HomeMy WebLinkAboutMinutes - City Council - Regular - 7/23/1952RECESSED REGULAR MEETING
Lubbock, Texas
August 23, 195,
The City Commission of the City of Lubbock, Texas, met at 10 A.M. in Recessed Regular Meeting,
Recessed from Regular Meeting of August 14, 1952, at the Regular Meeting place in the City Hall,
the following memberqChereof being present to -wit:
Mayor Murrell R. Tripp, Commissioners Harry Morris, L. E. Davis, City Manager Steve Matthews,
City Attorney Vaughn Be Wilson and.City $ecretary Lavenia Lowe.
Absent: Commissioners Hurley Carpenter and Lucian Thomas.
Also present in this meeting: County Judge Walter Davies and County Commissioners Newton
Stokes, R. 0. Short and George G. Green.
52-11-66-125 This meeting was called for the purpose of letting contract for installation of toilets and
9ther facilities at the Lubbock Transient Labor Camp, located west of North .Avenue "H" near
the Yellow House Canyon, as authorized by Ordinance Number 1266 passed by the City Commission
on August 20, 1952.
Atcheson & Atkinson are architects on this Project.
The following Notice to Bidders was sent out to contractors:
NOTICE TO . BIDDERS
Sealed proposals addressed to the Honorable Mayor and City Commission of Lubbock, Texas, will
be received at the office of Steve Matthews, City Manager, until 10:00 A.M., August 23, 1952"
for furnishing all necessary materials, equipment, superintendence and Labor for the con-
struction of Additions and Alterations to City -County Public Labor Camp.
Bidders are required to use the proposal form attached to and made a part of the contract
documents. Each proposal must be accompanied by a certified check, cashier's check, or bid
bond, acceptable. to the City in an amount equal to at least 5% of the proposal, payable,
without condition, to the City as a guartee that the Bidder, if awarded the contract will
furnish good and sufficient bond for the faithful performenee�.af the same. The bid security of
the three lowest bidders will be retained until the contract is awarded or other disposition
is made thereof. The bid security of all bidders except the three lowest will be returned j
promptly after the canvass of bids.
Attention is called to the forms of contract and bond included in these specifications which
the successful bidder will be required to execute. Contract and Bond shall be executed with
five (5) days after the notice of award.
The successful bidder must furnish bond on the attached form in the amount of 100% of contract
price from a surety company holding a permit from the State of Texas to act as surety, or other
sureties acceptable to the owner.
All unit prices must be stated in both script and figures. The owner reserves the right to
reject any or all bids and to waive formalities. In case of ambiguity or lack of clearness
in stating the price in the bids, the owner reserves the right to consider the most advantageous
construction thereof, or to reject the bid. Unreasonable (or "unbalanced" ) unit prices will
authorize the owner to reject the bid.
Bidders are expected to inspect the site of the work and to inform themselves regarding the
local conditions and conditions under which the work is to be done. Attention is called to
the provisions of the Acts of the 43rd Legislature of the State of Texas, Page 91, Chapter
45, (Article No. 5159A Civil Statutes 1925) concerning the wage scale and payment of prevail-
ing wages established by the Owner.. said scale of prevailing minimum wage is set forth in
the specifications.
Instructions to bidders, proposal forms, specifications and plans are on file in the office
of W. B. Holmes, City Engineer, City Hall, Lubbock, Texas, and may be had from Atcheson &
_Atkinson, Architects, 204 Sanford Building, Lubbock, Texas.
CITY_ OF LUBBOCK, TEXAS
OWNER
BY /s/ Murrell R. Tripp
Murrell R. Tripp
ATTEST:
/s/ Lavenia Lorne
City Secretary
In accordance with the above Notice to Bidders, motion was made by Commissioner Morris,
seconded by Commissioner Davis, motion carried, Mayor Tripp and Commissioners Morris and
Davis voting Yea, none voting Nay, that the bids be opened and read, whereupon the follow-
ing bids were opened and read: 11 f
ADDITIONS AND ALTERATIONS TO
CITY -COUNTY PUBLIC LABOR CAMP
TABULATION OF BIAS August 23, 1952
Contractor Bid Security Receipt of Addendum Base Bid
W. B. Abbott, Jr. Bid Bond - 5% Acknowledged $16,650.00
Harold Bif fle " " " 16, 699.00
Davis Construction Co. " " " 17,809.08
S. R. Duncan " $1000 " 17,815.00
Joe Garrison " 5% " 16,836.00
r. South Plains Construction Co*
(Jim Reid) u It 18,494.00
Tisdel Construction Company NO BID
James Walker Construction Co. " 5% 15,810,00
After consideration of all bids, motion was made by commissioner Davis, seconded by
Commissioner Morris, motion carried, Mayor Tripp and Commissioners.Mbrris and Davis
voting Yea, none voting Nay, that the bid of James Walker Construction Company -be
accepted -for this construction, it being ccnsidered the lowest and best bid, the
Mayor being hereby authorized to enter into contract.
Motion by Commissioner Morris, seconded by Commissioner Davis, motion carried, Mayor
Tripp and Commissioners Norris and Davis voting Yea, none voting Nay, to authorize
construction by city forces of a lift station and approximately 7001 of force sewer
line to serve this Transient Labor Camp at an estimated cost of $2200.00.
The County Commissioners Court, represented by Judge Davies and County Commissioners
Short, Stokes and Green, agreed to pay one-half of the cost of this improvement at
the Labor Camp as set out above to an extent of $9,400.00 being computed as follows:
of Construction Cost $7,905.00
of estimated cost of Lift
Station & Sewer Lines 1,100.00
of Architects fee 395.25
Total to be paid by County
of Lubbock $9,400.25
No further business cominv up for considr-ration, the City Uommission
adjourned.
Read and F,-rroved this the _llthSeptember, 1952.
A
a
A
it,y Secret ry .