HomeMy WebLinkAboutMinutes - City Council - Regular - 6/26/2007CITY OF LUBBOCK
REGULAR CITY COUNCIL MEETING
JUNE 26, 2007
7:30 A. M.
The City Council of the City of Lubbock, Texas met in regular session on the 26th
day of June, 2007, in the City Council Chambers, first floor, City Hall, 1625 13th
Street, Lubbock, Texas at 7:30 A. M.
7:30 A.M. CITY COUNCIL CONVENED
City Council Cham6ers,1625 13th Street, Lubbock, Texas
Present: Mayor David A. lO�Iiller, Mayor Pro Tem Jim Gilbreath, Council
Member Linda DeLeon, Council Member Phyllis Jones, Council
Member Todd R. Klein, Council Member John Leonard, Council
Member Floyd Price
Absent: No one
1. CITIZEN COMMENTS
1.1. Burley Owen will appear before City Council to discuss the City's budget
and red light cameras.
Burley Owen appeared before Council and shared his reasons for opposing the
red light cameras. He also asked Council to withdraw their support of the
cameras.
• John F. Brown and Jim Watters spoke to Council in favor of red light cameras.
Mikel Ward, Rick Bennett, and Leta Reeves addressed Council in opposition to
the red light cameras.
• Charles Joplin addressed Council in opposition of the proposed name change of
Canyon Lakes Drive to Cesar E. Chavez Drive. Robert Narvaiz, Jaime Garcia,
and Julia Carrillo spoke in favor of the proposed name change.
• John Smothers and Johnny Rogers shared their concerns with Council
regarding the current waters restrictions.
2. EXECUTIVE SESSION
Mayor Miller stated: "City Council will hold an Executive Session today for the
purpose of consulting with the City Staff with respect to pending or contemplated
litigation; the purchase, exchange, lease, or value of real property; personnel
matters; and competitive matters of the public power utility, as provided by
Subchapter p of Chapter 551 of the Government Code, the Open Meetings Law."
8:05 A. M. CITY COUNCIL RECESSED TO EXECUTNE SESSION
City Council Conference Room
All council members were present.
2.1. I3old an executive session in accordance with V.T.C.A. Government Code,
Section 551.071, to discuss pending or contemplated litigation or settlement
agreement, and hold a consultation with attorney (Water Utilities, City
'� Council Staff, Finance, Traffie Engineering, Storm Water, City Secretary,
consultation with attorney regarding V.T.C.A. Government Code, Chapter
551).
2.2. Hold an executive session in accordance with V.T.C.A. Government Code,
Section 551.072, to deliberate the purchase, exchange, lease, or value of
real property (Right-of-Way, Information Technology, Solid Waste, Water
Utilities).
2.3. Hold an executive session in accordance with V.T.C.A. Government Code,
Section 551.074 (a)(1), to discuss personnel matters (City Attorney, City
�"� � 3
Regular City Council Meeting
June 26, 2007
Manager, City Secretary, City Council Chief of Staf� and take
appropriate action.
2.4. Hold an executive session in accordance with V.T.C.A. Government Code,
Section 551.086, on the following competitive matters (Electric Utilities):
2.4.1 to deliberate, vote and take fmal action on electric rates of Lubbock
Power and Light;
2.4.2 to discuss, vote and take final action on a competitive matter
regarding operation, financial and capital statements and budgets,
revenue and expense projections, strategic and business plans and
studies of Lubbock Power and Light;
2.4.3 to discuss and deliberate a competitive matter regarding the
strategies, goals, funding and strategic purpose of the City of
Lubbock's relationship with and membership in the West Texas
Municipal Power Agency.
2.5. Hold an executive session in accordance with V.T.C.A. Government Code,
Section 551.074(a)(1), to discuss personnel matters regarding duNes,
responsibilities, and/or appointments to the Building Board of Appeals, the
Junked Vehicle Compliance Board, and the Permit & License Appeal
Board.
9:50 A.M. CITY COUNCIL REGULAR MEETING RECONVENED
City Council Chambers
Present: Mayor David A. Miller; Mayor Pro Tem Jim Gilbreath; Council
Member Linda DeLeon; Council Member Phyllis Jones; Council
Member Todd R. Klein; Council Member John Leonard; Council
Member Floyd Price; Lee Ann Dumbauld, City Manager; Anita
Burgess, City Attorney; and Rebecca Garza, City Secretary
Absent: No one
Mayor Miller reconvened the meeting at 9:50 a. m.
3. PROCLAMATIONS AND PRESENTATIONS
3.1. Invocation by Pastor pon Jackson, South Plains Christian Fellowship.
3.2. Pledge of Allegiance to the Flags.
Pledge of Allegiance was given in unison by those in the City Council
Chambers to both the United States flag and the Texas flag.
3.3. Presentation from Clifton Wilkinson, Event Chairman for the 2007 "4th
on Broadway" celebration.
Clifton Wilkinson, Event Chairman for the 2007 4th on Broadway celebration,
and Steering Committee members Tracy Bacon, Brandy Headley, and Gary
Mitchell presented Council with a formal invitation to the "4th on Broadway"
festivities. Blair Elbert, one of the "Cactus Cuties", sang the invitation to
Council.
4. CONSENT AGNEDA Items were addressed following Item 5.18.
5. REGULAR AGENDA
5.18. Appointment ConfirmaHon ResoluNon - City Manager: Resolution No.
2007-R0255 confirming the appointment of Rhea Cooper as Fire Chief of
the City of Lubbock.
���
Regular City Council Meeting
June 26, 2007
RESOLUTION NO. 2007-R0255
WHEREAS, Section 143.013 of the Texas Local Government Code requires
appointment of the head of a civil service department of a municipality to be made by the
municipality's chief executive and confirmed by the municipality's governing body; and
WHEREAS, Steve Hailey, Fire Chief of the City of Lubbock Fire Department
retired January 5, 2007 from the City of Lubbock Fire Department; and
WHEREAS, the City Manager of the City of Lubbock appointed on an interim
�" basis as fire chief for the City of Lubbock Deputy Chief Rhea Cooper to fill the vacancy
created by the retirement of Chief Steve Hailey; and
WHEREAS, Rhea Cooper meets all of the qualifications to hold the position of fire
chief as outlined in Section 143.013 of the Texas Local Government Code and has done an
admirable job on an interim basis serving as fire chief for the City of Lubbock; and
WHEREAS, the City Manager appointed Rhea Cooper as fire chief for the City of
Lubbock effective June 22, 2007 at an annual salary of $120,001.40; and NOW
THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock hereby confirms the appointment of
Rhea Cooper as fire chief of the City of Lubbock at an annual salary of $120,001.40.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
1sf Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ LeeAnn Dumbauld
Lee Ann Dumbauld, City Manager
APPROVED AS TO FORM:
1 sf Anita Bur�ess _ _
Anita Burgess, City Attorney
Section 143.013 of the Local Government Code requires appointment of the
head of a civil servic� department of a municipality to be made by the
municipality's chief executive and confirmed by the municipality's governing
body.
The City Manager of the City of Lubbock has appointed a Fire Chief for the
City of Lubbock to fill the vacancy created by the retirement of Chief Steve
Hailey.
Rhea Cooper has served in the Lubbock Fire Department for more than 28
years. He began his career as a fire fighter in July 1978 before rising through
the ranks to become deputy chief of operations in 1996. Chief Cooper was
�- serving in that position when he was named Interim Fire Chief in December
2006. Chief Cooper received a Bachelor of Science in Occupational
Education/Fire Science in 1998 from Wayland Baptist University. He has
extensive educational experience from the National Fire Academy in
Emmitsburg, Maryland, including completion of the four-yeaz long Executive
Fire Program. Chief Cooper has received numerous professional certifications,
including Chief Fire Officer for the Center for Public Safety Excellence in
Chantilly, Virginia; Fire Service Instructor III Master; and Master Fire Fighter
from the Texas Commission on Fire Protection. Chief Cooper was awarded the
Medal of Valor after +he Wylie Propane Plant Fire in February 2006. Once
�w5
Regular City Council Meeting
June 26, 2007
confirmed by City Council, Rhea Cooper will be the sixth Fire Chief in
Lubbock's history.
FISCAL IMPACT
Rhea Cooper's annual salary will be $120,000.
Those in Council Chambers applauded newly appointed Fire Chief Rhea
Cooper.
Motion was made by Council Member DeLeon, seconded by Council Member
Price to pass Resolution No. 2007-R0255 as recommended by staff. Motion
carried: 7 Ayes, 0 Nays.
4. CONSENT AGENDA (Items 4.1-4.40)
Motion was made by Mayor Pro Tem Gilbreath, seconded by Council Member Price to
approve Items 4.1-4.40 on consent agenda as recommended by staff. Motion carried:
7 Ayes, 0 Nays.
4.1. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0256 authorizing approval and any changes of the
proposal for the Citibus Paratransit Program to the U.S. Department of
Housing and Urban Development under the Community Development
Block Grant Program to offset expenses associated with providing
Paratransit services for low to moderate income or handicapped
individuals.
RESOLUTION NO. 2007-R0256
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the Citibus Paratransit Program from the
Community Development Block Grant (CDBG) Program, and all related docuxnents. Said
proposal is attached hereto and incorporated in this resolution as if fully set forth herein and shall
be included in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 200 �
/s/ L �:rid A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerteon, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: Citibus
Program: Paratransit Program
Funding Source: 2007 Community Develorrnent Block Grant
Use of Funds: Funds will be used to offset expenses associated with providing
Paratransit services for low to modera+e income, handicapped individuals.
Amount: $200,000
Period of Performance: October 1, 2007, to September 30, 2008
��J
Regular City Council Meeting
June 26, 2007
A public hearing was heia on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 20(17-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $200,000.
Staff recommended approval of this resolution.
4.2. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0257 authorizing approval and any changes of the
proposal for the Lubbock Boys and Girls Club Summer Program to the
U.S. Department of I3ousing and Urban Development under the
Community Development Block Grant Program to provide children with a
safe and positive environment during the summer.
RESOLUTION NO. 2007-R0257
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the Lubbock Boys & Girls Clubs
Summer Program from the Community Development Block Grant (CDBG) Program, and all
related documents. Said proposal is attached hereto and incorporated in this resolution as if fully
set forth herein and shall be includecl in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
�--
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: Boys and rirls Club
/s/ David A. Miller
DAVID A. MILLER, MAYOR
Program: Summer Program
Funding Source: 2007 Community Development Block Grant
Use of Funds: Funds will be used to provide a safe and positive environment
'�' for children during the summer.
Amount: $14,700
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations aze provided in
the agenda backup.
���
Regular City Council Meeting
June 26, 2007
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this progr�� is $14,700.
Staff recommended approval of this resolution.
4.3. Grant Funding Recommendation I��so�ution - Community Development:
Resolution No. 2007-R0258 authorizing a,pproval and any changes of the
proposal for the CommuniNes in Schools Path to Expansion Program to
the U.S. Department of Housing and Urban Development under the
Community Development Block Grant Program to provide dropout
prevention and intervention services for low to moderate income youth at
risk.
RESOLUTION NO. 2007-R0258
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Parks Department
Summer Satellite Program from the Community Development Block Grant (CDBG) Program, and
all related documents. Said proposal is attached hereto and incorporated in this resolution as if
fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: Communities in Schools
Program: Path to Expansion
Funding Source: 2007 Community Development Block Grant
Use of Funds: Funds will be used to provide dropout prevention and
intervention services for children from low to moderate income households.
Amount: $11,830
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2G07, for consideration of the
Community Development Services �S�ard recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Inveshnent Partnership (HOME), Emergency Shelter Crrant (ESG), and
previously generated program income. The recornmendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $11,830.
Staff recommended approval of this resolution
Regular City Council Meeting
June 26, 2007
4.4. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0259 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development Housing
Barrier Free Program to the U.S. Department of Housing and Urban
Development under the Community Development Block Grant Program to
provide handicapped accessibility for disabled individuals or low to
moderate income hou�eholds.
RESJLUTION NO. 2007-R0259
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development Housing Barrier Free Program from the Community Development Block Grant
(CDBG) Program, and all related documents. Said proposal is attached hereto and incorporated in
this resolution as if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�` day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton. Jr.
Bill Howerton, Jr.
Community Development Director
r-�
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: City of Lubbock Community Development Housing
Program: Barrier Free
Funding Source: 2007 Community Development Block Grant
Use of Funds: Funds will be used to provide handicapped accessibility for
disabled individuals or low to moderate income households.
Amount: $125,000
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal fi.�ncs from the Community Development Block Grant.
The maximum to be allocated to this program is $125,000.
Staff recommende� apprnval of this resolution.
���
Regular City Council Meeting
June 26, 2007
4.5. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0260 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development 108 Loan
Payment Program to the U.S. Department of Housing and Urban
Development under the Community Development Block Grant Program to
repay Department of Housing and Urban Development for the 108 Loan
Program.
RESOLUTION NO. 2007-R0260
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development 108 Loan Payment Program from the Community Development Block Grant
(CDBG) Program, and all related documents. Said proposal is attached hereto and incorporated in
this resolution as if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David H. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton. Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: COL Community Development
Program: 108 Loan Payment
Funding Source: 2007 Community Development Block Grant
Use of Funds: Funds will be used to repay Department of Housing and Urban
Development for the 108 Loan Program.
Amount: $150,000
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $150,000.
Staff recommended approval of this resolution.
���
Regular City Council Meeting
June 26, 2007
4.6. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0261 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development Street Paving
East Lubbock Project to the U.S. Department of Housing and Urban
Development under the Community Development Block Grant Program to
pay for the development and street paving for East Lubbock.
RESOLUTION NO. 2007-R0261
�,,,,, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
i THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development Street Paving East Lubbock Project from the Community Development Block Grant
(CDBG) Program, and all related documents. Said proposal is attached hereto and incorporated in
this resolution as if fully set forth rerein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�' da� cf June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
� APPROVED AS TO FORM:
r--
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: City of Lubbock Community Development
Program: Street Paving East Lubbock
Funding Source: 2007 Cc mr.luuty Development Block Grant
Use of Funds: Funds will be used to pay for development and street paving for
East Lubbock
Amount: $150,000
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investrnent Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this project is $150,000.
Staff recommended approval of this resolution.
4.7. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-0262 authorizing approval and any changes of the
proposal for the WorkSource Direct Childcare Assistance Program to the
U.S. Department of I3ousing and Urban Development under the
Community DevelopuJent Block Grant Program to provide direct
childcare services for chilciri;n from low to moderate income households.
Regular City Council Meeting
June 26, 2007
RESOLUTION NO. 2007-R0262
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the WorkSource Direct Child Care
Assistance Program from the Community Development Block Grant (CDBG) Program, and all
related documents. Said proposal is attached hereto and incorporated in this resolution as if fully
set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26th day of June, 2007.
/s/ David �. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton. Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ AmYSims
Amy Sims, Assistant City Attorney
Grantee: WorkSource
Program: Direct Child Care Assistance
Funding Source: 2007 Community Development Block Grant
Use of Funds: Funds will be used to provide direct childcare services for
children from low to moderate income hous�l�olds.
Amount: $23,515
Period of Performance: October 1, 201;7, tc September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $23,515.
Staff recommended approval of this resolution.
4.8. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0263 authorizing approval and any changes of the
proposal for the YWCA Challenger Ed Program to the U.S. Department of
Housing and Urban Development under the Community Development
Block Grant Program to provide education and recreation for emotionally
disturbed children from low to moderate income households.
RESOLUTION NO. 2007-R0263
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City �f Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal f�r the YWCA Challenger Ed Program from
the Community Development Block Grant (CDBG) Program, and all related documents. Said
�
5��
Regular City Council Meeting
June 26, 2007
proposal is attached hereto an� incorporated in this resolution as if fully set forth herein and shall
be included in the minutes of the City Council.
Passed by the City Council this 26`� day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
� /s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: YWCA
Program: Challenger Ed
Funding Source: 2007 Community Development Block Grant
Use of Funds: Funds will be used to provide education and recreation for
emotionally disturbed children from low to moderate income households.
Amount: $18,780
�
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-2008 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $18,780.
Staff recommended approval of this resolution.
4.9. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R�264 authorizing approval and any changes of the
proposal for the YWCA Childcare Services Program to the U.S.
Department of Iiousing and Urban Development under the Community
Development Bloek �Grant Program to provide childcare fee assistance
from low to moderate income eligible households.
RESOLUTION NO. 2007-R0264
Ir' BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the YWCA Child Care Services Program
from the Community Development Block Grant (CDBG) Program, and all related documents.
Said proposal is attached hereto and incorporated in this resolution as if fully set forth herein and
shall be included in the minutes of the City Council.
Passed by the City Council this 26`� day of June, 2007.
5�3
Regular City Council Meeting
June 26, 2007
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: YWCA
Program: Childcare Services
Funding Source: 2007 Community Development Block Grant
Use of Funds: Funds will be used to provide childcare fee assistance for low to
moderate income eligible households.
Amount: $48,080
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-2008 Commi.a::ty !�evelopment Block Grant (CDBG),
Home Investment Partnership (HOME), Err...�rgency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $48,080.
Staff recommended approval of this resolution.
4.10. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0265 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development Housing
Emergency Repair Program to the U.S. Department of Housing and Urban
Development under the Community Development Block Grant Program to
provide low to moderate income households with housing repairs that are
of an emergency nature.
RESOLUTION NO. 2007-R0265
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Li�?�bock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development Housing Emergency Repair Program from the Community Development Block
Grant (CDBG) Program, and all related docun��n:�?. Said proposal is attached hereto and
incorporated in this resolution as if fully set forth here:n and shall be included in the minutes of
the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
n
5�1�,
Regular City Council Meeting
June 26, 2007
AT'TEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
,.... Bill Howerton, Jr.
, Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: City of Lubbock Community Development Housing
Program: Emergency Repair
Funding Source: 2007 Community Development Block Grant
Use of Funds: Funds will be used to provide for low to moderate income
households with housing repairs that are of an emergency nature.
Amount: $175,000
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated pr��gram income. The recommendations are provided in
''� the agenda backup.
�
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $175,000.
Staff recommended approval of this resolution.
4.11. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0266 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development Housing Home
Exterior Energy Efficiency Loan Program to the U.S. Department of
Housing and Urban Development under the Community Development
Block Grant Program to provide exterior and energy efficient
improvements to homes for low to moderate income homeowners.
RESOLUTION NO. 2007-R0266
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development Home Exterior Energy Efficiency Loan Program (HEEELP) from the Community
Development Block Grant (CDBG) Program, and all related documents. Said proposal is attached
hereto and incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 26`� day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
5�5
Regular City Council Meeting
June 26, 2007
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: City of Lubbock Community Development Housing
Program: HEEELP
Funding Source: 2007 Community Deveiopment Block Grant
Use of Funds: Funds will be used to provide exterior and energy efficient
improvements to homes of low to moderate income homeowners.
Amount: $200,000
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $200,000.
Staff recommended approval of this resolution.
4.12. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0267 authorizing approval and any changes of the
proposal for the City of Lubbock Police Department Code Administration
Section Property Maintenance Inspection Program to the U.S. Department
of Housing and Urban Development under the Community Development
Block Grant Program to provide inspection of residential and commercial
substandard structures to facilitate repair or removal.
RESOLUTION NO. 20�7-R0267
BE IT RESOLVED BY THE CITY COUNCIL OF T�iE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Police Departrnent
Code Administration Section Property Maintenance Inspection Program from the Community
Development Block Grant (CDBG) Program, and all related documents. Said proposal is attached
hereto and incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLEIZ, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
Regular City Council Meeting
June 26, 2007
APPROVED AS TO CONTENT:
/s/ Bill Howerton. Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
�.... /s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: City of Lubbock Code Administration
Program: Property Maintenance Inspection
Funding Source: 2007 Co� :z�nity Development Block Grant
Use of Funds: Funds will be used to provide for inspection of residential and
commercial substandarc�. �tructures to facilitate repair or removal.
Amount: $213,793
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $213,793.
r•-�
Staff recommended approval of this resolution.
4.13. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0268 authorizing approval and any c6anges of the
proposal for the City of Lubbock Community Development Housing Direct
Delivery Field Services Program to the U.S. Department of Housing and
Urban Development irnder the Community Development Block Grant
Program to provide salaries of field services staff.
RESOLUTION NO. 2007-R0268
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development Housing Direct Delivery Field Services Program from the Community Development
Block Grant (CDBG) Program, and all related documents. Said proposal is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the minutes of
the City Council.
Passed by the City Cou.nci? this 26`� day of June, 2007.
r
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton. Jr. ,__
Bill Howerton, Jr.
Community Development Director
/s/ David A. Miller
DAVID A. MILLER, MAYOR
5 �'�
Regular City Council Meeting
June 26, 2007
APPROVED AS TO FORM:
/s/ Am_y Sims
Amy Sims, Assistant City Attorney
Grantee: COL Community Development Housing
Program: Direct Delivery Field Services
Funding Sourcee 2007 Community Development Block Grant
Use of Funds: Funds will be used to provide salaries of field services staff.
Amount: $635,000
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services b.�ar� recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. T'he recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $635,000.
Staff recommended approval of this resolution.
4.14. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0269 authorizing approval and any changes of the
proposal for the City of Lubbock Police Department Code Administrallon
Section Substandard Structure Removal-Demo Program to the U.S.
Department of Housing and Urban Development under the Community
Development Block Grant Program to provide removal and demoliNon of
residential and commercial substandard structures.
RESOLUTION NO. 2007-R0269
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for ttie City of Lubbock Police Deparhnent
Code Administration Section Substandard St:uc;��re Removal-Demo Program from the
Community Development Block Grant (CDBG) Pro�ram, and all related documents. Said
proposal is attached hereto and incorporated in this resolution as if fully set forth herein and shall
be included in the minutes of the City Council.
Passed by the City Council this 26`� day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
5�3
Regular City Council Meeting
June 26, 2007
Grantee: City of Lubbock Code Administration
Program: Substandard Scructure Removal and Demolition
Funding Source: 2007 Community Development Block Grant
Use of Funds: Funds will be used to provide for removal and demolition of
residential and commercial substandard structures.
Amount: $66,786
r-- Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investrnent Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $66,786.
Staff recommended approval of this resolution.
4.15. Grant Funding Recom►nea �ation Resolution - Community Development:
Resolution No. 20�J7-R0270 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development
Administration a�� �udirect Cost Program to the U.S. Department of
Housing and Urban Development under the Community Development
Block Grant Program to provide salaries of administrative staff and
indirect cost.
RESOLUTION NO. 2007-R0270
� BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development Administration and Indirect Cost Program from the Community Development Block
Grant (CDBG) Program, and all related documents. Said proposal is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the minutes of
the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza _
Rebecca Garza, City Secretary
APPROVED AS TO CONTEI�T i:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
�"' Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: COL Community Development
Program: Administration and Indirect Cost
Funding Source: 2007 Community Development Block Grant
5��
Regular City Council Meeting
June 26, 2007
Use of Funds: Funds will be used to provide salaries of administrative staff and
indirect cost.
Amount: $472,947
Period of Performance: October 1, 2007, tc� �eptember 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services �^:�rd recommendations for the program
funding of the FY 2007-08 Community U�velopment Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $472,947.
Staff recommended approval of this resolution.
4.16. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0271 authorizing approval and any changes of the
proposal for the Community Housing Resource Board Community
Housing Development Organization Operations Program to the U.S.
Department of Housing and Urban Development under the Home
Investment Partnership Program for the administration and operation of
programs.
RESOLUTION NO. 2007-R0271
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the Community Housing Resource
Board Lease Purchase Program from the Home i►�•.-�s+�nent Partnership (HOME) Program, and all
related documents. Said proposal is attached hereto and incorporated in this resolution as if fully
set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton. Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: Community Housing Resourcc Bc,�rd
Program: Community Housing Development Organization Operations
Funding Source: 2007 Home Investment Partnership Program
Use of Funds: Funds will be used for the administration and operation of
programs.
Amount: $50,000
Period of Performance: October 1, 2007, to September 30, 2009
5�.�
Regular City Council Meeting
June 26, 2007
A public hearing was held on June 14, 2007, for consideration of the
Community Developrnent Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
�,,,,, Funds used are federal funds from the Home Investment Partnership Program.
The maximum to be allocated to this program is $50,000.
Staff recommended approval of this resolution.
4.17. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0272 authorizing approval and any changes of the
proposal for the Community Iiousing Resource Board Lease Purchase
Program to the U.S. Department of Housing and Urban Development
under the Home Investment Partnership Program for the purchase and
rehabilitation of existing homes to be leased to low to moderate income
families.
RESOLUTION NO. 2007-R0272
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the Community Housing Resource
Board Community Housing Development Organization Operations Program from the Home
Investment Partnership (HOME) Program, and all related documents. Said proposal is attached
hereto and incorporated in this resolution as if fully set forth herein and shall be included in the
minutes of the City Council.
Passed by the City Council this 26`�' �iav of June, 2008.
r
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: Community Housing Resource Board
Program: Lease Purchase
r-� Funding Source: 2007 Hnme Investment Partnership Program
Use of Funds: Funds will be used for the purchase and rehabilitation of existing
homes to be leased to low to moderate income families.
Amount: $174,886
Period of Performance: October 1, 2007, to September 30, 2009
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
5'. .f
Regular City Council Meeting
June 26, 2007
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Home Investment Partnership Program.
The maximum to be allocated to this program is $174,886.
Staff recommended approval of this resolution.
4.18. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0273 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development Housing
American Dream Downpayment Initiative Program targeted for East
Lubbock to the U.S. Department of Housing and Urban Development
under the Home Investment Partnership Program to provide buy down,
down payment, and closing costs for eGgible low to moderate first time
home buyers.
RESOLUTION NO. 2007-R0273
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of LL;;bock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development Housing American Dream Downpayrnent Initiative (ADDI) Program from the
Home Inveshnent Partnership (HOME) Program, au:� all related documents. Said proposal is
attached hereto and incorporated in this resolution as if �ully set forth herein and shall be included
in the minutes of the City Council.
Passed by the City Council this 26`� day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: COL Community Development Hausing
Program: American Dream Downpayment Initiative Targeted for East
Lubbock
Funding Source: 2007 Home Investment Partnership Program
Use of Funds: Funds will be used to provide buy down, downpayment, and
closing cost for eligible low to moderate first time homebuyers.
Amount: $25,110
Period of Performance: October 1, 2007, to September 30, 2009
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. T'he recommendations are provided in
the agenda backup.
� X a'�+
Regular City Council Meeting
June 26, 2007
FISCAL IMPACT
Funds used aze federal funds from the Home Investment Partnership Program.
The maximum to be allocated to this program is $25,110.
Staff recommended approval of this resolution.
4.19. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0274 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development Housing New
�- Construction Program to the U.S. Department of Housing and Urban
i Development under the Iiome Investment Partnership Program to build
affordable quality housing for eligible first time home buyers.
RESOLUTION NO. 2007-R0274
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development Housing New Construction Program from the Home Investment Partnership
(HOME) Program, and all related docur.ients. Said proposal is attached hereto and incorporated in
this resolution as if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton. Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: COL Community Development Housing
Program: New Construction
Funding Source: 2007 Home Investment Partnership Program
Use of Funds: Funds will be used to build affordable quality housing for
eligible first time homebuyers.
Amount: $302,278
Period of Performance: October 1, 2007, to September 30, 2009
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
�""' funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Home Investment Partnership Program.
The maximum to be allocated to this program is $302,278.
Staff recommended approvai cf this resolution.
Sa3
Regular City Council Meeting
June 26, 2007
4.20. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0275 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development Housing
Rehab/Recon Program to the U.S. Department of Housing and Urban
Development under the Home Investment Partnership Program to rehab
or reconstruct homes for eligible low to moderate income homeowners in
target areas with a combination payback and forgivable loan.
RESOLUTION NO. 2007-R0275
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development Housing Rehab/Recon Program from tlie Home Investment Partnership (HOME)
Program, and all related documents. Said proposal is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be ��clu�led in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: COL Community Development Housing
Program: Rehabilitation/Reconstructinn
Funding Source: 2007 Home Investment Partnership Program
Use of Funds: Funds will be used to rehab or reconstruct homes for eligible low
to moderate income homeowners in target areas with a combination payback
and forgivable loan.
Amount: $635,000
Period of Performance: October 1, 2007, to September 30, 2009
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Home Investment Partnership Program.
The maximum to be allocated to this program is $635,000.
Staff recommended approval of this reso?ution.
4.21. Grant Funding Recommendation Resola�-�on �- Community Development:
Resolution No. 2007-R0276 authorizing approval and any changes of the
proposal for the North and East Lubbock Community Development
Corporation Downpayment Closing C�st Kings Dominion New Homes
Regular City Council Meeting
June 26, 2007
Program to the 1CT.S. Department of Housing and Urban Development
under the Home Investment Partnership Program for downpayment and
closing costs for new homes in the Kings Dominion neighborhood.
RESOLUTION NO. 2007-R0276
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the North and East Lubbock Community
�"' Development Corporation Downpayment Closing Cost Kings Dominion New Homes Program
from the Home Investment Fartnership (HOME) Program, and all related documents. Said
proposal is attached hereto and incorporated in this resolution as if fully set forth herein and shall
be included in the minutes of the City Council.
Passed by the City Council this 26`� day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton. Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
'� /s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: North and East Lubbock Community Development Corporation
Program: Downpayment Closing Cost Kings Dominion New Homes
Funding Source: 2007 Home Investment Partnership Program
Use of Funds: Funds will be used for downpayment and closing cost for new
homes in the Kings Dominion neighborhood.
Amount: $50,000
Period of Performance: October 1, 2007, to September 30, 2009
A public hearing was held on June 14, 2007, for consideration of the
Community Developme*�t Services Board recommendations for the program
funding of the FY 2007-0� Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generatPd program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Home Investment Partnership Program.
r The maximum to be allocated to this program is $50,000.
�
Staff recommended approval of this resolution.
4.22. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0277 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development
Administration and Direct Delivery Program to the U.S. Department of
Housing and Urban Development under the Home Investment Partnership
Program to provide salaries of administrative and filed services staff.
�1 C
Regular City Council Meeting
June 26, 2007
RESOLUTION NO. 2007-R0277
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the prop�sal for the City of Lubbock Community
Development Administration and Direct Delivery Program from the Home Investment Partnership
(HOME) Program, and all related documents. Said proposal is attached hereto and incorporated in
this resolution as if fully set forth herein and shali 3;•� i::cluded in the minutes of the City Council.
Passed by the City Council this 26`� day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: COL Community Development
Program: Administration and Direct ��e��very
Funding Source: 2007 Home Investment Par'cnership Program
Use of Funds: Funds will be used to provide salaries of administrative and filed
services staff.
Amount: $116,591
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Home Investment Partnership Program.
The maximum to be allocated to this program is $116,591.
Staff recommended approval of this resolution.
4.23. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0278 authorizing approval and any changes of the
proposal for the BRIDGE Homeless Prevention Program to the U.S.
Department of Housing and Urb�n Development under the Emergency
Shelter Grant Program for assistance in paying rent and utilities to
prevent homelessness.
RESOLUTION NO. 2007-R0278
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the BRIDGE Homeless Prevention
Program from the Emergency Shelter Grant (ESG) Program, and all related documents. Said
Regular City Council Meeting
June 26, 2007
proposal is attached hereto and incorporated in this resolution as if fully set forth herein and shall
be included in the minutes of the City Council.
Passed by the City Council this 26`� day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
�•—
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: The BRIDGE
Program: Homeless Prevention
Funding Source: 2007 Emergency Shelter Grant
Use of Funds: Funds will be used for assistance in paying rent and utilities to
prevent homelessness.
Amount: $9,711
� Period of Performance: October l, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Emergency Shelter Grant. The maximum
to be allocated to this program is $9,711.
Staff recommended approval of this resolution.
4.24. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0279 authorizing approval and any changes of the
proposal for the Family Promise Operat�ons Program to the U.S.
Department of Housing and Urban Development under the Emergency
Shelter Grant Program for day center facility operations including
utilities, insurance, vehicle fuel, and maintenance.
RESOLUTION NO. 2007-R0279
'�'"' BE IT RESOLVED BY THE CITY ��G�'NCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any �hanuPs of the proposal for the Family Promise Operations Program
from the Emergency Shelter Grant (ESG) Program, and all related documents. Said proposal is
attached hereto and incorporated in this resolution as if fully set forth herein and shall be included
in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
Regulax City Council Meeting
June 26, 2007
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton. Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: Family Promise
Program: Operations
Funding Source: 2007 Emergency Shelter Grant
Use of Funds: Funds will be used for day center facility operations including
utilities, insurance, vehicle fuel, and maintt�zance.
Amount: $12,948
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Inveshnent Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Emergency Shelter Grant. The maximum
to be allocated to this program is $12,948.
Staff recommended approval of this resolution.
4.25. Grant Funding RecommendaHon Resolution - Community Development:
Resolution No. 2007-R0280 authorizing approval and any changes of the
proposal for the Salvation Army Operations, Essential Services, and
Homeless Prevention Programs to the U.S. Department of Housing and
Urban Development under the Emerg::zcy Shelter Grant Program for
facility operations, essential services, and homeless prevention
RESOLUT?')N NO. 2007-R0280
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the Salvation Army Operations,
Essential Services and Homeless Prevention Programs from the Emergency Shelter Grant (ESG)
Program, and all related documents. Said proposal is attached hereto and incorporated in this
resolution as if fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
Regular City Council Meeting
June 26, 2007
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
�, Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: Salvation Arr�i;�
Program: Operations, Essential Services, Homeless Prevention
Funding Source: 2007 Emergency Shelter Grant
Use of Funds: Funds will be used for facility operations, essential services and
homeless prevention.
Amount: $37,226 ($12,948 for operations, $14,567 for essential services and
$9,711 for homeless prevention).
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
''"' previously generated program income. The recommendations are provided in
� the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Emergency Shelter Grant. The maximum
to be allocated to these programs is $37,226.
Staff recommended approvai o� this resolution.
4.26. Grant Fundi.ng Recommendation Resolution - Community Development:
Resolution No. 2U07-f�U281 authorizing approval and any changes of the
proposal for the Vandelia Church of Christ Homeless Prevention
Programs to the U.S. Department of Housing and Urban Development
under the Emergency Shelter Grant Program for homeless prevendon in
the form of utility and rent assistance.
RESOLUTION NO. 2007-R0281
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the Vandelia Church of Christ Homeless
Prevention Program from the Emergency Shelter Grant (ESG) Program, and all related documents.
Said proposal is attached hereto and incorporated in this resolution as if fully set forth herein and
� shall be included in the minutes of the City Council.
Passed by the City Council this 26�` day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
5' 9
Regular City Council Meeting
June 26, 2007
APPROVED AS TO CONTENT:
/s/ Bill Howerton. Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: Vandelia Church of Christ
Program: Homeless Prevention
Funding Source: 2007 Emergency Shelter Grant
Use of Funds: Funds will be used for 'r�cmeless prevention in the form of utility
and rent assistance.
Amount: $9,711
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Emergency Shelter Grant. The maximum
to be allocated to these programs is $9,711.
Staff recommended approval of this resolution.
4.27. Grant Funding Recommendallon Resolution - Community Development:
Resolution No. 2007-R0282 authorizing approval and any changes of the
proposal for the Women's Protective Services EssemNal Services Programs
to the U.S. Department of Housing and Urban Development under the
Emergency Shelter Grant Program to provide social services referrals to
battered individuals.
RESOLUT1i;�1 ��TO. 2007-R0282
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the Women's Protective Services
Essential Services Program from the Emergency Shelter Grant (ESG) Program, and all related
documents. Said proposal is attached hereto and incorporated in this resolution as if fully set forth
herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
AT'TEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
�J��
Regular City Council Meeting
June 26, 2007
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: Women's Protective Services
Program: Essential Services
Funding Source: 2007 Emergency Shelter Grant
� Use of Funds: Funds will be used to provide social services referrals to battered
individuals.
Amount: $14,567
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Emergency Shelter Grant. The maximum
to be allocated to trese �r�grams is $14,567.
Staff recommended approv� of this resolution.
4.28. Grant Funding Recommendation Resoludon - Community Development:
Resolution No. 2007-R0283 authorizing approval and any changes of the
proposal for the City of Lubbock Community Development
Administration Program to the U.S. Department of Housing and Urban
�r"'^ Development under the Emergency Shelter Grant Program to provide
salaries of administrative staff.
RESOLUTION NO. 2007-R283
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Community
Development Administration Program from the Emergency Shelter Grant (ESG) Program, and all
related documents. Said proposal is attached hereto and incorporated in this resolution as if fully
set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26`� day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
r--
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amy Sims
Amy Sims, Assistant City Attorney
Grantee: COL Community Development
5�1
Regular City Council Meeting
June 26, 2007
Program: Administration
Funding Source: 2007 Emergency Shelter Grant
Use of Funds: Funds will be used to provide salaries of administrative staff.
Amount: $5,111
Period of Performance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated program income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Emergency Shelter Grant. The maximum
to be allocated to this program is $5,111.
Staff recommended approval of this resolution.
4.29. Grant Funding Recommendallon Resolution - Community Development:
Resolution No. 2007-R0284 authorizing approval and any changes of the
proposal for the Alcoholic Recovery Center Operations Program to the
U.S. Department of Housing and Urban Development under the
Emergency Shelter Grant Program for operations cost of the facility.
RESOLUTION NO. 2007-R0284
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the Alcoholic Recovery Center
Operations Program from the Emergency Shelter Grant (ESG) Program, and all related
documents. Said proposal is attached hereto and �ncorporated in this resolution as if fully set forth
herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: Alcoholic Recovery Center
Program: Operations
Funding Source: 2007 Emergency Shelter Grant
Use of Funds: Funds will be used for operations cost of the facility.
Amount: $12,953
Period of Performance: October 1, 2007, to September 30, 2008
5�'`�
Regular City Council Meeting
June 26, 2007
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investrnent Partnership (HOME), Emergency Shelter Grant (ESG), and
previously generated pr�gram income. The recommendations are provided in
the agenda backup.
FISCAL IMPACT
,,�,.. Funds used are federal funds from the Emergency Shelter Grant. The maximum
to be allocated to this program is $12,953.
Staff recommended approval of this resolution.
4.30. Grant Funding Recommendation Resolution - Community Development:
Resolution No. 2007-R0285 authorizing approval and any changes of the
proposal for the City of Lubbock Parks Department Summer Satellite
Program to the U.S. Department of Iiousing and Urban Development
under the Community Development Block Grant Program to provide low-
income families with an affordable, safe, educational and supervised
summer camp for youth ages five to twelve.
RESOLUTION NO. 2007-R0285
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the City of Lubbock Parks Deparhnent
Sununer Satellite Program from the Community Development Block Grant (CDBG) Program, and
all related documents. Said proposal is attached hereto and incorporated in this resolution as if
fully set forth herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�' �ia�r of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
Grantee: City of Lubbock Parks Department
Program: Summer Satellite Program
Funding Source: 2007 C�mmunity Development Block Grant
�� Use of Funds: Fur.ds will be used to provide low-income families with an
affordable, safe, educational and supervised summer camp for youth ages 5-12.
Amount: $37,805
Period of PerFormance: October 1, 2007, to September 30, 2008
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Boazd recommendations for the program
funding of the FY 2007-08 Community Development Block Grant (CDBG),
Home Investment Partnership (HOME), Emergency Shelter Grant (ESG), and
n
�, 3
Regular City Council Meeting
June 26, 2007
previously generated program incom�. Tl- � recommendations are provided in
the agenda backup.
FISCAL IMPACT
Funds used are federal funds from the Community Development Block Grant.
The maximum to be allocated to this program is $37,805.
Staff recommended approval of this resolution.
4.31. Contract ResoluNon - Community Development: Resolution No. 2007-
R0286 authorizing approval and any changes of the proposal for the
Community Development Services Board FY 2007-08 funding
recommendations to the U.S. Department of Housing and Urban
Development under the Community Development Block Grant, Home
Investment Partnership Program, and the Emergency Shelter Grant.
RESOLUTION NO. 2007-R0286
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council of the City of Lubbock does hereby consider a resolution
authorizing approval and any changes of the proposal for the Community Development Services
Board FY 2007-2008 funding recommendations to the U. S. Department of Housing and Urban
Development under the Community Development �lo�ic Grant (CDBG), Home Investment
Partnership Program (HOME), and the Emergency Shelter Grant (ESG), and all related
documents. Said proposal is attached hereto and incorporated in this resolution as if fully set forth
herein and shall be included in the minutes of the �ity ^ouncil.
Passed by the City Council this 26`� day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Bill Howerton, Jr.
Bill Howerton, Jr.
Community Development Director
APPROVED AS TO FORM:
/s/ Amv Sims
Amy Sims, Assistant City Attorney
A public hearing was held on June 14, 2007, for consideration of the
Community Development Services Board recommendations for the program
funding of the FY 2007-08 Community Development Block Grant, Home
Investment Partnership, Emergency Shelter Grant, and previously generated
program income.
FISCAL IMPACT
Funds are federal funds from the Community Development Block Grant
(CDBG), Home Investment Partnership Program (HOME), and the Emergency
Shelter Grant (ESG).
Staff recommended approval of this resolution.
4.32. Contract Resolution - Health: Resolution No. 2007-R0287 authorizing the
Mayor to execute a contract with Applied Biosystems for an Applied
Biosystems 7500 Fast Real-Time Protease Chain Reaction System.
n
� %s /1
Regular City Council Meeting
June 26, 2007
RESOLUTION NO. 2007-R0287
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock a Contract and any associated documents
by and between the City of Lubbock and Applied Biosystems of Foster City, CA, for an
Applied Biosystems 7500 Fast Real-Time PCR System with tower computer, a copy of
which Contract and any associated documents are attached hereto and which shall be
�„ spread upon the minutes of this Council and as spread upon the minutes of this Council
shall constitute and be a part hereof as if fully copied herein in detail.
Passed by the City Council this 26`� day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Tommv Camden
Tommy Camden, Health Director
APPROVED AS TO FORM:
/s/ Donald G. Vandiver
Donald G. Vandiver, Attorney of Counsel
This contract is for the purchase of a Applied Biosystems 7500 Fast Real-Time
"�" Protease Chain Reaction s stem and tower com uter. This counter to
, Y P P
instrument is used to detect and identify multiple biothreat agents such as
anthrax, ricin toxin, plague, and tularemia.
The City of Lubbock Health Department Biosafety Level 3(BSL3) Lab is one
of 220 Laboratory Response Network (LRN) laboratories nationwide. The BSL
performs testing on all Lioi:,�:orism suspected specimens, both environmental
and clinical, for a 1 �0-mile radius area that includes 66 counties. The QST 7500
FAST instrument is used at the Lubbock BSL-3 Laboratory by trained
microbiologists wit�i select agent clearance from the FBI.
The QST 7500 FAST will improve the turn around time on reporting biothreat
specimens by approximately 50%, which is critical with biothreat specimens.
The Center for Disease Control (CDC) has designed specific detection and
differentiation testing protocols for biothreat agents using the QST 7500 FAST
system. The testing protocols are the only approved protocols for use by the
LRN laboratories and must be performed using the QST 7500 FAST system as
validated at the CDC in order to maintain LRN membership. All laboratories
have signed agreements to perform all testing with approved equipment and by
the approved methods. There is no al�ernate equipment or protocols. This
specific instrumentation is required by Department State Health Services
Document No. 7560005906-2006 approved by City Council on September 13,
,r... 2006.
FISCAL IMPACT
The full $53,523 purchase is funded through the previously appropriated
Laboratory Public Health Bioterrorism Grant.
Staff recommended approval of this resolution.
4.33. Contract Resolution -?iealth: Resolution No. 2007-R0288 authorizing the
Mayor to execute a Niemu� andum of Understanding with Texas Tech
University for parent education services Early Head Start Program.
���
Regular City Council Meeting
June 26, 2007
RESOLUTION NO. 2007-R0288
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute for and on behalf of the City of Lubbock a Memorandum of Understanding for
parent education services with Texas Tech University (Early Head Start Program), and any
associated documents, a copy of which Memorandum of Understanding is attached hereto
and which shall be spread upon the minutes of this Council and as spread upon the minutes
of this Council shall constitute and be a part hereof as if fully copied herein in detail.
Passed by the City Council this 26�' day of June, 2007.
/s/ Da�7d A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Tommv Camden
Tommy Camden, Public Health Director
APPROVED AS TO FORM:
/s/ Donald G. Vandiver
Donald G. Vandiver, Attorney of Counsel
Through this memorandum of understanding the City and Texas Tech
University will provide parent education services from the Early Head Start
program. The program includes nine to ten families per educator and requires
one and one-half hours of direct service per family, per week. The program
requires the health educators to attend monthly socializations and parent
meetings. The program requires three families per educator in the Title V
Program with the same parent education services and commitments.
Health educators will assist, when requested, in the development of policies and
procedures for health care services. They will also, using the Title V
Curriculum, assist in solving health related problems throughout the program
year for participants and families by �c ;ch:ng classes at Estacado High School
and New Directions. The health educators v��ill provide additional training and
education for the staff and Early Head Start families upon request.
FISCAL IMPACT
No fiscal impact.
4.34. Contract Resolution - Fleet Services: ResoluNon No. 2007-R0289
authorizing the Mayor to execute a purchase order contract for five police
sedans.
RESOLUTION NO. 2007-R0289
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to
execute a Purchase Order Contract and any associated documents with Dallas Dodge of
Dallas, Texas, for purchase of police package sedans per HGAC Contract #VE03-06,
which Purchase Order Contract and any associated documents are attached hereto as
Exhibit A and made a part hereof for a11 intents and purposes.
Passed by the City Council this 26`h day of June, 2007.
/s/ David A. Miller
DAVID !':. MILLER, MAYOR
Regular City Council Meeting
June 26, 2007
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Mark Yearwood
,,.,, Mark Yearwood
I Assistant City Manager/Chief Information Officer
APPROVED AS TO FORM:
/s/ Don Vandiver
Don Vandiver, Attorney of Counsel
The purchase of five police package sedans has been authorized in the adopted
FY 2006-07 Master Lease Program. The vehicles are available for purchase
through the Houston-Galveston Area Council (H-GAC) Purchasing
Cooperative, Contract VE03-06. H-GAC is a regional planning commission
created under Acts of th;, 5�'±h Legislature, Regular Session, 1965, re-codified
as a Texas Local Government Code, Chapter 391.
Local automobile dealers declined to participate in the competitive sealed bid
process.
FISCAL IMPACT
Funds are available through the adopted FY 2006-07 Master Lease Program.
Staff recommended purchase from Dallas Dodge of Dallas, Texas for $112,835.
4.35. Grant Application ResoluNon - Citibus: Resolution No. 2007-R0290
,r-- authorizing the Mayor to sign the Fiscal Year 2008 Grant AppGcation Part
I with the Texas Department of Transportation for Public Transportation
Funding.
RESOLUTION NO. 2007-R0290
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed
to execute for and on behalf of the City of Lubbock, a Master Grant Application Part 1
with the Texas Department of Transportation (TxDOT) of Austin, Texas, and any other
related documents. Said Master Grant Application Part 1 is attached hereto and
incorporated in this Resolution as if fully set forth herein and shall be included in the
minutes of the Council. '
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
�-- /s/ James Loomis
' James Loomis, Assistant City Manager/
Transportation and Public Works
APPROVED AS TO FORM:
/s/ Mitchell Satterwhite
D. Mitchell Satterwhite
Assistant City Attorney
As part of the grant application program the Texas Department of
Transportation (TxDOT) requires potential grant recipients to complete and
submit a Grant Application Part 1 document no later than July 19, 2007. The
n��y/
/•ar (
Regular City Council Meeting
June 26, 2007
Fiscal Year 2008 Grant Application Part I is used by all entities applying for
and/or requesting Public Transportation Funding. By submission of this
application, the applicant certifies that the proposed public transportation
project is consistent with the continuing, cooperating, and comprehensive
regional transportation planning requirements.
The Grant Application Part 1 document contains basic agency information not
specific to particular grant programs.
FISCAL IMPACT
No funding will be awaxded as a resulc of the Grant Application Part 1
document. When funds are available from programs administered by TxDOT,
application documents specific to the programs will be filed.
The Lubbock Public Transit Advisory Board and Citibus recommended
approval of this resolution.
4.36. Contract Resolution - Public Works: Resolution No. 2007-R0291 accepting
paving improvements in North Point Addition, Lot 332 through Lot 725,
and directing payment of the City's share of the cost of those
improvements to the developer.
RESOLUTION NO. 2007-R0291
A RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS,
AVENUES AND ALLEYS AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of Chapter 25 of the
City of Lubbock Code of Ordinances, the developer of Lots 332-725, North Pointe Addition, made
arrangements with Price Construction Company for the construction of paving improvements on
certain streets, avenues and alleys dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivi sion plats of the above-mentioned Addition,
including the streets, avenues and alleys designated on Exhibits A-1 and A-2 hereto, which
exhibits are incorporated herein and made a part of tiiis Resolution as if fully copied herein in
detail.
WHEREAS, the construction of the above improvctne�lts on the above-mentioned streets, avenues
and alleys was performed under the supervision of the City Engineer, and said improvements have
been completed and have been inspected and found to have been constructed in accordance with
City specifications and in accordance with the provisions of Chapter 25 of the City of Lubbock
Code of Ordinances, NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements on said portions of the above-mentioned streets,
avenues and alleys incorporated herein by Exhibits A-1 and A-2 BE and the same are hereby
accepted and the City Engineer is hereby authorized to notify the Developer of acceptance by the
Lubbock City Council and to direct payment of the City's portion of the cost in the amount of
$129,225.46 to the Developer.
SECTION 2. THAT this Resolution shall take effect and be in force from and after the
date of its passage.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Larry D. Hertel
Larry D. Hertel, City Engineer
���
Regular City Council Meeting
June 26, 2007
APPROVED AS TO FORM:
/s/ Don Vandiver
Don Vandiver, Attorney of Counscl
This resolution is for the ac,c�ptance of paving improvements required at the time of
platting this new subdivision. The paving improvements include curb and gutter,
asphalt paving, and alle;� paving on streets, avenues, and alleys as indicated on Exhibits
A-1 and A-2 attached to the acceptance resolution.
►-�,
Slide Road is a seven lane thoroughfare with three lanes going each direction
and one continuous left turn lane (T-2 street). With the platting of this
subdivision, the developer initiated the paving on Slide Road, and City Council
agreed to participate in $129,225 of the cost. Normally, the thoroughfare would
have remained unpaved until such time as the City included the paving
improvements in the Capital Improvement Program.
FISCAL IMPACT
$129,225 is appropriated in the Streets Capital Improvement Fund for the City's
participation. The $129,225 is appropriated from the Prepaid paving program
funds.
Staff recommended approval of this resolution.
4.37. Ordinance Amendment 2nd Reading - Business Development: Ordinance
No. 2007-00058 Approving the Service and Assessment Plan and
Assessment Roll and levying assessment for the Vintage Township Public
Improvement District.
ORI?�NANCE NO. 2007-O0058
AN ORDINANCE OF THL l,i:'I' COUNCIL OF THE CITY OF LUBBOCK
ACCEPTING AND APPROVING A SERVICE AND ASSESSMENT PLAN AND
,,,,._. ASSESSMENT ROLL FOR VINTAGE TOWNSHIP PUBLIC IMPROVEMENT
DISTRICT; MAKING A FINliING OF SPECIAL BENEFIT TO CERTAIN PROPERTY
IN THE DISTRICT AND LEVYING ASSESSMENTS ON SUCH PROPERTY AND
PROVIDING FOR THE METHOD OF ASSESSMENT AND THE PAYMENT OF THE
ASSESSMENT
This is the second reading of the ordinance setting the assessment for the
Vintage Township Public Improvement District (PID). A public hearing was
held on June 14, 2007, to allow property owners in the proposed District the
opportunity to speak in favor of or in opposition to the assessment to be levied
in the Vintage Township Public Improvement District. The Vintage Township
PID is a defined assessment area providing specific types of public
improvements of a given area.
FISCAL IMPACT
Pursuant to the Master Development Agreement approved by City Council on
November 7, 2005, and amended on February 24, 2006, the developer has
agreed to pay all the City's cost and expenses relating to the development and
establishment of this PID. In addition, construction and expenses identified in
the PID Service Plan will be funded through an assessment to the property
owners and the improvements will be maintained by the Vintage Township
Home Owners Associati•�n.
�r-� Staff recommended approval of the second reading of this ordinance.
4.38. Contract Resolut:�n - Rusiness Development: Resolution No. 2007-R0292
authorizing the Mayor to execute an agreement with McCanton Woods,
Ltd. regarding the funding of public improvements in Phase One, Bond
Issue Two, Project Sixty-Eight of the Fourth Amended Project Plan for the
North Overton Tax Increment Finance Reinvestment Zone.
RESOLUTION NO. 2007-R0292
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
�rn�
Regular City Council Meeting
June 26, 2007
THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed
to execute for and on behalf of the City of Lubbock an Agreement between the City of
Lubbock and McCanton Woods, Ltd. regarding the funding of public improvements in
Phase One, Bond Issue Two, Project Sixty-Eight of the Fourth Amended Project Plan for
the North Overton Tax Increment Finance Reinvestment Zone. Said Agreement is
attached hereto and incorporated in this Resolution as if fully set forth herein and shall be
included in the minutes of the Council.
Passed by the City Council this 26th day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Rob Allison
Rob Allison, Assistant City Manager
Development Services
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda L. Chamales, Senior Attorney
Office Practice Section
Under this agreement, the City agrees to dedicate and pledge the use of revenue
in the Tax Increment Fund to participate in the cost of public improvements for
Phase One, Bond Issue Two, Project Sixty-Eight of the Amended Project Plan
as recommended by the Board of Directors of the North Overton Tax Increment
Finance (TIF) Reinvestment Zone. Project Sixty-Eight is Main Street
Condominiums II on tract 12 in the North Overton TIF. This agreement
delineates the division of funding for the public improvements as represented in
Exhibit D(TIF participation) and Exhibit E(Developer participation). The total
amount of tax increment financing for public improvements shown in Exhibit D
is $377,948.
FISCAL IMPACT
$377,948 is appropriated in Capital Improvement Program, Project 91068.
Condo No. 3 with $377,948 is available for this purpose. The funding source
for this project is North Overton TIF Revenue funded certificates of obligation.
Staff recommended approval of this resolution.
4.39. Contract Resolution - Business Development: Resolution No. 2007-R0293
authorizing the Mayor to execute an agreement with McCanton Woods,
Ltd. regarding the funding of public iz�:provements in Phase One, Bond
Issue Two, Project Seventy of the Fourth Amended Project Plan for the
North Overton Tax Increment Finance Reinvestment Zone.
RESOLUTION NO. 2007-R0293
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed
to execute for and on behalf of the City of Lubbock an Agreement between the City of
Lubbock and McCanton Woods, Ltd., regarding the funding of public improvements in
Phase One, Bond Issue Two, Project 70 of the Project Plan for the North Overton Tax
Increment Finance Reinvestment Zone, as amended. Said Agreement is attached hereto
and incorporated in this Resolution as if fully set forth herein and shall be included in the
minutes of the Council.
Passed by the City Council this 26th day of June, 2007.
Regular City Council Meeting
June 26, 2007
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
r•-
/s/ Rob Allison
Rob Allison, Assistant City Manager
Development Services
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda L. Chamales, Seni�r Attorney
Office Practice Section
In this agreement with McCanton Woods, the City agrees to dedicate and
pledge the use of revenue in the Tax Increment Fund to participate in the cost of
the public improvements for Phase One, Bond Issue Two, Project Seventy of
the Amended Project Plan as recommended by the Board of Directors of the
North Overton Tax Increment Finance (TIF) Reinveshnent Zone. This project is
for the landscaping in the parkway on Single Family Blocks 1— 4. This
Agreement delineates the division of funding for the public improvements as
shown in Exhibit D(TIF participation) and Exhibit E(Developer participation).
T'he total amount of tax increment financing for public improvements shown in
Exhibit D is $795,924.
FISCAL IMPACT
�^
These public improvements will be funded from bonds issued and revenues
collected by the North Overton Tax Increment Finance Reinvestment Zone.
$6.01 million has been appropriated in Capital Project 91070 with $795,924
available for this purpose.
Staff recommended appr�v�' �f this resolution.
4.40. Contract Resolution - Business Development: Resolution No. 2007-R0294
authorizing the 1Viayo:- to execute an agreement with Lubbock Economic
Development Alliance (LEDA) for LEDA to convey the FAA Hangar,
located at 31� East Edinboro Street at the Lubbock Preston Smith Airport,
in partial exchange for the cost of the sanitary sewer line to the Rail Port.
RESOLUTION NO. 2007-R0294
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed
to execute for and on behalf of the City of Lubbock, an Agreement between the City of
Lubbock and Lubbock Economic Development Alliance, and all related documents. Said
Agreement is attached hereto and incorporated in this Resolution as if fully set forth herein
and shall be included in the minutes of the Council.
Passed by the City Council this 26`� day of June, 2007.
r
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ James Loomis
James Loomis
Assistant City Manager/Transpartation and Public Works
���
Regular City Council Meeting
June 26, 2007
/s/ Rob Allison
Rob Allison
Assistant City Manager/Development Services
APPROVED AS TO FORM:
/s/ Richaxd K. Casner
Richard K. Casner
First Assistant City Attorney
The City has been requested by the Lubbock Economic Development Alliance
(LEDA), in support of the Lubbock Rail Port to construct a sanitary sewer line.
LEDA is funding the total project. As part of their funding LEDA has asked
that the personal property, commonly described as the "FAA Hangar" located
at 310 East Edinboro Street at the Lubbock €'reston Smith International Airport,
owned by LEDA, be conveyed and assigned as a credit toward the cost of
construction of the sanitary sewer line. LEDA will pay the City all of the costs
and expenses related to the Sanitary Sew�r Line, less the value of the FAA
Hangar. A resolution was approved by the LEDA Board at their June 18, 2007
meeting.
FISCAL IMPACT
The estimated cost of the needed sewer infrastructure is $1.1 million. This
project is funded from the sewer fund at $860,000 and LEDA participation of
$240,000. In exchange for the $860,000 sewer fund participation LEDA will
convey the FAA Hangar (valued at $860,000) to the City. The City
participation is limited to the $860,000, LEDA will be responsible to fund any
additional cost.
Staff recommended approval of this resolution.
4.41. This item was moved from consent agenda to regular agenda and
considered following Item 4.40.
5. REGULAR AGENDA (continued)
Note: Regular Agenda items, and Consent Agenda items moved to Regular
Agenda, are listed in the order they were addressed (Items 4,41, 5.1, 5.6,
5.2-5.5, 5.7-5.16). Item 5.17 was deleted.
4.41. Budget Amendment Ordinance 2nd Readin� - Finance: Ordinance No.
2007-00059 Amendment No. 15 �:m ending the FY 2006-07 budget
respecting the General Fund, Sewer Fund. Storm Water Fund, Solid Waste
Fund, Capital Improvement Program, North Overton Public Improvement
District, North Overton Tax Increment Financing Reinvestment Zone,
North Overton TIF, and the Master Lease Program.
ORDINANCE NO.2007-O0059
AN ORDINANCE AMENDING THE FY 2006-07 BUDGET FOR MUNICIPAL
PURPOSES RESPECTING THE (1) GENERAL FUND; (2) WASTEWATER FUND; (3)
STORM WATER FUND; (4) SOLID WASTE FUND; (5) CAPITAL IMPROVEMENT
PROGRAM; (6) NORTH OVERTON PUBLIC IMPROVEMENT DISTRICT; (7)
WATER FUND; (8) NORTH OVERTON TAX INCREMENT FINANCIING
REINVESTMENT ZONE FUND; (9) SOLID WASTE MAS � ER LEASE PROGRAM;
(10) GENERAL FUND MASTER LEASE PROGRAM; AND (11) STORM WATER
FUND MASTER LEASE PROGRAM.
1. Establish a Capital Improvement Project and appropriate $109,000 for
Hodges Baseball Field improvements funded with $30,000 of Wastewater
Fund fund balance, $63,500 from General Fund fund balance, and $15,500
participation from Trinity School. The improvements funded with this
project include the installation of a perimeter fence and restroom and all
related infrastructure.
��n
v�=�
Regular City Council Meeting
June 26, 2007
2. Establish a Capital Improvement Project and appropriate $58,981 for
Traffic Signals on Spur 327 at Frankford Avenue and Milwaukee Avenue
funded with $58,981 from TxDOT participation. The project will provide
for the rehabilitation of two existing signals at the intersections at Spur 327
and Frankford Avenue and at Spur 327 and Milwaukee Avenue.
3. Establish a Capital Improvement Project and appropriate $114,000 for
Traffic Signals at 82nd Street and Avenue P funded with $114,000 from
previously issued unallocated bond proceeds. The project will provide for
"°"' the construction of one traffic signal at the intersection of 82nd Street and
� Avenue P near the newly constructed school, Roberts Elementary.
4. Establish a Capital Improvement Project and appropriate $l.l million for
Airport Industrial Area Sewer System Improvements funded from $860,000
of FY 2007 Wastewater Certificates of Obligation and $240,000 of
revenues from LEDA. This project will provide for improvements to the
wastewater system for the Lubbock Rail Port Area.
5. Amend Capital Improvement Project 92115, Airport Industrial Area Water
System Improvements, by appropriating an additional $3.2 million of FY
2007 Water Certifi;:ates of Obligation. The project will loop and increase
the size of the water li_ic and construct Pump Station No. 13 in an area
previously desiknated by Water Utility Engineering. The total appropriation
for this project, including this amendment, is $3,691,081.
6. Amend Capital Improvement Project 91040, Sewer Tap Replacements, by
transferring $160,000 from Capital Improvement Project 90346, Lift Station
Rehabilitation. The reallocation is necessary to continue repairing and
replacing sewer line connections for service in alleys and easements. The
total appropriation for this project, including this amendment, is
$1,385,000.
7. Amend Capital Improvement Projects in the North Overton Tax Increment
� Financing Reinvestment Zone by transferring appropriations between
projects as reflected in Exhibit A. The total appropriations for projects in
the North Overton Tax Increment Financing Reinvestment Zone will not
change.
8. Appropriate $140,000 of North Overton Public Improvement District fund
balance for increased expenses related to landscaping maintenance.
9. Establish a Capital Improvement Project and appropriate $3.8 million for
the Street Maintenance Program funded with $1.3 million of previously
appropriated General Fund revenues and $2.5 million of unappropriated
pre-paid paving funds. The project is for the pavement repair of City streets
including seal coa+., asphalt milling, asphalt milling and overlay, full or
partial depth paven.Pn+ repair, crack sealing, patching, concrete joint
sealing, brick s�xeet repair, and other activities necessary for the routine
maintenance of the street network. The project includes the development of
a new pavement r.:::nagement system. Portions of this project will be
performed by City personnel.
10. Transfer six full-time positions from the General Fund to the Storm Water
Fund for improved storm sewer maintenance, as part of the new Street
Maintenance Program. These positions will be funded with efficiency
savings for the remainder of the fiscal year.
�
11. Appropriate $175,000 of General Fund Master Lease Program proceeds for
the acquisition of one (1) backhoe at $75,000 and one (1) asphalt zipper.
Each of these items will be financed for a period of ten years.
12. Appropriate $1,225,000 of Solid Waste Fund Master Lease Program
proceeds for the acquisition of one roller at $130,000, one motor grader at
$135,000, one heavy conshuction loader at $150,000, two dump trucks at
$160,000, one rock crusher at $500,000, and one grad-all at $150,000.
Each of these items will be financed for a period of ten years.
�'' 3u ��
Regular City Council Meeting
June 26, 2007
13. Appropriate $808,533 of Storm Water Fund Master Lease Program
proceeds for the acquisition of one Vac-Con truck at $270,000, one roll-off
truck at $166,189, and two street sweepers at 372,344. The Vac-Con truck
and roll-off truck will be financed for a period of ten years. The street
sweepers will be financed for a period of six years.
FISCAL IMPACT
Included in item summary.
Staff recommended approval of the sc�ond reading of this ordinance.
Motion was made by Council Member DeLcon, seconded by Council Member
Jones to pass on second and final reading Ordinance No. 2006-O0059 as
recommended by staff.
Jeff Yates, Chief Financial Officer, and Marsha Reed, Assistant City Engineer,
gave comments and answered questions from Council.
Motion was made by Mayor Pro Tem Gilbreath, seconded by Council Member
Leonard to amend the motion and vote on items 1-10 separately from items 11-
13. Motion failed: 3 Ayes, 4 Nays. Mayor Miller and Council Members
Jones, DeLeon, and Price voted Nay.
Vote was then taken on the original motion, which carried: 4 Ayes, 3 Nays.
Mayor Pro Tem Gilbreath and Council Members Leonard and Klein voted Nay.
5.1. Public Hearing 10:00 a.m. - Community Development: Hold a Public
Hearing to receive public comment on changing the proposed use of
Housing and Urban Development Section 108 Loan funds.
Mayor Miller opened the public hearing at 10:11 a. m. No one appeared on
behalf of the Housing and Urban Development Section 108 Loan fund. No one
appeared in opposition. Mayor Miller closed the hearing at 10:12 a. m.
The City was approved for a$2 million �ection 108 Loan from the United
States Department of Housing and Urban Development (HUD). City Council
voted to accept a$1 million 108 Loan. '�rust certificates were then sold by
HUD in a public offering on June 30, 200�+. The funding received through the
public offering was in the form of a loan and must be repaid to HUD. The
payback is amortized over an eight-year period. To date, the payments have
been made utilizing the City's annual Community Development Board Grant
(CDBG) allocation, payments from homeowners, and interest earned on the
HUD 108 funds. Future payments will come from the annual CDBG allocation.
The funds were to be used for the HUD 108 Housing Rehab Loan Program.
Guidelines for the city-wide program are as follows:
• Rehabs range from basic home repair to major rehabs of homes.
• Program will follow CDBG regulations.
• Loans will be a 100% payback for participating homeowners.
• The interest rate for the rehab loan is 6.0%.
The program funds have not been spent as originally allocated for the following
reasons:
• Lead-based paint requirements set forth by HUD have increased the total
cost of renovations. This is not a requirement that a homeowner would have
if they obtained financing from a private source.
• Rates in the open market are comparable to the Program's rates, ranging
from 6.75% to 9.0%. When the program was first discussed, interest rates in
the open market were much highei. Jr.•.1er similar loans, clients would have
been expected to pay rates up to 12.0%.
• Staff has initiated the application process with 881 homeowners. This has
resulted in a total of 15 approved cases (1.7% approval rate).
Regular City Council Meeting
June 26, 2007
There is approximately $863,671 available in the 108 Loan fund to be used for
actual projects. Staff is recommending that the funds be used for Parks projects
within the CDBG-eligible areas of Lubbock.
These projects include:
Burns Park, 23rd Street and Avenue K, replacement of the existing
playground equipme�t and ADA accessibility improvements to the park.
• Hollins Park, lst Street and Vernon, replacement of the existing
*""' playground equipment and ADA accessibility improvements to the park.
• Mae Simmons Park/Dunbar Historic Lake Improvements, MLK Boulevard,
construction of restroom, accessibility improvements, and a walking track.
To change the proposed use of the funds, staff must submit a change in use plan
to the Regional HUD Office in Fort Worth, Texas. Staff will also need to
complete environmental requirements as set forth by HUD.
After today's discussion and public hearing, this item will be brought back to
Council for a vote on July 26, 2007.
FISCAL IMPACT
Funds used are federal funds from the Section 108 Loan Program. The
maximum to be allocated to these projects is $863,671.
Staff recommended approval.
Bill Howerton, Director of Community Development, gave comments and
answered questions from Council.
5.6. Public Hearing 10:0(� a.m. - Zoning: Zone Case No. 3082 (7903 19th
Street) Iiold a public Lea=� �g in continuation from previous City Council
Meeting to consider request of Andy R. Hernandez for a zoning change
from R-1 to C-4 on 1 acre of unplatted land out of Section 41, Block AK.
� This item was continued to the next Regular City Council meeting of July
� 12, 2007.
The applicant purchased a parcel that is the former location of Wrigley's
Rentals after the business moved out of the downtown area to this location. The
business was on a parcel outside the city limits at the time of the relocation. The
collection of materials on the parcel remains staggering, but it is a legal
nonconforming use until it has been vacated for one year. The applicant is the
caretaker of Mr. Wrigley who now lives in a rest home. Mr. Hernandez is in the
process of clearing the lot and does not intend to continue the rental business.
The applicant is requesting C-4 and has not expressed an indication of what the
proposed use would be other than the desire of placing a billboard on the lot.
After the staff discussed at length the background of the West 19th Street
Policy described below and the fact that billboards have traditionally been an
excluded use, Mr. Hernandez chose to continue the request. Even without the
billboard, the zone change will make the property marketable to a large number
of permitted uses once the rental facility is cleared.
Adjacent land uses:
N— 19th Street and vac�r►t
S— the horse arena of thc- hcmeowner to the south
E — commercial
�""' W — commercial
The proposed zoning is within a geographic area that has developed over the
years as being subject to an informal "West 19th Street Corridor" zoning
policy. T'he conditions that will be proposed for this parcel have been attached
to a majority of zone cases by the Planning Commission and City Council for
C-4 zoning requests along 19th Street west of Loop 289. Following the
informal policy, the recommendations exclude a number of C4 permitted uses
that have been eliminated during zone cases on the four miles west of the Loop
inside the City. The policy evolved since the 1960s on land outside the Loop
adjacent to 19t�'� Street because the street is a State Highway and many heavy
n
�L�5
Regular City Council Meeting
June 26, 2007
commercial uses and industrial uses were inherited as the area was annexed (as
well as the fact that the Comprehens� t�e L� nd Use Plan recommended that C-4
be limited to major highways and expressways). However, several C-4 uses
were identified during the evolution of numerous zone cases as not the most
compatible with the major entry portal to Lubbock represented by 19th Street.
Thus, the request with conditions meets both the Comprehensive Land Use Plan
and zoning policies. The project will have no additional impact on the
thoroughfare system. TxDOT governs driveways to 19th Street.
The Planning Commission recommended the request which includes the
following "strikes" as permitted uses:
Prohibited uses:
• Automobile body shops
• Billboards
• Commercial private clubs and teenage clubs
• Dancehall
• Used furniture store
• Game room except as an incidental use, pool, billiard andlor domino parlor
• Motorcycle shop
• Second hand goods store or pawn shop
• Used car lot
• Nightclubs
FISCAL IMPACT
No fiscal impact.
Staff supports the recommendation of the Planning and Zoning Commission.
Randy Henson, Director of Planning, gave comments and answered questions
from Council.
After discussions were had, consensus from Council was to continue this item
until the next City Council meeting of July 12, 2007, so more information could
be gathered and Council would have the opportunity to visit the area.
Motion was made by Council Member DeLeon, seconded by Council Member
Jones to continue this item until the July 12, 2007 Regular City Council
meeting. Motion carried: 7 Ayes, 0 Nays.
5.2. Public Hearing 10:00 a.m. - Zoning: Ordinance No. 2007-00060 Zone Case
No. 2072-A (2123 15th Street) Hold a public hearing to consider request of
ADC Architects Developers Contractors (for Alberto Chavez) for a zoning
change from A-2 limited to a church and church related uses to A-1
Specific Use (for apartments with reduced parking) on Lot 12, Block 52,
Overton Addition.
ORDINANCE NO. 2007-�00o0
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBROCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 2072-A; A ZONING I;HANGE FROM A-2 LIMITED TO
CHURCH AND CHURCH RELATED USES 'IO A-1 SPECIFIC USE FOR
APARTMENTS WITH REDUCED PARKING ON LOT 12, BLOCK 52, OVERTON
ADDITION, LUBBOCK, TEXAS; SUBJECT TO CONDITIONS; PROVIDING A
PENALTY, PROVIDING A SAVINGS CLAUSE AND PROVIDING FOR
PUBLICATION.
Mayor Miller opened the public hearing at 10:13 a. m. Ted Hogan and Lorrie
Jarnagin appeared in favor of the zoning change. No one appeared in
opposition. Mayor Miller closed the hearing at 10:20 a. m.
The City Council considered this case with a recommendation for approval
from the Planning Commission on Apri126, 2007. In the week prior to the City
Council hearing, amended information on the number of units actually in
existence on the second floor (six versus five) and an amended number of units
proposed on the ground floor (four one bedroom units versus three two
� r� �n,i
� iY v
Regulaz City Council Meeting
June 26, 2007
bedroom and one single bedroom unit on the ground floor) was provided to
staff and included in the discussion with City Council.
City Council was concerned that there was no discussion of the changes when
the Planning Commission reviewed the case. In addition, public testimony of
activities at the facility were not described to the Planning Commission, and the
applicant or his agent was not present to address questions and issues. The
applicant obtained the assistance of a local real estate agent the day before the
Planning Commission hearing who made a compelling but unacceptable
�'""'' proposal (for the neighbors) that the ground floor be allowed to remain as an
open space for social functions for the residents, or a coin operated laundry, and
to not have to reinstate the curb line and landscaping along Avenue V as will be
noted in the recommendatio�is �f the Planning Commission below.
Staff "started from scratch" with regard to comments and recommendations for
the case.
Presented in the first case, background for this property was speculated as
possibly a"mom and pop" grocery store or some other small business on the
first floor and apartments on the second floor prior to the current zoning
ordinance that was adopted in 1975. Since then, the original use has been
determined as a structure with six upstairs apartments, with the ground floor
being primarily a laundry for the residents and the public, as well as a small
area where a pool table was located and used by the residents.
In 1976, the First Baptist Church bought the building and requested zoning that
would allow the ground floor as extended church activity area (Sunday school
and other church gatherings), and the apartments were either rented or used in
some capacity for the church.
Several months ago, the applicant requested Zoning Board of Adjustment
approval to expand a nonconforming use to allow conversion of the bottom
floor into the three two-bedroom and one single-bedroom apartments. As staff
researched the case the need for the request to be a zone case versus a ZBA
request became clear because the bottom floor has never been used for
apartments and the current zone case ties the property to the church and church
related uses.
Adjacent land uses:
N— a small business now zoned C-1
S — residential
E — residential
W — vacant, zoned residential
The structure has been a fixture at this location for years. While the
Comprehensive Land Use Plan indicates "single family residential" for this
vicinity of Overton South, it is fact that a number of parcels were zoned for
apartrnents that exist in the area, as well as one Apartment Medical (AM)
(office) and several commercial parcels.
In the case of the current building, with the change of zoning for church and
church related use in 1976, the ability to claim the apartments as
nonconforming apartments for rent to the general public was dissolved. If
approved as "residential", although A-1 is a higher density than R-1, it is the
opinion of staff that a minor amendment to the Comprehensive Land Use Plan
�, will not be necessary.
The first hearing before the Planning Commission was delayed due to the
absence of the owner and the inability of the representative to accurately
represent exactly what is being proposed. The applicant also started renovation
of the second story units with no building permit. Their opinion was that the
work did not meet the level of needing a permit. With the first delay, the
Planning Commission re.�ue�<<:d the applicant to acquire an investigative permit
from Building Inspection. They did that, and the inspection revealed a host of
issues that should have been completed under a construction permit and subject
to inspections for compliance.
Regular City Council Meeting
June 26, 2007
The inspection report from Building Inspection and the Fire Marshall's report
are provided in agenda backup.
Even before the lack of communication, permits, and attendance by the owner,
one aspect of the zone case not clear in the original filing is related to the
number of parking spaces available. The parcel has 15 "head in" 90 degree
parking spaces from both adjacent streets. As the neighborhood has indicated in
discussion with staff since the City Council meeting, 12 of the spaces are "head
in" from Avenue V and are the result of someone breaking off the curb to allow
parking. The result created two violations of City law — the first is parking
across the sidewalk and parkway (the area between the original curb and
sidewalk) and the fact that parking for aparhnents is supposed to be located
entirely on the parcel with no backing into the adjacent street. When that
process (breaking the curb) happened is not known, but the length of time does
not alter the fact that it is not legal. The apartments were constructed prior to
the date that the zoning code required any ori-site parking.
A discussion between staff and some neighborhuod residents creates a proposal
significantly different from the stated u�je:;tive of the applicant. As noted, it is
verified that when the complex was constru::ted the side along Avenue V was
landscaped with a sidewalk in place and no curb cuts. The actual parcel has
only the three spaces on 15th Street that are semi-legal in that they are on-site
but still back into the street. A list of conditions noted as recommendations
below will illustrate what staff and at least most of the adjacent property owners
indicate will allow an appropriate measure of use by the owner and not be a
"step back" for the neighborhood as quoted by one Council member. The case
will continue to need to be titled as Specific Use because the six one-bedroom
units would normally require eleven spaces (nine for the apartments and two for
guests). The final result will be short eight spaces.
Reconstruction of the adjacent curb on Avenue V will provide at least six
spaces on street spaces that are not usually considered in a zone case but that
are the preference of the neighborhood. Also, the neighbors are adamant that
the numbers of units or bedrooms not be increased. The recommended
conditions will speak to that issue. Many of the aparhnents in Overton were
built before a zoning ordinance even existed, this particular unit was
constructed during several "lax" years during the 1960s and 70s. As noted in
the last two hearings, the dilemma for the owners of this property and the City
is to either have a change of zoning that will allow use of the building, or the
building will remain vacant and subject to vandalism until it is referred to the
Substandard Housing Commission and an order issued that it must be brought
into compliance or torn down.
Approval of the request with the amendcd conditions should not have a
significant impact on the area. This entire area is subject to congestion because
of a significant number of accessory units, Texas Tech off-campus parking, and
Lubbock High School to some extent.
The Planning and Zoning commission, after a lengthy discussion and some
difference of opinion on which options to recommended to City Council,
submits the following as a positive recommendation that has the support of at
least a majority of the neighborhood (the immediate neighbor to the east
actually supported the additional units and expressed appreciation to the
improvements made to the property by the new owner):
1. All of the units on the second floor shall meet a level of the construction
and fire codes as determined acceptable by the Building Official and Fire
Marshall.
2. The bottom floor shall be used only in the following manner: The area may
be partitioned with a door installed in each partitioned space as storage for
the unit above.
3. The exterior of the building be either painted and/or enhanced with regard
to appearance.
5^3
Regular City Council Meeting
June 26, 2007
4. The curb �n Avenue V shall be replaced, the parkway and private portion of
the parcel adjacent to Avenue V shall be landscaped, and the sidewalk shall
be approved by the Building Official as acceptable or repaired to an
acceptable condition.
FISCAL IMPACT
No fiscal impact.
Staff supports the recommendation of the Planning and Zoning Commission.
�
Randy Henson, Director of Planning, gave comments and answered questions
from Council. Mr. Henson requested an amendment to the Ordinance by
adding another bulleted item to #2, which states that the area shall be enclosed
and used for functions related to maintenance of the property only.
Motion was made by Mayor Pro Tem Gilbreath, seconded by Council Member
Jones to pass on first reading Ordinance No. 2007-O0060 with an amendment
to add another bulleted item to #2, which states that the first floor shall remain
unused, and the area shall be enclosed and used for functions related to
maintenance of the property only. The area shall not be used for any public or
social gathering. Motior carried: 7 Ayes, 0 Nays.
5.3. Public Hearing 10:00 a.m. - Zoning: Ordinance No. 2007-00061 Zone Case
No. 2499-A (2411 20th Street) Hold a pubGc hearing to consider request of
Robin Sittre for zaning change from R-2 to AM on Lot 6, Block 2, Ellwood
Place.
ORDINANCE NO. 2007-O0061
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 2499-A; A ZONING CHANGE FROM R-2 TO AM
ZONING ON LOT 6, BLOCK 2, ELLWOOD PLACE, LUBBOCK, TEXAS;
�.,. PROVIDING A PENALTY; SUBJECT TO CONDITIONS; PROVIDING A SAVINGS
CLAUSE AND PROVIDING FOR PUBLICATION.
Mayor Miller opened the public hearing at 10:13 a. m. No one appeared on
behalf of Robin Sittre. No one appeared in opposition. Mayor Miller closed
the hearing at 10:20 a. m.
The applicant originally filled out the wrong form (for the Zoning Board of
Adjustment) the staff corrected the application as a zone case. Zoning required
for a daycare with more than six children requires Apartment (A-2), Apartment
Medical (AM) or commercial zoning.
Adjacent land uses:
N — commercial
S — residential
E — residential
W — office develop_nen+
This block face is currently subject to a policy for conversion to offices within
the Comprehensive Land Use Plan. Before development of the bank building
and restaurants between 19th Street and 20th Street, the full block face was
developed as upscale single family dwellings. While the original trend on the
block was for offices, childcare is a permitted use in the AM District. The
offices on the block are zoned AM limited to offices since the requests were
�� made before the development of the Garden Office District. A number of
homes remain on the block and will not be rezoned as a matter of policy until
requested by the owner; presumably their appraisal is not affected until the land
is actually rezoned. As a matter of policy, the request is consistent with the
Comprehensive Land Use Plan.
The applicant will be expected to meet the requirements for parking and
building code issues for childcare occupancy with the exceptions that a circle
drive is normally dictated, the width of the parcel will not allow construction of
that requirement. The building will be part of an existing childcare operation
across the street in the commercial area.
5u9
Regular City Council Meeting
June 26, 2007
The project will have no impact on the thoroughfare system.
The Planning and Zoning Commission recommended the request with the
following conditions:
1. An attempt for appropriate on site parking shall be made, and the normally
required circle drive will not be a requirement.
2. Should the business that is north of 20th Street that is the primary facility
for the daycare be abandoned as a daycare facility, this structure will be
required to submit a new zon
standing facility.
FISCAL IMPACT
e case with site plan to prove up as a free
No fiscal impact.
Staff supports the recommendation of the Planning and Zoning Commission.
Motion was made by Council Member Jones, seconded by Mayor Pro Tem
Gilbreath to pass on first reading Ordinance No. 2007-O0061 as recommended
by staff. Motion carried: 7 Ayes, 0 Nays.
5.4. Public Hearing 10:00 a.m. - Zoning: Ordinance No. 2007-00062 Zone Case
No. 2658-I (3103 SOth Street) Hold a public hearing to consider request of
Hugo Reed and Associates, Inc. (for U-Stor of America) for a zoning
change from A-2 to C-4 Specific Use (for mini-warehouses) and C-2 on a
3.5 acre portion of Tract E Boardwalk Addition.
ORDINANCE NO. 2007-O0062
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 2658-I; A ZONING CHANGE FROM A-2 TO C-2 AND
C-4 SPECIFIC USE FOR MINI WAREHOUSES ON A 3.5 ACRE PORTION OF
TRACT E, BOARDWALK ADDITION, LUBROCIC, TEXAS; SUBJECT TO
CONDITIONS; PROVIDING A PENALTY, PROVIUING A SAVINGS CLAUSE AND
PROVIDING FOR PUBLICATION.
Mayor Miller opened the public hearing d� 10:13 a. m. No one appeared on
behalf of U-Stor of America. No one appeared in opposition. Mayor Miller
closed the hearing at 10:20 a. m.
The applicant is requesting new zoning for the site at SOth Street and Elgin
Avenue behind W.D. Wilkins Furniture and Rosa's Restaurant. The east portion
is requested as C-4 Specific Use to expand the current mini-warehouse project.
The west portion is requested as C-2 to enable development with a light
commercial use. A gate or entry to the mini warehouse project is indicated as a
part of the site plan through the C-2 area. The entire block, except for the
former Second Baptist Church, was the location of the former Monterey
Shopping Center.
The applicant is requesting C-2 zoning from the west edge of the proposed
mini-warehouse expansion to Gary Avenue. Several years ago, a case for this
same parcel was proposed except that the area desired as C-2 within this request
was targeted as C-4 for a general contractor office and shop compound that was
heavily screened from Gary Avenue. That case was denied by City Council
based on the recently completed but yet to be adopted Central Lubbock Study
that discouraged heavy commercial zoning along the SOth Street corridor. This
proposal is much closer to the intent of the study than the last request.
A portion of the proposed C-2 parcel in this case (south of Rosa's Restaurant
and W.D. Wilkins Furniture) is across from residential on 53rd Street and it
backs up to the senior living center t:� +he south. The staff and the owner have
explored a number of uses for this out of the way parcel to be redeveloped and
become an asset as an infill project while not a detriment to the adjacent
property owners. It is important to note that a majority of this zone case is north
of the single level portion (cottages) of the senior living center, not the multi-
story portion. Screening of the development from the senior living parcel and a
���
Regular City Council Meeting
June 26, 2007
small portion along Gary Avenue will be required either by the Zoning Code or
the recommended staff conditions.
Adjacent land use:
N - commercial
S - senior care facility
E- commercial and a s�:�all portion of residential
W- commercial (C-4 Speci�c Use for a mini-warehouse project)
� The project is reasonably consistent with the intent of the Comprehensive Land
Use Plan. Approval of the expansion of the adjacent mini-warehouse project is
screened from Gary Avenue and should have no impact on the area with the
existence of the current project in the interior area of the old Monterrey
Shopping Center tract. The proposed C-2 is across Gary Avenue from existing
C-3 except the approximate south 50 to 75 feet.
The project should have less impact on overall traffic in the area since the
occupants should not attract a customer base like general retail.
The Planning Commission recommended the request to the City Council with
conditions:
1. The C-4 Specific use development shall be in substantial compliance with
the site plan proposed in Zone Case 2658-G for the expansion of the mini-
warehouse project (see item 3).
2. A steel post wood picket fence is in place on the south side of the C-2
property, the same shall be constructed along for 75 feet north from the
southwest corner oi; the tract adj acent to Gary Avenue.
3. The screening fence on ule mini-warehouse portion of the request shall
comply with the SD1 site plan from the file from ZC 2858-G. A gated
opening shall l�ti alZav��ed in the fence.
� FISCAL IMPACT
No fiscal impact.
Staff supports the recommendation of the Planning and Zoning Commission.
Motion was made by Council Member Jones, seconded by Mayor Pro Tem
Gilbreath to pass on first reading Ordinance No. 2007-O0062 as recommended
by staff. Motion carried: 7 Ayes, 0 Nays.
5.5. Public Hearing 10:00 a.m. - Zoning: Ordinance No. 2007-00063 Zone Case
No. 3055-A (Avenue R and Glenna Goodacre Boulevard) Hold a public
hearing to consider request of Hugo Reed & Associates (for McCanton
Woods, Ltd) for zoning change from R-3 to C-3 on Lots 6-10, Block 113,
Overton Addition.
ORDINANCE NO. 2007-O0063
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 3055-A; A ZONING CHANGE FROM R-3 TO C-3
ZONING ON LOTS 6-10, BLOCK 113, OVERTON ADDITION, LUBBOCK, TEXAS;
PROVIDING A PENALTY; PRO`-'IDING A SAVINGS CLAUSE; AND PROVIDING
FOR PUBLICATION.
Mayor Miller opened the public hearing at 10:13 a. m. No one appeared on
� behalf of McCanton VJuods, Ltd. No one appeared in opposition. Mayor
Miller closed the hearing at ? 0:20 a. m.
The applicant is requesting C-3 on lots along Avenue R between 7th Street and
Glenna Goodacre (8th Street) to join with already commercially zoned lots that
face Avenue Q. A proposed plat will close the alley and the entire block will be
eligible for redevelopment.
Adjacent Land Uses:
N — commercial
S— high density residential eligible for redevelopment as commercial
Regular City Council Meeting
June 26, 2007
E — commercial
W — commercial
The request is consistent with the amendment made to the Comprehensive Land
Use Plan for the redevelopment of the Overton North area. When developed,
the eventual use will comply with commercial development guidelines.
The project will have little impact on the thoroughfare system; Texas
Department of Transportation will govern curb cuts allowed on Avenue Q.
The Planning and Zoning Commission supports the request as submitted.
FISCAL IMPACT
No fiscal impact.
Staff supports the recommendation of the Planning and Zoning Commission.
Motion was made by Council Member Jones, seconded by Mayor Pro Tem
Gilbreath to pass on first reading Ordinance No, 2007-O0063 as recommended
by staff. Motion carried: 7 Ayes, 0 Nays.
5.6. This item was considered following Item 5.1.
5.7. Public Hearing 10:00 a.m. - Zoning: Ordinance No. 2007-00064 Zone Case
No. 3083 (6302 114th Street) Hold a public hearing to consider request of
Hugo Reed and Associates, Inc. (for Carl Mortensen) for a zoning change
from R-1 to C-2 on 74.42 acres of unpla+#�d land out of Block AK, Section
21.
ORDINANCE NO. �007-O0064
AN ORDINANCE AMENDING ZONING OR DINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 3083; A ZONING CHANGE FROM T TO R-1 and C-2A
ZONING ON 74.42 ACRES OF UNPLATTED LAND OUT OF BLOCK AK, SECTION
21, LUBBOCK, TEXAS; PROVIDING A PENALTY; SUBJECT TO CONDITIONS;
PROVIDING A SAVINGS CLAUSE AND PROVIDING FOR PUBLICATION.
Mayor Miller opened the public hearing at 10:13 a. m. No one appeared on
behalf of Carl Mortensen. No one appeared in opposition. Mayor Miller closed
the hearing at 10:20 a. m.
The applicant originally requested that the entire boundary of the playa that
abuts 114th Street and is surrounded by the proposed Fountain Hills
development be zoned C-2. During the meeting, the applicant amended the
request from C-2 to C-2A with a limited number of uses on a 450 deep parcel
adjacent to 114th Street and as R-1 on the balance. The applicant may, at a later
date, submit a request to the ZBA for a golf course on the R-1 portion, which is
a conditional use in R-1.
Adjacent land use is vacant to the north, east and west, and several older homes
on large lots exist to the south across l l�th Street. The proposal does not meet
the criteria established for the Comprehen:.:ve Land Use Plan. The location is
not at the corner of two major intersections. Development would be recovered
land from the playa along 114th Street and would constitute strip development
along 114th Street contrary to current polict�.
The applicant has developed a C-2A case on a reclaimed portion of the playa
that will limit uses to several that they believe will benefit the neighborhood
and limitations created by the configuration of the playa. The question to the
Commission was presented by staff as whether the proposal is an asset to the
development and fits the "lay of the land" better than any other proposal.
For the non-policy location proposed in this request the following is a
theoretical discussion — that the amount of "strip commercial" along major
thoroughfares in addition to the traditional 40 acres at each thoroughfare
intersection is fostering the circumstances of the City of Lubbock zoning
process becoming involved in an undesirable situation of providing too much
commercial property than the market will sustain. While it is not the specific
responsibility of the City to dictate the market, when zoning becomes a factor
Regular City Council Meeting
June 26, 2007
in the appraisal and creates zoning for which there is a lack of the ability of the
owner to develop someone loses. If the current or new owner pays retail values
for property and then cannot find a buyer or tenants, he or she is highly likely to
become the financial loser.
In the alternative, several well known examples of the viability of off-corner
locations exist on the ground. The Falls Subdivision to the east on 114th Street
between Quaker and Slide Road is one example. When the community
responds to too many requests for commercial outside the bounds of established
!"" policy and there are not extenuating circumstances, the process is not, in the
opinion of the staff, ��od business. While Lubbock has a number of very
successful strip locations - 4?nd Street west of Frankford is a hot market. South
Slide Road is prov:ng viable. But, both these streets represent more than the
"normal" thoroughfare, with 82nd Street generating traffic from the Brownfield
Highway and Slide �tcaci being a major connection to many developed areas
south of Lubbock, as well as a TxDOT facility (a Farm to Market Road). The
other miles and miles of thoroughfares that are developed as Lubbock grows
will not have the luxury of having enough roof tops to sustain both the ten-acre
corner commercial groupings as well as the strips in between.
In the past, a number of locations that have been illustrated to prove up the "too
much commercial" include:
• 98th Street and Slide Road, the northeast corner has a ten acre allotment in
the original zone case for the Lakeridge Public Utility Department, but nine
acres were rezoned to residential since that market is stronger in the long
run for the consumption of land.
• 82nd Street and Frankford Avenue, the southeast corner was zoned as a ten
acre commercial site. All of the land except the 82nd Street frontage was
rezoned to residential and has been built out for a number of years.
The corner forty acre allocation of commercial at major intersections is
� intended to allow residential to occur between mile intersections, normally with
every other street developed with a cul-de-sac — allowing the thoroughfare to
function as designed with the least amount of interFerence from side streets or
curb cuts. The origin;:l thinking behind the massing of commercial at
intersections was to allow tne development of major shopping areas for
consumers to park in one location and visit a number of shops, and to not have
to travel along the mu;�- street to visit each shop while exiting and entering
from a thoroughfare. With this style of development, both the traveling public
and the business community enjoyed access and a safer street system.
All this additional discussion is to indicate that the process of allocating
commercial, apartment and residential areas is a vital asset and responsibility to
the community that is accomplished through the Comprehensive Land Use
Plan. Changes should be contemplated with forethought and reason.
The drawing and preliminary plat for Fountain Hills will show that a street
could be connected in the vicinity of 112th Street or 113th Street, and with a cut
and fill a series of single family cul-de-sac lots could be introduced on
north/south streets as are the lots to the east. The applicant is of the opinion that
the cut and fill costs for residential square footage would not create a return on
investrnent.
Staff is very cautious with regard to requests as represented by this zone case
('"' due to concern about over-abundance of commercial away from the corners of
major thoroughfares. Mr. Mortenson has three such corners in this 416-acre
development. Also, as noted at the beginning of this discussion, the applicant
has asked that the number of uses be limited and perhaps even designed to take
advantage of the rest of the playa.
The motion by the Planning �ommission reflects that the action is a minor
amendment to the Comprehensive Land Use Plan and recommended the request
to the City Counci] witb the following conditions:
1. The uses permitted in the C-2A District shall be limited to:
��3
Regular City Council Meeting
June 26, 2007
• restaurants with no drive thru (no window service fast food)
• professional and medical offices
• health or athletic clubs
• church
• daycare
2. The approximate 1,4321ength of the property would be limited to a curb cut
plan approved by the Planning Commission before any portion of the
property is developed.
FISCAL IMPACT
No fiscal impact.
With only the generic reservations described above and during several recent
"strip" annexation cases, staff supports the recommendation of the Planning
Commission.
Motion was made by Council Member Janes, seconded by Mayor Pro Tem
Gilbreath to pass on first reading Ordinance No. 2007-O0064 as recommended
by staff. Motion carried: 7 Ayes, 0 1�::�•s.
5.8. Public Hearing 10:00 a.m. - Zoning: Ordivance No. 2007-00065 Zone Case
No. 3085 (6502, 6504, 6506, 6508, 6510, and 6512 21st Street) Hold a public
hearing to consider request of Drue Gault (for Cameron Communities,
L.L.C.) for zoning change from R-2 to GO on Lots 85-A-1 through 90-B-1,
Ridgewood II Addition.
ORDINANCE NO. 2007-O0065
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 3085; A ZONING CHANGE FROM R-2 TO GO
ZONING ON LOTS 85-A-1 THROUGH 90-B-1, RIDGEWOOD II ADDITION,
LUBBOCK, TEXAS; PROVIDING A PENALTY; PROVIDING A SAVINGS CLAUSE;
AND PROVIDING FOR PUBLICATION.
Mayor Miller opened the public hearing at 10:13 a. m. No one appeared on
behalf of Cameron Communities, L.L.C. No one appeared in opposition.
Mayor Miller closed the hearing at 10:20 a. m.
The applicant is requesting Garden Office as the zoning on a series of lots along
21 st Street west of Milwaukee Avenue. The lots are currently zoned for garden
homes, and four of the lots on the west end have actually been built as
residential.
Adjacent land uses:
N — commercial
S — duplex development
E — commercial
W — residential
The request is different than most locations for Garden Office (although an area
west of University Avenue on 81 st Street has the same type of designation
requested in this case). The row of lots across the street are developed as duplex
lots and within the policy guidelines of the Comprehensive Land Use Plan —
Garden Office zoning is considered a buffer in the same manner as the duplex
zoning, or the current garden home zoning.
Regarding zoning policy, this case should depend a lot on what the owners of
the duplex units (since they are the established use) think about the change. The
only letter of protest is in the file.
As the property is now platted for Garden Homes, the number of curb returns
and actual traffic associated with off thoroughfare offices may be less than
average for garden home use, plus the office users normally are not present at
night.
The Planning and Zoning Commission recommended the request to the City
Council as presented.
���
Regular City Council Meeting
June 26, 2007
FISCAL IMPACT
No fiscal impact.
Staff supports the recommendation of the Planning Commission. The Garden
Office use will back up to true commercial that fronts on 19th Street and help
buffer the existing duplex units to the south.
Motion was made by Council Member Jones, seconded by Mayor Pro Tem
Gilbreath to pass on first reading Ordinance No. 2007-O0065 as recommended
�°� by staff. Motion carried: 7 Ayes, 0 Nays.
5.9. Public Hearing 10:00 a.m. - Zoning: Ordinance No. 2007-00066 Zone Case
No. 3087 (5801 Erskine Street) Hold a public hearing to consider request of
Randy Brooks (for Town & Country Food Stores) for zoning change from
Commercial (C-2) to Commercial (C-3) on Tract B-1, Shadow Hills
Addition.
ORDINANCE NO. 2007-O0066
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CIT`' OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 3087; A ZONING CHANGE FROM C-2 TO C-3
ZONING ON TRACT B-1 SAVE AND EXCEPT THE SOUTHWEST PORTION
DESCRIBED AS THE (E/V;� 8�.� FEET AND THE (N/S) 98.71 FEET, SHADOW
HILLS ADDITION, LUBBOCK, TEXAS; PROVIDING A PENALTY; SUBJECT TO
CONDITIONS; PROVIDING A SAVINGS CLAUSE AND PROVIDING FOR
PUBLICATION.
Mayor Miller opened the public hearing at 10:13 a. m. No one appeared on
behalf of Town & Country Food Stores. No one appeared in opposition.
Mayor Miller closed the hearing at 10:20 a. m.
T'he applicant is requesting a parcel located at Erskine and Frankford be
� amended from C-2 to C-3 to enable construction of a convenience store with
gasoline sales. The shape of the C-2 parcel is a fat "L", and the applicant
withdrew the "L" portion on the west from the zone case leaving a rectangular
parcel that fronts Erskine and North Frankford Avenue.
Adjacent land uses:
N— undeveloped, subject of approval of a commercial zone request
S— existing C-2, originally developed as a garden center and now used as a
child care facility
E— across Frankford, the town home project described below
W— a City of Lubbock fire station and several homes
The parcel is eligible fc, - C-3 within the policies of the Comprehensive Land
Use Plan. Why C-2 was requested originally probably had to do with the
smaller than ten acre allotment the developer chose for the corner when Shadow
Hills was master ��'ar :�d. The property to the east was originally zoned
commercially.
Until this case was filed there has been no market for commercial in this
vicinity. The owner of the southeast corner down zoned the entire original
commercial parcel to build a two cul-de-sac subdivision of townhomes. A
similar down zone was done on a portion of the northeast corner, although a
strip adjacent to Frankford and Erskine remains commercial.
'"'�"� One resident did object during the meeting, concerned about noise, trash, and
lighting resulting from the convenience store. When informed that the store
portion is eligible on the C-2 tract, the C-3 adds the sales of gasoline; the
resident remained unsatisfied. The applicant withdrew the "L" portion of the
parcel noted above and agreed to the fencing along the west property line as
noted in the Commission recommendations below to attempt to satisfy the
resident's concerns. The parcel will be isolated from the main development lot
but still zoned C-2. The resident's garden home backs up to the child care
facility (originally constructed as a garden center) rather than the tract in
question.
5�5
Regular City Council Meeting
June 26, 2007
The project will have little impact on the thoroughfare plan. A limitation of one
curb cut on Erskine, located as far west as feasible from the intersection will be
requested as a condition. Curb cuts on Frankford Avenue are within the
jurisdiction of TxDOT.
The Planning and Zoning Commission recommended the request with the
following condition:
The parcel shall be limited to one drive r�*an �n Erskine, as far west of the
intersection with Frankford Avenue as feasible.
FISCAL IMPACT
No fiscal impact.
Staff supports the recommendation of the Planning and Zoning Commission.
Randy Henson, Director of Planning, gave comments and answered questions
from Council.
Motion was made by Council Member Jones, seconded by Council Member
Gilbreath to pass on first reading Ordinance No. 2007-O0066 as recommended
by staff. Motion carried: 7 Ayes, 0 Nays.
5.10. Public Hearing 10:00 a.m. - Zoning: Ordinance No. 2007-00067 Zone Case
No. 3088 (East of Quaker Avenue at 108th Street) Hold a public hearing to
consider request of AMD Engineering, LP (for Dr. Jewell Davis) for zoning
change from T to R-1 Specific Use (for Garden Homes) on 1.12 acres of
unplatted land out of Section 17, Block E2.
ORDINANCE NO. 2007-O0067
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 3088; A ZONING CHANGE FROM T TO R-1
SPECIFIC USE FOR GARDEN HOMES ON 1.12 ACRES OF UNPLATTED LAND
OUT OF SECTION 17, BLOCK E-2, LUBBOCK, TEXAS; PROVIDING A PENALTY,
PROVIDING A SAVINGS CLAUSE AND PROVIDING FOR PUBLICATION.
Mayor Miller opened the public heari:�g ��t 10:13 a. m. No one appeared on
behalf of Dr. Jewell Davis. No one appeared in opposition. Mayor Miller
closed the hearing at 10:20 a. m.
The request is to rezone an R-1 azea for development as garden homes.
Adjacent land uses:
N — vacant, zoned R-1
S — vacant, zoned R-1
E — vacant, zoned R-1
W— vacant, zoned Garden Office
The request is consistent with the Lubbock Comprehensive Land Use Plan and
with zoning policy. The change is simply one style of residential construction to
another (free standing single family to garden home single family).
The project will have no impact on the thoroughfare system.
The Planning and Zoning Commission recommended the request to the City
Council as submitted.
FISCAL IMPACT
No fiscal impact.
Staff supports the recommendation of the Planning and Zoning Commission.
Motion was made by Council Member Jones, seconded by Mayor Pro Tem
Gilbreath to pass on first reading Ordinanc�• No. 2007-O0067 as recommended
by staff. Motion carried: 7 Ayes, 0 Nays.
5.11. Public Hearing 10:00 a.m. - Zoning: Ordinance No. 2007-00068 Zone Case
No. 3089 (Frankford Avenue and 102nd Street) Hold a public hearing to
consider request of Truett Craft (for CLCL Development) for zoning
��s�
Regular City Council Meeting
June 26, 2007
change from T to Apartment Medical (AM) Garden Office on 16.416 acres
located in Section 21, Block AK.
ORDTi?ATTCE NO. 2007-O0068
AN ORDINANCE A1�iENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NG. 3U�9; A ZONING CHANGE FROM T TO AM ZONING
ON 16.416 ACRES LOCATED IN SECTION 21, BLOCK AK, LUBBOCK, TEXAS;
PROVIDING A PENALTY; SUBJECT TO CONDITIONS; PROVIDING A SAVINGS
� CLAUSE AND PROVIDING FOR PUBLICATION.
Mayor Miller opened the public hearing at 10:13 a. m. No one appeared on
behalf of CLCL Development. No one appeared in opposition. Mayor Miller
closed the hearing at 10:20 a. m.
The applicant i s requesting a ten-acre parcel south of 98th Street on the west
side of Frankford Avenue to be zoned to allow development of a
convalescent/nursing home and offices that are allowed in the AM District.
Adjacent land uses:
N — vacant
S — school under construction
E— single family across Frankford Avenue
W— vacant, zoned single family
The parcel is between a parcel being developed currently by Cooper
Independent School District as a school and a ten-acre parcel on the corner of
98th Street and Frankford Avenue that is owned by a church. The applicant is
developing the subdivisiun t� �he west (Lakewood Estates). Originally, this ten-
acre tract was under contract by Lubbock-Cooper to build a secondary school,
that agreement has since been abandoned.
,�-. The request is consistent with the Comprehensive Land Use Plan with regard to
facilities such as a convalescent home, church or andlor offices be developed on
the perimeter of subdivisions, adjacent to the thoroughfares. One of the
neighbors in the large lot subdivision across Frankford Avenue questioned the
proposed land use as "strip commercial", although AM and Garden Office are
not officially included in commercial, they do not constitute single family. A
discussion may exist as to whether the addition of a convalescent home and
garden offices is less or more of a neighbor than the originally planned junior
high school.
The project will develop within the guidelines of AM when actual construction
is proposed. A proposed condition will eliminate the Apartment-2 (A-2)
development that is included in AM, and the intention of the developer does not
include apartments. The project will have little additional impact on the
thoroughfare system, particularly after Frankford Avenue is developed to full
width. As noted, at one time Lubbock-Cooper had an option to build a junior
high school on the parcel that would have created a significantly greater amount
of traffic than this request.
T'he Planning and Zoning Commission recommended the request with one
condition:
The A-2 permitted use listing in AM is prohibited on this parcel.
FISCAL IMPACT
No fiscal impact.
Staff supports the recommendation of the Planning and Zoning Commission.
Motion was made by Council Member Jones, seconded by Mayor Pro Tem
Gilbreath to pass on first reading Ordinance No. 2007-O0068 as recommended
by staff. Motion carried: 7 Ayes, 0 Nays.
5.12. Public Hearing 10:00 a.m. - Zoning: Ordinance No. 2007-00069 Zone Case
No. 3086 (South of 39th Street between Elgin Avenue and Flint Avenue)
I3old a public hearing to consider request of the City of Lubbock Planning
� Ar�
�.�(
Regular City Council Meeting
June 26, 2007
Department for zoning change from R-1 �nd It-2 to R-2 and A-2 (limited to
a church and church related uses) on Lots 1-8, Block 1, McMath Addition
and Lot 1, Block 1, New Home Add«i�n.
ORDINANCE NO. 2007-G0069
AN ORDINANCE AMENDING ZONING ORDINANCE NO. 7084 AND THE
OFFICIAL MAP OF THE CITY OF LUBBOCK MAKING THE FOLLOWING
CHANGES: ZONE CASE NO. 3086; A ZONING CHANGE FROM R-1 AND R-2 TO R-
2 ZONING ON LOTS 1-8, BLOCK 1, MCMATH ADDITION AND A-2 ZONING
LIMITED TO CHURCH AND CHURCH RELATED USES ON LOT 1, BLOCK 1, NEW
HOME ADDITION, LUBBOCK, TEXAS; SUBJECT TO CONDITIONS; PROVIDING
A PENALTY; PROVIDING A SAVINGS CLAUSE AND PROVIDING FOR
PUBLICATION.
Mayor Miller opened the public hearing at 10:13 a. m. No one appeared on
behalf of, or in opposition of this zone case. Mayor Miller closed the hearing at
10:20 a. m.
The current Zoning Code requires that accessory living units or homes that
were subdivided into more than one living unit in Residential-1 (R-1) and
Residential-2 (R-2) be registered, a condition of a 1979 ordinance designed to
bring a halt to the continued conversion of multiple units on R-1 and R-2 zoned
lots, yet let owners keep what they had as "grandfath�red". Recently, the City
Council enacted a new exception subject to a hearing by the Zoning Board of
Adjustment to allow owners of properties with unregistered units that cannot
meet the criteria for registration as a"grandfathered" unit provided in the 1979
ordinance to have approval to use both the front and back units, but a provision
is that the owner must live in one of the units. The pride of ownership and
maintenance of older neighborhoods is the emphasis of that approval.
Staff and several neighborhood associations initiated the new exception to
allow the small units in back of a home or a main unit conversion constructed
prior to 1980 to be approved for use with a stipulation that the owner of the
property must live in one of the units. As noted, this exception is new, and does
not interfere with the ability of an owner of a property that was not registered in
1980 to "prove up" the nonconforming status and have the property registered
as nonconforming without the on-site residential requirement.
During investigation of this new ZBA conditional use, it was discovered that a
row of duplex units exist on the south side of 39th Street between Elgin Avenue
and Flint Avenue. They were built in the R-1 or single family district, how and
why are lost to history. With the new ordinance in effect, staff filed this zone
case to "clean up" that block (because the two units on one lot violate the
current ordinance) and also to enable a long existing church to have updated
zoning. When built, the church was a permitted use in R-1, in 1975 church use
was relocated to the Aparhnent-2 (A-2) district.
Adjacent land uses:
N — residential
S — park
E — residential
W — residential
As noted, the nature of the current land use will not change; the request is just
making the zoning conform to what has existed on the property for years.
The proposal will have no impact on the thoroughfare system.
The Planning and Zoning Commission recommended approval of this request
with one condition:
The A-2 portion of the request shall be limited to church and church related use.
FISCAL IMPACT
No fiscal impact.
Staff supports the recommendation of the Planning and Zoning Commission.
Regular City Council Meeting
June 26, 2007
Randy Henson, Director of Planning, gave comments and answered questions
from Council.
Motion was made by Council Member Jones, seconded by Mayor Pro Tem
Gilbreath to pass on first reading Ordinance No. 2007-O0069 as recommended
by staff. Motion carried: 7 Ayes, 0 Nays.
5.13. Grant Application Resolution - Business Development: Resolution No.
2007-R0295 authorizing the Mayor to execute a grant application with the
�„ Moody Foundation for additional funding of design, engineering, and
� construction of the O��erton Park Conference Center.
RESOLU: ��N NO. 2007-R0295
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the �iiy of Lubbock BE and is hereby authorized and directed
to execute for and on behalf of the City of Lubbock a Grant Application to the Moody
Foundation for additional funding for the Overton Park Conference Center, and all related
documents. Said Application is attached hereto and incorporated in this Resolution as if
fully set forth and shall be included in the minutes of the Council.
Passed by the City Council this 26�' day of June, 2007.
/s/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
/s/ Rob Allison
Rob Allison, Assistant City Manager
Development Services
APPROVED AS TO FORM:
/s/ Linda L. Chamales
Linda L. Chamales, Senior Att�rney
Office Practice Section
This resolution authorizes the Mayor to execute a grant application to the
Moody Foundation for additional funding for the 47,603 square foot Overton
Park Conference Center. The additional funding will increase the size and scope
of the project. The amount of the grant requested is $6 million.
The Overton Park Conference Center will be 47,603 square feet at a cost of
$23.4 million. Funding for the project includes $11.4 million from the North
Overton TIF Fund in Capital Project 91074, $6 million from the CH
Foundation, and $6 million from the Moody Foundation.
The grant application will be provided before the City Council Meeting.
FISCAL IMPACT
The $6 million grant provides additional funding for the Overton Park
� Conference Center. The total funding for the conference center is $23.4 with $6
million from the Moody Foundation, $6 million from CH Foundation, and
$11.4 from the North Overton TIF revenue funded certificates of obligation.
Staff recommended approval of this resolution.
Motion was made by C�u.r ,�l Member Jones, seconded by Council Member
Leonard to pass Resolution No. 2007-R0295 as recommended by staff. Motion
carried: 6 Ayes, 0 Nays.
Mayor Pro Tem Gilereath recused himself.
Regular City Council Meeting
June 26, 2007
5.14. Certificates of Obligation Issuance Ordinance - Finance: Ordinance No.
2007-00070 providing for the issuance of City of Lubbock, Texas, Tax and
Waterworks System Surplus Revenue Certificates of Obligation, Taxable
Series 2007 in an amount not to exceed $12 million; levying a tax and
pledging surplus waterworks system revenues in payment thereof;
approving the official statement; approving execution of a purchase
contract; and enacting other provisions relating thereto.
ORDINANCE NO. 2007-O0070
AN ORDINANCE PROVIDING FOR THE ISSUANCE OF CITY OF LUBBOCK,
TEXAS, TAX AND WATERWORKS SYSTEM SURPLUS REVENUE CERTIFICATES
OF OBLIGATION, TAXABLE SERIES 2007 IN AN AMOUNT NOT TO EXCEED
$12,000,000;LEVYING A TAX AND PLEDGING SURPLUS WATERWORKS
SYSTEMREVENUES IN PAYMENT THEREOF; APPROVING THE OFFICIAL
STATEMENT; APPROVING EXECUTION OF A PURCHASE CONTRACT; AND
ENACTING OTHER PROVISIONS RELATING TH�,RET�.
On April 26, 2007, the City Council approve� the first step in the issuance
process of City of Lubbock, Texas, Ta-; and Waterworks System Surplus
Revenue Certificates of Obligation, Taxable Series 2007. Resolution No. 2007-
R0175 was approved for the purpose of allowing the reimbursement of bond-
funded construction costs expected to be incurred prior to the issuance of
bonds. On May 11, 2007, City Council approved and authorized the publication
of a notice of intention to issue the certificates of obligation. The notices were
published on May 16, 2007, and again on May 23, 2007.
Staff is requesting that City Council approve the bond ordinance as a
"parameters ordinance", which delegates authority to the City's Chief Financial
Officer (CFO) to authorize the timing, terms, and interest rates of the bond
issuance. The ordinance designates certain parameters to which the CFO must
conform while executing the bond sale, and expires after a 60 day period. This
designated authority will allow the City to attain the most attractive rates or
terms by timing the issuance under the best market conditions. In accordance
with Section 7.1(a) of the Ordinance, the following conditions with respect to
the Bonds must be satisfied in order for the Authorized Officer to act on behalf
of the City in selling and delivering the Bonds to the Underwriter:
(a) the price to be paid for the Bonds shall be not less than 95% of the
aggregate principal amount of the Bonds;
(b) the Bonds shall not bear interest at a-«te �eater than the maximum rate
allowed by Chapter 1204, Texas Government Code, as amended;
(c) the aggregate principal amount oY the Ronds authorized to be issued for the
purposes described in Section 3.1 shati not exceed the maximum amount
authorized in Section 3.1;
(d) the maximum maturity for the Bonds shall not exceed forty years; and
(e) the Bonds to be issued, prior to delivery, must have been rated by a
nationally reco�nized rating agency for municipal securities in one of the
four highest rating categories for long term obligations.
At a future City Council meeting, City Council will be asked to approve a
resolution which authorizes the Mayor to execute a Design-Build Agreement
between Garfield Traub Development, LLC., Turner Lee Lewis, and the City of
Lubbock to design and construct a conference/civic center adjacent to a
separately-owned upscale hotel located on Tract 7, Overton Park. The proceeds
of this issue will provide the City's participation in the conference/civic center.
These certificates will not be sold until that contract has been executed and
approved by City Council.
On the date of execution, the City will sell these certificates on a negotiated
basis. The City and RBC Capital Markets, the City's Financial Advisor, will
negotiate a purchase price for the certificates with the City's chosen
undervvriter, Morgan Stanley.
�r�
Regular City Council Meeting
June 26, 2007
Senate Bill 1759 of the 77th Legislative Session amends Subchapter B, Chapter
1201, of the Texas Government Code under Section 1201.028(3) allowing the
authorization of a public security with only one reading of the ordinance.
Therefore, this will be the only reading of this ordinance that authorizes the
issuance of these certificates. The ordinance provided in the agenda backup
excludes certain information that is unknown as of the printing of the backup
material. Examples of this information include: annual principal & interest
amounts and maturity dates. Once the negotiations have concluded, the
information will be completed and a revised ordinance will be made available
to City Council.
FISCAL IMPACT
The ordinance authorizes the bonds not to exceed $12 million. The amount of
the debt issuance will be approximately $11.7 million, which provides $11.4
million in construction proceeds and approximately $0.3 million in associated
bond issuance costs.
The debt service payments on these obligations are funded from hotelfmotel tax
collections related to thP hotel, contractual payments from the owners of the
Hotel, and North Overton �'ax Increment Financing Reinvestment Zone
revenues.
The annual debt seiv:ce rayments will be approximately $1 million.
Staff recomm�nded approval of the first reading of this ordinance.
Motion was made by Council Member Price, seconded by Council Member
Jones to pass on first reading Ordinance No. 2007-O0070 as recommended by
staff. Motion carried: 7 Ayes, 0 Nays.
5.15. Contract Resolution - Public Works: Resolution No. 2007-R0296
authorizing the Mayor to execute a contract change order with Lone Star
Dirt and Paving to add three streets to the 2007 Primary Streets
Maintenance Program.
RESOLUTION NO. 2007-R0296
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed
to execute for and on behalf of the City of Lubbock, Change Order #1 to the Contract
previously executed between the City of Lubbock and Lone Star Dirt and Paving for 2007
Primary Streets Maintenance Program (RFP# 07-705-BM), and related documents. Said
Change Order #1 is attached hereto and incorporated in this resolution as if fully set forth
herein and shall be included in the minutes of the City Council.
Passed by the City Council this 26�' 3a;� of June, 2007.
Is/ David A. Miller
DAVID A. MILLER, MAYOR
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary
APPROVED AS TO CONTENT:
�
/s/ James Loomis
James Loomis
Assistant City Manager/Transportation and Public Work
APPROVED AS TO FORM:
/s/ Richard K. Casner
Richard K. Casner
First Assistant City Attorney
�r�
Regular City Council Meeting �
June 26, 2007
This change order includes seal coating three additional streets during the 2007
season. Lone Star Dirt and Paving has agreed to add the following streets to the
contract:
58th Street — University Avenue to Avenue U
58th Street — Avenue P to Avenue Q
SOth Street — Quaker Avenue to Slide Road
The change order increases the total lane miles from 34 to 43. The seal coat
program uses latex asphalt and crushed ston�.
FISCAL IMPACT
The contract increases $239,658 from $1,158,558 to $1,438,216.
$770,000 is appropriated in Capital Improvement Project 92101, Seal Coat
Program, and $2,928,396 is appropriated in Capital Improvement Project, Street
Maintenance Program, as approved on Item 5.15 of this agenda.
Staff recommended approval of this resolution.
Motion was made by Council Member Jones, seconded by Council Member
DeLeon to pass Resolution No. 2007-R0296 as recommended by staff. Motion
carried: 7 Ayes, 0 Nays.
5.16. Contract Resolution - City Council: Consider a resolution terminating the
Red Light Camera contract with American Traffic Solutions (ATS) for
convenience pursuant to Section 6.1 of the contract betvt�een the City and
ATS in light of the action of the Texas Legislature in Senate Bi111119.
John W. Leonard, III, Councilman, presented this item.
Each Council Member gave comments and participated in discussion on the red
light cameras.
After further discussion, Council Member Jones called for the question,
seconded by Council Member DeLeon. Vote was taken, which carried: 4
Ayes, 3 Nays. Mayor Pro Tem Gilbreath, and Council Members Leonard and
Klein voted Nay.
Motion was made by Council Member iec.nard, seconded by Council Member
Klein to pass this resolution as recommende:l. Motion failed: 2 Ayes, 5 Nays.
Mayor Miller, Mayor Pro Tem Gilbreath, and Council Members DeLeon,
Jones, and Price voted Nay.
5.17. Board Appointments - City Secretary: Consider five appointments to
Building Board of Appeals, one appointment to Junked Vehicle
Compliance Board, one appointment to Permit & License Appeal Board,
one appointment to Animal Shelter Advisory Committee, one appointment
to Canadian River Municipal Water Authority, four appointments to
Citizens Traffic Commission, four appointments to Civic Lubbock, Inc.
Board of Directors, one appointment to Community Development and
Services Board, and five appointments to Lubbock Water Advisory Board.
Motion was made by Council Member DeLeon, seconded by Council Member
Price to continue this item until the July 12, 2007 Regular City Council
meeting. Motion carried: 7 Ayes, 0 Nays.
5.18. This item was moved from regular agenda and considered following Item
3.3.
12:08 P.M. CITY COUNCIL RECESSED
12:50 P.M. CITY COUNCIL RECONVENED
6. WORK SESSION
6.1. Presentation - Business Development: Presentation of Lubbock Economic
Development Alliance and Visit Lubbock projects and activities. Gary
Lawrence, CEO (30 minutes)
� r_ �
.� : � ....
Regular City Council Meeting
June 26, 2007
This change order includes seal coating three additional streets during the 2007
season. Lone Star Dirt and Paving has agreed to add the following streets to the
contract:
58th Street — University Avenue to Avenue U
58th Street — Avenue P to Avenue Q
SOth Street — Quaker Avenue to Slide Road
The change order increases the total lane miles from 34 to 43. The seal coat
,�,, program uses latex asphalt and crushed stone.
FISCAL IMPACT
The contract increases $239,658 from $1,198,558 to $1,438,216.
$770,000 is appropriated in Capital Improvement Project 92101, Seal Coat
Program, and $2,928,396 is appropriated in Capital Improvement Project, Street
Maintenance Program, as approved on Item 5.15 of this agenda.
Staff recommended approval of this resolution.
Motion was made by Council Member Jones, seconded by Council Member
DeLeon to pass Resolution No. 2007-R0296 as recommended by staff. Motion
carried: 7 Ayes, 0 Nays.
5.16. Contract Resolution - City Council: Consider a resolution terminating the
Red Light Camera contract with American Traffic Solutions (ATS) for
convenience pursuant to Section 6.1 of the contract between the City and
ATS in light of the action of the Texas Legislature in Senate Bill 1119.
John W. Leonard, III, Councilman, presented this item.
Each Council Member gave comments and participated in discussion on the red
light cameras.
After further discussion, Council Member Jones called for the question,
seconded by Council Member DeLeon. Vote was taken, which carried: 4
�I Ayes, 3 Nays. Mayor Pro Tem Gilbreath, and Council Members Leonard and
Klein voted Nay.
Motion was made by Council Member Leonard, seconded by Council Member
Klein to pass this resolution as recommended. Motion failed: 2 Ayes, 5 Nays.
Mayor Miller, Mayor Pro Tem Gilbreath, and Council Members DeLeon,
Jones, and Price voted Nay.
5.17. Board Appointments - City Secretary: Consider five appointments to
Building Board of Appeals, one appointment to Junked Vehicle
Compliance Board, one appointment to Permit & License Appeal Board,
one appointment to Animal Shelter Advisory Committee, one appointment
to Canadian River Municipal Water Authority, four appointments to
Citizens Traffic Commission, four appointments to Civic Lubbock, Inc.
Board of Directors, one appointment to Community Development and
Services Board, and five appointments to Lubbock Water Advisory Board.
Motion was made by Council Member DeLeon, seconded by Council Member
Price to continue this item until the July 12, 2007 Regular City Council
meeting. Motion carried: 7 Ayes, 0 Nays.
5.18. This item was moved from regular agenda and considered following Item
3.3.
�
12:08 P.M. CITY COUNCIL RECESSED
12:50 P.M. CITY COUNCIL RECONVENED
6. WORK SESSION
6.1. Presentation - Business Development: Presentation of Lubbock Economic
Development Alliance and Visit Lubbock projects and activities. Gary
Lawrence, CEO (30 minutes)
5�3
Regular City Council Meeting
June 26, 2007
Gary Lawrence, CEO of Lubbock Economic Development Alliance (LEDA),
gave a presentation of the LEDA and Visit Lubbock projects and activities.
Lawrence started off by introducing Jana Johnston, new CFO for LEDA, who
he says adds a great deal of strength. He then gave an update on Shearer's
Foods LLC, the new kettle chip company in Lubbock. He thanked City staff
for their efforts in helping to make this possible. Lawrence, his staff, and the
LEDA Board also thanked the City for all that was done to help with the airport
hanger. He then gave an update on several upcoming projects to Lubbock,
including projected costs and new capital investment over the next two years.
Lawrence stated that the move to the new Wells Fargo Center has helped
LEDA tremendously. He asked Council to take a very positive look at building
a first-class visitors center, which would be a huge contribution to economic
development in Lubbock. Lawrence also commented on the Hotel/Motel tax
and its intended use, and how it comes with no expense to the citizens of
Lubbock, unless you spend the night at a hotel. Council thanked him for a job
well done.
6.2. Department Presentation - Water Utilities: Diseuss construction, plans,
progress and schedule for completion of the relocation of water lines ahead
of construction on Marsha Sharp Freeway and discuss plans for the
transition from Stage 4 Emergency Water Shortage Conditions back to
Stage 1 Mild Water Shortage Conditions. Thomas L. Adams, Water
Utilities Deputy City Manager
Thomas L. Adams, Water Utilities Deputy City Manager discussed
construction, plans, progress and schedule for completion of the relocation of
water lines ahead of construction on Marsha Sharp Freeway. He also discussed
plans for the transition from Stage 4 Emergency Water Shortage Conditions
back to Stage 1 Mild Water Shortage Conditions. Adams stated that for over
eight years now, the City has been moving water and sewer lines ahead of the
Marsha Sharp Freeway. These lines have to either be relocated or lowered to
make way for the new highway infrastructure, including drainage systems, the
low and high highways, and whatever is required. Adams thanked the citizens
for being so responsive and cooperating at staying below the 35 million gallons
that the system could move through. Adams also thanked the media for helping
get the word out and helping in this process. He then thanked City staff and
TxDOT for keeping this project on track. Adams then introduced Aubrey
Spear, Assistant Director of Water Utilities, who gave an update on the
construction, where it stands now, and the "phasing in" of the different zones
here in town to help get back to Stage II. Wood Franklin, Interim Chief
Engineer, gave comments and answered questions from Council. Lee Ann
Dumbauld, City Manager, also answered questions from Council.
1:55 P. M. COUNCIL ADJOURNED
There being no further business to come before Council, Mayor Miller
adjourned the meeting.
Read and approved this 26`h day of July, 2007.
/s/ David A. Miller
David A. Miller, Mayor
ATTEST:
/s/ Rebecca Garza
Rebecca Garza, City Secretary