HomeMy WebLinkAboutMinutes - City Council - Regular - 10/15/1948RECESSED REGULAR MEETING.
Lubbock, Texas
Oct. 150 1948
The City Commission of the City of Lubbock, Texas, met in recessed regular
session at the regular meeting place, at 8:30 A.M., in the City Hall,
the following members thereof beino, present, to -wit:
Mayor W.H. Rodgers, Commissioners Clarence K. Whiteside, John Spikes,
City Attorney Vaughn E. Wilson, City Manager M.R. Smith, Fr, City
Secretary Lavenia Williams.
Absent: Commissioner W.B. Price and Commissioner E.K. Hufstedler, Jr.
There was discussion of construction of storm sever to drain College
Avenue from 2nd Street North and the Northwest area wrest of College
Avenue, also the widening of the pavement of College Avenue from
4th Street North. After discussion of this matter, motion was made
by Commissioner Whiteside, seconded by Commissioner Spikes, carried
unanimously, that the City of Lubbock request the State Highwaw Department
to widen the paving on College Avenue from 4th Street to the Center section
of the new Northwest Highway and construct storm sewers for the draining
of the Highway and that the City of Lubbock will agree to construct
the curb and gutter without cpst to the Highway department. And that
the City will contribute not to exceed $40,000.00 on the construction of
the Storm Sewer, provided the storm sewer project covers the line on
College Avenue, the out -fall line from College Avenue East of the Canyon
and a line on North 4th Street from College Avenue to Madison Avenue.
The Lines to be of sufficient size to serve the drainage area.
There was discussion of the necessary storm sewers to drain the Northeast
pavt of the Old Town section, North of the Santa Fe Railroad. It boing
brought to the attention of the City Commission that before this area can
be adequately drained that it will be necessary to construct storm sewers
in this area, and since at the present time the Highway Department
pro-oses to construct storm sewer from Avenue A and 6th Street for
draining a portion of the proposed Highway, it was thought advisable
by the City of Lubbock to request the Highway Department to increase
the size of their proposed line and to construcv it at such an
elevation so that future storm sewers in this area could connect to this
proposed storm sewer. After discussion of tnis matter motion was
made by Commissioner Whiteside, seconded by Commissioner Spikes,
carried unanimously, that the City agree to -pay for the cost of lowering
and enlarging the proposed Highway storm sewer in an amount not to exceed
$3,000.00.
Motion by Commissioner Spikes, seconded by Commissioner Whiteside,
carried unanimously, to authorize the Wayor to execute Agricultural lease agreement
for year 1949, between the City of Lubbock and B.W. Lawson on the tract of land
Purchased from H. G. Lawson, described as f.,,llows:
A tract of 286.15 acres, 18.4 acres out of Section 13, Block A, 0.�6 acres
out of Section 17, Block A, and 267.39 acres out of Section 12, Block A.
all in Lubbock Bounty, Texas, and more fully described by field notes
in Warranty Deed filed for record August 30, 1948.
Herbert Brasher of Butler and Bra --her, Architects, presented preliminary
plans for fire station to be constructed at College Avenue and 3rd Street.
After discussion, motion was made by Commissioner Whiteside, seconded by
Commissioner Price, carried unanimously, that the preliminary plans be
approved and that the Architect procedd with preparation of final plans and
specifications.
There was discussion of purshase of additional fire trucks and the City
Manager was instructed to get bids on two 750 G.P.M`i Pumper trucks, with
alternate on one 500 G.P. M. PumpT truck.
There was discussion of location of the proposed outfall line to the
Sewage Treatment 'Plant Southeast of the City and the following discussion
was presented by R.L. Oldham, Acting City Engineer.
October 12, 1948
Sewer Outfall Line
Mr. M. R. Smith, Jr.
City Manager
In the selection of the location of a new sewer outfall line, we have
kept two objectives in mind, the first and princial objective is to relieve
the present sewer system and the proposed Northp:est sewer of approximately
6,200 gpm of sewage. We expect the ultimate flog- from the above named lines
to reach this amount in excess of the amount of the present 24" outfall line will
carry. The second objective would be to so locate this line that a portion
of it maybe used to handle another future trunk line coming in frDm the South-
west. After consideration of the entire area and of r•ossible methods of
accomplishing these objectives, we narrowed the field to three pissible locations.
These locations are listed below:
Location No. I.
This location is paralled to the present line and is approximately 10,000
Feet long. It involves the construction of a 30" line approximately 7,000 feet
on the North side of the present line and about 3,000 feet on the South side
of the present line. The estimated cost of the construction required now on
this line is $150,000.00. In a period of 3 to 5 years it would be necessary
to build an 18" line from the beginning of the present outfall line back North
to the intersection of 16th Street main line. This ultimate total cost to handle
everything North of 42nd Street will be approximately $169,000.00.
Location No. 2.
This proposed location is along the Santa Fe Railroad Right-of-way beginning
at East 22nd Street and Axtending to the intersection of ..he Santa Fe and Fort
Worth & Denver City Railroad; Thence along the Disposal Plant Road to the i-lant.
To adequately handle immediate needs it is necessary that this line intercept
both the 23rd and 26th Street sewers. The estimated cost of the immediate
construction exclusive of enlargement of accommodate a future outfall line from
the Southwest is approximately 184,000.00. If this line is enlarged to handle
a future line from the Southwest, the present construction cost would be
approximately $211,000.00. Ultimately, say within 3 to 5 years from the present
this line would have to be extended on back North to 14th Street to relieve
present system of enough flow so that the existing 24" outfall line would not
be overloaded. The total ultimate cost of this location would be approximately
$246,000.00.
Location No. 3.
This proposed location paralled to Fort Worth & Denver City Pailroad and
intercepts at the 23rd and 26th Street sewers. The estimated cost of present
construction, exclusive of enlargement to accommodate a future outf•-ll line from
the Southwest, would be approximately $169,000.00. If larger pipe were used
to handle the additional flow from the Southwest, the cost would be approximately
$217,000.00 and then the line is extended on back to 14th Street the total
cost would be approximately $"51,000.00.
Since the cost of Location No 3 is well in excess of the cost of the
other two lines, even in the pr--sent construction, and since it has no advantage
over Location No 2 in any respect, I thin,: that we can rule it out, In
considering the other tow lined, I bE-lieve that we should take into account
what our ultimate cost will be. The ultimate cast of Location No. 1 is
$169,000.&0 . The ultimate cost of Location No 2 is $246,000.00. The ultimate
difference is cost of lines 1 and 2 would be approximately $77,000.00, and only
$27,000.00 of that difference is due to the extra size pipe to handle an
additional line from the Southwest. Since the onl.v reason for building location
No. 2 would be to receive the flow from an outfall to the Southwest, and since
we are now prepares to handle the flow from this area with our present system
for s�-veral years, I do not believe it would be a wise investment to spend the
additional $77,000.00 at this time. Therefore, I recommend that we construct
Location No.lst an estimated cost of $150,000.00 now, and extend this line
on North to 16th Street in 1953 or when needed at an estimated cost of $19,000.60,4
RLO/rL
(Signed) R. L. Oldham
Acting City Engineer.
After thorouf=;h discussion of this matter motion was made by Commissioner
Whiteside, seconded by Commissioner Spikes, carried unanimously, that the
location be made in accordance with the recommendations presented by
Mr. Oldham, and that the City Engineer be authorized to proceed immediately
with preparation of complete plans and specifications.
There was discussion of agreement with Frank Gray relative to the use of
his land in disposing of Sewage Irrigation Water, and the City Manager
was instructed to work out an agreement with Mr. Gray in this regard
and bring back to the City Commission for consideration.
Bids as follows were read in three (3) additional jail cells, bids being
received Sept. 29, 1948.
South Plains Construction Company �1,882.10
Engineering Service and Supple Co. 3,100.00
W. G. McMillan 19757.92
After consideration of bids, motion was made by Commissioner Spikes,
Seconded by Commissioner Whiteside, carried unanimously, to reject all bids.
r
I
J
Motion by Commissioner Uh!.ite.side:, secLo.hded by- Commimsione'r Spikes,,
carried unanimously, Ordnance No. 887 passed third and final reading.
ORDINANCE NO. 887
AN ORDINANCE CLOSING HEARING AND LEVYING ASSESSMENTS FOR A PART OF THE
COST OF IMPROVING A PORTION OF 23RD STREET, 24TH STREET, AVENUE W, 20TH
STREET, 27TH STREET, AVENUE V, 31ST STREET, SANDERS STREET, 32ND STREET,
29TH STREET, AVENUE K, JACKSON AVENUE, 26TH STREET, HARRISON AVENUE, AVENUE
U, 25TH STREET, AVENUE M, VERNON AVENUE, 8TH STREET, 21ST STREET, 33RD STREET
2$TH STREET, ADAMS AVENUE, SUCH PORTIONS BEING MORE PARTICULARLY DESCRIBED
IN THE PAVING ASSESSMENTS OF THE CITY OF LUBBOCK ATTACHED HERETO AN D MADE
A PART HEREOF AND PORTIONSOF SUNDRY OTHER STREETS, A�FENTJES AND ALLEYS IN
THE CITY OF LUBBBOCK TEXAS ANO PR(WIDENG FOR THE COLLECTION OF SUCH
THEREOF,NALLOANT FEAFUNDSI6SUANCE OF ASSIGNABLE CERTIFICATES IN EVIDENCE
No further busim ss comin.g up for consideration, the City Commission
recessed to meet October 18, 1948, at 10 A.M.
Read and approved this the -.38 — day of QgtQhgr , 1948.
ATTE
e
City S retary .