by 1996, so that this $1.50 continues to cover the costs? Mr. Massengale stated Council would probably have an opportunity to consider this at that time because they are going to be peaking on the debt service in the next few years and the rate would be going up to meet that debt service. After that it starts falling off. If operating expenses have not gone up, he thinks they could have an opportunity at that time to adjust the rate if the rate is more than necessary. Mr. Massengale stated he also knew when they did the five-year maturity on the 1986 CO's that they would have a drop off in rate if they didn't do anything else at the end of five years, but all the additional requirements came up. Councilman Carpenter stated they all know it's peaking and it may come down. But they're also looking at another $26-30 million financing need depending on the State and what they do. They are not looking at any costs to come down and he doesn't want to give any false impressions that it will come down, because the way he looks at it, it's only going to go up. Councilman Maloy said his fear is that they may not be increasing it right now sufficiently to build a cover because if they're having to pay 67% of the increase for operating expenses and that number will be forced to be reduced 35-40%. If it does not increase much more than that, he asked where the rest of the money would come from. Mr. Massengale said that theoretically the 67% could still be applied to operations because there's other cash that will be available from decreasing debt service on prior issues. Councilman Carpenter said his question is after the $1.50 goes into effect there probably is not enough to service the increased debt. They know they're going to have the additional expense coming up. Would it not be better to gradually increase some of the rates and build a reserve that they could be drawing interest on, instead of paying later when the next project comes up, level out the rate increases and have a reserve on hand which would not be tapped for anything except for this next project which is already on the board. Mr. Massengale agreed, and said their objective in designing the rate has been to keep it at strictly what was needed and when they needed it. July 14, 1988 461 Councilman Carpenter said he meant that Staff knows that they're going t❑ go up $4 or $5. He did not think the citizens of Lubbock would appreciate knowing that rate increases were going for interest when they could have maybe gone with $2-$2.50 and built part of it up in a reserve. Mr. Cunningham stated that to raise the amount that is needed to do the capital projects in the high period, the rate would have to be tripled or quadrupled. Mr. Massengale stated they could do a number of variations and that he would agree that if the big rate up front could be feasible with all customers, then that's financially better. Councilman Carpenter stated that if they had three years head start on it at a reasonable rate, then they could maybe avoid that high peak. If they had already pre -collected and had that in reserve when the next phase of projects comes on, instead of going up $4 or $5, they might be able to hold it to the $2 or $3 range. Mr. Massengale said the rate could be raised more now and possibly peak at less. Councilman Carpenter went on to say that once it peaks and the debt service on a 12-year refinancing begins to come off, then they would begin to pick up some additional leverage from the fact that some of the bonds will have been matured. He just couldn't see them all of a sudden hitting everyone with such an exorbitant increase. Mayor Pro Tem Baker stated her opinion that the main thing Council was looking at when they issued the 1986 CD's for five years was a short term pay -back so they wouldn't have to have an exorbitant interest cost. Now they're extending through the refinancing to 12 years. This is more than doubling the original maturity. Touching on what Councilman Carpenter and Councilman Maloy said, Ms. Baker stated it seems they are raising the rate because there is a need for operating money in which case she definitely thinks they ought t❑ look to increase the sewer charge to maybe $1.50. They should be financing the operating expenses in this manner. Councilman Maloy asked if the $1.50 raises them to $6.50. Mr. Massengale replied that it depends and gave the following example: at 6,000 gallons it would be $6.34 at a minimum. Councilman Malay asked if in 4 or 5 years that number would go to $13-$14. Mr. Massengale replied that assuming they don't get any more requirements from the EPA, it would go to $10 or so. Councilman Maloy said he understands Staff does not know in advance and expanded on Councilman Carpenter's comments that rather than go up $1.50 now and leave it stable, instead, get it up to where it ought to be now, and then during the years when money is not needed, keep it in some form of reserve. He stated he wants to make sure it is an isolated reserve and set aside. Mr. Massengale stated they did something similar in the water fund and put the money in a rate stabilization fund. Councilman Carpenter stated, instead of paying such a high rate of interest to whomever buys the bonds, he would not set the rate at 75¢ and 75�, he'd put it at $1.50 and $1.50. Staff will have to know what would be feasible and then have it on hand, or at least have a portion of it and have a rate structure 462 July 14, 1988 already built in to pay the bonds. They know they'll have to sell the bonds for the other big projects and they'll never have that kind of reserve, but it would be better management to accumulate funds for those projects. Mayor Pro Tem Baker made a suggestion that after the vote and maybe at the next Council meeting, they appoint a temporary tax advisory committee to look at how Council should finance the additional improvements or requirements at the sewer farm. They should look at the list of capital needs and the overall debt of the city and make a recommendation to the Council as to how the sewer farm improvements or requirements should be financed. They should take a look at how much debt Lubbock can afford and in addition, they should set up some guidelines for issuance of certificates of obligation so council can have something to rely on. She thinks a committee should be made up of bankers and business people, not 100% bankers, but people in the business community who understand financing who would make the best recommendation to Council as to how Lubbock and council can meet financial needs. Mayor McMinn agreed and stated this has been discussed before and if it was the consensus of Council they would appoint such a committee. Councilman Carpenter asked Mr. Massengale if it would be proper to pass the bond resolution without setting the rate until such time as Staff has determined a rate which would keep it from peaking out. Mayor Pro Tem Baker suggested Council approve the 75� increase for August and hold off on the other rate increase or come back later and amend the ordinance if the figures prove this is needed. Motion was made by Councilman Carpenter to approve Ordinance #9212 with the 75¢ rate increase to be in effect August 1, and instructed Staff to come back to Council with a proper recommendation to keep the rate from peaking out when the additional bonds are sold. Council will act on it at that time and in the mean time the first 75� increase will go into effect. Instead of having the second 75� increase, they will take up whatever rate should be applicable at that time. Mayor Pro Tem Baker said they would need the input from the committee if it is appointed before the additional increase is set. Councilman Carpenter requested Staff to come back with new numbers prior to setting the next rate increase. The motion was seconded by Councilman Maloy. Motion carried; 6 Yeas; 0 Nays. 88-47B-462-440 (17„) Consider Resolution #2880 authorizing publication of Notice of Intention to issue Certificates of Obligation. RESOLUTION #2880 A RESOLUTION APPROVING AND AUTHORIZING PUBLICATION OF NOTICE OF INTENTION TO ISSUE CERTIFICATES OF OBLIGATION. July 14, 1988 463 WHEREAS, the City Council of the City of Lubbock, Texas, has determined that certificates of obligation should be issued under and pursuant to the provisions of Subchapter C of Chapter 271, Local Government Code, for the purpose of providing funds for the payment of contractual obligations incurred with respect to (i) the purchase of (a) additional land for authorized needs and purposes, to wit: a sewer farm and (b) the expansion and upgrading of the land - application site (including the construction of new irrigation systems and piping on existing and newly acquired land, construction of a terminal storage reservoir, and other construction and improvement in connection therewith) and (ii) professional services; and WHEREAS, prior to the issuance of such certificates, the City Councl is required to publish notice of its intention to issue the same in a newspaper of general circulation in the City, said notice stating (i) the time and place the Council tentatively proposes to pass the ordinance authorizing the issuance of the certificates, (ii) the maximum amount proposed to be issued, (iii) the purposes for which the certificates are to be issued and (iv) the manner in which the Council proposes to pay the certificates; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK, TEXAS: SECTION 1: That the City Secretary is hereby authorized and directed to cause notice to be published of the Council's intention to -issue certificates of obligation in the principal amount not to exceed $5,000,000 for the purpose of providing funds for the payment of contractual obligations incurred with respect to (i) the purchase of (a) additional land for authorized needs and purposes, to wit: a sewer farm and (b) the expansion and upgrading of the land - application site (including the construction of new irrigation systems and piping on existing and newly acquired land, construction of a terminal storage reservoir, and other construction and improvement in connection therewith) and (ii) professional services, such certificates to be payable from ad valorem taxes and a subordinate lien on and pledge of the net revenues of the City's Sewer System. The notice hereby approved and authorized to be published shall read substantially in the form and content of Exhibit A hereto attached and incorporated herein by reference as a part of this resolution for all purposes. SECTION 2: That the City Secretary shall cause the aforesaid notice to be published in a newspaper of general circulation in the City, once a week for two consecutive weeks, the date of the first publication to be before the fourteenth day before the date stated therein for the first reading of the ordinance authorizing the issuance of the certificates of obligation. PASSED AND APPROVED ON FIRST READING, THIS 14TH DAY OF JULY, 1988. PASSED AND APPROVED ON SECOND AND FINAL READING, THIS 28TH DAY OF JULY, 1988. /s/ B. C. McMinn B. C. McMINN, MAYOR ATTE-ST: LsL Ranette Boyd Ranette Boyd, City Secretary Lubbock, Texas (City Seal) 464 July 14, 1988 This is the first step in the process of issuing the $5,000,000 Combination Tax and Subordinate Lien Revenue Certificates of Obligation. The second reading will be during the July 28th Council meeting. The Notice will be published Sunday, July 31, 1988 and Sunday, August 7, 1988. The first reading of the Ordinances to award the refunding bonds and Certificates of Obligation will be at the regular Council meeting held August 25, 1988 and second reading will be during a special meeting held on August 26, 1988. Staff is proceeding with the combination of re- funding of the 1986 Certificates of Obligation and the issuance of $5,000,000 Combination Tax and Sewer System Subordinate Lien Revenue Certificates of Obligation. The proceeds of the refunding bonds will be used to refund $2,700,000 outstanding Certificates of Obligation, Series 1986. The refunding will enable the City to more efficiently provide for the Wastewater Treatment and Effluent Disposal Improvement Program over the period 1988-1991. The refunding will provide for lower debt service payments in 1989, 1990 and 1991 by stretching the term to extend the debt service obligations into years 1992 through 2000. The proceeds from the 1988 Certificates of Obligation will be used to fund the first phase of a major Wastewater Treatment and Effluent Disposal Improvement and Construction Program by initiating the upgrading and expansion of the City's Sewage Effluent Land Application Site located adjacent to the City on the southeast. Upgrading and expansion of the Site, including purchase of 977 acres of land now under Lease - Purchase Agreements, construction of a terminal storage reservoir, replacement of existing irrigation systems and piping on the City -owned 3,975 acres, and the construction of irrigation systems and piping an the 977 acres to be purchased, will permit the City to comply with requirements for effluent disposal of the Texas Water Commission. Financing alternatives currently being investigated include the issuance ❑f additional Sewer System Improvement General Obligation Debt (voted general obligation bonds or additional certificates of obligation) and the feasibility of applying for low interest loans (currently 4%) from the Texas Water Development Board's State Revolving Fund. There are two options for handling the refunding of the 1986 Certificates of Obligation and the issuance of the $5,000,000 Combination Tax and Sewer System Certificates of Obligation: One option is to refund the 1986 CO's and provide the private placement for these funds, which is the normal method of refunding any issue, and then to take bids for the $5,O00.000 in new CO's for the storage reservoir; the second option is to combine both the refunding and the sale of the $5,000,000 into one negotiated sale. The City's bond attorneys, financial advisors, and City finance Staff recommended the combining of both the refunding and the 55,000,000 sale into one negotiated sale. July 14, 1988 465 The proposed financing is unique in that it combines an advanced refunding with a new issue, and for that reason, Staff is able to negotiate the rates rather than advertise for public bids. Industry experience indicates that better rates are received on negotiated issues. Since the rating agencies have recently been updated on the City of Lubbock, Staff requested a rating without conferences in New York. The underwriters being recommended by First Southwest Company, the City's financial advisors, to handle the refunding and sale are Thomson McKinnon Securities, Inc., Lead Underwriter, and Dean Witter Reynolds, Inc. These two were selected after evaluation of the following criteria: 1. Retail sales base available 2. Expertise in this type of sale 3. Local presence in the community Therefore, Staff recommended proceeding with the refunding and sale with Thomson McKinnon Securities, Inc. and Dean Witter Reynolds, Inc. as underwriters. Consensus of Council is all that Staff needs at this point to proceed. The final financing will be presented to the Council on August 25, 1988. Motion was made by Councilman Maloy, seconded by Councilman Patterson to authorize Resolution #2880 on first reading as recommended by Staff. Motion carried: 6 Yeas; 0 Nays. 88-47B-465-441 (18.) BID #9820--Fire hose Fire Department). Daco Fire Safety Equipment--4,500' 5" fire hose; 1,000' 2-1/2" fire hose; 2,500' 1-3/4" fire hose. Motion was made by Councilman Phillips, seconded by Councilman Patterson to accept low bid meeting specifications. Motion carried: 6 Yeas; 0 Nays. 88-47B-465-442 (19.) BID #9826--Tensioner„(Garage). TSE Pengo International, Shreveport, LA--1 wire tensioner. Motion was made by Councilman Phillips, seconded by Councilman Patterson to accept low bid meeting specifications. Motion carried: 6 Yeas; 0 Nays. 88-47B-465-443 (20.,) BID #9829--Traffic signal equipment (Traffic Engineering). Consolidated Traffic Controls, Arlington--4 Astro-Brat AB-102; 5 5-section programmable traffic signal head. Traffic Signal Control, Inc., Longmont, CA-4 Astro-Giac AB-103 w/tube extension; 4 Astro-Brae AB-110. 466 duly 14, 1988 Traffic Parts, Spring--12 3-section traffic signal head. Reid Sales Agency--2 Type A pole, 40' mast arm; 1 Type A pole, 25' mast arm. Motion was made by Councilman Phillips, seconded by Councilman Patterson to accept low bids meeting specifications. Motion carried: 6 Yeas; 0 Nays. 88-47B-466-444 (21.; BID #9831--Copper conductor_- 500 MCM, 15,000 volts (Central Warehouse). Fields & Company--112,500' 500 MCM; 23,600 lbs 4/0 S.D. bare copper. Motion was made by Councilman Phillips, seconded by Councilman Patterson to accept low bid meeting specifications. Motion carried: 6 Yeas; 0 Nays. 88-47B-469V-445 (22.1 BID #9839--Electrical connectors - 15KV (Central Warehouse). Nelson Electric Supply--86 500 MCM pothead. Cummins Supply, Amarillo--150 4/0 elbow. Elastimold, Dallas--75 Bushing extension; 75 reducing tap well; 50 load break bushing; 200 600A elbow; 250 600A cable adapter; 60 600A deadend plug; 300 600A ground device; 260 600A insulating plug; 340 1/0 elbow; 300 500 MCM crimp connector; 100 600A connector plug. Motion was made by Councilman Phillips, seconded by Councilman Patterson to accept low bids meeting specifications. Motion carried: 6 Yeas; 0 Nays. 88-47B-466-446 (23.) BID #9840--Electrical conduit (Central_ Warehouse). Temple, Inc.--400 5" 3-way spacer; 350 5" 3-way spacer base; 150 5" 3-way conduit spacer cap. General Electric Supply Co.--50,000' 5" PVC conduit. Motion was made by Councilman Phillips, seconded by Councilman Patterson to accept low bids meeting specifications. Motion carried: 6 Yeas; 0 Nays. 88-47B-466-447 (24.) BID #9841--Vacuum switches (Electric Distribution). Temple, Inc.--8 vacuum switch, 3-way, 3-switched; 3 vacuum switch, 4-way, 4-switched. July 14, 1988 467 Motion was made by Councilman Phillips, seconded by Councilman Patterson to accept low bid meeting specifications. Motion carried: 6 Yeas; 0 Nays. 88-47B-467-448 (25.) BID #9808--Yearlyricing on pharmaceuticals Health Departmentj_ Mission Pharacal Co., San Antonio--840 bl. prenatal multivitamin w/folic acid, iron. Goldline Laboratories, Ft. Lauderdale, FL--50 bl. Gamma Globulin; 200 bl. Metronidazole; 600 bl. Pyrinyl liquid, pediculcide; 100 bl. Lindane USP 1% shampoo; 50 bl. Lindane USP 1% lotion. Ortho Pharmaceutical, Raritan, NJ--50 Contraceptive diaphragm, coil ❑r arching; 60 diaphragm jelly, 126GM tube; 3,000 contraceptive foam w/applicator, 20GM; 360 Miconazole nitrate tube w/applicator; 240 Miconazole nitrate, dual- pak; 50 cs. Ortho-Novum 7/7/7; 5 cs. Ortho-Novum 10/11; 10 cs. Ortho-Novum 1/35; 5 cs. Ortho-Novum 1/50. Care Pharmaceutical, Monsey, NY--90 bl. Erythromycin base filmtab; 30 bl. Erythromycin base or Stearate. Lederle Laboratories, Wayne, NJ--10 bl. Tuberculin, purified protein deriv.; 6 bl. penicillin v potassium, 250 mg; 15 bl. penicillin v potassium, 500 mg. Rugby Laboratories, Westburg, NY--240 Sulfa vaginal cream w/applicator. Baxter Healthcare--10 bx. pregnancy test. Barrett, Inc., Charlotte, NC--40 cs. condom w/reservoir end. Motion was made by Councilman Phillips, seconded by Councilman Patterson to accept low bids meeting specifications. Motion carried: 6 Yeas; 0 Nays. 88-47B-467-449 (26.) BID #9768--Temporary Employee Service (Personnel Departments. Boren Services --Cashier, Intermediate Clerk Typist, Intermediate Clerk, Clerk Typist; Clerk, Construction & Maintenance I; Grounds Maintenance Worker; Food Service Assistant. Motion was made by Councilman Phillips, seconded by Councilman Patterson to accept low bid meeting specifications. Motion carried: 6 Yeas; 0 Nays. 88-47B-467-450 (27.) Consider three appointments to the Citizens Traffic Commission. The terms ❑f Alan Hatch, Rita Wallace, and Harold Chatman expire on July 13, 1988. � f i July 14, 1988 88-47B-468-451 (28.) 88-47B-468-452 (29.) 88-47B-468-453 (3d.) 88-47B-468-454 (16,) Motion was made by Councilman Phillips, seconded by Councilman Patterson reappointing Alan Hatch, Rita Wallace, and Harold Chatman on the Citizens Traffic Commission. Motion carried: 6 Yeas; d Nays. July 24, 1988. Motion was made by Councilman Phillips, seconded by Councilman Maloy to reappoint 8. C. McMinn and appointing Douglas Sanford to replace Marion Sanford on the Lubbock Industrial Development Corporation. Motion carried: 6 Yeas; d Nays. Motion was made by Councilman Phillips, seconded by Councilman Patterson to appoint Greg Sherwood to replace Pete Ragus on the Lubbock Athletic Committee. Motion carried: 6 Yeas; 0 Nays. Consider one appointment to the Transportation Temporary Advisory Committee. (Joe McKay_ declined appointment.)_ Motion was made by Councilman Phillips, seconded by Councilman Patterson to appoint Roy Roberts to replace Joe McKay on the Transportation Temporary Advisory Committee. Motion carried: 6 Yeas; d Nays. Hold an Executive Session to discuss pending litigation --Water Utilities. July 14, 1988 469 There being no further business to come before Council, motion was made by Councilman Phillips, seconded by Councilman Maloy to adjourn the meeting at 11:55 a.m. Motion carried: 6 Yeas; 0 Nays. B. C. MCMINN, MAYOR ATTEST: Ran tte Boyd, City Secretary READ AND APPROVED THIS 21'th DAY OF JULY, 1988. t/7 C - h/ 2" e, �4 B. C. McM N , MAYOR ATTEST: ette Boyd, City Sec tar —