HomeMy WebLinkAboutMinutes - City Council - Regular - 4/11/19300i
RECESSED REGULAR MEETING.
Lubbock,Texas, April 11, 1930.
The City Commission of the City of Lubbock, Texas, met at 7 P.M.
in Recessed Regular Session, recessed fromth= Regular Meeting of
April 10, 1930, at the rc-gular meeting place in the City Hall,
the following members thereof being present, to -wit:
Mayor J.J. Clements, Commissioners Jno.E. Roach, George E.Benson,
J.F. Bacon, City Manager G,W. McCleary and Secretary W.H. Rodgers.
Absent: Cormissioner D.N. Leaverton.
H.D. Woods and A.V. Weaver met with the City Commission to discuss
the matter of Swift and Company damage on Avenue H Subway with
Attorneys Bledsoe, Crenshaw and Dupree. Tom, matter was discussed
at length and it was decided to meet at a later date at the Subway
and go over the matter.
The matter of painting the City Stand Pipe on 19th Street came on
for discussion and bids -being received from Pyle Brothers and the
Water Tank Service Company. After due discussion the contract was
awarded to Pyle Brothers Iron Preserving Company at a cost of
$1750.00 as per the following contract.
STATE OF TEXAS.
COUNTY OF LUBB OC K.
CONTRACT AND SPECIFICATION FOR CLEANING
AND PAINTING THE LARGE STAND PIPE, FOR THE CITY OF LUBBOCK, TEXAS.
THIS CONTRACT; made and entered into on t}lis the llth day of April
A.D. 1930, by and between the City of Lubbock, Texas, Party of the
First Part, and PYLE BROS IRON PRESERVING COMPANY, of Dallas, Texas,
Party of the Second Part, WITNESSETH:
THAT; The Party of the Second -Part, hereby agrees to clean thor-
oughly with chipping hammers steel scrapers and electric motor driven
steel wire brushes removing all scale and rust formation the interior
of the large stand pipe belonging to the Party of the First Part,
the City of Lubbock, Texas, and located on 'nineteenth street in the
City of Lubbock, Texas. All rivet heads, joints and crevices and
all pitt holes showing signs of seepage are to be cold calked and
then run with BLUE LABEL ST,�OOTH-ON C=TENT, when all caulking and
applying of cement and cleaning has been done to the satisfaction
of a duly authorized inspector of the Party of the First Part, then
to paint said interior with two coats of DIXONS SILICA GRAPHITE,
mixed with the best grade of super boiled linseed oil. It is fur-
ther agreed to in this contract. That all essential joints, crevices,
Pitt holes and deteriorated rivet heads, are to be sprayed with com-
pressed air sprays, each and every time a coat of paint is applied,
each coat to be thoroughly dryed before second coat is applied.
THAT; The Party of the Second Part, hereby agrees to clean thor-
oughly with chipping hammers steel scrapers and steel wire brushes,
removing all scale and rust formation the exterior of said stand
pipe, from top to base of said-st-ructure. And after all cleaning
has been done to the satisfaction of a duly authorized inspector,
to paint said exterior with two coats of the above mentioned material.
It is further agreed to in tris contract that all essential joints,
crevices and deteriorated rivet heads, are to be sprayed with com-
pressed air sprays, each and every time a coat of Daint is applied.
THAT; The Party of the Second Part, further agrees to; if the
Party of the First Part may desire; to paint the exterior of roof
and two top rings in white, with two coats of paint, first two coats
to be of white lead and oil, third coat to be of Riplins exterior
white enamel; then to paint one large sign on each side of tank in
six or eight foot white enamel letters the name of the vity or
any word the Party of the First Part, may desire. Or to paint
entire exterior of said stand pipe with two coats of the best grade
of aluminum, with letters of either black or yellow enamel, as
perferred by the Party of the First Part.
THAT; The Party of the Second -Part, hereby agrees to furnish all
labor equipments and material necessary in the performance of said
work; to assume all risk of accident or injury to men employed on
said work; to carry said work to completion in a first class and
workmenlike manner, said work to be at all times subject to the
inspection of a duly authorized inspector of the Party of the First
Part. Work to cormence in 15 days and to be completed in 15 days
thereafter.
THAT; The Party of the Second Part, hereby agrees to guarantee the
interior and exterior of said structure, against all oxidation and
deterioration of iron by reason of rust formation, for a period of
six years. To service and inspect said structure each and every year
until the expiration of our guarantee in case such painting does not
stand in accordance - with this guarantee, and does not preserve the
surface of said structure against all oxidation as above specified
the Party of the Second Part, hereby agrees to paint any or all of
said structure showing signs of deterioration with out further cost
to the Party of the First Part with same paint and workmanship.
THAT; The Party of the First Part, hereby agree to upon completion
and acceptanee of said work, to pay to the Party of the Second Part,
the sum of $1750.00 seventeen hundred and fifty dollars.
PYIE BROS IRON PRESERVING COWANY.
J.T. Clements by D.W. Pyle
Mayor, City of LubUock, Tex.
No further business coming up for consideration, upon motion by
Mr. Roach, seconded by Mr. Benson, the City Commission recessed
to meet April 16, 1930, at 9:45 A.M.
Read and approved tris- day of , A.D. 1930.
IVA
IWWAMM�T
ATTEST:
y ecre ary.