HomeMy WebLinkAboutMinutes - City Council - Special - 2/17/2015 CITY OF LUBBOCK
SPECIAL CITY COUNCIL MEETING
February 17, 2015
1:00 P. M.
The City Council of the City of Lubbock,Texas met in special session on the 17th of February,
2015,at Lubbock Power&Light(LP&L),1301 Broadway-Basement Conference Room A,
Lubbock,Texas at 1:00 p.m.
1:04 P.M. CITY COUNCIL CONVENED
Lubbock Power&Light(LP&L),1301 Broadway-Basement Conference Room
A,Lubbock,Texas
Present: Mayor Glen C.Robertson; Mayor Fro Tem Jim Gent; Council Member Karen
Gibson; Council Member Jeff Griffith; Council Member Victor Hernandez; City
Manager James Loomis; City Secretary Rebecca Garza; City Attorney Chad Weaver
Absent: Council Member Latrelle Joy; Council Member Floyd Price
Note:Council Member Victor Hernandez arrived in Executive Session at 1:10 p.m.
This was a meeting of the Electric Utility Board.A quorum of Council Members attended and
participated in discussions during the meeting which the board considered the following topics as
shown below.
Note. The Electric Utility Board addressed agenda items in the following order:
•1.1;Executive Session,Public Comments, 5.1-5.4.
•No quorum (of the City Council)was present for items 5.5-6.3.
1. MINUTES
1. 1. The Board will approve the minutes from the Regular Electric Utility Board Meeting on
January 20,2015.
Motion by Charles Dunn,seconded by Clayton Isom to approve the minutes of January 20,
2015.
Vote: 7-0 Motion carried by the Board
Other: James Conwright(ABSENT)
Electric Utility Board member,James Conwright,arrived in Executive Session at 1:59
p.m.
2. EXECUTIVE SESSION: Jointly with West Texas Municipal Power Agene
y Board
The meeting was called into a closed session at 1:13 p.m.under the provisions of Section
551,Texas Government Code.The meeting was called back into a public session at 3:50
p.m.
2. 1. Hold an executive session in accordance with V.T.C.A.Government Code §551.086 on the
following competitive matters:
2. 1. 1. Discuss generation unit specific fixed and variable costs, including forecasts of those costs,
capital improvement plans for generation units,and generation unit operating characteristics
and outage scheduling.
2. 1. 2. Discuss and deliberate proposals and strategies related to plans,studies,and analyses for
system improvements, generation additions,or sales(other than transmission and distribution
system improvements inside the service area for which LP&L is the sole certificated retail
provider).
2. 1. 3. Discuss and deliberate bidding and pricing information for purchased power,generation and
fuel; purchased power agreements;risk management information and related services and
strategies.
2. 1. 4. Discuss and deliberate customer billing,contract,and usage information,electric power pricing
information,system load characteristics,and electric power marketing analyses and strategies.
3. EXECUTIVE SESSION CONTINUED
3. 1. Hold an executive session in accordance with V.T.C.A.Government Code §551.086 on the
following competitive matters of Lubbock Power&Light:
3. 1. 1. Discuss generation unit specific fixed and variable costs, including forecasts of those costs,
capital improvement plans for generation units,and generation unit operating characteristics
and outage scheduling.
3. 1. 2. Discuss and deliberate proposals and strategies related to plans,studies,and analyses for
system improvements, generation additions, or sales(other than transmission and distribution
system improvements inside the service area for which LP&L is the sole certificated retail
provider).
3. 1. 3. Discuss and deliberate bidding and pricing information for purchased power,generation and
fuel;purchased power agreements; risk management information and related services and
strategies.
3. 2. Hold an executive session in accordance with V.T.C.A. Government Code §551.071 seeking
the advice of its legal counsel about pending or contemplated litigation or settlement offers and
hold a consultation with the attorney on a matter in which the duty of the attorney to the
Electric Utility Board under the Texas Disciplinary Rules of Professional Conduct of the State
Bar of Texas conflicts with Chapter 551 of the Texas Government Code(purchase power
agreements).
4. PUBLIC COMMENT This period,of up to thirty minutes, is dedicated to citizen
comments.Each citizen will have three minutes to speak.All comments must be limited to
only those items posted on the Electric Utility Board agenda.Any citizen wishing to speak
shall sign up on the citizen comment sheet on the day of the Electric Utility Board Meeting.
The Electric Utility Board shall follow the order of citizens wishing to speak as listed on the
sign-up sheet. If everyone who signed up to speak has been given an opportunity to speak and
the thirty minutes designated for citizen comment has not been exhausted, the Electric Utility
Board may,at its discretion, open the floor to anyone else wishing to address the Electric
Utility Board,subject to all the same procedures and guidelines.
No one appeared to speak.
5. REGULAR AGENDA
5. 1. Discuss and the Board will take action regarding a resolution accepting the Lubbock Power&
Light Annual Financial Report(AFR) for fiscal year ended September 30,2014.
Andy Burcham,Chief Financial Officer for LP&L;and Kevin Kemp,partner with BKD, gave
comments and answered questions from the Board.
Motion by Clayton Isom,seconded by James Conwright to accept the Lubbock Power&Light
Annual Financial Report(AFR).
Vote: 8-0 Motion carried by the Board
5. 2. Presentation on downtown redevelopment activities, including status of underground utility
location and relocation activities and update on progress and future of Downtown
Redevelopment and the attraction and retention of residential and commercial parties to the
downtown area(collectively,the"Downtown Project").
Delbert McDougal, Chairman of McDougal Companies and Downtown Master
Developer,gave a presentation and answered questions from the Board.
Eduardo Rodriguez,Electric Engineering Manager at LP&L;and Wood Franklin,City
Engineer,gave comments and answered questions from the Board.
5. 3. Discuss availability,cost, speed and other issues regarding present broadband service related
to the Downtown Project and the Board will take minuted action instructing staff to prepare an
estimate of any increased costs that would be incurred related to installation of fiber along with
other underground utility infrastructure.
Motion by Charles Dunn,seconded by Stephanie Hill to direct staff to took at feasibility and
cost to run the fiber optics in phase I and also cost to add fiber optic in future phases,with
an amendment by Clayton Isom,seconded by Jerry Bell to include all aspects of feasibility of
the project,including legal issues.
Vote: 0 Motion carried by the Board.
5. 4. The Board will consider a resolution authorizing the Director of Electric Utilities to execute an
amended Exhibit A to that certain Professional Services Agreement,dated September 6,2011,
by and between Lubbock Power& Light and Black and Veatch Corporation, regarding studies
related to capacity and energy supply services.
Andy Burcham, Chief Financial Officer for LP&L,gave comments and answered questions
from the Board.
*City Council lost quorum before a vote was taken.
5. 5. Update/report by the Director of Electric Utilities regarding customer service,business center
practices,procedures and policies, billing procedures, and LP&L staffing and performance.
*This item was deleted.
5. 6. Discuss financial and capital statements,financing options, audits,and financial policies of
Lubbock Power&Light relating to debt issuance issues,reserve account funding,cost
allocation,and revenue and expense projections of Lubbock Power&Light.
*This item was deleted.
5. 7. The Board will consider a resolution approving,and requesting the City Council to amend,the
FY2014-15 Capital Program to amend Capital Improvement Projects (CIF's)(i)8585,Air
Switch Replacement; (ii) 92341, Overhead Fault Indicators; (iii)92374, 69 kV Line Rebuild—
Coop to Slaton; (iv)92377, Brandon Station Outage—Medium Term; (v) 8591, Massengale
Station Outage—Medium Term;and(vi)92334, Massengale Station Outage—Long Term.
*This item was deleted.
5. 8. Discuss and the Board will take minuted action setting the date,time and place of the March
2015 meetings of the Electric Utility Board.
*This item was deleted.
5. 9. Chairman of the Electric Utility Board appointments to the(i)Technical Review Committee;
(ii) Financial Review Committee;(iii)Human Resources committee;and(iv)Low-Income
Customer Committee.
*This item was deleted.
6. CONSENT AGENDA
6. 1. The Board will consider a resolution authorizing the Purchasing Manager to execute a
purchase order, RFP#7111-15-ELP,to Siemens Energy Incorporated for LP&L Fabrication of
a Water Gland Diaphragm for a 22 megawatt Westinghouse Turbine.
*This item was deleted.
6. Z. The Board will consider a resolution aUthOriZing the Director ofl.1,lectric Utilities to execute a
contract, ITB# 7 1 07-154"ILD, by and between the City o1'Lubbock, by and throuh Lubbock
Im
Power& Li)ht, and HD Supply Power Solutions, LTD for LP&L GE Demand Meters—
Annual Pricing.
*This item was deleted.
6. 3. The Board will consider resolution authorizing the Director of Electric Utilities to CXeCL)te a
contract. ITB4 7109-15-El-D, by and between the City of`Lubbock, by and through Lubbock
Power& [J-ht and College Fund Power Wash. for LP&L Mobile Car Wash Services—Annual
Pricing.
*This iters was deleted.
4:57 P.M. CITY COUNCIL ADJOURNED
There being no further business to came before Council, the meeting was adjourned.
GLEV/C./ROBEATSON, MAYOR
ATTEST:
P,ebea Garza, City SecretaitV
*This tein was discussed, by the Board, without a quoi-tim of Council Members present.